Loading...
HomeMy WebLinkAboutPlanTREAT SUITABLE FILL EROSION AND SEDIMENT CONTROL PLAN TEST HOLEA 1 CLEAR|NC, GRUBB|NG, AND GRADING OF THE PROPOSED. LDT '` PER REFERENCE P|'1/ TEST HOLE #30 DR|VEWAY, AND SEPTIC SYSTEM, TREAT 1()oSUITABLEFILL EROSION AND SEDIMENT CONTROL PLAN TEST HOLEA 1 CLEAR|NC, GRUBB|NG, AND GRADING OF THE PROPOSED. LDT '` PER REFERENCE P|'1/ TO BE LIMITED TD AREAS ADJACENT TO THE PROPOSED HDUS[, TEST HOLE #30 O^-12" TOPSOIL, 12"-25" DARK YELLOWISH- BROWN FINEDR|VEWAY, AND SEPTIC SYSTEM, SANDY LOAM, 25°-96^ OLIVE -GREY MEDIUM -COARSE LOAMY2. DISTURBED AREAS TO BE LOAMEO, SEEDED, AND MULCHED. S:AND. COMPACT, NO LEDGE WATER 25^ MOTTLING @24^ 3. ALL TOPSOIL TO BE STOCKPILED ON SITE AND PROTECTED WITH HAYBALES D SILT FENCE. TEST HOLE 77 O-5^ RK BROWN TOPSOIL., 5"--35" ORANGE BROWN SANDY 4. ALL CUT AND RLL SLOPES ARE NOT TO EXCEED 3:1 SLOPES, LOAM WITH GRAVEL COBBLES' 35"-82^ TAN MODERATELY 5' PRIOR TO SITE D|STURBANCE, THE REPRESENTATIVE OF THE COMPACTFINE SAND WITH SOME GRAVEL &_ LARGE RDCKS, TOWN OF WDNTV|LLE SHALL BE NOTIFIED WHEN SEDIMENT IRON OXIDE STAINING @ 34". MOTTLING @ 39^^ NO LEDGE CONTROL MEASURES ARE IN PLACE SD THAT THE INSPECTION UO WATER CAN OCCUR, 6. THE DEVELOPER WILL BE RESPONSIBLE FOR T'E INSTALLATION TEST HOLE #79: 0-5" DARK BROWN TOPSOIL, 5''-35^ ORANGE BROWN FINE AND MAINTENANCE OF ALL REQUIRED SEDIMENT CONTROL SANDY LOAM WITH SOME GRAVEL, 35^-87^ TAN MODERATELY MEASURES THROUGHOUT CONSTRUCTION, COk4pACT FINE SANDY LOAM WITH SOME SILT 8c GRAVEL & 7. DUST CONTROL WILL BE ACCOMPLISHED BY SPRAYING WITH COBBLES, MOTTLING @ 31", NO LEDGE` NO WATER WATER. AND IF NECESSARY THE APPLICATION OF CALCIUM CHLORIDE, TFST }|OLF #208 l2" TOPSOIL, 12"-728" LIGHT BROWN F|N[ SANDY |(-)4M GREY -BROWN MEDIUM FINE SAND, SOME GRAVEL ND LEDGE, WATER 0 31", MOTTLING @ 24^ TEMPORARY VEGETATIVE COVER TEST HOLE #209, 0-12^ TOPSOIL, 12"-30" LIGHT BROWN FINE SANDY LOAM APPLICATION RATE 0"-72" GREY -BROWN MEDIUM FINE SAND, SOME GRAV[L MULCHES PER lODO S.F. NOTES NOLEDGE, WATER (9J4^. MOTTLING (9 29" 7O QO |b. FREE FROM WEEDS TEST HOLE #21& O 10" TOPSOIL, 10"-30^ LIGHT BROWN FINE S4NDY LOAM5TRA/HAY 0^-70^ GREY -BROWN MEDIUM FINE SANO, SOME GRAVELANDCOARSEMATTERUOLEDGE, WATER @ JO", MOTTLING @ 24" WOOD CHIPS 185-275 |bo' FREE OF COARSE MATTER IDu/ IJuu vv 4^ PVC ELBOW 2X2 5/O 16 GA, WIRE MESH 1 1/2 "_7 CD P0 00 NOTTO SCALE 1%, FILTER FABRIC - 4^ PERFORATED P|PE--------- l^ STONE - K U U. |K A| YY||M 12|bs NITROGEN / TON PLANTING SCHEDULE SEEDING DATES: APRIL l ------- JUNE 15 AUGUST 1 ------ SEPTEMBER 15 SEED M|XTURE: 45% RED FESCUE 45% KENTUCKY BLUE GRASS 10% PERENNIAL RYE FILTER FABRIC AHGLE 10' UP SLOPE vS. FOR STABILITY AND SELF CLEANING CONPACTED BACKFILL SILT FENCE NOT TO SCALE KNOCKOUT INLET ATID OUTLET OPENINGS RIBS INSIDE CASl oowonErs CovERS-' PLAH 4 126/i w|nE wES- i4" SCHEDULE #4 1' INLET LIQUID LEVEL---' U-) CONTINUOUS HOT If CIO ASPHALT SEAL — LET H2T LE #40 INLET BAFFLE of 3. CROSS, SECTION 1000, GALLON SEPTIC, TANK NOTTO SCALE TOPSOIL 1()oSUITABLEFILL CROSS 5ECTION` NOT TO SCALE PERCOLATION RATE INFORMATION PRC,v0ED PER REFERENCE PLAN PERCOLATION R4J|. PERC #27A = lO.O MIN/INCH PERCOLATION RAT[ PERC #30 = 267 MIN/INC MAP REFERENCI_ LDCHOALE ESTATE'.' PROPERTY OF BERNARD BARNETT 8c HAROLD D. BATT F0RSYTH ROAD Al|b JEFFERY MANOR DR|VE, MDNTV|LLE' CONNECTICUT JANUARY 1992' T''TAL TECHNOLOGY, INC, DESIGN DATA PERCOLATION RAT! = l0.1-20 MIN,/INCH 3 BEDROOM RES'U'LNCE REQUIRES 660 SF OF LEACHING AREA PROVIDE 2 - 11'/' TRENCHES EFFECTIVE LEACHU| AREA - 220 x 3 = 660 SF USE A 1000 GAL, /`2 -COMPARTMENT TANK., M.LS.S. REQUIRE[) = 34 x 1.5 x 1.5 = 76.5' MLS.S. PROVIDE) = 110' PREPARE AREA OF PROPOSED SYSTEM AS FO . LLOWS 1 REMOVE AND .K]CKP|LE TOPSOIL` 2. PLACE BANK |'UN G5S THAN 5% F|NES\ PLACED IN6' LIFTS AND COk4P4CTED TO 95% DENSITY. 3. EXCAVATE 4 .'11DE TRENCHES AND PREPARE SURFACE. 4. FILL TRENCHF'' WITH 1^ WASHED STONE TDE|GHT OF PIPE INVERTS PPLACEPIPE |/| TRENCH. AND FILL TO 2" OV[R TOOF PIPE, 5CAP ENDS O/ PIPES. 6`.PLACE A 4' Y|IUE STRIP OF NON -WOVEN FILTER FABRIC ON TOP OFTHEENTIRELENOTHOFTHESYSTEk4\, AWD BACKFILL WITH NATIVE K4ATER|4L ` 7. REPLACE TOP Y|L. SEE. & k4ULCH. DATE DESCRIPTIO11\1 DATE- Cl/ 1112000 SHEET I CF 1 NOTES . TOPOGRAPHIC U/FDRMAJ|ON ON THIS PLAN COMPLIES YV|TH T-2 MAPPING STANDARDS, 2. BASE FOR LEVi|'S: SUBDIVISION MAP. 3 PROPOSED HDI,. --,E AND SEPTIC SYSTEM TO BE STAKED IN THE FIELD BY A LAND SURVL'OR LICENSED IN THE STATE OFCONNECT|CUT, 4. LOT AREA = l 12± ACRES 5. AFTER THE FlL| IS PLACED AND COMPACTED, IT MUST BE PERC TESTEDPRIORTD |N37 LLAT|ON OF THE SYSTEM. GEKj[) FF FIRST FLOOR ELEV ELEVATION S. F. SQUARE FEET 514EXISTING CONTOURS PROPOSED CONTOURS B BUILDING SETBACK LINE TEST HOLE 11J0 INVERT ELEVATION SEPTIC SYSTEM PLAN PREPARED FOR DEVELOPMENT, INC9 LOT #25 |OCAOA|E ESTATES klCADA| E [}RK/E CONNECTICUT M AW CHANDLER, PALMER cSu KINGitamokNAw Architecture, Engineering and Surveying m/ /`o BROADWAYwon*CH, cr omaW 8no-889-3397 FAX moo-mon-renv