Loading...
HomeMy WebLinkAboutSite Plan—396 SSONE WALL QUALITY CONTROL CERTIFICATION GROUP I REVIEWED DATE PROJECT MANAGER 10"-20" SUBSOIL SURVEY `,y �w7,'i.• ENVIRONMENTAL NO LEDGE, WATER 0 44", MOTTLING @ 20" CIVIL �7's STRUCTURAL � ARC H IT ECTU R'AL 0 0 FILE J PROVIDE AND MAINTAIN SILT FENCE THROUGHOUT CONSTRUCTION (SEE DETAIL) BL&P \� 2284 \� --- CHERRY LANE LOT 5 STONY BROOK ACRES TOPSOIL SUITABLE FILL. FILTER FABRIC - 4" PERFORATED PIPE 1" STONE r�r • j►i•%ii� r�• m ••�'w TRENCH iO NOT TO SCALE 4" c u CAST CONCRETE COVERS PLAN CAPACITIES A B C 1250 GAL 61" 51" 48" 1500 GAL 69" 59" 56" PROVIDE RISERS TO WITHIN 4 x 4 12.6/12.6 6 x 6 6/6 GA. A7"INOF FINISHED AND OUTLETRADE GA. WIRE MESH WIRE MESH 24" PROVIDE OUTLET FILTER POLYLOK PL -122 INLET 3 VENT--IT OUTLET ' LIQUID LEVEL � CONTINUOUS HOT p 4 OUTLEASPHALT SEAL..BAFFL4" SCHED. #40 INLT BAFFLES 60' GDEFLECT CROSS SECTION 1250/1500 GALLON 2 COMPARTMENT SEPTIC TANK NOT TO SCALE � CATCH Q� /BASIN ---396\ FILTER FABRIC POST 1 � COMPACTED BACKFILL ANGLE 10' UP SLOPE FOR STABILITY AND SELF CLEANING goo 1v -V KNOCKOUT INLET AND OUTLET OPENINGS \\% AfL0 10"-20" SUBSOIL SQUARE FEET 20"-80" SANDY TILL i 04 NO LEDGE, WATER 0 44", MOTTLING @ 20" W � � o 0 0 27"-80" SANDY TILL C1 NO LEDGE, NO WATER, MOTTLING 0 27" � TH# z co 00 10"-28" SUBSOIL Cdr V) m NO LEDGE, NO WATER, MOTTLING @ 28" TESTHOLE #107 U CAST CONCRETE COVERS PLAN CAPACITIES A B C 1250 GAL 61" 51" 48" 1500 GAL 69" 59" 56" PROVIDE RISERS TO WITHIN 4 x 4 12.6/12.6 6 x 6 6/6 GA. A7"INOF FINISHED AND OUTLETRADE GA. WIRE MESH WIRE MESH 24" PROVIDE OUTLET FILTER POLYLOK PL -122 INLET 3 VENT--IT OUTLET ' LIQUID LEVEL � CONTINUOUS HOT p 4 OUTLEASPHALT SEAL..BAFFL4" SCHED. #40 INLT BAFFLES 60' GDEFLECT CROSS SECTION 1250/1500 GALLON 2 COMPARTMENT SEPTIC TANK NOT TO SCALE � CATCH Q� /BASIN ---396\ FILTER FABRIC POST 1 � COMPACTED BACKFILL ANGLE 10' UP SLOPE FOR STABILITY AND SELF CLEANING goo SILT FENCE NOT TO SCALE 2x2 5/8 16 GA. 4" PVC ELBOW WIRE MESH 1-1/2 in F 1-1/4" i <D k t M O 2" 2"�-- 'ENT 2 STANDARD D—BOX WITH ELBOW NOT TO SCALE EROSION AND SEDIME14T _ CONTROL PLAN 1.) CLEARING, GRUBBING, AND GRADING OF THE PROPOSED LOT TO BE LIMITED TO AREAS ADJACENT TO THE PROPOSED HOUSE, DRIVEWAY, AND SEPTIC SYSTEM. 2.) DISTURBED AREAS TO BE LOAMED, SEEDED, AND MULCHED. 3.) ALL TOPSOIL TO BE STOCKPILED ON SITE AND PROTECTED WITH HAYBALES OR SILT FENCE. 4.) ALL CUT AND FILL SLOPES ARE NOT TO EXCEED 3:1 SLOPES. 5.) PRIOR TO SITE DISTURBANCE, THE REPRESENTATIVE OF THE TOWN OF MONTVILLE SHALL BE NOTIFIED W--IEN SEDIMENT CONTROL MEASURES ARE IN PLACE SO THAT THE INSPECTION CAN OCCUR. 6.) THE CONTRACTOR WILL BE RESPONSIBLE FOR THE INSTALLATION AND MAINTENANCE OF ALL REQUIRED SEE,'IMENT CONTROL MEASURES THROUGHOUT CONSTRUCTION, 7.) DUST CONTROL WILL BE ACCOMPLISHED BY SPRAYING WITH WATER, AND IF NECESSARY THE APPLICATION OF CALCIUM CHLORIDE. TEMPORARY VEGETATIVE �,,OVE PLANTING SCHEDULE MULCHES APPLICATIOf4 RATE NOTES SEEDING DATES: PER 100? S.F. APRIL 1 - JUNE 15 AUGUST 1 - SEPTEMBER 15 STRAW/HAY 70-90 lbs. FREE FROM WEEDS AND COARSE MATTER SEED MIXTURE: WOOD CHIPS 185-275 lbs. FREE OF COARSE MATTER 45% RED FESCUE AIR DRIED, TREAT WITH 45% KENTUCKY BLUE GRASS 12lbs NITROGEN / TON 10% PERENNIAL RYE TESTHOLE DATA PER MAP REFERENCE TESTHOLE #5 Z y \\% CL iv a SILT FENCE NOT TO SCALE 2x2 5/8 16 GA. 4" PVC ELBOW WIRE MESH 1-1/2 in F 1-1/4" i <D k t M O 2" 2"�-- 'ENT 2 STANDARD D—BOX WITH ELBOW NOT TO SCALE EROSION AND SEDIME14T _ CONTROL PLAN 1.) CLEARING, GRUBBING, AND GRADING OF THE PROPOSED LOT TO BE LIMITED TO AREAS ADJACENT TO THE PROPOSED HOUSE, DRIVEWAY, AND SEPTIC SYSTEM. 2.) DISTURBED AREAS TO BE LOAMED, SEEDED, AND MULCHED. 3.) ALL TOPSOIL TO BE STOCKPILED ON SITE AND PROTECTED WITH HAYBALES OR SILT FENCE. 4.) ALL CUT AND FILL SLOPES ARE NOT TO EXCEED 3:1 SLOPES. 5.) PRIOR TO SITE DISTURBANCE, THE REPRESENTATIVE OF THE TOWN OF MONTVILLE SHALL BE NOTIFIED W--IEN SEDIMENT CONTROL MEASURES ARE IN PLACE SO THAT THE INSPECTION CAN OCCUR. 6.) THE CONTRACTOR WILL BE RESPONSIBLE FOR THE INSTALLATION AND MAINTENANCE OF ALL REQUIRED SEE,'IMENT CONTROL MEASURES THROUGHOUT CONSTRUCTION, 7.) DUST CONTROL WILL BE ACCOMPLISHED BY SPRAYING WITH WATER, AND IF NECESSARY THE APPLICATION OF CALCIUM CHLORIDE. TEMPORARY VEGETATIVE �,,OVE PLANTING SCHEDULE MULCHES APPLICATIOf4 RATE NOTES SEEDING DATES: PER 100? S.F. APRIL 1 - JUNE 15 AUGUST 1 - SEPTEMBER 15 STRAW/HAY 70-90 lbs. FREE FROM WEEDS AND COARSE MATTER SEED MIXTURE: WOOD CHIPS 185-275 lbs. FREE OF COARSE MATTER 45% RED FESCUE AIR DRIED, TREAT WITH 45% KENTUCKY BLUE GRASS 12lbs NITROGEN / TON 10% PERENNIAL RYE TESTHOLE DATA PER MAP REFERENCE TESTHOLE #5 FIRST FLOOR 0"-10" TOPSOIL ELEVATION 10"-20" SUBSOIL SQUARE FEET 20"-80" SANDY TILL EXISTING CONTOURS NO LEDGE, WATER 0 44", MOTTLING @ 20" TESTHOLE #105 0"-9" TOPSOIL V 9"-27" SUBSOIL 0 0 27"-80" SANDY TILL C1 NO LEDGE, NO WATER, MOTTLING 0 27" TESTHOLE #106 TH# 0"-10" TOPSOIL co 00 10"-28" SUBSOIL Cdr 28"-82" SANDY TILL NO LEDGE, NO WATER, MOTTLING @ 28" TESTHOLE #107 U 0"-9" TOPSOIL W 9"-32" SUBSOIL _CL W � O 32"-80" SANDY TILL Q. NO LEDGE, NO WATER, MOTTLING @ 32" TESTHOLE #108 0"-14" TOPSOIL 0 O 14"-30" SUBSOIL Q 0:� 30"-82" SANDY TILL p NO LEDGE, NO WATER, MOTTLING @ 30" PERCOLATION RATE PER MAP REFERENCE PERC 11 MINUTES / INCH MAP REFERENCE SUBDIVISION PLAN, STOTMIY BROOK ACRES, PREPARED FOR WILLIAM M. HRACYK & ANNE M. DANIEWICZ, SALEM TURNPIKE (RTE #82), CHERRY LANE & NOBLE HILL ROAD, MONTVILLE, CONNECTICUT, BY CHANDLER, PALMER & KING, NORWICH, CT, DATED APRIL 24, 1997 WITH REVISIONS TO 8/11/98. DESIGN DATA PERCOLATION RATE = 11 MINUTES/INCH 4 BEDROOM RESIDENCE REQUIRES 900 SF OF LEACHING AREA PROVIDE (3) 102' (48" WIDE) TRENCHES EFFECTIVE LEACHING AREA = 918 SF PROVIDE A 1250 GALLON} 2 -COMPARTMENT TANK M.L.S.S. REQUIRED = 3 x 2.0 x 1.5 = 102' M.L.S.S. PROVIDED = 102' j 1.) REMOVE AND STOCKPILE TOPSOIL. 2.) PLACE BANK RUN GRAVEL (LESS THAN 57. FINES) PLACED IN 6" LIFTS AND COMPACTED TO 957. DENSITY. 3.) EXCAVATE 4' WIDE 1RENCHES AND PREPARE SURFACE. 4.) FILL TRENCHES WITI; 1" WASHED STONE TO HEIGHT OF PIPE INVERTS PLACE PIPE IN TRENCH, AND FILL TO OVER TOP OF PIPE. 5.) CAP ENDS OF PIPES. 6.) PLACE A 4' WIDE &'RIP OF NON -WOVEN FILTER FABRIC ON TOP OF THE ENTIRE LENGTH OF THE SYSTEN), AND BACKFILL WITH NATIVE MATERIAL. 7.) REPLACE TOPSOIL, `TEED & MULCH. NOTES 1.) TOPOGRAPHIC INFORMATION ON THIS PLAN COMPLIES WITH T-2 MAPPING STANDARDS. 2.) BASE FOR LEVELS: `SUBDIVISION MAP. 3.) PROPOSED HOUSE AND SEPTIC SYSTEM TO BE STAKED IN THE FIELD BY A LAND SURVEYOR LICENSED IN THE STATE OF CONNECTICUT. 4.) LOT AREA = 1.87f ACRES 5.) BENCHMARK TO BE SET IN AREA OF SEPTIC SYSTEM AT TIME OF CONSTRUCTION. IFS FF FIRST FLOOR ELEV ELEVATION SF SQUARE FEET — —390— — EXISTING CONTOURS 390 PROPOSED CONTOURS STONE WALL V BUILDING SETBACK LINE 0 0 PROPOSED SILT FENCE C1 PROPOSED LIMITS OF CLEARING 390.0 INVERT ELEVATION TH# TEST HOLE 20 10 0 20 GRAPHIC SCALE IN FEET Q >- n, r 00 CCN t � Q, � v) m V w > Q N o? cz a. C1 �►- aoCD 0 H WLL co 00 d- Cdr X cu ° u- r z0 m <C U � W _CL W � O " Q. Q Y Lli V) 0 O w Q 0:� O p O W coo V� con Z M o U co o o N m �j o ( 4 F� a~ Ldm -o w C U ^ 0 a o � r „S W 0 0 bA V) a w �. m ct o u Q >- cn Q, � v) m w > Q U cz a. C1 �►- 0 .�... WLL d- Lu z �z N r z0 m <C U c) W _CL W � O " Q. Q Y Lli V) 0 O w Q 0:� O p J Z 0 m 0 C-) u U co Q >- cn Q, � m cr, C1 �►- d- ill N c� O O Z Q Y Lli O cr 0 O w Q 0:� w = p J Z c- m 0 C-) u U co o o cr o z a~ Ldm 0 a W 0 0 V) a �. m ct Lv -. (D ot� a Q o Q N N Q O .- Q U Q, � � cr, C1 �►- d- ill N c� O O Z Q Y Lli O cr 0 O w Q 0:� w = p J c- m 0 C-) u U IL DATE: 01/21/2004 SCALE: 1 " = 20' SHEET 1 OF 1