Loading...
HomeMy WebLinkAboutSite PlanY 41—ox WOOD PO TS AT 1 FABRIC SILT FENCINC B A C KF ILl'- EXCAVATE 1000 NATIVE CL&P IRON ROD 2559 RECOVERED J) o I CONNECTION TO SEWER MANHOLE AND ROADWAY REPAIR TO BE IN ACCORDANCE WITH TOWN OF MONTVILLE WATER POLL' TION CONTROL AUTHORITY AND PUBLIC WORKS DEPARTMENT. IRON PIPE IN CONPRETE 1v R EC' 0V'E'REI - V SM H CB0 41100 LEGEND a--- SILT FENCE TO BE INSTALLED PR C) RQ S ED 0 OSED,\,\ 1 0 a NATIONEX A, OR BUILDING SETBACK LINE WELL%,. kA 250 ISTING CONTOUR ELE OTTR ELEVATION 0PROPOSEDCONTJLE 11 - TBSXx PROPOSED SPOT ELEVATION 0 0F2 c C f. MARKER TO BE SET #3 9-0 hAPLE AVE N UTBS ....... . 58 LOT AREA,: 1\0 45 SQ. F7. 08§ X, IRON PIPE/' to RECOVERS IRON PIPE RECOVERED N, t'K -- A rl ro LA TBS 69 IRON ROD RECOVEREl_IRON PIPE RECOVERED S, P5, 7 S 72* --- 5l'-28" W 18.40, 0 lu) TIA ly- C) 7 PARCEL TO BE CONVEYED TO AND COMBINED WITH { _ ADJOINING PROPERTY OF THOMAS GARBAll AT 390 MAPLE AVE. E 0 1 IRON PI E RECOVERED Ll rI-l. NO./ 832 0 0 40 FTErl" GRAPHIC SCAI'l, MAP REFERENCE: 1. "PROPERTY BOUNDARY SURVEY SHOWING PROPERTY LINE REVISIONS LAND OF 1-01,S G. MORICH & CARL. ALTON GETCHELL AND THOMAS GARBATI, #376 & #390 MAPLE AVENUE, (Jw.,ASVILLE, CT ZONE: R40, SCALE: 1"=20', OCTOBER, 2002, BRIAN E. SITTY, LAND SURVEYOR" 12" BANK RUN GRAVEL T()P SIZE STONE = " 4" BITUMANU=S CONC P AVEMENT sLoFE 4 17 MIN H 0 MIN 12' WIDE FROM ROAD TO FRONT PROPERTYLINE TYPICAL DRIVEWAY CONSTRUCTION E_XCAVATE TOPSOIL AND ORGANIC MATERIAL, GRADE AND COMPACT SUBGRADE, BACKFILL UP TO BASE WITH BANk RUN GRAVEL COMPACT GRAVEL WITH 5 TON VIBRATORY ROLLER TO 9-5% OF DRY DENSITY, APPLY 4!" BITUMINOUS CONCRETE PAVEMENT CROWN FINISH GRADE TO A SLOPE OF 1/2" PER FOOT N OTES 1. THIS SITE PLAN IS VALID ONLY UPON COMPLETION OFT CONVEYANCE OF THE CROSS—HATCHED PARCEL SHOWN (SEE MAP REFERENCE 1). NO WORK SHAL, TAKE PLACE ON THE SUBJECT PARCEL UNTIL SAID CONVEYANCE IS MADE. 2. ALL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE INSTALLED PRIOR TO ANY EARTHWORK ON SITE. 3. THERE ARE NO APPARENT INLAND WETLANDS ON THE SITE. 4. THE PROPOSED HOUSE IS TO BE SERVED BY MUNICIPAL SEWER AND ON SITE WELL. a NOWay 2002 BRIAN E. S M. L.L.S. THESE - DRAWINGS ARE THE PR lOPERT Y OF THE ENGINEER/SURVEYOR AND ARE NOT TO BE ALTERED, MODIFIED, OR DUPLICATED IN ANY WAY WITHOUT T+ -IE EXPRESS WRITTEN CONSENT OF THE ENGINEER,,.' SURVEYOR. PROPERTY BOUNDARY, SITRVEY AND T E 1" _LANN IA, N D 0 14' T110MAS GARDATI ZONE: R4 -O 390MAJILE A TNUE UNCA-SVILLE, CT 0 Tk 0 0 0 40 FTErl" GRAPHIC SCAI'l, MAP REFERENCE: 1. "PROPERTY BOUNDARY SURVEY SHOWING PROPERTY LINE REVISIONS LAND OF 1-01,S G. MORICH & CARL. ALTON GETCHELL AND THOMAS GARBATI, #376 & #390 MAPLE AVENUE, (Jw.,ASVILLE, CT ZONE: R40, SCALE: 1"=20', OCTOBER, 2002, BRIAN E. SITTY, LAND SURVEYOR" 12" BANK RUN GRAVEL T()P SIZE STONE = " 4" BITUMANU=S CONC P AVEMENT sLoFE 4 17 MIN H 0 MIN 12' WIDE FROM ROAD TO FRONT PROPERTYLINE TYPICAL DRIVEWAY CONSTRUCTION E_XCAVATE TOPSOIL AND ORGANIC MATERIAL, GRADE AND COMPACT SUBGRADE, BACKFILL UP TO BASE WITH BANk RUN GRAVEL COMPACT GRAVEL WITH 5 TON VIBRATORY ROLLER TO 9-5% OF DRY DENSITY, APPLY 4!" BITUMINOUS CONCRETE PAVEMENT CROWN FINISH GRADE TO A SLOPE OF 1/2" PER FOOT N OTES 1. THIS SITE PLAN IS VALID ONLY UPON COMPLETION OFT CONVEYANCE OF THE CROSS—HATCHED PARCEL SHOWN (SEE MAP REFERENCE 1). NO WORK SHAL, TAKE PLACE ON THE SUBJECT PARCEL UNTIL SAID CONVEYANCE IS MADE. 2. ALL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE INSTALLED PRIOR TO ANY EARTHWORK ON SITE. 3. THERE ARE NO APPARENT INLAND WETLANDS ON THE SITE. 4. THE PROPOSED HOUSE IS TO BE SERVED BY MUNICIPAL SEWER AND ON SITE WELL. a NOWay 2002 BRIAN E. S M. L.L.S. THESE - DRAWINGS ARE THE PR lOPERT Y OF THE ENGINEER/SURVEYOR AND ARE NOT TO BE ALTERED, MODIFIED, OR DUPLICATED IN ANY WAY WITHOUT T+ -IE EXPRESS WRITTEN CONSENT OF THE ENGINEER,,.' SURVEYOR. PROPERTY BOUNDARY, SITRVEY AND T E 1" _LANN IA, N D 0 14' T110MAS GARDATI ZONE: R4 -O 390MAJILE A TNUE UNCA-SVILLE, CT