HomeMy WebLinkAboutPlan SUB 209Location Map
Scale: 1"=1000'
CB#1
- TYPE "C"
CB#11-
TYPE "C"
T.F.-101.80
30 FT.
T. F. --152.63
INV.
IN -98.4(W)
INV.
OUT -147.9(S)
INV.
OUT -98,4(E)
R4
394.39
r
Proposed
Metal Frame BWdt*ng_ -170-
MON EJ
CB#12-
TYPE "C"
GB
2- TYPE "C"
T F.-152.58
T.F.-103.74
INV.
IN -147.6(N)
INV.
INV.
IN -98.5(E
OUT -98.5 w)
INV.
INV.
IN -147.8(S)
OUT -147.1(E)
CB#3-
T.F.-1
TYPE "CL"
20.87(COVERED)
CB
13- TYPE "CL"
INV.
IN-
TBURIED)
INV.
IN -
INV.
OUT-
INV.
OUT-
CB#4-
TYPE "C-"
T.F.-128.74
CB#1
4- TYPE "C"
INV.
IN -124.6(N)
T.F.-178.67
INV,
OUT -124.6 S)
INV.
IN -173.8(E
N r013 Proposed
C)
INV.
IN -1 S
73.8
CBW5-
TYPE "C"
INV.
OUT- N)
T.F.-128.32
INV.
IN -124,1(N)
CB#15-
TYPE "C„
INV.
IN -124.0(W)
T.F.-178.71
INV.
IN -124,4(S)
INV.
OUT -174.4(W)
INV.
OUT -124-0(E)
-2110
CB#16-
TYPE "C"
CB#6-
TYPE "CL"
T.F.- 191.60
T.F.-131.19
INV.
IN-188.1SS
INV,
IN - 12 6 5 W�N)OUT-185.77
INV.
N)
INV.
OUT -126.5
CB#17-
TYPE "C"
CB#7- TYPE "C"
T.F.-200.94
INV. IN -198.4(E)
T.F.-132.90
INV.
IN -128.2(W)
INV.
IN -198.3(W
N)
INV.
OUT -127.8(E)
INV.
OUT -198.3
CB
8- TYPE "CL"
CB#18- TYPE "CL"
T.F.-201.81
I.F.-133.97
INV.
IN -131.0(5
INV.
OUT -198.8(W)
INV.
OUT -130.8() S)
CB#19-
TYPE "CL"
T.F.-207,20
QB#9-
TYPE. "CL"
INV.
OUT -204.3(E)
TF
-134.81
INV.
INV.
IN -131.9(S
OUT- 1 31.71�1\1)
CB#20-
TYPE "CIL"
T.F.-215.75
INV.
OUT -214.1(E)
CB41
0- TYPE "CL"
T.F.-136.73
INV.
OUT -132.7(N)
N/F Gouviia Group, L
#424 M.,ie Aven,e
Note:
Cross Hatcbed Area Denotes The Limits
Of A Proposed Sewer Easement
In Favor Of The Proposed Lot
Note:
Shaded Area Denotes The Limits
Of A Proposed Right Of Way
In Favor Of The Proposed Lot
ow -C
10161011"JI
A
If Iron Pin
(set)
r\11,1_10
Wetland Area
r1-12 �>
WF#2-2 -
R=273.51'
A=22*04'07"
L= 105.35'
ChBrg=N48*37'05"W
e
N 16'02'00" E Ch = 104.70' To
5.70' (Street Line Per 0 \J�
r
Ref Map #1) CURVE DATA
R=25.00'
SIGN L=34.97'
14
L=26.7-3'
ChBrg=S84°55'20'W
V Ch=32.19'
CURVE DATA
Un R= 15.00'
Detention A=98'54'13"
-L
< 14-.88' Area L=25.891
INV,
4,4 n ChBrg=NO4�36�'00"W
700-
Ch=22.80'
U11
.4
4-4*51'05" E
23.81'
co
0
'0
'T
'e �1
LC C
J
1000",
Ole a
Drill Hal C7t ;00
(fn
S80'11 7'25"W
13.45'
Drill Hole -\ 3#4
(fnd� ') -)
18 _ES
ELFV- 1 __3
Iron Pi
- ----- --- -
NU I r.%
THIS SURVEY AND MAP HAS BEEN PREPARED IN ACCORDANCE WITH SECTION 20-300b-1
THRU 20-300b-20 OF THE REGULATIONS FOR STATE AGENCIES '"STANDARDS FOR SURVEYS
DETE-NT110�1 AND MAPS IN THE STATE OF CONNECTICUT" AS ENDORSED BY THE CONNECTICUT ASSOCIATION
rte
POND J OF LAND SURVEYORS, INC.
A. TYPE OF SURVEY: PROPERTY SURVEY
B. BOUNDARY DETERMINATION CATEGORY: DEPENDANT RESURVEY EXIST. BDRY.
C
C. HORIZONTAL ACCURACY: CLASS A-2
TOPOGRAPHIC ACCURACY: T-2
4.0
2. DATE OF LATEST FIELD WORK- DECEMBER 2008
3. SUBJECT PARCEL IS LOCATED IN ZONE DISTRICT: INDUSTRIAL
- - ----- rz
4. THIS SURVEY AND MAP ARE VALID ONLY IF PRINT OR MYLAR HAS THE EMBOSSED SEAL AND
LIVE SIGNATURE OF THE SURVEYOR.
CO
ill Hol" 5. SUBSURFACE AND EVVIRONMENTAL CONDITIONS OTHER THAN WETLAND SOIL DELINEATION AND
LOCATION WERE NOT EXAMINED OR CONSIDERED AS A PART OF THIS SURVEY.
Sew r
6. A PREBLAST SURVEY WILL BE PERFORMED PRIOR TO ANY BLASTING DONE ON SITE.
e n o u 11
FL nv Q)
44 _3 7. EXISTING UTILITY LOCATIONS ARE BASED ON THE BEST AVAILABLE INFORMATION. LOCATIONS
MAY VARY BASED ON AN ACCURATE FIELD DEMARCATION. ALL EXISTING UTILITIES TO BE
rrj ACCURATELY LOCATED PRIOR TO CONSTRUCTION. "CALL BEFORE YOU DIG" 1-800-922-4455.
0
Q) 8. APPROVAL BY THE TOWN OF MONTVILLE INLAND WETLANDS COMMISSION GRANTED
co , 0 -
MARCH 19, 2009.
60
C)
0KAAC REFERENCES
f% -=Q■
CU 1. SURVEY PLAN PROPERTY OF PAUL F. & JUDITH A. MACHNIK, MAPLE AVENUE, MONTVILLE,
IN;
CONNECTICUT, DATE: MARCH 17, 1988, SCALE: 1"=40', REV. JUNE 21, 1988 BY ANGUS
McDONALD/GARY SHARPE & ASSOCIATES, INC.
2. BOUNDARY/TOPOGRAPHIC SURVEY AND SUBDIVISION MAP, PROPERTY OF HEPO, L.L.C., 420
MAPLE AVENUE, TOWN OF MONTVILLE, CONNECTICUT, SCALE: 1-=50', PROJECT NO. CLA-
2979, DATE: 4/28/03, SHEET NO. 2, REVISED TO 1/26/04 BY CLA ENGINEERS, INC.
3. BOUNDARY SURVEY, PROPERTY OF REPO, LLC. 420 MAPLE AVENUE, TOWN OF MONTVILLE, CT.
SCALE: 1"=50', DATE: 3/20/06, SHEET 1, BY CLA ENGINEERS, INC.
ZONING COMPLIANCE CHART
ZONE - I
REM
REQUIRED
PROPOSED
MTF 4-14 Iron Pin
Z
Ose
�jC�
30 FT.
SIDE YARD SETBACK
WF411-26
(set
k
. 0
30 FT.
WF44-23
6
R4
394.39
r
Proposed
Metal Frame BWdt*ng_ -170-
MON EJ
01
WF#4-24 ---------------.--
NFA} -19
WF#1-17
�4
Wer
Cleanou/
-
C_
>
Iron Pin
N
FL I V.
15 .7/
TYPICAL
WF#5_1 (set)
Weiland Area
WF#5-4
WFIF5-8
WF#4-13 > WF14-20
1> WF#1-19 rill Hole
EXISTING CONTOUR
3
�F# 4-21
F>
z
/�21 _J�
PROPOSED CONTOUR
OF
W1711 -20
WIF
J W1711-21 #1_4>
SIGN
-7
N r013 Proposed
C)
Hale/ S F
SQUARE FEET
ZZ
Parking Area
WFJI-23
W1711-24 Weiland Area co"',
WFJ4-22
�WF#4_
-29
WF#1-27• WF#1-32
W411 -28P>
CU 1. SURVEY PLAN PROPERTY OF PAUL F. & JUDITH A. MACHNIK, MAPLE AVENUE, MONTVILLE,
IN;
CONNECTICUT, DATE: MARCH 17, 1988, SCALE: 1"=40', REV. JUNE 21, 1988 BY ANGUS
McDONALD/GARY SHARPE & ASSOCIATES, INC.
2. BOUNDARY/TOPOGRAPHIC SURVEY AND SUBDIVISION MAP, PROPERTY OF HEPO, L.L.C., 420
MAPLE AVENUE, TOWN OF MONTVILLE, CONNECTICUT, SCALE: 1-=50', PROJECT NO. CLA-
2979, DATE: 4/28/03, SHEET NO. 2, REVISED TO 1/26/04 BY CLA ENGINEERS, INC.
3. BOUNDARY SURVEY, PROPERTY OF REPO, LLC. 420 MAPLE AVENUE, TOWN OF MONTVILLE, CT.
SCALE: 1"=50', DATE: 3/20/06, SHEET 1, BY CLA ENGINEERS, INC.
ZONING COMPLIANCE CHART
ZONE - I
REM
REQUIRED
PROPOSED
W1`11 -31
1>
q)
30 FT.
SIDE YARD SETBACK
WF411-26
15 FT.
REAR YARD SETBACK
30 FT.
WF44-23
6
R4
Proposed
Metal Frame BWdt*ng_ -170-
MON EJ
01
WF#4-24 ---------------.--
Sheet No.
L40
-
C_
>
CU 1. SURVEY PLAN PROPERTY OF PAUL F. & JUDITH A. MACHNIK, MAPLE AVENUE, MONTVILLE,
IN;
CONNECTICUT, DATE: MARCH 17, 1988, SCALE: 1"=40', REV. JUNE 21, 1988 BY ANGUS
McDONALD/GARY SHARPE & ASSOCIATES, INC.
2. BOUNDARY/TOPOGRAPHIC SURVEY AND SUBDIVISION MAP, PROPERTY OF HEPO, L.L.C., 420
MAPLE AVENUE, TOWN OF MONTVILLE, CONNECTICUT, SCALE: 1-=50', PROJECT NO. CLA-
2979, DATE: 4/28/03, SHEET NO. 2, REVISED TO 1/26/04 BY CLA ENGINEERS, INC.
3. BOUNDARY SURVEY, PROPERTY OF REPO, LLC. 420 MAPLE AVENUE, TOWN OF MONTVILLE, CT.
SCALE: 1"=50', DATE: 3/20/06, SHEET 1, BY CLA ENGINEERS, INC.
ZONING COMPLIANCE CHART
ZONE - I
REM
REQUIRED
PROPOSED
FRONT YARD SETBACK
30 FT,
30 FT.
SIDE YARD SETBACK
15 FT.
15 FT.
REAR YARD SETBACK
30 FT.
30
LEGEND:
411111Z Ay WFf.
/P NOW OR FORMERLY
531*31'25"E
7.19'
N67*40'50"E
16.08'
CID,
00)
z
N46! 11'1 5"E
38.72'
Drill ole
(SW X/
1,
T. F. TOP FRAME
INV. INVERT
WATER
SEWER
TELE/ELEC/CATV
I HAVE DELINEATED THE WETLANDS ON THE PROPERTY IN THE FIELD AND HAVE
REVIEWED THE WETLANDS AS SHOWN ON THE PLAN AND FIND THAT THEY
SUBSTANTIALLY REPRESENT THE WETLANDS AS DELINEATED IN THE FIELD.
-200�
_202-
'4 ROBERT t. ROSSO
CERTIFIED SOIL SCIENTIST
-210-i►t C
•
0 nd)
S_W00 E 356.1-5'
187.75' 10090"
3:ir35
1,10" W 288.155 0_�
N 361 cop -4
0
Plua
set) I I— -_ 5 'TO Y KNOWLEDGE AND BELIEF THIS MAP IS SUBSTANTIALLY CORRECT AS NOTED HEREON
nn:, woie & 0.
-220 (fn seNO. 17W7
N53' 15' MV
17.23" N=58'45W %4-%1bEt4SS!�9--* R"
12.18 N/F Bruce R. Duchesneau
N41'05'25"W 'k U F04
N35"30 45"W 24.58'
25.55'
F. McNALLY, JR.,
. #17387
r�
DATE
PASSIVE SOLAR ENERGY TECHNIQUES AS PRESCRIBED BY LAW
HAVE BEEN CONSIDERED IN DEVELOPMENT OF THIS PLAN
SIGNATURE
DATE
SIGNATURE DATE
DATE OF COMPLETION OF ALL WORK
SIGNATURE
DATE
APPROVED BY THE TOWN OF MONTVILLE PLANNING AND
ZONING COMMISSION
SIGNATURE
DATE
MMMEA
LA Engineers, Inc.
CIVIL - STRUCTURAL - SURVEYING
Cq1
317 Main Street
0) 886-1966
Wetland Area-
IRON PIPE o
IRON PIN
R4
WF
MON EJ
MONUMENT
Date:
05/18/09
Sheet No.
L40
N
TIP.
C9
TYPICAL
(14
110,
'z
t
EXISTING CONTOUR
z
/�21 _J�
PROPOSED CONTOUR
W#" 0- Pr oDo-se-_ Lot -
SIGN
412, Map'^ Avenue - Driff
Hale/ S F
SQUARE FEET
W/Plu
\VFf4 - 1, *Ff4-30 -1 -As-&. Ret -031,10 -02 -CIA -1- - - (se
_204-_206
MORE OR LESS
-190-
-2110
4,
T. F. TOP FRAME
INV. INVERT
WATER
SEWER
TELE/ELEC/CATV
I HAVE DELINEATED THE WETLANDS ON THE PROPERTY IN THE FIELD AND HAVE
REVIEWED THE WETLANDS AS SHOWN ON THE PLAN AND FIND THAT THEY
SUBSTANTIALLY REPRESENT THE WETLANDS AS DELINEATED IN THE FIELD.
-200�
_202-
'4 ROBERT t. ROSSO
CERTIFIED SOIL SCIENTIST
-210-i►t C
•
0 nd)
S_W00 E 356.1-5'
187.75' 10090"
3:ir35
1,10" W 288.155 0_�
N 361 cop -4
0
Plua
set) I I— -_ 5 'TO Y KNOWLEDGE AND BELIEF THIS MAP IS SUBSTANTIALLY CORRECT AS NOTED HEREON
nn:, woie & 0.
-220 (fn seNO. 17W7
N53' 15' MV
17.23" N=58'45W %4-%1bEt4SS!�9--* R"
12.18 N/F Bruce R. Duchesneau
N41'05'25"W 'k U F04
N35"30 45"W 24.58'
25.55'
F. McNALLY, JR.,
. #17387
r�
DATE
PASSIVE SOLAR ENERGY TECHNIQUES AS PRESCRIBED BY LAW
HAVE BEEN CONSIDERED IN DEVELOPMENT OF THIS PLAN
SIGNATURE
DATE
SIGNATURE DATE
DATE OF COMPLETION OF ALL WORK
SIGNATURE
DATE
APPROVED BY THE TOWN OF MONTVILLE PLANNING AND
ZONING COMMISSION
SIGNATURE
DATE
MMMEA
LA Engineers, Inc.
CIVIL - STRUCTURAL - SURVEYING
317 Main Street
0) 886-1966
Norwich, Connecticut
Fax (860) 886-9165
No. Date Revision
Advanced Associates, LLC
Project No.
CIA -4142
Proj. Engineer
JFM
Subdivision Plan
Zoning District I
aple Avenue
410 Maple,,
Montville, Connecticut
Date:
05/18/09
Sheet No.
Property Survey