HomeMy WebLinkAboutSite PlanNOT TO SCALE
PLACEMENT AND CONSTRUCTION OF SYNTHETIC FILTER BARRIER
POSTS I .)SET POSTS AND 2.) STAPLE THE
ANGLE 10* EXCAVATE A 6"X 6" WIRE MESH
I TRENCH, SET POSTS Z FENCING TO
UPSLOPE FOR DOWN SLOPE. FENCING END POST,
STABILITY AND
SELF CLEANING.
MIN.
DEPTH
3.) ATTACH FILTER FABRIC
'-)s'
E'
TRENCH,
D
AND
CLEANING.
2-t wn L
71 '64T
FILTER FAB TO THE WIRE FENCING 4.) BACKFILL THE
Rj TRENCH AND
AND EXTEND IT TO COMPACT THE
THE
HE TRENCH. EXCAVATED SOIL.
BACKFILL
BOTTOM OF
DRAINAGEWAY
A B B A
PLAN VEIW ELEVATION
POINTS "A" SHOULD BE HIGHER
THAN POINTS "B".
U.S. DEPARTMENT OF AGRICULTURE, SOILS CONSERVATION SERVICE:
STORRS, CONNECTICUT
M
EXISTING
CONTOUR
EXISTING
CONTOUR
LOTLINE
STONEWALL
SILT FENCE
– — — — — — — — — — — – BUILDING LINE
BIT, LIP CURBING
1281 PROPOSED
-CONTOUR
CLEARING LIMIT
NOTE:
CONTACT TOWN OF MONTVILLE WPCA FOR SEWER CONNECTION PERMIT
AND TIE IN SPEC. S (860-848-3030 EXT. 311)
1.) LOT BOUNDARY DATA TAKEN FROM A MAP ENTITLED "MONTVILLE ESTATES
CLUSTER SUBDIVISION, MONTVILLE, CONNECTICUT, SUBDIVISION PLAN,
SHEET NO. 2, PREPARED FOR MONTVILLE LAND DEVELOPMENT, LLC,
SCALE: 119=100' 'DA TE., 3130107 LA S T REV. 6118107, CLA ENGINEERS, INC.
317 MAIN STREET, NORWICH, CONN,, ROBERT L. MULLEN L, S. NO, 12331,
GRAPHIC SCALE IN FEET
30 0 30 60 90 120
4HOLE RIM =432.00'
ss -l-____
SS__1_
SG
CN
4
UTLITIES
'22
SS___
0 0 jW
REFER TO THE 2002 GUIDELINES F OR SOIL EROSION AND SEDIMENT CONTROL DEP BULLETIN EFF. MAY
2002, THE CONTRA CTORSHALL REFER TO THIS DOCUMENT A S NECESSARY To MEET ANY UNFORESEEN
SITE CONDITIONS DURING CONSTRUCTION,
REMOVAL OF TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES:
CONTROL MEASURES WILL CONTINUE TO BE MAINTAINED UNTILL THE SITE HAS STABILIZED. STABILIZATION IS
UNDERSTOOD TO MEANALL STORMWATER RUNOFF IS OCCURING ON SURFACES THAT ARE PERMANENTLY
PROTECTED FROM EROSION AND THE PRODUCTION OF SEDIMENT
MAINTENCE REQUIREMENTS FOR CONTROL MEASURES:
SILTFENCE OR HAYBALE BARRIERS -INSPECT ONCEIWEEK OR AFTER ALL RAIN EVENTS OF 0.51' OR GREATER.
REMOVE SEDIMENT DEPOSITS OF 6" OR GREATER. MAINTAIN SILT FENCE INTEGRITY WITH NEED REPAIRS AND
REPLACE ANY ROTTED OR DISTURBED HAYBALES.
CONSTRUCTION ENTRANCE:
MAINTAIN ENTRANCE INA CONDITION THAT WILL PREVENT TRACKINGIWASHING OF SEDIMENT ONTO PAVED
SURFACES, PROVIDE PERIODIC TOP DRESSING OF STONE AS NEEDED. EXTEND LENGTH OF ENTRANCE AS WARRANTED,
IMMEDIATELY REMOVE SEDIMENT DEPOSITS TRACKED ONTO PAVED AREAS.
ff,; 5!ii
1 11111,
TEMPORARY STABILIZATION METHODS USING A HEAVY MULCH OF WOOD CHIPS ON SLOPES OR DRAINAGE
CHANNELS TO BE APPLIED AS REQUIRED.
DRIVEWAY WATER BARS SHALL BEINSTALLEDAS SHOWN ON THIS PLAN. REVISED LOCATIONS OF BARS OR
ADDITIONAL BARS TO BE ADDED AS NEEDED.
GRASS MIX FOR TEMPORARY SEEDING SHALL BEA CONTRACTORS MIX OR EQUAL RAKED OR ROLLED INTO SOIL.
PERMANENT SEEDING
SEED THE GRADED SLOPES OF THE DRIVEWAY WITH A SEED MIXTURECONTAINING A HIGH
PERCENTAGE OF CREEPING RED FESCUE AND PERENNIAL R YEGRASS, MULCH THE SEED
BED TO OBTAIN A 90% SURFACE COVERAGE,
%
%
�p 1b
7
>
co
1. 84 8 ACRES
PROPOSED 415x0
WELL IV
4�
50,
415x6 r
S44 RA
424.
CLEAN
C OUT
401F
y
INSTALL
4<d4 l ENTRANCE
N PAD
4,4
.SS 4-4,14
SS -1
'411* VO
tF52`1948"
R=30,000
L=27.40'
;1
---ss____
___SS__
PVC -PIPE
:r,74` 9'22" R:z6000,
go
- \.- I L=77.8_3�'
SEQUENCE OF ACTIVITY- HOUSE LOT DEVELOPMENT
RL^N \/IF=\/V
1. LIMIT OF DISTURBANCE. Upon approval of site plan
the limits of development shall be established in the field
2"X3' STAKE
for each proposed structure. Disturbance limits shall be A S- SHOWN and
shall be bounded by staked haybales, sift fence or wood chips.
BALES BUTTED
or removed from the site,
TOGETHER
2"X273'
BALES TO BE DUG
haybales or silte fence. All erosion controls, including sift fence and
NTo GROUND
INTO
100
PlannerIZEO and Wetlands Agent PRIOR TO STUMPS BEING PULLED,
GRUBBING, OR EXCAVATION. The PlannerIZEO and Wetlands Agent
#WPM 60FMW�
may modify the erosion control requirements based on field conditions so as
to adequately control erosion and siltation from the site,
o
STAKES
E3 L-
H ^")r^EE
graded as shown on plan, and graveled. All driveway shoulders shall be
(2 PER/BALE)
stabilized immediately upon grading, either by diverting runoff, mulching,
or seeding and mulching (depending on the season).
N.T.S.
5, TOPSOIL. All topsoil shall be stripped and saved in an area as shown
4HOLE RIM =432.00'
ss -l-____
SS__1_
SG
CN
4
UTLITIES
'22
SS___
0 0 jW
REFER TO THE 2002 GUIDELINES F OR SOIL EROSION AND SEDIMENT CONTROL DEP BULLETIN EFF. MAY
2002, THE CONTRA CTORSHALL REFER TO THIS DOCUMENT A S NECESSARY To MEET ANY UNFORESEEN
SITE CONDITIONS DURING CONSTRUCTION,
REMOVAL OF TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES:
CONTROL MEASURES WILL CONTINUE TO BE MAINTAINED UNTILL THE SITE HAS STABILIZED. STABILIZATION IS
UNDERSTOOD TO MEANALL STORMWATER RUNOFF IS OCCURING ON SURFACES THAT ARE PERMANENTLY
PROTECTED FROM EROSION AND THE PRODUCTION OF SEDIMENT
MAINTENCE REQUIREMENTS FOR CONTROL MEASURES:
SILTFENCE OR HAYBALE BARRIERS -INSPECT ONCEIWEEK OR AFTER ALL RAIN EVENTS OF 0.51' OR GREATER.
REMOVE SEDIMENT DEPOSITS OF 6" OR GREATER. MAINTAIN SILT FENCE INTEGRITY WITH NEED REPAIRS AND
REPLACE ANY ROTTED OR DISTURBED HAYBALES.
CONSTRUCTION ENTRANCE:
MAINTAIN ENTRANCE INA CONDITION THAT WILL PREVENT TRACKINGIWASHING OF SEDIMENT ONTO PAVED
SURFACES, PROVIDE PERIODIC TOP DRESSING OF STONE AS NEEDED. EXTEND LENGTH OF ENTRANCE AS WARRANTED,
IMMEDIATELY REMOVE SEDIMENT DEPOSITS TRACKED ONTO PAVED AREAS.
ff,; 5!ii
1 11111,
TEMPORARY STABILIZATION METHODS USING A HEAVY MULCH OF WOOD CHIPS ON SLOPES OR DRAINAGE
CHANNELS TO BE APPLIED AS REQUIRED.
DRIVEWAY WATER BARS SHALL BEINSTALLEDAS SHOWN ON THIS PLAN. REVISED LOCATIONS OF BARS OR
ADDITIONAL BARS TO BE ADDED AS NEEDED.
GRASS MIX FOR TEMPORARY SEEDING SHALL BEA CONTRACTORS MIX OR EQUAL RAKED OR ROLLED INTO SOIL.
PERMANENT SEEDING
SEED THE GRADED SLOPES OF THE DRIVEWAY WITH A SEED MIXTURECONTAINING A HIGH
PERCENTAGE OF CREEPING RED FESCUE AND PERENNIAL R YEGRASS, MULCH THE SEED
BED TO OBTAIN A 90% SURFACE COVERAGE,
%
%
�p 1b
7
>
co
1. 84 8 ACRES
PROPOSED 415x0
WELL IV
4�
50,
415x6 r
S44 RA
424.
CLEAN
C OUT
401F
y
INSTALL
4<d4 l ENTRANCE
N PAD
4,4
.SS 4-4,14
SS -1
'411* VO
tF52`1948"
R=30,000
L=27.40'
;1
---ss____
___SS__
PVC -PIPE
:r,74` 9'22" R:z6000,
go
- \.- I L=77.8_3�'
SEQUENCE OF ACTIVITY- HOUSE LOT DEVELOPMENT
1. LIMIT OF DISTURBANCE. Upon approval of site plan
the limits of development shall be established in the field
for each proposed structure. Disturbance limits shall be A S- SHOWN and
shall be bounded by staked haybales, sift fence or wood chips.
2, TREES CLEARED. Trees shall be cleared and cut to length and stacked
or removed from the site,
3, EROSION CONTROLS. Disturbed area shall be bounded by staked
haybales or silte fence. All erosion controls, including sift fence and
antitrackingpad, shall be installed and inspected by the Land Use
PlannerIZEO and Wetlands Agent PRIOR TO STUMPS BEING PULLED,
GRUBBING, OR EXCAVATION. The PlannerIZEO and Wetlands Agent
may modify the erosion control requirements based on field conditions so as
to adequately control erosion and siltation from the site,
4. DRIVEWAY. All driveway and driveway shoulders shall be stripped,
graded as shown on plan, and graveled. All driveway shoulders shall be
stabilized immediately upon grading, either by diverting runoff, mulching,
or seeding and mulching (depending on the season).
5, TOPSOIL. All topsoil shall be stripped and saved in an area as shown
on the plan or as approved by the Planner and Wetlands Agent. Topsoil
shall not be removed from the site except as in compliance with the
CC
Zoning Regulations.
0
6, CONSTRUCTIONAND DISTURBED AREA. Excavation and
construction shall commence following inspection and approval of erosion
0
controls and construction of the driveway. The disturbed area shall be
co
graded so as to contain runoff within the lot to the greatest extent possible.
7, SITES IN WINTER. When a site will be open during the winter months,
rough grading and 4-6 inch mulching must occur prior to construction in
C0
order to minimize erosion and uncontrolled runoff during the winter months.
8, DRAINS. Roof water drains shall be installed as shown
on the approved plan. ANY CHANGES TO THE L 0 CA TION OF THE
DRAINS OR THE ADDITION OF ANY DRAINS SHALL BE APPROVED
BY THE PLANNER AND WETLANDS AGENT PRIOR TO INSTALLATION.
9, COMPLETE SITE WORK. Finish grading shall occur as soon as possible on
all lots where there is potential for erosion and for degradation of wetlands and
watercourses. Lots shall be finish graded, seeded with perennial grasses suitable
for the respective amount of sun or shade and mulched prior to Certificate of
Zoning Compliance,
10. FINAL STABILIZATION. EROSION CONTROLS SHALL BE
MAINTAINED ON THE LOTAS LONG AS THEYARE NEEDED TO
CONTROL EROSION AND SEDIMENTATION.
SITE IMPROVEMENT PLAN
LIN
AP
BENCHMARK PROPOSED
TOP MANHOLE
ASSUMED EL.
417.20'
ss -- LOT 2
SS___
E
1
mar
EROSION CONTROL CONTACT
LAND OWNER:
FIL MONTVILLE, LLC
388 ORANGE STREET
NEWHAVEN, CT. 06511
VOL. 584 PG. 690
MONTVILLE, CONNECTICUT
PREPARED FOR
FlL MONTVILLE, LLC
SCALE. 1"=30' -DATE" NOV. 1112019