Loading...
HomeMy WebLinkAboutSite Plan 215 Sr—( Q01 C L N % g 2 11 66 mat1. Rookanc' ad 1.000 500 0 1000 GRAPHIC SCALE IN FEET LOCATION MAP SITE DATA TABLE - ZONEC-1 ITBm E -REQUIRED =1 PROPOSED LOTAREA 40,000 S.F. 814,565 SF +/- LOTFRONTAGE 150 FT. 173.28 FT, FRONT YARD 30 FT, 560 FT.± SIDEYARD 15 FT, 75 FT.± PARKING_XiEQUIREMENTS IN,LCuDF,S PROPOSED ADDITIONS AND FUTURE BUILDING) REQUIRED: 14,400 SF/1000 SF PER SPACE =14.4 PROVIDED: 24 SPACES EXISTING N1 /F GHP, LLC MAP 31 - LOT 4) N31*31'25"W Iron Pin fnd) ) OWNER/APPLICANT: ADVANCED ASSOCIATES, LLC 410 MAPLE AVENUE - P.O. BOX 164 UNCASVILLE, CT NOTES: 1. THIS SURVEY HAS BEEN PREPARED PURSUANT TO THE REGULATIONS OF CONNECTICUT STATE AGENCIES SECTIONS 20-300b-1 THROUGH 20-300b-20 AND THE "STANDARDS FOR SURVEYS AND MAPS IN THE STATE OF CONNECTICUT" AS ADOPTED BY THE CONNECTICUT ASSOCIATION OF LAND SURVEYORS, INC. ON SEPTEMBER 26, 1996. IT IS A PROPERTY SURVEY BASED ON A DEPENDENT RESURVEY AND CONFORMS TO HORIZONTAL ACCURACY CLASS A-2. 2. FOR SUBJECT PROPERTY REFERENCE IS MADE TO THE, TOWN OF MONTVILLE LAND RECORDS VOLUME 493 - PAGE 026. 3. THE PROPERTY IS SHOWN ON ASSESSORS MAP 31 - LOT 2-A, 4. TOTAL AREA OF PROPERTY - 19.60 ACRES+. 5. THE LOCATION OF ALL UNDERGROUND UTILITIES SHOWN ARE APPROXIMATE. THE OWNER SHOULD "CALL BEFORE YOU DIG" BEFORE CONDUCTING ANY EXCAVATION. 1-800-922-4455). 6. REFERENCE IS MADE TO A DECLARATION OF COMMON DRIVEWAY EASEMENT AND MAINTENANCE AGREEMENT - 410 AND 412 MAPLE AVENUE, MONTVILLE, CONNECTICUT BY ADVANCED ASSOCIATES, LLC, DATED JULY 10, 2009 AND RECORDED IN THE MONTVILLE LAND RECORDS. 7. THE PROPERTY IS LOCATED IN ZONING DISTRICT - INDUSTRIAL. 8. A PRE -BLAST SURVEY SHALL BE CONDUCTED PRIOR TO ANY BLASTING. 9. TOPOGRAPHIC INFORMATION CONFORMS TO T-2 MAPPING STANDARDS. BASE FOR LEVELS: N.G.V.D. 1929. 10. NO PORTION OF THE SITEIS LOCATED WITHIN THE TOWN OF MONTVILLE DESIGNATED COASTALAREAMANAGEMENT (CAM) ZONE, 11. THE SITE IS SERVICED BY MUNICIPAL SANITARY SEWER AND ON SITE WELLS. 12, ALL SITE WORK SHALL CONFORM TO THE TOWN OF MONTVILLE SITE PLAN STANDARDS, LATEST REVISION. 13. THE PROPERTY IS NOT LOCATED WITHIN A FLOOD HAZARD ZONE PER "FIRM MAP NEW LONDON COUNTY, CONNECTICUT - ALL JURISDICTIONS, PANEL 334 OF 554, NUMBER 09011C03340, EFFECTIVE DATE: JULY 18, 2011. 14, THE LIMITS OF THE INLAND NTTLANDS ARE SHOWN PER THE PREVIOUS SITE PLAN, SEE REFERENCE MAP #1 15, THERE ARE PROPOSED IMPROVEMENTS ON THREE AREAS OF THE SITE. A PROPOSED CONCRETE BLOCK RETAING WALL FOR MATERIAL STORAGE IS TO BE INSTALLED IN THE EARTH PRODUCTS PROCESSING AREA. ON THE WEST SIDE OF THE PROPERTY A PROPOSED CONCRETE PAD IS TO BE INSTALLED FOR A SEWAGE HOLDING TANK ALSO IN THE SAME AREA THERE IA A PROPOSED 540 S.F. BUILDING ADDITION FOR OFFICE SPACE AND A PROPOSED 2,900 S.F. BUILDING ADDITION FOR STORAGE. LOCATED ON THE NORTH SIDE IF THE PROPERTY IS A PROPOSED 4,500 S.F. SELF STORAGE BUILDINGIS TO BE BUILT WITH A PAVED AREA TO THE FRONT OF THE BUILDING. MAP REFERENCES: D-22'04'07" R-273,51' L— 1 0535' CBRG—N48'37'O5"W N,34*35'31 "W CHD-104-70' -5 —_0 I T, 01. SITE DEVELOPMENT PLAN PROPOSED MANUFACTURING BUILDING PREPARED 5,66' L-34.97' FOR ADVANCED ASSOCIATES, LLC, ZONING DISTRICT 1, 410 MAPLE AVENUE, MONTVILLE, CONNECTICUT, IMPROVEMENT LOCATION SURVEY, CHAIRPERSON DATE CBRG--- N8455'20"E SCALE: 1"=50', DATE: 2/08,107, REV. 1/6/09, PREPARED BY CLA ENGINEERS, INC, CHD-32,19' 2. COMPILATION PLAN - MAP SHOWING EASEMENT AREA TO BE GRANTED TO CI-L,iWERSOIN' DATE THE CONNECTICUT LIGHT AND POWER COMPANY ACROSS THE PROPERTY OF SITE DEVELOPMENT PLAN ADVANCED ASSOCIATES, LLC, SCALE: 1'1=50', DATE: 10/12/09, PREPARED BY PREPARED FOR ADVANCED SURVEYS, LLC. CON11MON 3. ADVANCED ASSOCIATES, LLC - SUBDIVISION PLAN ZONING DISTRICT I, 410 MAPLE AVENUE, MONTVILLE, CONNECTICUT, PROPERTY SURVEY, DRIVEWAY DAT 6 1011 4 SCALE: 1 '1=50% DATE: 5,118/09, PREPARED BY CLA ENGINEERS, INC, EASEMENT 4, EXHIBET A-3 TO THE DECLARATION OF ROCKLAND OVERLOOK INDUSTRIAL SEE NOTE #6) SEWER 10 SC -UE: 1"=50' PARK CONDOMINIUM - DECLARED BY ADVANCED ASSOCIATES, LLC, 410 MAPLE AVENUE, UNCASVILLE, CONNECTCUT, 06382,412 MAPLE AVENUE, MONTVILLE, EASEMENT------__ REN71SIONS CONNECTICUT, SCALE: 1"=50, DATE: 10/13/09, PREPARED BY ADVANCED SURVEYS. SEE MAP REF. #3) ell 5. SITE PLAN PREPARED FOR ADVANCED ASSOCIATES, LLC, 410 MAPLE AVENUE,N/FMONTVILLE, CONNECTICUT, DATE: JANUARY 1997, REV. 4/15/97, SCALE: 111=401, I'll/ 0 0 TIMOTHY RUSSELL & PREPARED BY TOTAL TECHNOLOGY, INC. eo r*) Iron Pin fnd) O / f t ;', - N 0 vv1000A COMMON DRIVEWAY Sfffl EASEMENTN, SMH SEE NOTE #6) X,F D -N031'54," GOUVNA GR0TjP C) CONCRETELLC /, r RET, WALLR- 1.012 i-,,11 MAP 31 - LOT 3) TIE -LINE 5,2: CBRG-S-'3025'23"E S 08033'58" E o oCTID-150,65' 78.84' C j" d 0 ') 0 " 0 C) 0- 0 0 oo(D0000000000 TIE-LINEIron Pin 0, P* a1-6N71005'22" W (fnd) 25' WIDE C.L.&P, CO. 97.05' EASEMENT 394.3 (SEE MAP REF. #2) 000 A Up co Drill Hole find) 00 0 CD fnd) Hole fnd t-3 0 Drill Hole fnd) A _: YVVI' S$3o53144"B 49 . 271 41 -28 1500)' N 39 7.19' S67'40'50" 4N 16.08 Drill Hole fnd)_ Drill Hole N543'07"E 32-z.()O' 0%oWillimliji (fnd) 20.20' S34*35'25"E 3-56 Drill Hole S 3) 26'12"- E 78.31' 36*00$55 (fnd) too, S - S53' 15'35E 17.23 Ez TO MY S MAP IS SUBSTANTIALLY CORRECT AS NOTE IS VALID WITHOUT A LIVE SIGNATURES41*05'25"E N/F E S "OR HEREON. S46* 11'1 5"W 288, 65' 24.58' BRUCE R. DUCHESNEAUA. Iron Pir" 38.72' S35*30'45"E (MAP 23 - LOT 63) Drill Hole S 3611 ZS22•58'45 E' W/Plug ( fnd) 25.55' INt 12'.18, RICHARDA. DESCHAMPS LS, #70019 LEGEND: VOL. PG. N/F S.F. DH IP REG, CL&P VOLUME PAGE NOW OR FORMERLY SQUARE FEET DRILL HOLE IRON PIPE RECOVERED CONNECTICUT LIGHT & POWER N/F KEVIN G. McCARTHY KAY 31 - LOT 1) Drill Hole,-, fnd) -- APPROVED BY THE TOWN OF MONTVILLE PLANNING AND ZONING COMMISSION CHAIRPERSON DATE APPROVED BY THE TOWN OF MONTVILLE INALND WETLANDS & WATERCOURSES COMMISSION CI-L,iWERSOIN' DATE PROJECT o. 14-032 SITE DEVELOPMENT PLAN PREPARED FORDRAINBR.A.D. DAT 6 1011 4 ADVANCED ASSOCIATES, LLC kP1 0 SC -UE: 1"=50' SHEET, 1 OF 4 REN71SIONS 419 & 412 MAPLE AVENUE MONTVILLE, CONNECTICUT BOUNDARY 7- N kUVANCED SURVEYS, LLC. 215 Apple Lane, Colchester, CT 06415 w E 50 Phone & Fax (860) 267-5979 GRAPHIC SCALE IN FEET S ael CL&P 2564 SEWER EASEMENT SEE MAP REF. #3) N/F MARK J. SACHUK C & C.O. 128MAP31 - LOT 3-1) IPIN (ZONE -1) REC. 0 LIMITS OF DH DHINLANDWETLANDS REC. 00SMH ..... . ....... (SEE NOTE #14) REC 0 STONE ... DETEN'l RIP -RAP0 LEC ARE, 00,- 0 SWALE CB0 s pa00\ 6 ..... '..'\. 13#4 & 010 0 d/, ', r r000 D ......... -DE NE 0 .00 0 0 0 0 ' B#5 do/ STO 0. oll ; 0 ........... ......... -INVRIP -RAP O0 00,00, 0 0 A ..... ......... SWALE 0 0000000 ...... DH .0. 0 ... ....... REC. 0 00. oo0 0 00 0. 00 0 ...... 00oo0,0,0 ... .... ---'c. 0. 0 0 OD L 6B#6CONCRETE 0- , go ....... ; o SEWER FENCE RET. NrVLL --00 0 WELLMT TmT o0,0, 0 ........ 00 x............. ........ ELEC 0 0 C.G. 41. ''' , - V.l'%V,V.--l.,l..l , - - -.1 - 1 I- R , ,asCHAINL NY,, N 45v 0 0B#7 FENCE 77-7.-,% V.% ......... .......... ..... 0og COMM.. ........ . . eg smH DRIVEWAY 1/FENS 00000000 EASEMENTto SMH CB, (SEE NOLIMITSOF, 1.1, TE 06) V-1 I + 0 n dl, Qci Q':` INLAND WETLANDS o25'WIDE C.L.&k C&, SEE NOTE #1 C. 0 'Q7EASEMENTB#860 (SEE MAP REF. #2) RETAININGTAYMYNT 212 STONEte T-1. )00 INV, l 0go6 WALL 10 DETENTION/RIP-RAP ;p oc AREA/ 0 SILT BA IN .110COMMON - - N/F BRUCE VALENTI & JOY NOEL VALENTI MAP 31 - LOT 12) olc DRIVEWAY goo 00, 0, 0 c", ASEMENT 0010SEENOTE #6) 00o0c 163.5 '0 c N/F zo N/F JOYCE E. SCOTT & FREDERICK A. DEEP MAP 31 - LOT 14) DRAINAGE TABLE u TYPE "C" CBftI 1 - TYPE "C" N\1 6 CB#IcTW4, (c) _01 -101.80 -152.63T.F. A66.0 DH INV. IN -98.4(W) INV. OUT -147.9(S) REC. INV, OUT -98.4(E) N CB#12- TYPE "C" 0 PROPOSED CONCRETE CB#2- TYPE "C" T.F.-152,58 BLOCK ENLOSURE INV, IN -147, T.F.-103.74Tw INV. IN -147.8(5) 74.0 AREAS FOR MATERIAL INV. IN -98.5(E) CONb, PAD INV. OUT -98.5(W) INV. OUT -147. I (E) W/P?lROPA-.TNM- STORAGE (20x24'TYP.) 60 TANK CB#3- TYPE "CL"CB#13- TYPE "CL" APLTFOR-NIAR-E-A, 162 T.F.-120.87(COVERED) (BURIED) INV. IN- INV. IN- CONC. TANK PROPOSED 64 INV. OUT- INV, OUT - ENCLOSURE LIMITS OF CB±,4- TYPE "C" CB#14- TYPE "C" BIT STONE, CLEARING 66 T.F.-128.74 T.F.-178.67PVMTRETAINING I 7w 68 INV. IN - 124.6(N) INV. IN -173,8(E) Z CONC. PAD wjN 15' \WALL 366.0 INV. OUT -124.6(S) INV. IN -173.8(S) N W/FUEL P CB#5- TYPE "C" INV. OUT -173.7(N) 5: I GRAVELowl, T.F.-128.32 CB#15- TYPE "Cl INV. IN- 124. 1 (N) T.F.-178.71PILE Tr124.0(W) INV. OUT -174.4(W) EXISTING GRAVEL HOLDINIG- INV. IN 124.0(W) INV. IN -124.4(S) DH PARKINO AREA CB#16- TYPE "C" TW INV. OUT -124.0(E) T.F.-191.60REC. 74. INV. IN -188.1(S) 00d CB#6- TYPE "CL11 INV. OUT -185.7(N) T.F.-131.19PROPOSED 1,\ \\\ - Is' I CB#17- TYPE "C" REC. INV IN -126.5(W) N;F CONCRETE PAD INV, OUT -126.5(N) TZ -200.94 BRUCE R, DUCHESNEAU FOR SENNTAGE CB#7- TYPE "C" INV. IN -198.4(E) INV. 1N -198.3(W) HOLDING TANK T.F.- 132.90MAP23 - LOT 63) INV. OUT -1.98.3(N) INV. IN -128.2(W) 101x20') INV, OUT -127.8(E) ZONE - R-40) N/F CB#18- TYPE "CL11SEEDETAIL) DH' T.F.-201,81KEVING. McCARTHY CB#8- TYPE "CL" MC. INV. OUT -198.8(W) T (MAP 31 - LOT 1) S.. T.F.-133.97X 131.0(S) INV. IN CB#19- TYPE "CL11ZONE - R-40) r`V, OUT -130.8(S) T.F.-207.20 INV. OUT -204,3(E) CB -+9- TYPE "CL11AQ . .... .......... .... •............. . ........... W`f T.F.-134.81 10- TYPE "CL" CB#2 1-1.9(S) INV.IN T.F.-215.75INV. OUT I INV.OUT-214.1 (E) CB•040- TYPE "CL11 LEGEND: T.F.-136.73I- % ................... UT-132.7(N) AN. O°:°:° .... .... I 7"T 7 TASU 5;;:i?:: i::a!!!!}::`:i :°i: j':•::•:::::•.....:::•:})::;:)::°.....................:}:::: f lap CB CATCH BASIN TT TOP OF FRAME INV, IN -VERT CL&P CONNECTICUT LIGHT & PONVER SNET SOUTHERN NEW ENGLAND TELEPI CONC. CONCRETE SCLC BITUMINOUS CONCRETE LIP CURB RET. RETAR41NG 140 EXISTING CONTOLFRS x 137.2 EXISTING SPOT GRADE r WF*5 INLAND WETLANDS FLAG 1 0 104No%jillililijill A k" vt co: No. T EF, HIS MAP IS SUBSTANTIALLY CORRECT AS N h IS OT VALID WITHOUT A LIVE SIGNATURE THE S 0 - SURVEYOR HEREON. RICH DA, DESCHAMPS LS. 470019 DATE REVISIONS 0 10 40 GRAPHIC SCALE IN FEET N "pRi.k GHP,, LLC MAP 31. - LOT 4) ZONE - 1) VOL. VOLUME PG, PAGE N/F NOW OR FORMERLY 60 S.F. SQUARE FEET PROJECT NO. 14-032 DR DRILL HOLE MON MONUMENT DR- ,VN' BY: R.A.D. IPIN IRON PIN DATE: 6/10/14 REC, RECOVERED NR NOT RECOVERED SCALE: 1!1=40' SMI -I SANITARY MANHOLE CB CATCH BASIN SHEET OF 4 IF TOP OFFRAME REVISIONS INV. INVERT av co 1,6, BUILDING SIZE & CL&P CONNECTICUT LIGHT & P01VER DH CO STONE WALL NESNETSOUTHERNNEWENGLANDTELEPHO REC. CONC, CONCRETE BCLC BITUMINOUS CONCRETE LIP CURBING RET, RETAINING 140 EXISTING CONTOURS x 137.2 EXISTING SPOT GRADE r WF#5 INLAND WETLANDS FLAG No. 70019 -Z C,"N S TO zvl TL AS NO 11 AND HE E f SE OF T A. DESCHAMPS Tls. i4170019 S MAP IS SUBSTANTIALLY CORRECT VALID WITHOUT A LIVE SIGNATURE RVEYOR HEREON. DATE I EROSION AND SEDIMENT CONTROL REPORT: SITE PLAN PREPARED FOR ADVANCED ASSOCIATES, LLC 410 MAPLE AVENUE MONTVILLE, CONNECTICUT REFERENCE IS MADE TO 1. Connecticut Guidelines for Soil Erosion and Sediment Control, January 2002. 2. Soil Survey of New London County Connecticut-, U.S.D.A. Soil Conservation Service 1983. Ir 1 There are proposed improvements on different areas of the site. A proposed concrete block retaining wall for material storage is to be installed in the earth products processing area. At the west side ofthe property a proposed concrete, pad is to be installed for the sewage holding tank. Also in the same area there is a proposed 540 s.f. building addition, for office space and a proposed 2,800 s.f. building addition. for storage. Located, to the north side of the property a proposed 4,500 s.f self storage building is to be built with a paved area, located to the front of the building. DE'VELOPMIENT SCHEDULE It is anticipated, that grading and construction activities will begin as soon as approvals are obtained and will be finished as required. SEQUENCE OF CONSTRUCTION: 1. Install erosion and sediment control structures. 2. At this point work can begin on each individual project. Strip and stockpile topsoil aand protect as required. 3. Install the proposed building additions, concrete wall & pad. 4. Grade and paved the paved areas shown. 5, Grade all disturbed areas, loam & seed. 6. Remove all erosion and sediment control. Prior to the commencement of operations in accordance with any permit issued by the Town of Lisbon, the owner (Advanced Associates. Ile) shall install all erosion and sediment control measures. Inspection of the erosion & sediment control should be at least once a week and within 24 hours of the end of a storm with a rainfall amount of 0.5 inch or greater. The owner shall obtain a site inspection from the Town of Montville Enforcement Officer to ensure that all erosion and sediment control measures have been installed in accordance with this narrative. Upon certification with respect to the installation of erosion and sediment control measures, the owner may commence operations pursuant to the permit. Erosion and control devices shall be installed in accordance with the "Filter Barrier Installation & Maintenance" and "Hay Bale Installation Maintenance" sections of this narrative hereinafter contained. Dust control will be accomplished by spraying with water and if necessary, the application of calcium chloride. The proposed planting schedule is to be adhered to during the planting ofdisturbed areas throughout the proposed construction site. Final stabilization of the site is to follow the procedures outlined in permanent vegetative cover. If necessary a temporary vegetative cover is to be provided until a permanent cover can be applied. During the stabilization period, all erosion and sediment control measures shall be maintained in proper working order, The Owner's representative shall be responsible for checking all erosion and sediment control measures on a twice -weekly basis during the stabilization period and after each storm event. During the stabilization period with respect to the site, any erosion which occurs within disturbed areas shall be immediately repaired, reseeded and restabilized. Once stabilization has been completed and ceitification thereof obtained in writing from the Enforcement Officer of the Town ofMontville, erosion and sediment control measures shall be removed by the Contractor. FILTER BARRIER INSTALLATION & MAINTENANCE: 1. Dig a 6" trench on the uphill side ofthe barrier location. 2. Position the posts on the downhill side of the barrier and drive the post 1.5 feet into the ground. 3. Lay the bottom 6" of the fabric in the trench to prevent undermining and backfill. 4. Inspect and repair barrier after heavy rainfall. 5. Sediment deposits are to be removed when they reach a height of one foot behind the barrier and are to be deposited in an area which is not regulated by the Inland Wetlands Commission. 6. Inspections and necessary repairs will be made twice - weekly. HAY BALE INSTALLATION & MAINTENANCE: 1. Bales shall be placed around all proposed catch basins with the ends ofthe bales tightly abutting each other. 2. Each bale shall be securely anchored with at least 2 stakes and gaps between bales shall be wedged with straw to prevent water from passing between the bales. 3. Inspect bales after each storm and repair or replace promptly as needed. Remove sediment behind the bales when it has reached halfthe height of the bale and deposit in an area which is not regulated by the Inland Wetlands Commission. 4. Inspections and necessary repairs will be made twice weekly. TEMPORARY VEGETATIVE COVER: A temporary seeding of Rye Grass will be completed within 15 days of the formation of stockpile(s). Ifthe soil in the stockpiles has been compacted byy construction operations it shall be loosened to a depth of 2 inches before the fertilizer, lime and seed is applied. 10-10-10 fertilizer at a rate of 7.5 pounds per 1.000 s.f. and time stone at a rate of 90 lbs. per 1000 s.f. shall be used. Rye Grass applied at a rate of I lb. per 1000 s.f. shalt provide the temporary vegetative cover. Straw or hay, free from weeds and coarse matter shall be used at a rate of 70-90 lbs. per 1000 s.f, as a temporary mulch. Apply mulch and drive tracked equipment up and down slope over entire surface so cleat marks are parallel to the contours. FINISHED GRADE W T X0 yxu0LARBACKFILLGRANU X/ > D X/ 1 CRUSHED STONE I TOP COURSE 3t-0" MINIMUM 0OZ/1 18!"'AJDE X 6" DEEP VA\ 2" BENDER COURSE, ALONG OUTER EDGE x rA71f P,,?j FINE SAND Zp- 0og ELECTRICAL, TELEPHONE AND AokiCABLETELEVISIONSERVICE 12 12, MIN 4 1011 COT\,,,E?ACTED SUBBASE BITUMINOUS CONCRETE PAVEMENT BURIED CABLE TRENCH NOT TO SCALE CROSS SECTION NOT TO SCALE FINISH GRADE k- OINUKI-1 TE VNII M 6x6 #10/10NNWF NOT - E: 8" ROLLED GRAVEL TANK PAD SIZE TO BE VERIFIED BY BASE (CO1\1PACTED THE CONTRACTOR IN 4" LIFTS) PRIOR TO CONSTRUCTION. AS REQUIRED BY SIZE OF TANK BOTH SIDES CONCRETE PAD FOR SEWAGE HOLDING TANK INTOT TO SCALE PERNLA,NENT VEGETATIVE COVER: Topsoil will be replaced once the excavation has been completed acid the shoulders are graded to a slope no greater than 3 to 1. Topsoil will be spread at a minimum compacted depth of 4 inches. Once the topsoil has been spread, all stones two inches or larger in any dimension will be removed as well as debris. Apply agricultural ground limestone at the rate of two tons per acre. or 100 lbs. per 1000 s.f Apply i _M10- 10-110-10 fertilizer or equivalent at a rate of 300 lbs. per 3 1/1411 acre or ?.1 lbs. per 1000 s.f Work lime and fertilizer into NEW PAVEMENT -\ 12" the soil to a depth of4 inches. Inspect seedbed before seeding. If traffic has compacted the soil, retill compacted areas. Apply the following grass seed mix: lbs./acre lbs.'1000 s.f. f / 1/` r,1 / j f 5 Seed Nfixture V/ 6 Switch -grass 4.0 0,10 i H_Q- Big bluestern 4.0 0.10 Little bluestem 2.0 0.05 PROPOSED BASE Sand lovegrass 1.5 0.03 COURSE & Z, Birds foot treefoil 2.0 0.05 SUBBASE COURSE LT Z The recommended seeding dates are: April 1 - June 15 and August I - September 15 Following seeding, firm seedbed with a roller. Mulch immediately following seeding. If a, permanent vegetative stand cannot be established by September 30, apply a temporary cover on the topsoil such as netting, mat or an organic mulch. REMOVE EXISTING BITUMINOUS PAVEMENT 12" FROM THE EXISITNG 1EDGE. EXISTING BASE MATERIAL TO RENIAIN AND COMPACTED TO OPTIMUM DENSITY EXISTING PAVEMENT WIDTH UNKNOWN 1. SAW CUT PA.VEAENT WITH POWER DRIVEN SAW 12" FROM THE EXISTING EDGE. SAW CUT TO BE PERPENDICULAR TO THE EXISTING SURFACE. 2. REMOVE ENTIRE WIDTH OF PAVEMENT. 3. CLEAN JOINT WITH COMPRESSED AIR HAVING A MINIMUM RATED CAPACITY OF 90 PSI. 4. APPLY TACK COAT TO THE SAW CUT EDGE AND MATCH THIS EDGE NVITH THE PROPOSED EDGE. 4TYPICALCROSSSECTIONFOR MATCHING EXISTING AND PROPOSED PAVEMENT NOT TO SCALE IJIM111illil # S, No. 7CK) 19 2)-2"1x.2"X3' STAKES EACH BALE 0 Cl L DESCHAMPS LS.#70019 NOTE: STAKES TO BE PL,,AkCE AT A 10 FT. INTERVALI FILTER fl FABRIC---- Hl' ANGLE 100 UP SLOPE POST ITFOR, STABILITY AND SELF CLEANING COMPACT BACKFILL SILT FENCE NOT TO SCALE B0LLA,RD__DETA1L NOT TO SCALE,