Loading...
HomeMy WebLinkAboutTE Comments IP - IICLA Engineers, Inc. Civil • Structural • Survey 317 MAIN STREET • NORWICH,CT 06360 • (860)886-1966 • (860)886-9165 FAX June 16, 2020 II Ms. Marcia Vlaun Town Planner 310 Norwich-New London Tpk. Uncasville, CT 06382 RE: Leemilt's Petroleum Rt. 82/163 Intersection CLA-5781Z Dear Marcia: We have reviewed the plans submitted for the proposed expansion of the gas station at 612 Norwich-Salem Turnpike. We have the following comments: 1. The limits of repaving and proposed curbing must be clearly delineated on the plans. 2. The installation of the walk-in cooler pad appears too close to the septic system and existing slope to be practical to construct as shown. 3. There is an existing monitor well not shown under the proposed addition. 4. The surface stormwater flow at the southeast corner of the pavement must be collected and treated. 5. Contact with CTDOT District 2 must be provided regarding access and drainage. 6. The "no parking" striped area at the SE corner of the site must have the pavement removed and the area loamed and seeded. 7. The width of the sidewalk must be provided. 8. Proposed spot grades must be shown at the handicap parking area and handicap ramp. 9. The location of the kerosene dispenser must be reconsidered and placed away from access to the building. 10. The proposed grading at the dumpster pad must be shown. 11, • 11. The relocation (replacement) of the existing condenser unit in the proposed cooler location must be shown on the plans. 12. The doors to the building must be shown. 13. The silt fencing or other siltation devices must be shown allowing access to the site, and at the separator, dumpster and fence installations. Silt inserts must be provided for the catch basins. 14. The term"refurbish"regarding the existing fencing must be more clearly defined. 15. The reference to DOT Form must be revised to read 817 in lieu of 816. Very truly yours, Tho---------r- - as L. Cummings, P.E. Principal TLC:bab From: T Cummings To: Marcia A.Vlaun;Colleen Bezanson Subject: Leemilt"s Petroleum Site Date: Tuesday,July 14,2020 9:40:28 AM Marcia/Colleen The plans we received yesterday did not address any previous comments, expect the walkway in front of the building is shown as 5.0' +or—(?). Tom Thomas L.Cummings,P.E. CLA Engineers,Inc. 317 Main Street Norwich, CT 06360 P: (860) 886-1966 F: (860) 886-9165 tcummings anclaengineers.com www.claengineers.com Consulting Civil Engineers Since 1984