Loading...
HomeMy WebLinkAboutPlanO O ❑ U) M LO (0 0 O Lr) N U) O C) Lr) (.0 0 LO 0 LO O O CL ❑ O FJL ❑ Z UL 136 F— PROJ. No.: 20050653.C10 DATE: AUGUST, 2006 1 V.0.1 PROJ. MANAGER: DAC SEAL eff Aft 16V 47' ft,�N4� -to 0 A� #01i* <1 4W C) - 0. it co J, Z .-A= ft t t;w No. 18868 < ir--VN 't- - EN 0 00 �t 00 -AO 40 1 ;�; Iq u F1 0 'Lu�4�4 TO MY KNOWLEDGE AND BELIEF, THESE MAPS ARE SUBSTANTIALLY CORRECT AS NOTED HEREON. q, 18868 SCALE: .OPREPARED FA'�f s ". FUSS NEILL Disciplines" to Deliver 146 HARTFORD ROAD, MANCHESTER, CONNECTICUT 06040 860.646.2469 www.�--=:"com BOUNDARY SURVEY MAP FOR BRUCE MARTEL , 4 7 MAPLE AVE. ROSELUND STREET CT MONTVILLE, CHIEF DESIGNER: SJB H ORZ.: 1 20' REVIEWED BY: DATE VERT.: DATUM: HORZ.: VERT.: 20 10 0 20 m GRAPHIC SCALE No. DATE DESCRIPTION BY MARK A. NAYLOR LICENSE No. REVISIONS PROJ. No.: 20050653.C10 DATE: AUGUST, 2006 1 V.0.1 m O N N N M O L: O D 2 T Ln O O N cl O U O F- QZ J CL U U) 0 O w J U U) 0 Z Q J ❑ w CL CL O o: U w U) 2 PROJ. No.: 20050653.C10 DATE: AUGUST 2006 CU -101 PROJ. MANAGER: DAC SEAL SEAL SCALE: .R FUSS & ONEILL Discipline to Defer 146 HARTFORD ROAD, MANCHESTER, CONNECTICUT 06040 860.646.2469 www SOUTHEASTERN CONNECTICUT WATER AUTHORITY WATER MAIN EXTENSION INTERCONNECTION OF HILLCREST NVITH TOWN OF MONTVILLE SYSTEM MO?` TVILLE CONNECTICUT CHIEF DESIGNER: SJB HORZ.: 1" = 40' REVIEWED BY: DATE VERT.: DATUM:' HORZ.:ry VERT.: 1. 40 20 0 40 GRAPHIC SCALE No. DATE DESCRIPTION BY REVISIONS PROJ. No.: 20050653.C10 DATE: AUGUST 2006 CU -101 0 N m 0 I.L 00 0 0 0 N C6 0 6 0 N F- c� G EL 3� cu J U 0 Z 6 w f' d° f` GATE VALVE 6" X 4" TEE N TH JOINT RESTRAINED (TYP. OF 2) W- 6" CLASS 53 D.I. WATER MAIN IvIlIr �m .,�.,�,..xv.;.u..�vMaa»s-eav,.v;�mssa;m.�w:s�dmaw..�-v"u++•`.,rscv.n..x.mrm+ � y3y 'Sy •'F v r 4" CLASS 53 D.I. 4" SCH 80 PVC ELECTRICAL CONDUIT 3" SCH 80 PVC TELEPHONE CONDUIT C" . /�_., 15' X 12" PRECAST CONCRETE f,w J= BOOSTER PUMP,' wLL ` STATION 11 1" DRY PACK WITH GROUT AFTER BUILDING IS IN FINAL POSITION —C) F.19 6.5 —� r 1 ��,�_t. . 00 v' :id.' / O O /. � �1� � � • \%//\/ ���/��i/�.`//i��%%��`����\��\`r�/jam/7 ��/�/�/�//\ .. � // z ,• �:�..: �� RIGID 2" .. } ® INSULATION (TYP.) If SUBGRADE PIPE & COUPLERS 4" DIA. 90'BEND WITH JOINT RESTRAINT FOUNDATION PLAN 4" GATE VALVE (TYP. OF 2) ,may 0 S'­ w ,..- ...._..gym ...-—n.,_.—. .v.m.'wa ua..0 .u..-.-;samesmusv.as«:a S _ 3 `i.. „x-) 4.. —'---BIT CONCRETE DRIVEWAY P 44" R)lA/-/) N`52 0 `4 5 "'r' -994 { s WATER EASEMENT �IN FAVOR OF SOUTHEASTERN CONNECTICUT WATER: AUTHORITY AREA: 0.020 AC. (874 FT 2) z o 7' X 4'X 6" CONCRETE PAD CENTERED AT DOOR WAY � (SEE DETAIL SHEET D-102 SILT FENCE I SITE PLAN SCALE: 1"=10' FALSE WINDOWS SIDE ELEVATION SHEET METAL EXHAUST DUCT DEHUMIDIFIER MOTORIZED 48" X 48" AIR EXHAUST DAMPER '— 0" 15 VINYL ASPHALT OPENING F EXHAUST F NOTE: LOCATION OF METER SOCKET AND DISCONNECT BY OTHERS EMERG11NCY LIGHTING OVERHEAD LIGHT PUMP CONTROL EXHAUST PANEL O SILENCER LOAD FIRE CENTER EXTINGUISHER I AIR RELIEF VALVE GENERATOR m DISCHARGE rr1T1...G'- Q(D I Q(D 0 C1-- — J 10 USUCTIONU JU OVERHEAD —LIGHT— I PLAN VIEW EQUIPMENT LAYOUT PLAN 2" X 6" DOUGLAS FIR Ulnnn CDA►AlAlr` 16" .C. WOOD WOOD EXT. PSF SNOW r—IN U VVHLL tLt V H I I UIN POWER FEED FROM CL&P GABLE VENT EEN i' PRECAST t uiv,,r«TE BUILDING WITH VINYL SIDING NOTES: AUTOMATIC 1) BOOSTER PUMP BUILDING IS USE GROUP F-1, BUILDING TYPE 2C, TRANSFER SWITCH NONCOMBUSTIBLE, UNPROTECTED. 6"x 6" WIRE WAY 2) 1 "x3" HORIZONTAL FURRING STRIPS SHALL BE DIRECTLY ATTACHED TO ABOVE EQUIPMENT CONCRETE BUILDING 16" O.C. 3) 1/2" CDX PLYWOOD SHEATHING SHALL BE ATTACHED TO FURRING STRIPS AROUND CONCRETE EXTERIOR OF BUILDING J 4) VINYL SIDING TO MATCH EXISTING BUILDING AT THE SITE. 5) LOCATION OF WINDOWS LIGHTING AS DIRECTED BY PROPERTY OWNER. HEATEREXHAUST FAN WITH _ BAC<DRAFT DAMPER BIRD J SCREEN & FIXED LOUVLRS FOUNDATION NOTES: SEAL 1. THE FOUNDATIONS HAVE BEEN DESIGNED TO REST ON INORGANIC, UNDISTURBED SOIL OR COMPACTED STRUCTURAL FILL PLACED ON pro„ ` g � �� FUSS & ONEILL rt pS Disciplines to Deliver 146 HARTFORD ROAD, MANCHESTER, CONNECTICUT 06040 8so.64s.2469 ww_ �- :: ;;or~ INORGANIC, UNDISTURBED SOIL HAVING A PRESUMPTIVE LOAD BEARING - VALUE OF 3,000 PSF EXPECTED TO BE FOUND AT THE SPECIFIED HORZ.: N.T.S. BOTTOM OF FOOTING ELEVATION. 2—#5 TOP AND 2. THE BOTTOM OF EXTERIOR FOOTINGS NOT ON SOLID ROCK SHALL BE AT BOTTOM (CONT.) LEAST 3'-6" BELOW FINISHED GRADE. FOOTINGS ON LEDGE SHALL REST ON BROOM CLEAN SOLID ROCK. IF SLOPE OF ROCK SURFACE EXCEEDS DATUM: 1 ON 6, FOOTING SHALL BE DOWELED TO LEDGE. FINISHED GRADE ELEV. 196.5 3. THE SLAB—ON—GRADE BASE COURSE SHALL CONSIST OF A 12" MINIMUM THICKNESS OF COMPACTED STRUCTURAL FILL, UNLESS OTHERWISE NOTED. VERT.: 4. BACKFILL FOR ALL BUILDING FOUNDATION WALLS SHALL BE RAISED r�12" CRUSHED STONE SIMULTANEOUSLY ON THE INSIDE AND OUTSIDE OF THE WALL TO BASE MATERIAL PROPOSED GRADES. FILTER FABRIC 5. ALL FILL AND BACKFILL FOR FOOTINGS, SLABS, AND WALLS SHALL REVISIONS BE STRUCTURAL FILL, WITH THE EXCEPTION OF BACKFILL AGAINST CONCRETE EXTERIOR SIDE OF FROST WALLS WHERE SUITABLE FILL MAY BE FOOTING USED. (4,000 PSI CONCRETE) 6. SIZES AND LOCATIONS OF ALL REQUIRED SLAB AND WALL PENETRATIONS FOR ALL TRADES SUCH AS PIPING SLEEVES SHALL BE COORDINATED BY THE CONTRACTOR WITH OTHER TRADES. 7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING, OPERATING AND MAINTAINING ALL EQUIPMENT NECESSARY TO DEWATER SITE EXCAVATIONS. 8. ALL BEARING MATERIAL SHALL BE INSPECTED BY A QUALIFIED TECHNICIAN PRIOR TO CONCRETE PLACEMENT. A QUALIFIED TECHNICIAN SHALL BE THE SOLE JUDGE AS TO THE SUITABILITY OF THE BEARING MATERIAL. FOOTING ELEVATIONS SHALL BE ADJUSTED AS REQUIRED. FALSE WINDOWS SIDE ELEVATION SHEET METAL EXHAUST DUCT DEHUMIDIFIER MOTORIZED 48" X 48" AIR EXHAUST DAMPER '— 0" 15 VINYL ASPHALT OPENING F EXHAUST F NOTE: LOCATION OF METER SOCKET AND DISCONNECT BY OTHERS EMERG11NCY LIGHTING OVERHEAD LIGHT PUMP CONTROL EXHAUST PANEL O SILENCER LOAD FIRE CENTER EXTINGUISHER I AIR RELIEF VALVE GENERATOR m DISCHARGE rr1T1...G'- Q(D I Q(D 0 C1-- — J 10 USUCTIONU JU OVERHEAD —LIGHT— I PLAN VIEW EQUIPMENT LAYOUT PLAN 2" X 6" DOUGLAS FIR Ulnnn CDA►AlAlr` 16" .C. WOOD WOOD EXT. PSF SNOW r—IN U VVHLL tLt V H I I UIN POWER FEED FROM CL&P GABLE VENT EEN i' PRECAST t uiv,,r«TE BUILDING WITH VINYL SIDING NOTES: AUTOMATIC 1) BOOSTER PUMP BUILDING IS USE GROUP F-1, BUILDING TYPE 2C, TRANSFER SWITCH NONCOMBUSTIBLE, UNPROTECTED. 6"x 6" WIRE WAY 2) 1 "x3" HORIZONTAL FURRING STRIPS SHALL BE DIRECTLY ATTACHED TO ABOVE EQUIPMENT CONCRETE BUILDING 16" O.C. 3) 1/2" CDX PLYWOOD SHEATHING SHALL BE ATTACHED TO FURRING STRIPS AROUND CONCRETE EXTERIOR OF BUILDING J 4) VINYL SIDING TO MATCH EXISTING BUILDING AT THE SITE. 5) LOCATION OF WINDOWS LIGHTING AS DIRECTED BY PROPERTY OWNER. HEATEREXHAUST FAN WITH _ BAC<DRAFT DAMPER BIRD J SCREEN & FIXED LOUVLRS PROJ. No.: 20050653.C10 DATE: AUGUST 2006 CU -1 02 PROJ. MANAGER: SEAL SEAL SCALE: pro„ ` g � �� FUSS & ONEILL rt pS Disciplines to Deliver 146 HARTFORD ROAD, MANCHESTER, CONNECTICUT 06040 8so.64s.2469 ww_ �- :: ;;or~ SOUTHEASTERN CONNECTICUT WATER AUTHORITY PUMPING STATION PLAN & DETAILS INTERCONNECTION OF HILLCRE T x.- WITH TOWN OF MONTVILLE SYSTEM'- �1(�)NTVILLE CONNECTICUT - CHIEF DESIGNER: HORZ.: N.T.S. REVIEWED BY: DATE VERT.: DATUM: HORZ.: VERT.: �. 20 10 0 20 GRAPHIC SCALE No. DATE DESCRIPTION BY REVISIONS PROJ. No.: 20050653.C10 DATE: AUGUST 2006 CU -1 02