HomeMy WebLinkAboutASI-04 Revised Statement of Special InspectionsP A U L B. B A I L E Y o A R C H I T E C T o 1 1 0 A U D U B O N S T R E E T N E W H A V E N , C O N N E C T I C U T 0 6 5 1 0 P H: 2 0 3 7 7 6 8 8 8 8 F A X : 2 0 3 7 7 2 13 6 5 Oxoboxo Lofts 42 Pink Row Uncasville, CT ASI-04 – Revised Statement of Special Inspections Issue Date: December 09, 2019 Changes to the Drawings Following the Construction Set dated 6/11/19: Statement of Special Inspections dated 11/11/19, revised to include inspections for helical piles. END OF ASI-04 Statement of Special Inspections Project:Oxoboxo Lofts Location:Pink Row, Uncasville, Connecticut Owner:Ox Owner, LLC Design Professional in Responsible Charge: Daniel J. Morrissey P.E., Morrissey Engineering LLC     This Statement of Special Inspections is submitted as a condition for permit issuance in accordance with the Special Inspection and Structural Testing requirements of the Building Code. It includes a schedule of Special Inspection services applicable to this project as well as the name of the Special Inspection Coordinator and the identity of other approved agencies to be retained for conducting these inspections and tests. This Statement of Special Inspections encompass the following disciplines: Structural Mechanical/Electrical/Plumbing Architectural Other:      The Special Inspection Coordinator shall keep records of all inspections and shall furnish inspection reports to the Building Official and the Registered Design Professional in Responsible Charge. Discovered discrepancies shall be brought to the immediate attention of the Contractor for correction. If such discrepancies are not corrected, the discrepancies shall be brought to the attention of the Building Official and the Registered Design Professional in Responsible Charge. The Special Inspection program does not relieve the Contractor of his or her responsibilities. Interim reports shall be submitted to the Building Official and the Registered Design Professional in Responsible Charge. A Final Report of Special Inspections documenting completion of all required Special Inspections, testing and correction of any discrepancies noted in the inspections shall be submitted prior to issuance of a Certificate of Use and Occupancy. Job site safety and means and methods of construction are solely the responsibility of the Contractor. Interim Report Frequency:monthly      or per attached schedule. Prepared by: Design Professional Seal Daniel J. Morrissey      (type or print name) 11/11/19 Signature Date Owner’s Authorization: Building Official’s Acceptance: Signature Date Signature Date Page 2 of 8 Schedule of Inspection and Testing Agencies This Statement of Special Inspections / Quality Assurance Plan includes the following building systems: Soils and Foundations Spray Fire Resistant Material Cast-in-Place Concrete Wood Construction Precast Concrete Exterior Insulation and Finish System Masonry Mechanical & Electrical Systems Structural Steel Architectural Systems Cold-Formed Steel Framing Special Cases Special Inspection Agencies Firm Address, Telephone, e-mail 1. Special Inspection Coordinator To Be Determined 2. Inspector Geotechnical Engineer if required 3. Inspector 4. Testing Agency Testing Laboratory To Be Determined 5. Testing Agency             6. Other             Note: The inspectors and testing agencies shall be engaged by the Owner or the Owner’s Agent, and not by the Contractor or Subcontractor whose work is to be inspected or tested. Any conflict of interest must be disclosed to the Building Official, prior to commencing work. CASE Form 101  Statement of Special Inspections  CASE 2004 Page 3 of 8 Qualifications of Inspectors and Testing Technicians The qualifications of all personnel performing Special Inspection and testing activities are subject to the approval of the Building Official. The credentials of all Inspectors and testing technicians shall be provided if requested. Key for Minimum Qualifications of Inspection Agents: When the Registered Design Professional in Responsible Charge deems it appropriate that the individual performing a stipulated test or inspection have a specific certification or license as indicated below, such designation shall appear below the Agency Number on the Schedule. PE/SE Structural Engineer – a licensed SE or PE specializing in the design of building structures PE/GE Geotechnical Engineer – a licensed PE specializing in soil mechanics and foundations EIT Engineer-In-Training – a graduate engineer who has passed the Fundamentals of Engineering examination American Concrete Institute (ACI) Certification ACI-CFTT Concrete Field Testing Technician – Grade 1 ACI-CCI Concrete Construction Inspector ACI-LTT Laboratory Testing Technician – Grade 1&2 ACI-STT Strength Testing Technician American Welding Society (AWS) Certification AWS-CWI Certified Welding Inspector AWS/AISC-SSI Certified Structural Steel Inspector American Society of Non-Destructive Testing (ASNT) Certification ASNT Non-Destructive Testing Technician – Level II or III. International Code Council (ICC) Certification ICC-SMSI Structural Masonry Special Inspector ICC-SWSI Structural Steel and Welding Special Inspector ICC-SFSI Spray-Applied Fireproofing Special Inspector ICC-PCSI Prestressed Concrete Special Inspector ICC-RCSI Reinforced Concrete Special Inspector National Institute for Certification in Engineering Technologies (NICET) NICET-CT Concrete Technician – Levels I, II, III & IV NICET-ST Soils Technician - Levels I, II, III & IV NICET-GET Geotechnical Engineering Technician - Levels I, II, III & IV Exterior Design Institute (EDI) Certification EDI-EIFS EIFS Third Party Inspector Other             CASE Form 101  Statement of Special Inspections  CASE 2004 Soils and Foundations Page 4 of 10 Item Agency # (Qualif.) Scope 1. Shallow Foundations 2 or 4 PE/GE Inspect soils below footings for adequate bearing capacity and consistency with geotechnical report. Inspect removal of unsuitable material and preparation of subgrade prior to placement of controlled fill Inspect 100% of bearing surfaces. 2. Controlled Structural Fill 2/4 PE/GE Perform sieve tests (ASTM D422 & D1140) and modified Proctor tests (ASTM D1557) of each source of fill material. Inspect placement, lift thickness and compaction of controlled fill. Test density of each lift of fill by nuclear methods (ASTM D2922) Verify extent and slope of fill placement. Full time inspection is required for fill under footings. Inspect 50 to 100% of fill under slabs on grade depending on results. 3. Deep Foundations (Helical Piles) 2/4 Inspect, locations and sizes for compliance with contract documents. Review boring logs for compliance with specifications and approved submittals. Inspect installation of hardware, brackets, etc. for compliance with contract documents, approved submittals and manufacturer’s specifications. 4. Load Testing             4. Other:       CASE Form 101  Statement of Special Inspections  CASE 2004 Cast-in-Place Concrete Page 5 of 10 Item Agency # (Qualif.) Scope 1. Mix Design 1/4 ACI-CCI ICC-RCSI Review concrete batch tickets and verify compliance with approved mix design. Verify that water added at the site does not exceed that allowed by the mix design. 2. Material Certification             3. Reinforcement Installation 1/4 ACI-CCI ICC-RCSI Inspect size, spacing, cover, positioning and grade of reinforcing steel. Verify that reinforcing bars are free of form oil or other deleterious materials. Inspect bar laps and mechanical splices. Verify that bars are adequately tied and supported on chairs or bolsters. Inspect 75 to 100% of bars. 4. Post-Tensioning Operations N/A 5. Welding of Reinforcing N/A 6. Anchor Rods 1/4 Inspect size, positioning and embedment of anchor rods. Inspect concrete placement and consolidation around anchors. Inspect 75 to 100% of rods. 7. Concrete Placement 1/4 ACI-CCI ICC-RCSI Inspect placement of concrete. Verify that concrete conveyance and depositing avoids segregation or contamination. Verify that concrete is properly consolidated. 8. Sampling and Testing of Concrete 4 ACI-CFTT ACI-STT Test concrete compressive strength (ASTM C31 & C39), slump (ASTM C143), air-content (ASTM C231 or C173) and temperature (ASTM C1064). Take samples for each day of placement operations and for each 150 cubic yards and each 5000 square feet of wall or slab surface. 9. Curing and Protection 1/4 ACI-CCI ICC-RCSI Inspect curing, cold weather protection and hot weather protection procedures. 10. Other:                   CASE Form 101  Statement of Special Inspections  CASE 2004 Masonry Required Inspection Level: 1 2 Page 6 of 10 Item Agency # (Qualif.) Scope 1. Material Certification             2. Mixing of Mortar and Grout ICC-SMSI Inspect proportioning, mixing and retempering of mortar and grout. 3. Installation of Masonry ICC-SMSI Inspect size, layout, bonding and placement of masonry units. 4. Mortar Joints ICC-SMSI Inspect construction of mortar joints including tooling and filling of head joints. 5. Reinforcement Installation ICC-SMSI AWS-CWI Inspect placement, positioning and lapping of reinforcing steel. 6. Prestressed Masonry ICC-SMSI N/A 7. Grouting Operations ICC-SMSI Inspect placement and consolidation of grout. Inspect masonry clean-outs for high-lift grouting. 7. Weather Protection ICC-SMSI Inspect cold weather protection and hot weather protection procedures. Verify that wall cavities are protected against precipitation. 9. Evaluation of Masonry Strength ICC-SMSI Test compressive strength of mortar and grout cube samples (ASTM C780). Test compressive strength of masonry prisms (ASTM C1314). 10. Anchors and Ties ICC-SMSI Inspect size, location, spacing and embedment of dowels, anchors and ties. 11. Other:                   CASE Form 101  Statement of Special Inspections  CASE 2004 Structural Steel Page 7 of 10 Item Agency # (Qualif.) Scope 1. Fabricator Certification/ Quality Control Procedures 4 AWS/ AISC-SSI ICC-SWSI Review shop fabrication and quality control procedures. 2. Material Certification 4 AWS/ AISC-SSI ICC-SWSI Review certified mill test reports and identification markings on wide-flange shapes, high-strength bolts, nuts and welding electrodes 3. Open Web Steel Joists      N/A 4. Bolting 4 AWS/ AISC-SSI ICC-SWSI Inspect installation and tightening of high-strength bolts. Verify that splines have separated from tension control bolts. Verify proper tightening sequence. Continuous inspection of bolts in slip-critical connections. 5. Welding 4 AWS-CWI ASNT Visually inspect all welds. Inspect pre-heat, post-heat and surface preparation between passes. Verify size and length of fillet welds. Ultrasonic testing of all full-penetration welds. 6. Shear Connectors 4 AWS/ AISC-SSI ICC-SWSI Inspect size, number, positioning and welding of shear connectors. Inspect suds for full 360 degree flash. Ring test all shear connectors with a 3 lb hammer. Bend test all questionable studs to 15 degrees. 7. Structural Details 1/4 PE/SE Inspect steel frame for compliance with structural drawings, including bracing, member configuration and connection details. 8. Metal Deck 4 AWS-CWI Inspect welding and side-lap fastening of metal floor deck. 9. Other:                   CASE Form 101  Statement of Special Inspections  CASE 2004 Cold-Formed Steel Framing Page 8 of 10 Item Agency # (Qualif.) Scope 1. Member Sizes 1/4 Inspect materials used for compliance with contract documents. Inspect 50 to 100% of members.      2. Material Thickness 1/4 Inspect materials used for compliance with contract documents. Inspect 50 to 100% of members.      3. Material Properties 1/4 Inspect materials used for compliance with contract documents. Inspect 50 to 100% of members.      4. Mechanical Connections 1/4 Inspect connections for compliance with contract documents, including member sizes, geometry, hardware, number and size of fasteners, etc.      5. Welding 1/4 Inspect connections for compliance with contract documents, including member sizes, geometry, hardware, number and size of fasteners, etc.      6. Framing Details 1/4 Inspect connections for compliance with contract documents, including member sizes, geometry, hardware, number and size of fasteners, etc.      7. Trusses      N/A 8. Permanent Truss Bracing      N/A 9. Other:            N/A CASE Form 101  Statement of Special Inspections  CASE 2004 Spray-Applied Fire Resistant Material Page 9 of 10 Item Agency # (Qualif.) Scope 1. Material Specifications             2. Laboratory Tested Fire Resistance Design 3/4 ICC-SFSI Review UL fire resistive design for each rated beam, column, or assembly. 3. Schedule of Thickness 3/4 ICC-SFSI Review approved thickness schedule. 4. Surface Preparation 4 ICC-SFSI Inspect surface preparation of steel prior to application of fireproofing 5. Application 4 ICC-SFSI Inspect application of fireproofing. 6. Curing and Ambient Condition 4 ICC-SFSI Verify ambient air temperature and ventilation is suitable for application and curing of fireproofing. 7. Thickness 4 ICC-SFSI Test thickness of fireproofing (ASTM E605). Perform a set of thickness measurements for every 1,000 SF of floor and roof assemblies and on not less than 25% of rated beams and columns. 8. Density 4 ICC-SFSI Test the density of fireproofing material (ASTM E605). 9. Bond Strength 4 ICC-SFSI Test the cohesive/adhesive bond strength of fireproofing ASTM E736). Perform not less than one test for each 10,000 SF. 10. Other:                   CASE Form 101  Statement of Special Inspections  CASE 2004 Wood Construction Page 10 of 10 Item Agency # (Qualif.) Scope 1. Fabricator Certification/ Quality Control Procedures Fabricator Exempt 1/4 Review shop fabrication and quality control procedures for wood truss plant. 2. Material Grading 1/4 Inspect materials used for compliance with contract documents. Inspect 50 to 100% of members.      3. Connections 1/4 Inspect connections for compliance with contract documents, including geometry, hardware, number and size of fasteners, etc. Inspect 50 to 100% of connections.      4. Framing and Details 1/4 Inspect connections for compliance with contract documents, including member sizes, geometry, hardware, number and size of fasteners, etc.      5. Diaphragms and Shearwalls 1/4 Inspect size, configuration, blocking and fastening of shearwalls and diaphragms. Verify panel grade and thickness. 6. Prefabricated Wood Trusses 1/4 Inspect the fabrication of wood trusses. Inspect placement, spacing and connections. 7. Permanent Truss Bracing 1/4 For floor faming, inspect size, placement and connections of strongbacks. For roof framing, inspect size, placement and connections of all permanent bracing including truss bracing and member bracing if required. 8. Other:                   CASE Form 101  Statement of Special Inspections  CASE 2004