Loading...
HomeMy WebLinkAboutPlanEROSION & SEDIMENTATION CONTROL PLAN THIS PLAN HAS BEEN DEVELOPED TO MINIMIZE EROSION AND SEDIMENTATION AND REDUCE THE IMPACT OF STORM WATER RUNOFF DURING CONSTRUCTION USING ENGINEERING PRINCIPALS DETAILED IN THE CONNECTICUT GUIDELINES FOR SOIL AND EROSION AND SEDIMENT CONTROL. THE ACCOMPANYING PLANS PROVIDE THE FOLLOWING INFORMATION FOR THE IMPLEMENTATION OF THIS PLA: LOCATION OF SEDIMENT CONTROL BARRIERS FINISHED GRADES TO BE ACHIEVED CONSTRUCTION SEQUENCE AND DETAILS THIS PROJECT IS FOR THE DEVELOPMENT OF A SINGLE FAMILY HOME. CONSTRUCTION SEQUENCE: 1. STAKEOUT LIMITS OF CONSTRUCTION. 2. INSTALL SEDIMENTATION CONTROL BARRIERS AS SHOWN ON THE PLAN. 3. REMOVE EXISTING VEGETATION AND TOPSOIL WITHIN THE LIMITS OF CONSTRUCTION. STOCKPILE TOPSOIL AS SHOWN ON THE PLAN. 4. ROUGH GRADE THE DRIVEWAY AND HOUSE AREA. 5. INSTALL/CONNECT UTILITIES 6. FOLLOWING CONSTRUCTION, FINISH GRADE ALL DISTURBED AREAS. 7. LOAM AND SEED ALL DISTURBED AREAS. MAINTENANCE INSPECT SEDIMENT BARRIERS AFTER EACH STORM EVENT AND REPAIR OR REPLACE AS NECESSARY. CLEAN OUT OF ACCUMULATED SEDIMENT IS NECESSARY IF 1/2 OF THE ORIGINAL HEIGHT OF THE BARRIER BECOMES FILLED IN WITH SEDIMENT. GENERAL NOTES 1. MAINTAIN ALL SEDIMENT AND EROSION CONTROL FACILITIES UNTIL ALL AREAS HAVE BEEN STABILIZED. 2. EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE CONSIDERED AS TYPICAL. MINIMUM STANDARDS. THE OWNER AT THE TIME OF CONSTRUCTION WILL. BE RESPONSIBLE FOR INSTALATION AND MAINTENANCE OF EROSION AND SEDIMENT CONTROL AND FOR IMPLEMENTING ADDITIONAL MEASURES AS SITE CONDITIONS WARRANT. 3. SLOPES IN HIGH MAINTENANCE AREAS SHALL NOT EXCEED 2:1 (H: V). E'NERAL NOTES I. MAP REFERENCE: ALAN SHOWING PARCEL OF LAND TO BE "TRANSFERRED BY LEOPOLD A. & JENNIE Y. 3ZCZYGIEL MAPLE AVENUE MONTVILLE, CONNECTICUT SCALE 1"=20' JANUARY 10, 1982 2'. INLAND WETLANDS VLRIFIED BY IAN COLE SOIL SCIENTIST. ELEVATIONS SHOWN HEREON ARE BASED ON NATIONAL GEODETIC VERTICAL DATUM. TOPOGARPHY BY FIELD SURVEY BY DIETER & GARDNER, INC. LAND SUREYORS. a TEMPORARY SEEDING USE A TEMPORARY VEGETATION COVER OF ANNUAL RYE GRASS AT A RATE OF 1.0 Ibs. / 1000 S.F. APPLY 10-10-10 FERTILIZER, OR EQUIVALENT, AT A RATE OF 7.5 lbs./1000 S.F- AND LIMESTONE AT A RATE OF 90 lbs./1000 S.F. APPLY STRAW OR HAY MULCH AT A RATE OF 70 lbs./1000 S.F. _ PERMANENT SEEDING SEED BED PREPARATION: FINE GRADE AND RAKE SOIL SURFACE TO REMOVE STONES LARGER THAN 2" IN DIAMETER. APPLY LIMESTONE AT A RATE OF 90 lbs./1000 S.F. FERTILIZE WITH 10-10-10, OR EQUIVALENT, AT A RATE OF 7.5 Ibs./1000 S.F. WORK LIMESTONE AND FERTILIZER INTO SOIL UNIFORMLY TO A DEPTH OF 4" WITH A HARROW OR EQUIVALENT. SEED APPLICATION: APPLY LAWN SEED BY HAND, CYCLONE SEEDER OR HYDROSEEDER. LIGHTLY DRAG OR ROLL THE SEED SURFACE TO COVER SEED. SEEDING SHOULD BE DONE BETWEEN APRIL 15 AND JUNE 15 OR BETWEEN AUGUST 15 AND SEPTEMBER 30.I1F SEEDING CANNOT BE DONE DURING THESE TIMES, REPEAT MULCHING PROCEDURE BELOW UNTIL SEEDING CAN TAKE PLACE. NOTE: IF HYDRQSEEDER IS USED, INCREASE SEED MIXTURE BY 107o. MULCHING, IMMEDIATELY FOLLOWING SEEDING, MULCH THE SEEDED SURFACE WITH STRAW OR HAY AT A RATE OF 70 lbs./1000 S.F. SPREAD MULCH BY HAND OR MULCH BLOWER. PUNCH MULCH INTO SOIL SURFACE WITH TRACK MACHINE OR DISK HARROW. 1T IS ANTICIPATED THAT CONSTRUCTION }HILL COMMENCE IN THE SPRING 2010 x I-•• - - 4'-8 3/4" ' A--.0-i PLAN oaaoaaaoa PRECAST CATCH BASIN TOP TYPE AS REQUIRED - TYPE "CL" SHOWN) NOTES: 1. IN PRECAST RISER SECTIONS, THE KNOCKOUTS OR OPENINGS AROUND THE PIPES SHALL BE 8„ MORTARED TO 6". 2. PRECAST REDUCER SHALL BE SPECIFICALLY SIZED & PLACED FOR THE TYPE OF TOP USED. 3. PLACE ALL PRECAST UNITS, TOPS AND CONCRETE BLOCKS IN A CEMENT MORTAR BED. 4. PRECAST UNITS SHALL BE REINFORCED WITH WELDED WIRE FABRIC. i--PROPERTY LINE MAX SLOPF- 1" LIP 1' TOWN ROAD a o" 2'-8 3/4" ME 'C' CL' ° I'-10° TYPE d PRECAST RISER VARIES CONCRETE ° PRECAST RISER OR 1 REDUCER OR 8" CONCRETE UNITS 1MIN.) CORBEL (2" MAX) CLASSL8" CONCRETE4 IJ- UNITSBITUMINOUS'`.,` d CONCRETE e DRIVE 18 KNOCKOUTS FOR PRECAST PIPES MIN. 4" 4 SUMP FROM TOP & A BOTTOM OF RISER 2'-0" MIN. 24" a 3/4" CRUSHED STONE SECTION B -B PAVEMENT REPAIR NOT TO SCALE RENT GRAVEL SECTION A -A PRECAST CATCH BASIN NOT TO SCALE FOR CONCRETE PIPE 15" AND LARGER IN DIAMETER, BACKFILL IN THIS AREA TO BE BANK RUN GRAVEL PLACED BY HAND AND THROUGHLY COMPACTED IN LAYERS NOT TO EXCEED 6" THICKNESS. FOR HDPE PIPE BACKFILL IN THIS AREA TO BE CRUSHED STONE OR SCREENED GRAVEL. MAX SIZE 3/4" LIMITS OF CRUSHED STONE OF SCREENED GRAVEL FOUNDATIC TO BE SHAPED TO FIT PIPE EXTERIOR TO THIS HEIGHT i ri%. r\ ,,vre i Li i NOTE: 1. USE BITUMINOUS CONCRETE CLASS 3 FOR CURBING. BIT, CONC. LIP CURBING THIS DRAWING IS THE PROPERTY OF THE LAND SURVEYOR. NOT TO SCALE THIS PLAN AND REPRODUCTIONS, ADDITIONS OR REVISIONS OF THIS PLAN ARE NOT VALID WITHOUT THE EMBOSSED SEAL AND SIGNATURE OF THE LAND SURVEYOR WHO PREPARED THIS PLAN. JOB# 09-071SH2 NT CURE EXI`J "NG GROUND 6" GRAVEL PROCESSED) DRIVE PROFILE NOT TO SCALE) TOWN ROAD PAVED APRON DETAIL NOT TO SCALE) BRAINAGE !RIPE DETAIL. NOT TO SCALE 2" ASPHALT KFILL WITH APPROVED MATERIAL ROUGHLY TAMPED TO 907 STD. DCTOR TEST IN LAYERS NOT TO EED 24" IN THICKNESS OVER LEDGE ER UNCONSOLIDATED L DIETER & GARDNER LAND SURVEYORS r PLANNERS 1641 CONNECTICUT ROUTE 12 P. 0. BOX 335 GALES FERRY, CT. 06335 860) 464-7455 FAX (860) 464-5028 EMAIL: [)IETER.GARDNEROSNET.NET PROPERTY LINE LOCATYOI,-T MAP GRAPHIC SCALE 1000 0 506 1000 2000 IN FEET 1 inch = 1000 ft. 1. SET POSTS & EXCAVATE A 6" x 6" TRENCH. SET POSTS DOWNSLOPE. ANGLE. UPSL.OPE FOR STABILITY SELF-CLEANING. 12 min FILTER FABRIC — 2.. STAPLE THE WIRE MESH FENCING TO END POST. COMPACTED BACKFILL -, A 3. ATTACH FILTER FABRIC TO 4. BACKFILL TI•IE TRENCH THE WIRE FENCING & & COMPACT WITH EXTEND IT INTO THE TRENCI- EXCAVATED MOIL. A000 SHEET 1 OF 2