SEPTIC TANK
A,S) TMl785\
TF=509.72
TF=507.00 INV IN VV 505.35
INV IN 50379 INV IN S 505.29
INV OUT 503.71 INV OUT 502.64
INV 505.57
INV IN 504.00
INV OUT 503.90
2x2
a'
KNOCKOUT INLET &
OUTLET OPENINGS
oc
o
m
00
L
RIBS INSIDE -4-_
uu J
om
ILL
c]
opz
u
J
N2
CAST ComoR*rE novcRs
00
PLm
11c
mo
z
m L
01Iff
@
Li cs
o 2V, 0 bb
r°
o'"
T '
SUlf-ARILE FILL
HL|Lw FABRIC U '
4^ PE v
i PIPE -----
1' STOmL
4' ^`
CROSS ECjlQN
NOT To scm'
LTEH
FABRIC
COMPACTED
BACKFILL —
FOR STAEBL]TY AND
SELF CLEANING
SILT FENCE
No no scmc
Iz
1.) CLEARING, GRUBB|NG, AND GRADING OF THE PROPOSED LOT TO BE LIMITED TO
AREAS ADJACENT TD THE PROPOSED HOUSE, DRNEWAY, AND SEPTIC SYSTEM.
2\ DISTURBED AREAS TO BE LOAMED, SE[DED, AND MULCHED.
3) ALL TOPSOIL TO BE STOCKPILED ON SITE AND PROTECTED WITH HAYBALES DR
SILT FENCE
4\ ALL CUT AND FILL SLOPES ARE NOT TO EXCEED 11 SLOPES.
5.) PRIOR TO SITE DISTURBANCE, THE REPRESENTATIVE OF THE TOWN OF MC)NTV|LLE
SHALL BE NOTIFIED WHEN SEDIMENT CONTROL MEASURES ARE IN PLACE SO THAT THE
INSPECTION CA OCCUR.
6.\ THE DEVELCPER WILL BE RESPONSIBLE FOR THE INSTALLATION AND MAINTENANCE
OF D SEDIMENT CONTROL MEASURES THROUGHOUT CONSTRUCTION.
7\ OUST CONTROL WILL BE ACCOMPLISHED BY SPRAYING WITH WATER, AND IF
NECESSARY THE APPLICATION OF CALCIUM CHLORIDE.
MULCHES APPLICATION RATE NOTES SEEDING QATES:
PEf 1000 S.F. APRIL 1 - JUNE 15
AUGUST 1 - SEPTEMBER 15
SITRAVV/HAY1.0-90 lbs. FREE FROM WEEDS
AND COARSE MATTER
SEED MIXTURE:
VVDD) CHIPS 1 -275 lbs. FREE OF COARSE MATTER 45% RED FESCUE
AIR DR|ED, TREAT WITH 45% KENTUCKY BLUE GRASS
l2lbs NITROGEN, / TON 10% PERENNIAL RYE
PER MAP REFERENCE
r) 12" TOPSOIL
i2"-
36pl DARKVV|SH-BROWN FINE SANDY LOAM' LARGE STONES
6^-95^ OLIVE- EY MEDIUM -COARSE LOAMY SAND AND GRAVEL' LARGE
STONES, COk4pA
NO LEDGE. WAT 1 @ 34^. MOTTLING @38^
0"-8" DARK BRIIVN TOPSOIL
8"-26" ORANGE_IBROWN COBBLY SANDY LOAM WITH SOME GRAVEL
26"-80" CRAY jN COMPACT FINE SAND WITH GRAVEL
NO LEDGE, NO TER, MOTTLING @ 30"
TESTHOLE #164
0"-10" TOPSOIL
10^-28^ LIGHT OWN FINE SANDY LAOM
28"-97^ GREY - OWN FIRM FINE SILTY SAND' TRACE OF GRAVEL
NO LEDGE, NO TER, MOTTLING @ JO^
L
TE THOLEL 65
TOPSOIL
12^-28^ L|CHT Bi WN FINE SANDY LOAM
28^-78" GREY -13 OWN FIRM FINE SILTY SANO, TRACE OF GRAVEL
NO LEDGE, NO WIER, MOTTLING @ 30"
INFORMATION REFERENCE PLAN
PERC 3 l ~/ INCH
PERC #38 = 8 MINUTES / INCH
MAP REF
SUBDIVISION PLA, LOCHDALE ESTATES, PROPERTY OF BERNARD BARNETT &
HAROLD D. BATI _ORSYTH ROAD AND JEFFERY MANOR DRIVE, MONTV|LLE,
CONNECTICUT JA!\UARY 1992, TOTAL TECHNOLOGY, INC.
PERCOLATION RA 18 MINUTES/INCH
REQUIRES 675 SF OF LEACHING AREA
PROVIDEWIDE) TRENCHES /CONNECT ENDS)
EFFECTIVE LEACH = 702 SF
PROVIDE A lOOC ALLON 2 -COMPARTMENT TANK
W LS.SREQUIRE= 42 x 1.5 x 1.5 = 94.5
M.L.S.S. PROVIDEJ= 112'
1.) REMOVE AND TOCKPILE TOPSOIL.
2.) PLACE BANK UN GRAVEL (LESS THAN 5% FINES) PLACED IN 6" LIFTS AND
COMPACTED TO t% DENSITY.
3.) EXCAVATE 4' WIDE TRENCHES AND PREPARE SURFACE.
4.) FILL TRENCH., WITH 1 " WASHED STONE TO HEIGHT OF PIPE INVERTS PLACE
PIPE IN TRENCH,
I
ND FILL TO 2" OVER P OF PIPE.
6.) PLACE A 4' E STRIP OF NON -WOVEN FILTER FABRIC ON TOP OF THE
ENTIRE LENGTH THE SYSTEW\, AND BACKFILL WITH NATIVE MATERIAL.
7.) REPLACE TOP OIL, SEED & MULCH.
KIEL
1.) TOPOGRAPHI( INFORMATION ON THIS PLAN COMPLIES WITH T-2 MAPPING
2.) BASE FOP L.... ELS.- SUBDIVISION MAP.
3,) PROPOSED - USE AND SEPTIC SYSTEM TO BE STAKED IN THE FIELD BY A
LAND SURVEYOR ICENSED IN THE STATE OF CONNECTICUT.
5.)BENCHMARK BE SET IN AREA OF SEPTIC SYSTEM AT TIME OF
CONSTRUCTION
FF FIRST FLOOR
ELEV ELEVATION
S. F. SQUARE FEET
512 EXISTING CONTOURS
512 PROPOSED CONTOURS
BUILDING SETBACK LINE
TEST HOLE
512.3 INVERT ELEVATION
a'
KNOCKOUT INLET &
OUTLET OPENINGS
oc
o
m
00
L
RIBS INSIDE -4-_
uu J
om
ILL
c]
opz
u
J
N2
CAST ComoR*rE novcRs
00
PLm
Iz
1.) CLEARING, GRUBB|NG, AND GRADING OF THE PROPOSED LOT TO BE LIMITED TO
AREAS ADJACENT TD THE PROPOSED HOUSE, DRNEWAY, AND SEPTIC SYSTEM.
2\ DISTURBED AREAS TO BE LOAMED, SE[DED, AND MULCHED.
3) ALL TOPSOIL TO BE STOCKPILED ON SITE AND PROTECTED WITH HAYBALES DR
SILT FENCE
4\ ALL CUT AND FILL SLOPES ARE NOT TO EXCEED 11 SLOPES.
5.) PRIOR TO SITE DISTURBANCE, THE REPRESENTATIVE OF THE TOWN OF MC)NTV|LLE
SHALL BE NOTIFIED WHEN SEDIMENT CONTROL MEASURES ARE IN PLACE SO THAT THE
INSPECTION CA OCCUR.
6.\ THE DEVELCPER WILL BE RESPONSIBLE FOR THE INSTALLATION AND MAINTENANCE
OF D SEDIMENT CONTROL MEASURES THROUGHOUT CONSTRUCTION.
7\ OUST CONTROL WILL BE ACCOMPLISHED BY SPRAYING WITH WATER, AND IF
NECESSARY THE APPLICATION OF CALCIUM CHLORIDE.
MULCHES APPLICATION RATE NOTES SEEDING QATES:
PEf 1000 S.F. APRIL 1 - JUNE 15
AUGUST 1 - SEPTEMBER 15
SITRAVV/HAY1.0-90 lbs. FREE FROM WEEDS
AND COARSE MATTER
SEED MIXTURE:
VVDD) CHIPS 1 -275 lbs. FREE OF COARSE MATTER 45% RED FESCUE
AIR DR|ED, TREAT WITH 45% KENTUCKY BLUE GRASS
l2lbs NITROGEN, / TON 10% PERENNIAL RYE
PER MAP REFERENCE
r) 12" TOPSOIL
i2"-
36pl DARKVV|SH-BROWN FINE SANDY LOAM' LARGE STONES
6^-95^ OLIVE- EY MEDIUM -COARSE LOAMY SAND AND GRAVEL' LARGE
STONES, COk4pA
NO LEDGE. WAT 1 @ 34^. MOTTLING @38^
0"-8" DARK BRIIVN TOPSOIL
8"-26" ORANGE_IBROWN COBBLY SANDY LOAM WITH SOME GRAVEL
26"-80" CRAY jN COMPACT FINE SAND WITH GRAVEL
NO LEDGE, NO TER, MOTTLING @ 30"
TESTHOLE #164
0"-10" TOPSOIL
10^-28^ LIGHT OWN FINE SANDY LAOM
28"-97^ GREY - OWN FIRM FINE SILTY SAND' TRACE OF GRAVEL
NO LEDGE, NO TER, MOTTLING @ JO^
L
TE THOLEL 65
TOPSOIL
12^-28^ L|CHT Bi WN FINE SANDY LOAM
28^-78" GREY -13 OWN FIRM FINE SILTY SANO, TRACE OF GRAVEL
NO LEDGE, NO WIER, MOTTLING @ 30"
INFORMATION REFERENCE PLAN
PERC 3 l ~/ INCH
PERC #38 = 8 MINUTES / INCH
MAP REF
SUBDIVISION PLA, LOCHDALE ESTATES, PROPERTY OF BERNARD BARNETT &
HAROLD D. BATI _ORSYTH ROAD AND JEFFERY MANOR DRIVE, MONTV|LLE,
CONNECTICUT JA!\UARY 1992, TOTAL TECHNOLOGY, INC.
PERCOLATION RA 18 MINUTES/INCH
REQUIRES 675 SF OF LEACHING AREA
PROVIDEWIDE) TRENCHES /CONNECT ENDS)
EFFECTIVE LEACH = 702 SF
PROVIDE A lOOC ALLON 2 -COMPARTMENT TANK
W LS.SREQUIRE= 42 x 1.5 x 1.5 = 94.5
M.L.S.S. PROVIDEJ= 112'
1.) REMOVE AND TOCKPILE TOPSOIL.
2.) PLACE BANK UN GRAVEL (LESS THAN 5% FINES) PLACED IN 6" LIFTS AND
COMPACTED TO t% DENSITY.
3.) EXCAVATE 4' WIDE TRENCHES AND PREPARE SURFACE.
4.) FILL TRENCH., WITH 1 " WASHED STONE TO HEIGHT OF PIPE INVERTS PLACE
PIPE IN TRENCH,
I
ND FILL TO 2" OVER P OF PIPE.
6.) PLACE A 4' E STRIP OF NON -WOVEN FILTER FABRIC ON TOP OF THE
ENTIRE LENGTH THE SYSTEW\, AND BACKFILL WITH NATIVE MATERIAL.
7.) REPLACE TOP OIL, SEED & MULCH.
KIEL
1.) TOPOGRAPHI( INFORMATION ON THIS PLAN COMPLIES WITH T-2 MAPPING
2.) BASE FOP L.... ELS.- SUBDIVISION MAP.
3,) PROPOSED - USE AND SEPTIC SYSTEM TO BE STAKED IN THE FIELD BY A
LAND SURVEYOR ICENSED IN THE STATE OF CONNECTICUT.
5.)BENCHMARK BE SET IN AREA OF SEPTIC SYSTEM AT TIME OF
CONSTRUCTION
FF FIRST FLOOR
ELEV ELEVATION
S. F. SQUARE FEET
512 EXISTING CONTOURS
512 PROPOSED CONTOURS
BUILDING SETBACK LINE
TEST HOLE
512.3 INVERT ELEVATION
DATE: 1(]/08/7[]01
SCALE- \ == 2(]`
SHFFT 1 l 1
oc
o
m
00
L 03
uu J
om
ILL
c]
opz
u
cc~ N2
0
00
a-
uu
11c
mo
z
m L
01Iff
@
Li cs
o 2V, 0 bb
r°
o'"
T '
DATE: 1(]/08/7[]01
SCALE- \ == 2(]`
SHFFT 1 l 1
m
uu J
Lj
ILL
c]
Z-
0u
0 uj
a-
uu
cw
z
m L
DATE: 1(]/08/7[]01
SCALE- \ == 2(]`
SHFFT 1 l 1