Loading...
HomeMy WebLinkAboutAPP 1n'l6kS J • 10k pc Site Plan or Special Permit Application 6.,4e 21, Site Plan Number %c2/7 - .S Plan Date /Li �Ua 0 Revision O Special Permit Fee paid 0I 0 , 00 Revision Ci<e- I(-)a 7 Assessors Map 5g Lot —A Project Address (p l 2 k)c?f uJ i CAR -e rY1 czo J AL g cR Name of Applicant Shahani Inc Address of Applicant 53 E Industrial Road,Unit c-1,Branford CT 06405 Project Name Oakdale Tank Job Tel#203-483-6464 Fax#203-483-1537 Email: shahaniinc n,sbcglobal.net Name of Property Owner Leemits Petroleum Name of Attorney Louis Crisci Tel# Fax# Email Name of Engineer N cA. Tel# Fax# Email 0fAti '{1Q(`tsfiCt1' @ c6 corn • Zoning District Lot Size 5B Total Acres 9 3 0 Yes 0 No Regulated Wetlands Acreage Permit Date O Yes 0 No Flood Plain Flood Hazard Area O Yes 0 No A-2 Survey Name of Surveyor Ric* IMarreA Building size t195 s.f. Building height Number of acres to be disturbed Applicable Zoning Regulation(s) Project description / / - to a u e 19u‘\ ten, Ij Waiver(s) requested O yes1 ' no Regulation section(s) This project will use: / ,A Septic system 0 Municipal sewer O Individual well 0 Public water supply well l SCWA well 0 Municipal water O Yes Q9 No This project is located in a Public Water Supply Watershed 6 Yes 0 No This project has received approval frcm the Uncas Health District O Yes 0 No This project has received approval from the appropriate Water Authority ** Attach Copy of All Approvals Page 1 of 2 FEI t1.9 Site Plan/Special Permit Application JUN 8 2020 FILE COPY By__ -_ - • • O Yes fJ No This project requires a State General Stormwater Quality.Permit. Registration# _ O Yes No This project requires a permit from the Army Corps of Engineers. O Yes V. No This project requires a Water Diversion Permit. O Yes Ft No This project requires a Dam Permit. 0 Yes No This property is subject to a Conservation Restriction and/or a Preservation Restriction. If yes,attach a copy of certified notice. O Yes 7r No Drainage calculations submitted: Date Rev. date Rev. date 0 Yes 41 No This project requires a OSTA Permit. O Yes No This project requires a DOT Encroachment Permit. O Yes No The plan has been submitted to the DOT District 2 Office. Number of parking spaces provided Number of vehicle trips per day generated by this project ap R)X 2- I YOUR RECE I PT THANK Y O U CALL AGA I N P I ann I ng 06-16-2020 0:).37 REG 0001 DEPT01 S71n nn TO: Marcia Vlaun,Town Planner FROM: Laurence P. Eiden,Jr. DATE July 28,2020 SUBJECT: 612 Route 82 Good day Ms.Vlaun I am writing to express some concerns with the site proposal submitted for 612 Norwich Salem Tpke (Route 82) by Shahani, Inc.of Branford. I am the abutting property owner on all sides and have owned my property since 1991. I realize progress and change are inevitable and my comments are not intended to stop that movement. I have reviewed the application and available comments from the various parties and offer the following. 1. The fence in question that will be"refurbished"was installed a few years ago by the dealer/sublessor Rinaldi, I believe as part of his agreement with Shahani. It falls short of the original installed privacy fence approved by the town in 1987 and on record. (Plan showing property of Getty Petroleum, Inc. March 3, 1987). Specifically,the fence is short on both ends by at least a section, possibly two or three. Reference can be made to the original map on file in the planning office which shows the fence extending to the lighting fixtures. I would ask that the applicant be required to extended the fence to the original approved length. 2. I am concerned that any replacement and or new lighting would be intrusive to myself and surrounding residential neighbors, especially in the Winter months when leaves are off the trees. New LED and high intensity lighting could easily make the site much brighter than needed for either function, safety or security. Lighting directed downward and not laterally projecting should help and is requested. The corporate property owners, Leemilt's are absentee owners from New York.The current lessee, Shahnai has no vested interest, nor ties to the community. It is my understanding this is one of several sites he has under lease from Leemilt's.The dealer, Rinaldi is a local resident but could walk away from the lease at any time.As such, I believe this is the time to establish the requirements for the property and produce a site that protects the needs of the community. Respectfully submitted, Laurence P. Eiden,Jr. cc:Colleen Bezanson,Asst. Planner, Planning and Zoning Commission