Loading...
HomeMy WebLinkAboutPlanNOTES: 1 m THIS PLAN IS A COMPILATION PLAN AND HAS BEEN PREPARED IN ACCORDANCE WITH THEREGULATIONSOFCONNECTICUTSTATEAGENCIES, SECTIONS 20-3008-1 THROUGH 20--3006-20, OMiNIMUM STANDARDS FOR SURVEYS AND MAPS IN THE STATE OF CONNECTICUT" ENDORSED BYTHECONNECTICUTASSOCIATIONOFLAND 'SURVEYORS, INC. IT IS EXPRESSLY NOTED THAT THISFLANWASCOMPILEDFROMOTHERMAPS, RECORD RESEARCH OR OTHER SOURCES OFINFORMATION. IT IS FURTHER NOTED THAT THIS PLAN IS NOT TO BE CONSTRUED AS HAVINGBEENOBTAINEDASARESULTOFAFIELDSURVEY, AND IS SUBJECT TO SUCH CHANGE AS ANACCURATEFIELDSURVEYMAYDISCLOSE. THE HORIZONTAL ACCURACY CONFORMS TO CLASS D. NO DECLARATION IS EXPRESSED OR IMPLIED BY THIS MAP OR COPIES THEREOF UNLESS THE PRINTBEARSTHEIMPRESSIONTYPESEALANDORIGINALLIVESIGNATUREOFTHESURVEYORWHOSENAMEANDREGISTRATIONNUMBERAPPEARBELOWORTHEREON. 2. THE SUBJECT PROPERTY IS LOCATED ENTIRELY WITHIN THE R-120 ZONE DISTRICT3. BY GRAPHICAL DEPICTION ONLY, THIS PARCEL LIES WITHIN FLOOD HAZARD ZONEX(UNSHADED) AS SHOWN ON "NATIONAL FLOOD INSURANCE. PROGRAM FLOOD INSURANCE RATEMAPNEWLONDONCOUNTY, CONNECTICUT PANEL 331 OF 554, COMMUNITY: MONTVILLE, TOWN OFMAPNUMBER: 09011C0331G MAP EFFECTIVE: JULY 18, 2011, FEDERAL EMERGENCY MANAGEMENTAGENCY'. 4. THE SUBJECT PROPERTY IS SHOWN ON THE TOWN OF MONTVILLE TAX ASSESSOR MAP 44, BLOCK 15 AS LOT 7 AND HAS AN ASSIGNED STREET ADDRESS OF 20 DAVID DRIVE. 5. THE BASIS FOR BEADINGS IS CONNECTICUT GRID NORTH AS SHOWN ON THE RECORDSUBDIVISIONMAPREFERENCEDBELOW. UNDERGROUND UTILIT`, STRUCTURE AND FACILITY LOCATIONS DEPICTED AND N07LD HEREONHAVEBEENCOMPILED, IN PART, FROM RECORD MAPPING SUPPLIED BY THE RESPECTIVE UTILITYCOMPANIESORGOVERNMENTALAGENCIES, FROM PAROLE TESTIMONY AND FROM OTHERSOURCES. THESE LOCATIONS MUST BE CONSIDERED AS APPROXIMATE IN NATURE. ADDITIONALLY, OTHER SUCH FEATURE MAY EXIST ON THE SITE, THE EXISTENCE OF WHICH ARE UNKNOWN TOJAMESBERNARDOLANDSURVEYING, LLC. THE SIZE, LOCATION AND EXISTENCE OF ALL SUCHFEATURESMUSTBEFIELDDETERMINEDANDVERIFIEDBYTHEAPPROPRIATEAUTHORITIESPRIORTOCONSTRUCTION. CALL, BEFORE YOU DIG 1-800-922-4455. 7. THE SITE CONTRACTOR SHALL VERIFY THE LOCATION AND ELEVATION OF THE SANITARYSEWERCONNECTIONFORTHESITEPRIORTOANYCONSTRUCTION. CHANGES TO THE BUILDING ELEVATIONS MAY BE NECESSARY PRIOR TO EXCAVATION TO ESTABLISH SATISFACTORY SLOPE OF THE NEW SEWER CONNECTION. MAP REFERENCES: 1. MONTVILLE ESTATES CLUSTER SUBDIVISION MONTVILLE, CONNECTICUT SUBDIVISION PLAN DATE: 3/30/07 REVISED: 1/2/08 BY CLA ENGINEERS, INC. LLLILIL THE FOLLOWINGSYMBOLS/ABBREVIATIONS MAY APPEAR ON THIS DRAWING AC ACRES TBR TO BE REMOVED BF BASEMENT FLOOR TYP TYPICAL P® BIT BITUMINOUS SOIL PERC TEST LOCATION BCLC BITUMINOUS CONCRETE LIP CURBING TH$ SOIL DEEP TEST LOCATION CONC CONCRETE WELL DIA DIAMETER + .J TREE DB DISTRIBUTION BOX BUILDING SETBACK LINE EOP EDGE OF PAVEMENT CLEARING LIMIT LINE ELEV ELEVATION EXISTING TREELINE FF FINISHED FIRST FLOOR - -- -- -158- - - - EXISTING CONTOUR LF LINEAR FOOT 158 NEW CONTOUR MIN) MINIMUM SEDIMENT FENCE M/L MORE OR LESS - - -- o — - STORM DRAIN PIPE N/F NOW OR FORMER(-`,; STONE WALL PVC POLY VINYL CHLORIDE S SANITARY SEWER SCH40 SCHEDULE 40 W WATER 5.4x SPOT ELEVATION SF SQUARE FEET TR TO REMAIN f NEW 4"PVCSANITARYSEWER OPEN SPACE TO THE BEST OF MY KNOWLEDGE AND BELIEF THIS MAP IS SUBSTANTIALLY (- RECT AS NOTED (HEREON. i A-MES BERNARDO LICENSE #70121 DATE 91 GRAPHIC SCALE 20 40 IN FEET ) 1 inch = 20 ft. A=49°14'34" R=60.00' L=51.57T=27.50' CH = N 73°23 32 E50.00' 2x2x48" WOOD POLE INDUSTRIAL NETTING, SNOWFENCEORWOVENWIREFENCEFORSUPPORTvFILTERFABRICNOTE: PREMANUFACTURED FENCE MAY BE USED. SEQ MENT FENCENOTTOSCALETEMPORARYSEDIMENTFENCE NEW UNDERGROUND UTILITIES vc NEW WELL _ J; y LOT #7 AREA -91,31 0_ SF CRZ. o9sES ' TREE LINE/UMTS OF CLEARING bV 5i 2 , 3S Z ZzQLd01W-Z0PI=-oryWwT0WQQ1- L Z Uo03Op Zw_1OZ - TL -0 = ZO::)o> 0 J 00 [Y0NZW0WWQJZWSWWLJzWW(YTZUF-- TW ZI- CfOZw~UZI-Tn0 WFw-C) ZF- mI-U00UZ Owz wIffflyW_U ZJQ W OW Z_ 00 0x1 wL- Z000Qcn?O n c=n0 It 1 dalkREVISIONSLTRDESCRIPTIONDATE F— U_ F- W Z z LiiU Z OC11 -*4 > 0 1-7Q 0 0 -J W Z W Q L O Z 0 J LL C ry F O a Cr- a w w IL> Z0CrI0- OE" UC 'n) n_ O 1 Z ILLW 0Z O Z O 5 ILLO Z 3 O Sheet No. r% 4 0IIIIIIIIII L) SHEET 1 OF 1 Scale: 1 —20 ate JUNE 12, 2017 Project No. 170P1 --1