HomeMy WebLinkAboutSite PlanFEZRNO
1VTC.E
N/F
HOMER F, WATERS &
SUSAN 1. WATERS
MAP 44, BLOCK 03, LOT 07)
1. .n -
0
A
15'
4
10' WIDE
PROPOSED DRTVE T—,1A—Y
q-
4" MIN, PROCESSED I
GRAVEL OR EQUIVALENT
LOAM AND
SEED SLOPE
BOTH SIDES
18" MIN. BANKRUN GRAVEL
PROVIDE CONTECH C-300
tATOVEN GEO FABRIC
20'x60")
N/F777
502 50 KENNETH W. BAKER:, Ill & N/I
KIM M, BAKER46DANIELM. CASTANO &
52 43, BLOCK 2, LOT 13KIMCASSTANO #49
MAP 43, BLOCK 2, LOT 15) 447
AVELL504- LIMITS OF
INLAND WETLANDS", #53
J SEE NOTE 47)
TONE
506 ROPOSED GRAVEL DRI v'E,,,- DECK PROPOSED LIMITS
T"E SET AT EXISTNd OF CLEARING508GRADE SO2GARAGE
EXISTING
510 RESIDENCEV 5
60"
PAVEDAVED
DRIVE
EXISTING' ` SEXITING "
SO6
EXISTING
SEPTIC SYSTEM DRAINAGE '
50, EASEMENT 55
455
DIIIPIN
REC. -N 09022'50\W 1 360.001
ELEC.
CBCB
PROVIDE,
PAVED APRON
LOCHDALE DRIVE
COMPACTED
BACKFILL—'
E)GSTING WETLANDS ELEVATION
gal
ANGLE 10" UP SLOPE
FOR STABILITY AND
SELF CLEANING
SILTFENCE
NOT TO SCALE
T U/-1UXTn.
VOL.
PG,
N/F
S.F.
IPIN
DH
REC.
CB
488
x 488.5
MATCH EXISTING
WETLANDS ELEVATION
BOTH SIDES
VOLUME
PAGE
NOW OR FORMERLY
SQUARE FEET
IRON PIN
DRILL HOLE
RECOVERED
CATCH BASIN
EXISTING CONTOURS
EXISTING SPOT GRADE
PROPOSED CONTOUR
F-ROSIONAND SEDIMENT CONTROL REPORT:
SITE PLAN
SHOWING PROPOSED IMPROVEMENTS
PREPARED FOR:
SHAYNE D. SHAYER & PAUL J. ALIGATA
32 LOCDALE DRIVE
MONTVILLE, coNNEcTicuT
RE, FERENCE, IS MADE TO:
1. Connecticut Guidelines for Soil Erosion and Sediment
Control.
The proposed activity will involve the installation of a gravel
drive -way (with wetlands crossing) and a proposed barn.
EVELOPMENT SCHEDULE:
It is anticipated that grading and construction activities will begin
April 2014 and will be completed by July 2014.
Construction will begin with the installation of all erosion and sediment
control measures (silt fence). After these measures have been installed and
inspected by the Town of Montville Zoning Enforcement Officer the
proposed gravel driveway will be installed. After the gravel driveway has been
up to the proposed barn construction of the barn will commence. Barn A411 be
set on a concrete slab with a 48" frost wall. Once barn is completed all
disturbed areas '"Till be loamed and seeded.
Prior to the commencement of operations in accordance with
any permit issued by the Town of Montville, the Contractor
shall install all erosion and sediment control measures.
The Contractor shall. obtain a site inspection from the Town of
Montville Enforcement Officer to ensure that all erosion and
sediment control measures have been installed in accordance with
this narrative,. Upon certification with respect to the installation
of erosion and sediment control measures, the
Contractor may commence operations pursuant to the permit.
Erosion and sediment control devices shall be installed in
accordance with the "Filter Barrier Installation &
Maintenance" sections of this narrative.
Dust control will be accomplished by spraying with water and
if necessary, the application of calcium chloride.
The proposed planting schedule is to be adhered to during
the planting of disturbed areas throughout the proposed
construction site.
Final stabilization of the site is to follow the procedures
outlined in permanent vegetative cover. If necessary a
temporary vegetative cover is to be provided -Lmtil a
permanent cover can be applied,
During the stabilization period, all erosion and sediment
control measures shall be maintained in proper- working
order. The Owner's representative shall be responsible for
checking all erosion and sediment control measures on a
twice -weekly basis during the stabilization period and after
each storm event. During the stabilization period with
respect to the site, any erosion which occurs within
disturbed areas shall be immediately repaired, reseeded and
restabilized.
Once stabilization has been completed and certification thereof
obtained in writing from the Town of Mont-ille Enforcement
Officer, erosion and sediment control measures may be removed,
If required proposed trees -Nvill be planted with the following precautions.
1. Trees and shrubs are to be planted in the spring.
2. Newly planted trees are to be staked and supported with guy wire.
3. Soil around trees and shrubs is to be thoroughly wateredwhen.
dry and mulch provided around the base to prevent roots from
drying out. Provide a depression at the base of all trees and
shrubs to insure the water will be received,
FILTER BARRIER INSTALLATION & -MAINTENANCE:
1 . Dig a 6" trench on the uphill side of the barrier
location.
2. Position the, posts on the downhill side of the barrier
and drive the post 1.5 feet into the ground.
3. Lay the bottom 6" of the fabric in the trench to prevent
undermining and backfill.
4. Inspect and repair barrier after heavy rainfall,
5. Sediment deposits are to be removed when they reach
a height of one foot behind the barrier and are to be
deposited in an area which is not regulated ty the Inland
Wetlands Commission.
6. Inspections and necessary repairs be male twice
weekly.
APPROVED BY THE TOWN OF MONTVILLE INLAND WETLANDS COMMISSION
SIGNATURE DATE
TO ]MY ICNO ED, EF, THIS NIAP IS SUBSTANTIALLY CORRECTRC
AS NOTFl) -. 31 IS NOT VALID WITHOUT A LIVE SIGNATUREU) -p TI
AND TH
r
L HE SURVEYOR HEREON.
X/ W
L
RICH -Zx) AZ L.S. #70019 DATE
LOCATION"MAP
500 150 0 500
GRAPHIC SCALE IN FEET
reAMA ON R I R LIN a• 1 =1105
NOTES:
1. TIES SURVEY HAS BEEN PREPARED PURSUANT TO THE REGULATIONS OF CONNECTICUT
STATE AGENCIES SECTIONS 20-300b-1 THROUGH 20-300b-20 AND THE "STANDARDS
FOR SURVEYS AND MAPS IN THE STATE OF CONNECTICUT" AS ADOPTED BY THE
CONNECTICUT ASSOCIATION OF LAND SURVEYORS, INC, ON SEPTEMBER 26, 1996x. IT
IS A GENERAL LOCATION SURVEY BASED ON A RESURVEY AIND CONFORMS TO
HORIZONTAL ACCURACY CLASS A-2.
2. FOR SUBJECT PROPERTY REFERENCE IS MADE TO THE TOWN OF NfiONTTVILLE LAND
RECORDS VOLUME 574 - PAGE 138.
3. TOTAL, AREA OF PROPERTY - (5.98 ACRES±),
4. THE PROPERTY IS SHOWN ON ASSESSORS MAP 43, BLOCK 02, LOT 14,
5. THE PROPERTY IS LOCATED WITHIN ZOING DISTRICT R-40,
6. TOPOGRAHIC MAPPING CONFORMS TO T-2 MAPPING STANDARDS,
BASE FOR LEVELS: APPROXIMATE N.G.V.D. 1929.
7. THE LIMITS OF INLAND WETLANDS ARE SHOWN PER THE APRROVED SUBDIVISION
PLAN-. (SEE REFERENCE I' -#`2).
REFERENCE MAPS:
1. LOT LAYOUT PHASE III, LOCHDALE ESTATES, PROPERTY OF BERNARD
BARNETT & HAROLD D. BATT, FORSYTH ROAD AND JEFFREY MANOR DRIVE,
MONTVILLE, CONNECTICUT, V=100', DEC. 2000, PREPARED BY TOTAL
TECHNOLOGY, INC.
2. GRADING AND EROSION CONTOL PLAN LOCHDALE ESTATES, PROPERTY OF
BERNARD BARNETT & HAROLD D. BATT, FORSYTH ROAD AND JEFFREY MANOR
DRIVE, MONTVILLE, CONNECTICUT, .1"-40', JAN. 1. 992, REV. 5/20/92, SHEET 10 OF 23,
PREPARED BY TOTAL TECHNOLOGY, INC.
PERMANENT VEGETATIVE COVER:
Topsoil will be replaced once the excavation. has been.
completed and the areas are graded to a slope no greater
than 2 to 1. Topsoil will be spread at a minimum compacted
depth of 4 inches. Once the topsoil has been. spread, all
stones two inches or larger in any dimension will be removed
as well as debris. Apply agricultural ground limestone at the
rate of two tons per acre or 100 tbs. per 1000 s.f. Apply
10-10-10 fertilizer or equivalent at a rate of 300 tbs. per
acre or 7.5 tbs. per 1000 s. f. Work lime and fertilizer into
the soil to a depth of 4 inches. Inspect seedbed before
seeding. If traffic has compacted the soil, retill
compacted areas. Apply the following grass seed mix: I
Seed Mixture lbs./acre lbs./1000 s.f.
Kentucky Bluegrass 20 .45
Creeping Red Fescue 20 .45
Perennial Rye Grass 5 .10
45 1.00
The recommended seeding dates are:
April I - June 15 and August I - September 15
Following seeding, firrn seedbed with a roller. Mulch
immediately following seeding. If a permanent vegetative
stand cannot be established by September 30, apply a temporary
cover on the topsoil such as netting, mat or an organic mulch.
DH
REC.
N/F
JACK AQUlLINA &
LORI AQUILINA
MAP 43, BLOCK 027, LOT 000)
IPIN
REC,
478 --
LIMITS OF
INLANDIA7ETLANDS
SEE NOTE 47)
10 ,
PROPOSED LIMITS
492- j STOCKPILE 494
96 ZTOPSOIL
484
486-- 52: 7 77
PROPOSERBARN LOAM & SEED ALL
98 EL -492.0 DISTURBED AREAS
35,
99490
Alho
PROVIDE A t>AITJLNUOUS LINE OF
492---- 0 SILT FENCE THROUGHT-CONSTRUCTION
Z SEE DETAIL)
100
101
494-
15'
4
10' WIDE
PROPOSED DRTVE T—,1A—Y
q-
4" MIN, PROCESSED I
GRAVEL OR EQUIVALENT
LOAM AND
SEED SLOPE
BOTH SIDES
18" MIN. BANKRUN GRAVEL
PROVIDE CONTECH C-300
tATOVEN GEO FABRIC
20'x60")
N/F777
502 50 KENNETH W. BAKER:, Ill & N/I
KIM M, BAKER46DANIELM. CASTANO &
52 43, BLOCK 2, LOT 13KIMCASSTANO #49
MAP 43, BLOCK 2, LOT 15) 447
AVELL504- LIMITS OF
INLAND WETLANDS", #53
J SEE NOTE 47)
TONE
506 ROPOSED GRAVEL DRI v'E,,,- DECK PROPOSED LIMITS
T"E SET AT EXISTNd OF CLEARING508GRADE SO2GARAGE
EXISTING
510 RESIDENCEV 5
60"
PAVEDAVED
DRIVE
EXISTING' ` SEXITING "
SO6
EXISTING
SEPTIC SYSTEM DRAINAGE '
50, EASEMENT 55
455
DIIIPIN
REC. -N 09022'50\W 1 360.001
ELEC.
CBCB
PROVIDE,
PAVED APRON
LOCHDALE DRIVE
COMPACTED
BACKFILL—'
E)GSTING WETLANDS ELEVATION
gal
ANGLE 10" UP SLOPE
FOR STABILITY AND
SELF CLEANING
SILTFENCE
NOT TO SCALE
T U/-1UXTn.
VOL.
PG,
N/F
S.F.
IPIN
DH
REC.
CB
488
x 488.5
MATCH EXISTING
WETLANDS ELEVATION
BOTH SIDES
VOLUME
PAGE
NOW OR FORMERLY
SQUARE FEET
IRON PIN
DRILL HOLE
RECOVERED
CATCH BASIN
EXISTING CONTOURS
EXISTING SPOT GRADE
PROPOSED CONTOUR
F-ROSIONAND SEDIMENT CONTROL REPORT:
SITE PLAN
SHOWING PROPOSED IMPROVEMENTS
PREPARED FOR:
SHAYNE D. SHAYER & PAUL J. ALIGATA
32 LOCDALE DRIVE
MONTVILLE, coNNEcTicuT
RE, FERENCE, IS MADE TO:
1. Connecticut Guidelines for Soil Erosion and Sediment
Control.
The proposed activity will involve the installation of a gravel
drive -way (with wetlands crossing) and a proposed barn.
EVELOPMENT SCHEDULE:
It is anticipated that grading and construction activities will begin
April 2014 and will be completed by July 2014.
Construction will begin with the installation of all erosion and sediment
control measures (silt fence). After these measures have been installed and
inspected by the Town of Montville Zoning Enforcement Officer the
proposed gravel driveway will be installed. After the gravel driveway has been
up to the proposed barn construction of the barn will commence. Barn A411 be
set on a concrete slab with a 48" frost wall. Once barn is completed all
disturbed areas '"Till be loamed and seeded.
Prior to the commencement of operations in accordance with
any permit issued by the Town of Montville, the Contractor
shall install all erosion and sediment control measures.
The Contractor shall. obtain a site inspection from the Town of
Montville Enforcement Officer to ensure that all erosion and
sediment control measures have been installed in accordance with
this narrative,. Upon certification with respect to the installation
of erosion and sediment control measures, the
Contractor may commence operations pursuant to the permit.
Erosion and sediment control devices shall be installed in
accordance with the "Filter Barrier Installation &
Maintenance" sections of this narrative.
Dust control will be accomplished by spraying with water and
if necessary, the application of calcium chloride.
The proposed planting schedule is to be adhered to during
the planting of disturbed areas throughout the proposed
construction site.
Final stabilization of the site is to follow the procedures
outlined in permanent vegetative cover. If necessary a
temporary vegetative cover is to be provided -Lmtil a
permanent cover can be applied,
During the stabilization period, all erosion and sediment
control measures shall be maintained in proper- working
order. The Owner's representative shall be responsible for
checking all erosion and sediment control measures on a
twice -weekly basis during the stabilization period and after
each storm event. During the stabilization period with
respect to the site, any erosion which occurs within
disturbed areas shall be immediately repaired, reseeded and
restabilized.
Once stabilization has been completed and certification thereof
obtained in writing from the Town of Mont-ille Enforcement
Officer, erosion and sediment control measures may be removed,
If required proposed trees -Nvill be planted with the following precautions.
1. Trees and shrubs are to be planted in the spring.
2. Newly planted trees are to be staked and supported with guy wire.
3. Soil around trees and shrubs is to be thoroughly wateredwhen.
dry and mulch provided around the base to prevent roots from
drying out. Provide a depression at the base of all trees and
shrubs to insure the water will be received,
FILTER BARRIER INSTALLATION & -MAINTENANCE:
1 . Dig a 6" trench on the uphill side of the barrier
location.
2. Position the, posts on the downhill side of the barrier
and drive the post 1.5 feet into the ground.
3. Lay the bottom 6" of the fabric in the trench to prevent
undermining and backfill.
4. Inspect and repair barrier after heavy rainfall,
5. Sediment deposits are to be removed when they reach
a height of one foot behind the barrier and are to be
deposited in an area which is not regulated ty the Inland
Wetlands Commission.
6. Inspections and necessary repairs be male twice
weekly.
APPROVED BY THE TOWN OF MONTVILLE INLAND WETLANDS COMMISSION
SIGNATURE DATE
TO ]MY ICNO ED, EF, THIS NIAP IS SUBSTANTIALLY CORRECTRC
AS NOTFl) -. 31 IS NOT VALID WITHOUT A LIVE SIGNATUREU) -p TI
AND TH
r
L HE SURVEYOR HEREON.
X/ W
L
RICH -Zx) AZ L.S. #70019 DATE
LOCATION"MAP
500 150 0 500
GRAPHIC SCALE IN FEET
reAMA ON RI R LIN a• 1 =1105
NOTES:
1. TIES SURVEY HAS BEEN PREPARED PURSUANT TO THE REGULATIONS OF CONNECTICUT
STATE AGENCIES SECTIONS 20-300b-1 THROUGH 20-300b-20 AND THE "STANDARDS
FOR SURVEYS AND MAPS IN THE STATE OF CONNECTICUT" AS ADOPTED BY THE
CONNECTICUT ASSOCIATION OF LAND SURVEYORS, INC, ON SEPTEMBER 26, 1996x. IT
IS A GENERAL LOCATION SURVEY BASED ON A RESURVEY AIND CONFORMS TO
HORIZONTAL ACCURACY CLASS A-2.
2. FOR SUBJECT PROPERTY REFERENCE IS MADE TO THE TOWN OF NfiONTTVILLE LAND
RECORDS VOLUME 574 - PAGE 138.
3. TOTAL, AREA OF PROPERTY - (5.98 ACRES±),
4. THE PROPERTY IS SHOWN ON ASSESSORS MAP 43, BLOCK 02, LOT 14,
5. THE PROPERTY IS LOCATED WITHIN ZOING DISTRICT R-40,
6. TOPOGRAHIC MAPPING CONFORMS TO T-2 MAPPING STANDARDS,
BASE FOR LEVELS: APPROXIMATE N.G.V.D. 1929.
7. THE LIMITS OF INLAND WETLANDS ARE SHOWN PER THE APRROVED SUBDIVISION
PLAN-. (SEE REFERENCE I' -#`2).
REFERENCE MAPS:
1. LOT LAYOUT PHASE III, LOCHDALE ESTATES, PROPERTY OF BERNARD
BARNETT & HAROLD D. BATT, FORSYTH ROAD AND JEFFREY MANOR DRIVE,
MONTVILLE, CONNECTICUT, V=100', DEC. 2000, PREPARED BY TOTAL
TECHNOLOGY, INC.
2. GRADING AND EROSION CONTOL PLAN LOCHDALE ESTATES, PROPERTY OF
BERNARD BARNETT & HAROLD D. BATT, FORSYTH ROAD AND JEFFREY MANOR
DRIVE, MONTVILLE, CONNECTICUT, .1"-40', JAN. 1. 992, REV. 5/20/92, SHEET 10 OF 23,
PREPARED BY TOTAL TECHNOLOGY, INC.
PERMANENT VEGETATIVE COVER:
Topsoil will be replaced once the excavation. has been.
completed and the areas are graded to a slope no greater
than 2 to 1. Topsoil will be spread at a minimum compacted
depth of 4 inches. Once the topsoil has been. spread, all
stones two inches or larger in any dimension will be removed
as well as debris. Apply agricultural ground limestone at the
rate of two tons per acre or 100 tbs. per 1000 s.f. Apply
10-10-10 fertilizer or equivalent at a rate of 300 tbs. per
acre or 7.5 tbs. per 1000 s. f. Work lime and fertilizer into
the soil to a depth of 4 inches. Inspect seedbed before
seeding. If traffic has compacted the soil, retill
compacted areas. Apply the following grass seed mix: I
Seed Mixture lbs./acre lbs./1000 s.f.
Kentucky Bluegrass 20 .45
Creeping Red Fescue 20 .45
Perennial Rye Grass 5 .10
45 1.00
The recommended seeding dates are:
April I - June 15 and August I - September 15
Following seeding, firrn seedbed with a roller. Mulch
immediately following seeding. If a permanent vegetative
stand cannot be established by September 30, apply a temporary
cover on the topsoil such as netting, mat or an organic mulch.