Loading...
HomeMy WebLinkAboutPlana 4J, w 6.0 c, L 0 L -EDDATA RUBBING', AND :ADI T OpCLEARIt, G, N j, OF +4E--lf`R,,-l, 05E0T, -,LOT PER 1-IE PLAN TO BE LIMITED TC) AREAS ADJACENT 1T0 THE PIROPOSE-otjsfl DRIVEWAY':SEPTIC SYSTEM. lESTSJL 7 2. DISTURBE"D 4,PEAS SEEED,, 14ND Mid. &DOA, Ci" -8*' DARK BROWN TOPSOIL3. ALL TOPSOIL TFC BE STOCKPILED ON SITE AND P'RoTECTEp 8" WITH HAYBALE` -28" ORANGE BROWN FINE SANDY LOAM W/ SOME GRAVEL0RSILTFENCE. 28"--82" TAN GRAY FINE SANDY LOAM ELWITHSOMESILT & GRAVE4. ALL CUT AND FILL SLOPES ARE NOT TO EXCEED 3,1 SU PES. 5 PRIOR TO SITE DISTURBANCE, THE REPRESENTATIVE OF THE NO LEDGE, WATER 072", MOTTLING 0 29" TOWN OF MONTVILLE SHALL BE NOTIFIED WHEN SEDIMENT CONTROL MEASURES ARE IN PLACE SO THAT THE INSPECITION 1"11 -OLE- jj7 CAN OCCUR. I 0",- 10" TOPSOIL 6. THE DEVELOPER WILL BE RESPONSIBLE FOR THE INSTALLATION 10"-30" LIGHT BROWN FINE SANDY LOAM AND MAINTENANCE OF ALL REQUIRED SEDIMENT CONTROL 30"-74" GREY -BROWN MEDIUM -FINE SILTY SAND, TRACE OF GRAVEL MEASURES THROUGHOUT CONSTRUCTION. Na LEDGE, WATER 0 40", MOTTLING 0 24" 7. DUST CONTROL WILL BE ACCOMPLISHED BY SPRAYING WITH WATER, AND IF NECESSARY THE APPLICATION OF CALCIUhCHLORIDE TEST HOSE #198 0"-1 " TOPSOIL 10"-30" LIGHT BROWN FINE SANDY LOAM TEMPQEARY YEC. 30"-78" GREY -BROWN MEDIUM -FINE SILTY SAND, TRACE OF GRAVELZQQYE NO LEDGE, WATER 0 44", MOTTLING 0 24" APPLICATION RATE MULCHES PER 1000 S.F. NOTES TEST HQLL # 199 0"-12" TOPSOIL STRAW/HAY 70-90 lbs. FREE FROM WEEDS 12"-30" LIGHT BROWN FINE SANDY LOAM AND COARSE MATTER 30*' -72" GREY -GROWN MEDIUM -FINE SILTY SAND, TRACE OF' GRAVEL WOOD CHIPS 185-275 lbs. FREE OF COARSE MTTER NO LEDGE, WATER 0 32", MOTTLING 0 26>" AIR DRIED, TREAT WITH PER UNCAS HEALTH DISTRICT 03/28/200012lbsNITROGENION TEST HOLE JA TEST HOLE *Q 0"-10" TOPSOIL - 0"9 TOPSOIL SEEDING DATA 10"-35" SUBSOIL 9"-26" SUBSOIL APRIL 1 - - - - - - - JUNE 15 35" l-77" WATER 26"--75" WATER AUGUST 1 - - - - - - SEPTEMBER 15 SEED MIXTURE: TEST HOLE #6 TEST HOLE #Q 45% RED FESCUE 0"- 11 " TOPSOIL 0"-9" TOPSOIL low 45% KENTUCKY BLUE GRASS 11"-34" SUBSOIL 9"-32" SUBSOIL 10% PERENNIAL RYE 34"-76" WATER 32"-74" WATER NF PERCOLADQU BEE 9* INFORMATION PROVIDED PER REFERENCE PLAN FILTER PERCOLATION RATE: PERC #16A = 13,3 MIN /INCH PERCOLATION RATE: PERC #26B- = 10.0 MIN/INCHFABRIC PERCOLATION RATE. PERC # I (UNCAS HEALTH DISTRICT) 13.3 MIN/INCHANGLE10' UP OPE R=60.00 POST FOR STABILITY D L =59*4723"• SELF CLEANING 50* L=62.61' JMAP RLEERENG COMPACTED LOCHDALE ESTATES, PROPERTY OF BERNARD BARNETT HAROLD D. BATToj C_114 BACKFILL TH ROAD AND JEFFERY MANOR DRIVE, MONTVILLE, CONNECTICUT1250FORSY THSSEPTIC JANUARY-, 1992, TOTAL TECHNOLOGY, INC. 198 THSNZ7197SILTFENCE Y NOT TO SCALE1 4 PERC.,DESIGN DATA R 630. 0026A IESJDENCEj PERCOLATION RATE 10, 1-20 MINJINCHFFFil_F'V' 516.0 41*2435" AREAPEC4BEDROOMRESIDENCEREQUIRES900SFOFLEACHINGR 26B PROVIDE 40 - 16" HIGH CAPACITY INFILTRATOR SECTIONS E CTIVE LEACHING AREA 250 LF x 3,8 SF/ LF 950 -'-FFFEC 9.5 V PROVIDE 1250GAC 2 -COMPARTMENT TANKEXISTINGii Tf M.L.S.S. REQUIRED 34 x 2.0 x 1. 5 102' CATCH BASIN7 0 TT- M.L..S,S, PROVIDED 123' v6M__ 01.1 0_ _:CKOUT INLET ANCOpp~ INV 5"! TH# OPENINGS7, OUTLET rtfvviut OZ. 14 rvkl SOLID P.IPE, NO STONE 1AARK0 4 iN TREE LLA_v508.76 10 77 DRAY S08'14'07" I)VEW 33.92 39 0 S81"45'53"W PROVIDE IN' N, 1lNrE_RT IN PROMPF-, 140" e Pvc M.AND WELAIN AiALOT 2 5 SCHEDU,! GASK DIVISION PLAN OINTS . V 4.0 PRoviu INA', i" SEAL AT INLIE.-T & (L), FIRST FLOOR ELEV ELEVATION S.F, SQUARE FEET FILTER FAB! BANKRI GRAVEL EXIS)TING CONTOURS 3" 3"_1 ED CONTOURSPROPOSS, 2'- 1 BUILDING SETBACK LINTE r _Y TEST HOLE co PREPARE AREA OF PEJOPOSEL) . 5YSTEM AS ELLOW5 1. REMOVE AND STOCKPILE TOPSOIL, 2. -PLACE BANK RUN GRAVEL (LESS THAN 5% FINES) PLACED IN 6" LIFTS AND COMPACTED TO 95% DENSITY'. 3. EXCAVATE 4' WIDE TRENCHES AND PREPARE SURFACE, 4, FILL TRENC-'HES WITH I" WASHED STONE TO HEIGHT OF PIPE INVERTS PIA F PIPE I KI TRENCH A FILL TCS e)" n\A7D T,`D OF PIKE CAST CAP ENDS OF PIPES. I 11 Z PLACE A 4' WIDE STRIP OF NON -WOVEN FILTER FABRIC ON TOP OF THE ENTIRE LENGTH OF THE SYSTEM AND BACKFILL. WITH NATIVE MATERIAL, V. A% REPLACE TOPSOIL, SEED & MULCH. cc L 1 PREPARE AREA OF PEJOPOSEL) . 5YSTEM AS ELLOW5 1. REMOVE AND STOCKPILE TOPSOIL, 2. -PLACE BANK RUN GRAVEL (LESS THAN 5% FINES) PLACED IN 6" LIFTS AND COMPACTED TO 95% DENSITY'. 3. EXCAVATE 4' WIDE TRENCHES AND PREPARE SURFACE, 4, FILL TRENC-'HES WITH I" WASHED STONE TO HEIGHT OF PIPE INVERTS PIA F PIPE I KI TRENCH A FILL TCS e)" n\A7D T,`D OF PIKE CAST 5, CAP ENDS OF PIPES. CONCRETE COVERS PLACE A 4' WIDE STRIP OF NON -WOVEN FILTER FABRIC ON TOP OF THE ENTIRE LENGTH OF THE SYSTEM AND BACKFILL. WITH NATIVE MATERIAL, V. A% REPLACE TOPSOIL, SEED & MULCH. CAPACITIES A 6;4 C 1250 GAL 61 51 " < 48 1500 GAL 69' 56" NQJE I TOPOGRAPHIC INFORMATION ON THIS PLAN COMPLIES WITH T-2 MAPPING 4 x 4 12.6/12.11, GA, E MESH STANDARDS. 17 1/2* 6 x 6 6 W11- MESH BASE FOR LEVELS: SUBDIVISION MAP, INL T 3. PROPOSED HOUSE AND SEPTIC SYSTEM TO BE STAKED IN THE FIELD BYOUTLETA, LAND SURVEYOR LICENSED IN THE STATE OF CONNECTICUT, LIQUID LEVEL 4'* OUTLET-, 4, LOT AREA = 1.21 ± ACRES CONTINUOUS HOT p 1BAFFLEI co I ASPHALT SEAL 5. AFTER THE FILL IS PLACED AND COMPACTED, IT MUST BE PERC TESTED 4" SCHED. 4 MAC U PRIOR TO INSTALLATION OF THE SYSTEM, I CT GAS CTOP 6. PROVIDE ADDITIONAL TEST HOLES PRIOR TO THE START OF CONSTRUCTION,DPU- REVISIONS DATDAT E DES( -l- TION C03/29 /200 ADDITIONAL TESTING INCAS HEALTH COMMENTS SEPTIC SYSTEM PLAN PREPARED FOR DEVELOPMENT. IfJC. RTT LOT #24 LOCHDALE ESTATES LOCHDALE DRIVE MONTVILLE, CONNECTICUT CHANOLER. PALME.-R. Az 11 wa P'r rchitecture, Engineering and Surveying 110 010ADWAY NORWICH, CT 0"M 8W -AN -3397 FAX 8W-386 --- 7WI