HomeMy WebLinkAboutltrfromsoilscientistreactivitydone8-19-2020From:B Russo
To:Colleen Bezanson
Subject:RE:
Date:Wednesday, August 19, 2020 2:43:56 PM
Hi Colleen.
At your request I inspected the LVK LLC site at the intersection of Leffingwell Rd and Montville Rd. I
understand that the applicant has indicated that they will be applying to renew the wetlands permit.
The plan for the site was prepared by Porovst Rovero Inc and revised to 8/18/2015. At the time of
my inspection, the following items relevant to wetland permitting that had either not been
completed or needed to be re-established.
The rip rap berm that runs parallel to Trading Cove Brook was not installed
The construction entrance (anti tracking pad) needs to be replaced
The swale that runs parallel to Trading Cove brook need to be mowed (vegetation within the swale
does not need to be removed)
The staked hay bales in, and at the end of the swale need to be replaced.
Please call me with any questions.
Bob Russo
C.S.S.
CLA Engineers
From: Colleen Bezanson [mailto:CBezanson@montville-ct.org]
Sent: Wednesday, August 19, 2020 2:24 PM
To: B Russo <brusso@claengineers.com>
Subject:
Colleen Bezanson
Assistant Planner/ GIS Specialist
Town of Montville
310 Norwich New London Tpke
Uncasville, CT. 06382
(860) 848-6779