Loading...
HomeMy WebLinkAboutPlan4P. LOT 30 m LOT 28 L06-11DALL' DPIVt,' F R0 P30S ED GATIONWEi_i EXISTING 15" RCP CATCH BASIN 510 MONUMENT FOUND) S16 2X2 5/8 16 GA. WIRE MESH 1 1/2" T T_ 2" L3QXNDMI) Q — NOT TO SCAtJ TOPSOIL SUITABLE FILL FILTER FABRIC 4" PERFORATED PIPE chiC3 1" STONE4:k& 4 TR bjQH CROSS SEC'ETN, NOT TO SCAL,l FILTER FABRIC POST Moak. COMPACTE XBACKFILL I 4„ Icc) 2 " ANGLE 10* UP SLOPE FOR STABILITY AND 9-F1. o SILT FENCE NOT TO SCALE L N_Q 1.) CLEARING, GRUBBING, AND GRADING OF THE PROPOSED LOT TO BE LIMITED TO AREAS ADJACENT TO THE PROPOSED HOUSE, DRIVEWAY, AND SEPTIC SYSTEM. 2.) DISTURBED AREAS TO BE LOAMED, SEEDED, AND MULCHED. S.) ALL TOPSOIL TO BE STOCKPILED ON SITE AND PROTECTED WITH HAYBALES OR SILT FENCE. 4.) ALL CUT AND FILL SLOPES ARE NOT TO EXCEED 3:1 SLOPES. 5.) PRIOR TO SITE DISTURBANCE, THE REPRESENTATIVE OF THE TOWN OF MONTVILLE SHALL BE NOTIFIED WHEN SEDIMENT CONTROL MEASURES ARE IN PLACE SO THAT THE INSPECTION CAN OCCUR. 6,) THE DEVELOPER WILL BE RESPONSIBLE FOR THE INSTALLATION AND MAINTENANCE OF ALL REQUIRED SEDIMENT CONTROL MEASURES THROUGHOUT CONSTRUCTION. 7.) DUST CONTROL WILL BE ACCOMPLISHED BY SPRAYING WITH WATER, AND IF NECESSARY THE APPLICATION OF CALCIUM CHLORIDE. TEMPORARY MEIAIff. C kLqr ING SQJEWLE MULCHES APPLICATION RATE NOTES 5ELQING DATES: PER 1000 S.F. APRIL 1 — JUNE 15 AUGUST 1 — SEPTEMBER 15 STRAW/HAY 70-90 lbs. FREE FROM 'WEEDS AND COARSE MATTER SEED MIXTURE WOOD CHIPS 185-275 lbs, FREE OF COARSE MATTER 459 RED FESCUE AIR DRIED, TREAT WITH 45% KENTUCKY BLUE GRASS 12lbs NITROGEN / TON 10% PERENNIAL RYE TESTHOLE DATi PER MAP REFERENCE TE THOLE #3_2 0"-7" TOPSOIL 7"-32" DARK YELLOWISH— OWN FINE SANDY LOAM 32"-96" OLIVKE—GREY LCA. MEDIUM SAND & GRAVEL, VERY COMPACT NO LEDGE, NO WATER, MO ING 0 32" TE THOLE #5L3 0"-6" DARK BROWN TOPS 6»-34" ORANGE YELLOW B WN SANDY LOAM WITH GRAVEL 34"-85" TAN MODERATELY MPACT COBBLY SAND AND GRAVEL NO LEDGE, NO WATER, MCII ING 0 31" TESTHOLL_1" 0"-12" TOPSOIL 12"-28" LIGHT BROWN FIN SANDY LOAM, SOME BOULDERS 28"-44" GREY—BROWN ME M—FINE SAND 44"-76" GREY—BROWN FIR MEDIUM—FINE SILTY SAND, TRACE OF GRAVEL NO LEDGE, NO WATER, MCj NG 0 30 JESTHOLL_-L&2 0"-12" TOPSOIL 12"-28" LIGHT BROWN FINE DY LOAM 28"-94" GREY—BROWN ME # —FINE SILTY SAND, TRACE OF GRAVEL NO LEDGE, WATER 0 76", NG 0 28" TESTHOLE _1" 0"-10" TOPSOIL 10"-30" LIGHT BROWN FINE NDY LOAM 30"-96" GREY—BROWN FILM MEDIUM—FINE SILTY SAND, TRACE OF GRAVEL NO LEDGE, NO WATER, MC NG 0 34" PERCOLATION RATE PER MAP REFERENC$_:- PERC #34A = 6.7 MINUTES INCH PERC #37 = 16 MINUT INCH MAP REFERLNQ SUBDIVISION PLAN, LOCHWE ESTATES, PROPERTY OF BERNARD BARNETT & HAROLD D. BATT, FORSYTH ROAD #4D JEFFREY MANOR DRIVE, MONTVILLE, CONNECTICUT, BY TOTAL TECHNOLOGY, JANUARY 1992, 4 DESIGN DATA PERCOLATION RATE — 6.11MINUTES/INCH 4 BEDROOM RESIDENCE JfQUIRES 660 Sr— OF LEACHING AREA PROVIDE (2) —110' (48"' VIDE) TRENCHES, CONNECT ENDS EFFECTIVE LEACHING AREA = 690 SF PROVIDE A 1250 GALLON 2—COMPARTUENT TANK M.L.S.S. REQUIRED = 2,0 x 1.2 x 42 = 100.8 M.L.S.S. PROVIDED = 1 10' PREPARE AREA OE n ' 1.) REMOVE AND STOCKIAE TOPSOIL. 2.) PLACE BANK RUN VEL (LESS THAN 5% FINES) PLACED IN 6" LIFTS AND COMPACTED TO 95% DEJITY. LACHES3.) EXCAVATE 4' WIDE NCHES AND PREPARE SURFACE. WIT4.) FILL TRENCHES WIT 1" WASHED STONE TO HEIGHT OF PIPE INVERTS PLACE PIPE IN TRENCH, AND L TO 2" OVER TOP OF PIPE. CAST CONCRFTF COVERS 5.) CAP ENDS OF PIPE 6.) PLACE A 4' WIDE S IP OF NON—WOVEN FILTER FABRIC ON TOP OF THE ENTIRE E Lm LENGTH OF THE SYSTEh4, AND BACKFILL WITH NATIVE MATERIAL. 7.) REPLACE TOPSOIL, SED & MULCH. CAPACITIES A B c 1250 CAL 61" 51" 48" NO 1500 GAL 69" 59" 56" PROVIDE RISERS TO WITHIN 1.) TOPOGRAPHIC INF04AT`ION ON THIS PLAN COMPLIES WITH T-2 MAPPING STANDARDS. 12" OFFINISHED GRADE AT INAND OUTLET 2.) BASE FOR LEVELS: UBDIVISION MAP. 4 x 4 12.6/12.6 6x6 6/6 GA. 3.) PROPOSED HOUSE D SEPTIC SYSTEM TO BE STAKED IN THE FIELD BY A LAND GA. WIRE MESH WIRE MESH PROVIDE SURVEYOR LICENSED I THE STATE OF CONNECTICUT. OUTLET ` FILTER 4.) LOT AREA = 2.37 ACRES POLYLOK 5.) BENCHMARK TO B SET AT TIME OF CONSTRUCTION. p N i 4 PL -122 No sew 2 COIMP6B 19LN-i 5EPTIQ TANK NOT TO SCALE LEGEN FF KNOCKOUT INLET AND OUTLET OPENINGS ELEV iEVATION S.F. UARE FEETfISTING512CONTOURS 512 fROPOSED CONTOURS t PUILDING SETBACK LINE CLQ ST HOLE 515.2 VERT ELEVATION 0 00 0 LAJ CL a "j 00 V) < a_ E u < Q LAI w—j a 00 L N_Q 1.) CLEARING, GRUBBING, AND GRADING OF THE PROPOSED LOT TO BE LIMITED TO AREAS ADJACENT TO THE PROPOSED HOUSE, DRIVEWAY, AND SEPTIC SYSTEM. 2.) DISTURBED AREAS TO BE LOAMED, SEEDED, AND MULCHED. S.) ALL TOPSOIL TO BE STOCKPILED ON SITE AND PROTECTED WITH HAYBALES OR SILT FENCE. 4.) ALL CUT AND FILL SLOPES ARE NOT TO EXCEED 3:1 SLOPES. 5.) PRIOR TO SITE DISTURBANCE, THE REPRESENTATIVE OF THE TOWN OF MONTVILLE SHALL BE NOTIFIED WHEN SEDIMENT CONTROL MEASURES ARE IN PLACE SO THAT THE INSPECTION CAN OCCUR. 6,) THE DEVELOPER WILL BE RESPONSIBLE FOR THE INSTALLATION AND MAINTENANCE OF ALL REQUIRED SEDIMENT CONTROL MEASURES THROUGHOUT CONSTRUCTION. 7.) DUST CONTROL WILL BE ACCOMPLISHED BY SPRAYING WITH WATER, AND IF NECESSARY THE APPLICATION OF CALCIUM CHLORIDE. TEMPORARY MEIAIff. C kLqr ING SQJEWLE MULCHES APPLICATION RATE NOTES 5ELQING DATES: PER 1000 S.F. APRIL 1 — JUNE 15 AUGUST 1 — SEPTEMBER 15 STRAW/HAY 70-90 lbs. FREE FROM 'WEEDS AND COARSE MATTER SEED MIXTURE WOOD CHIPS 185-275 lbs, FREE OF COARSE MATTER 459 RED FESCUE AIR DRIED, TREAT WITH 45% KENTUCKY BLUE GRASS 12lbs NITROGEN / TON 10% PERENNIAL RYE TESTHOLE DATi PER MAP REFERENCE TE THOLE #3_2 0"-7" TOPSOIL 7"-32" DARK YELLOWISH— OWN FINE SANDY LOAM 32"-96" OLIVKE—GREY LCA. MEDIUM SAND & GRAVEL, VERY COMPACT NO LEDGE, NO WATER, MO ING 0 32" TE THOLE #5L3 0"-6" DARK BROWN TOPS 6»-34" ORANGE YELLOW B WN SANDY LOAM WITH GRAVEL 34"-85" TAN MODERATELY MPACT COBBLY SAND AND GRAVEL NO LEDGE, NO WATER, MCII ING 0 31" TESTHOLL_1" 0"-12" TOPSOIL 12"-28" LIGHT BROWN FIN SANDY LOAM, SOME BOULDERS 28"-44" GREY—BROWN ME M—FINE SAND 44"-76" GREY—BROWN FIR MEDIUM—FINE SILTY SAND, TRACE OF GRAVEL NO LEDGE, NO WATER, MCj NG 0 30 JESTHOLL_-L&2 0"-12" TOPSOIL 12"-28" LIGHT BROWN FINE DY LOAM 28"-94" GREY—BROWN ME # —FINE SILTY SAND, TRACE OF GRAVEL NO LEDGE, WATER 0 76", NG 0 28" TESTHOLE _1" 0"-10" TOPSOIL 10"-30" LIGHT BROWN FINE NDY LOAM 30"-96" GREY—BROWN FILM MEDIUM—FINE SILTY SAND, TRACE OF GRAVEL NO LEDGE, NO WATER, MC NG 0 34" PERCOLATION RATE PER MAP REFERENC$_:- PERC #34A = 6.7 MINUTES INCH PERC #37 = 16 MINUT INCH MAP REFERLNQ SUBDIVISION PLAN, LOCHWE ESTATES, PROPERTY OF BERNARD BARNETT & HAROLD D. BATT, FORSYTH ROAD #4D JEFFREY MANOR DRIVE, MONTVILLE, CONNECTICUT, BY TOTAL TECHNOLOGY, JANUARY 1992, 4 DESIGN DATA PERCOLATION RATE — 6.11MINUTES/INCH 4 BEDROOM RESIDENCE JfQUIRES 660 Sr— OF LEACHING AREA PROVIDE (2) —110' (48"' VIDE) TRENCHES, CONNECT ENDS EFFECTIVE LEACHING AREA = 690 SF PROVIDE A 1250 GALLON 2—COMPARTUENT TANK M.L.S.S. REQUIRED = 2,0 x 1.2 x 42 = 100.8 M.L.S.S. PROVIDED = 1 10' PREPARE AREA OE n ' 1.) REMOVE AND STOCKIAE TOPSOIL. 2.) PLACE BANK RUN VEL (LESS THAN 5% FINES) PLACED IN 6" LIFTS AND COMPACTED TO 95% DEJITY. LACHES3.) EXCAVATE 4' WIDE NCHES AND PREPARE SURFACE. WIT4.) FILL TRENCHES WIT 1" WASHED STONE TO HEIGHT OF PIPE INVERTS PLACE PIPE IN TRENCH, AND L TO 2" OVER TOP OF PIPE. CAST CONCRFTF COVERS 5.) CAP ENDS OF PIPE 6.) PLACE A 4' WIDE S IP OF NON—WOVEN FILTER FABRIC ON TOP OF THE ENTIRE E Lm LENGTH OF THE SYSTEh4, AND BACKFILL WITH NATIVE MATERIAL. 7.) REPLACE TOPSOIL, SED & MULCH. CAPACITIES A B c 1250 CAL 61" 51" 48" NO 1500 GAL 69" 59" 56" PROVIDE RISERS TO WITHIN 1.) TOPOGRAPHIC INF04AT`ION ON THIS PLAN COMPLIES WITH T-2 MAPPING STANDARDS. 12" OFFINISHED GRADE AT INAND OUTLET 2.) BASE FOR LEVELS: UBDIVISION MAP. 4 x 4 12.6/12.6 6x6 6/6 GA. 3.) PROPOSED HOUSE D SEPTIC SYSTEM TO BE STAKED IN THE FIELD BY A LAND GA. WIRE MESH WIRE MESH PROVIDE SURVEYOR LICENSED I THE STATE OF CONNECTICUT. OUTLET ` FILTER 4.) LOT AREA = 2.37 ACRES POLYLOK 5.) BENCHMARK TO B SET AT TIME OF CONSTRUCTION. p N i 4 PL -122 No sew 2 COIMP6B 19LN-i 5EPTIQ TANK NOT TO SCALE LEGEN FF ST FLOOR ELEV iEVATION S.F. UARE FEETfISTING512 CONTOURS 512 fROPOSED CONTOURS t PUILDING SETBACK LINE CLQ ST HOLE 515.2 VERT ELEVATION 20 10 0 20 SEEN GRAPHIC SCALE IN FEET DATE. 09/07/2001 SCALE: i SHEET: 1 OF 1 C) z Z.. 0 Z), Lj V) LdCLQ Lj Fr LAJ 0 00 0 LAJ CL a "j 00 V) < a_ E u < Q LAI w—j a 00 I -j 0 _j F- 5- CL U LAJ F- 0 00 lu A_ Z 0 00 0? 4-4 uj 00 4 z crw 0 0 Q_ U 0 a 0 z 0 QD 0 DATE. 09/07/2001 SCALE: i SHEET: 1 OF 1 C) z Z.. 0 Z), Lj V) LdCLQ Lj Fr LAJ 0 17 0 LAJ CL a "j 00 V) < a_ u < Q LAI w—j a C) I -j 0 _j F- 5- CL 0 LAJ F- 0 A_ DATE. 09/07/2001 SCALE: i SHEET: 1 OF 1 z Lj0 C) A_ o uj W cr, 0 z 0 QD 0 z C) 0 cr C) Cy 4Y- X D zoaf) ui 0 tp z 0 0 Z a. 0 u LAJ V) LLJ LLJ vi co 04 r C) 0 6 cl Q 0 L0 0t0 r) 0 U 0 DATE. 09/07/2001 SCALE: i SHEET: 1 OF 1