Loading...
HomeMy WebLinkAboutPlanAr3r30nVlkAA*rr_7 I lklITC nV RTT-LOT34. _L0CHDALE,DlAG/`00253/MD k-1 - M E'S5/8 16 A, 'AlIRE H D 21.6NINQ SCHMUL FIRST FLOOR nw APRIL 1 JUNE SQUARE FEET SEPTEMBER SEED MIXTURE, E.RQSIO NANQ_SEDIMENTCONTROL PLAN E ,DATA 45% KENTUCKY BLUE PER REFERENCE PLIIAN l()% PERENI`IAL RYE CLEARING, GRUBBING, AND GRADING OF THE PROPOSED LOT iE5THOLE #40TOBELIMITEDTC) AREAS ADJACENT TO THE PROPOSED HOUSE, DRIVEWA"f', AND SEPTIC SYSTEM, 0"--8" TOPSOIL 2. DISTURBED AREAS TO BE LOAMED, SEEDED, AND MULCHED. 8"-21'4" DARK YELLOWISH—BROWN FINE SANDY LOAM 7 ALL TOPSOIL TO BE ST( DCKPILED ON SITE AND PR(TECTED 24"-83" OLIVE—GREY LOAMY MEDIUM—FINE SAND, COMPACT WITH HAYBALES OR SILT FENCE.NO LEDGE, WATER 4 24", MOTTLINt-I 0 24" 4. ALL ("UT AND FILL SLOPES ARE NOT TO EXCEED _3 1 SL" PE 5 PRIOR TO SITE DISTURBANCE, THE REPRESENTATIVE OF THE TEceTHOLE, 453 TO'AN OF MONTVILLE SHALL BE NOTIFIED WHEN SEDIMENT M» 9" DARK BROWN TO ONTROL MEASURES ARE IN PL4(--E SO THAT THE IfASPECTION 26*' YELLOW BROWN FINE: SANDY LOAM WITH SOME GRAVELI—AN OCCUR.2,6"-513" THE DEVELOPER WILL BE RESPONSIBLE FOR THE INSTALLATIOI`,_I GRAY TAN MODERATELY COMPACT FINE SAND AND GRAVEL AND MAINTENANCE OF ALL REQUIRED SEDIMENT CONTROL 53"-74" GRAY TAN SILTY LOAM WITH GRAVEL MEASURES THROUGHOUT CONSTRUCTION. NO LEDGE, NO WATER, DISTINCT MOTTLING ( 31 DUST CONTROL, 'WILL BE ACCOMPLISHED BY SPRA) T' , WITH PPLIC-TIC)N OF CALCiUM CHLiCDRIDE, A"ATER, AND IF NECES::ARTHE A TE THQLE 4139 0 "— 12 " TOPSOIL 12"-30" LIGHT BROWN FINE SANDY LOAM 30"-78" GREY—BROWN FIRM MEDIUM—FINE SILTY SAND, TRACE OF GRAVEL, TEMPORARY VEGETATIVE COVER NO LEDGE, WATER 0 42'", MOTTLING (94_ '8 P', ULC H ES APPLICATIk-__)'N RATE HC) TE S TE —TtJQLL 4 140 1 1PER1,000 F 0,"— 12" TOPSOIL STRAW/HAY lbs FREE FROM WEEDS 12"-36" LIGHT BROWN FINE SANDY LOAM 4ND ("OARSE M/JTER 37REY—BROWN FIRM MEDIUM—FINE SILTY SAND, TRACE OF GRAVEL N) LED(_3E, WATER C4- 40", MOTTLING 4 _30" D 21.6NINQ SCHMUL FIRST FLOOR SEEDIN6, DATES: APRIL 1 JUNE SQUARE FEET SEPTEMBER SEED MIXTURE, KII 45% RED FESCUE 45% KENTUCKY BLUE GRAS(.--, l()% PERENI`IAL RYE 51 ?.5 FREE ', F COARSE I,,.i.AT-ER 41F DRIED, TREAT ',AITH 12 -Iles- NITROGE1,4 TON 0' 0P SLOPE POST FJ-) F, _T4BILIT' AND ELF LEANINi__ C; T_ COMPACTED BACKFILL SILT EENCE NOT TO SCALE KNOCKOOT INLET AND OUTLET OPENINGS 7 + z CAST _-'0N(7PETF CAPACITIES 1250 GAL 61 1148' 1500 GAL El PROVIDE RtSE WITHIN 4 x 4 1 "12' 6 / 1 2 612' OF FINJSi CRAGE GA WII AT' INLET ANC LETEMESH' -7 SIRE E 4 PR, OUTLET FILTER P, y PL- 1242 INLET ENT041 FLET Ar, QVIV LLVEL— I ' ' 4 UTLETET-, CONTINUOUS HOT/ pt F - T BAFFLEE ASPHALT SEAL 4" SCHEN. jf4 LULEl SAEF 6c, ,A DEFLECTN Q 5ECTION FILTER FABRI' 4" PERI` ORATED PIPE -- PERCOLATION REE INFORMATION PROVIDED PER REFERENCE PLAN PERCOLATION RATE: PERC #371A = 6,0 MINUTES ff INCH PERCOLATION RATE: PIE -RC #178 = 4.0 MINUTES INCH N, LOCHDALE ESTATES, PROPERTY OF BERNARD BARNETT & HAROLD D. BATT FORSYTH ROAD AND JEFFERY MANC)R DRIVE, MONTVILLE, CONNECTICUT JANUARY 1992; TOTAL TECHNOLOGY. INC, DESIGN DALA PERCOLATION RATE = 6.0 MINUTES/INCH 4 BEDROOM RESIDENCE REQUIRES 661) SF OF LEACHING AREA PROVIDE 2-116' ('46" 48" WIDE) TRENCHES, CONNECIT ENDS EFFECTIVE LEACHING AREA — 726 SF PROVIDE A 1250 GALLON 2—COMPARTMENT TANK M.L.S.S, REQUIRED = 43 x 1.2 x 2.0 = 115-2 M..L,S.S. PROVIDED = 116 EIELEARE AREA QE PROPOSED SYSTEM AS EQLLQ_LS 1, REMOVE AND STOCKPILE TOPSOIL, 2 PLACE BANK RUN GRAVEL (LESS THAN 5% FINES) PLACED IN 6" LIFTS AND COMPACTED TO 95% DENSITY, 3. EXCAVATE 4' WIDE TRENCHES AND PREPARE SURFACE, 4, FILL TRENCHES WITH I" WASHED STONE TO HEIGHT OF PIPE INVERTS PLACE PIPE IN TRENCH, AND FILL TO 2" OVER TOP OF PIPE. 5. CAP ENDS OF PIPES, 6. PLACE A 4' WIDE STRIP OF NON—WOVEN FILTER FABRIC ON TOP OF THE ENTIRE LENGTH OF THE SYSTEM), AND BACKFILL WITH NATIVE MATERIAL, 7 REPLACE TOPSOIL, SEED & MUL-H NOIES It TOPOGRAPHIC INFORMATION ON THIS PLAN COMPLIES WITH T-21 MAPPING STANDARDS, 2. BASE FOR LEVELS, SUBDIVISION MAP, 3. PROPOSED HOUSE AND SEPTIC SYSTEM TO BE STAKED IN THE FIELD BY A LAND SURVEYOR LICENSED IN THE STATE OF CONNECTICUT. 4. LOT AREA = 1.50± ACRES 1,LE_ __-ET F L_ V I C)4, TE ,'Rl P T1 ON F -F FIRST FLOOR ELEV 4' S.F. SQUARE FEET 516 EXISTING CONTOURS-, KII NOT TO SCALE PERCOLATION REE INFORMATION PROVIDED PER REFERENCE PLAN PERCOLATION RATE: PERC #371A = 6,0 MINUTES ff INCH PERCOLATION RATE: PIE -RC #178 = 4.0 MINUTES INCH N, LOCHDALE ESTATES, PROPERTY OF BERNARD BARNETT & HAROLD D. BATT FORSYTH ROAD AND JEFFERY MANC)R DRIVE, MONTVILLE, CONNECTICUT JANUARY 1992; TOTAL TECHNOLOGY. INC, DESIGN DALA PERCOLATION RATE = 6.0 MINUTES/INCH 4 BEDROOM RESIDENCE REQUIRES 661) SF OF LEACHING AREA PROVIDE 2-116' ('46" 48" WIDE) TRENCHES, CONNECIT ENDS EFFECTIVE LEACHING AREA — 726 SF PROVIDE A 1250 GALLON 2—COMPARTMENT TANK M.L.S.S, REQUIRED = 43 x 1.2 x 2.0 = 115-2 M..L,S.S. PROVIDED = 116 EIELEARE AREA QE PROPOSED SYSTEM AS EQLLQ_LS 1, REMOVE AND STOCKPILE TOPSOIL, 2 PLACE BANK RUN GRAVEL (LESS THAN 5% FINES) PLACED IN 6" LIFTS AND COMPACTED TO 95% DENSITY, 3. EXCAVATE 4' WIDE TRENCHES AND PREPARE SURFACE, 4, FILL TRENCHES WITH I" WASHED STONE TO HEIGHT OF PIPE INVERTS PLACE PIPE IN TRENCH, AND FILL TO 2" OVER TOP OF PIPE. 5. CAP ENDS OF PIPES, 6. PLACE A 4' WIDE STRIP OF NON—WOVEN FILTER FABRIC ON TOP OF THE ENTIRE LENGTH OF THE SYSTEM), AND BACKFILL WITH NATIVE MATERIAL, 7 REPLACE TOPSOIL, SEED & MUL-H NOIES It TOPOGRAPHIC INFORMATION ON THIS PLAN COMPLIES WITH T-21 MAPPING STANDARDS, 2. BASE FOR LEVELS, SUBDIVISION MAP, 3. PROPOSED HOUSE AND SEPTIC SYSTEM TO BE STAKED IN THE FIELD BY A LAND SURVEYOR LICENSED IN THE STATE OF CONNECTICUT. 4. LOT AREA = 1.50± ACRES 1,LE_ __-ET F L_ VI C)4, TE ,'Rl P T1 ON F -F FIRST FLOOR ELEV ELEVATION S.F. SQUARE FEET 516 EXISTING CONTOURS-, 516 PROPOSED CONTC_)URS BUILDING SETBACK LINE TEST HOLE 51 ?.5 INVERT ELEVATION SEPTIC SYSTEM PLAN PREPARED FOR EVELr v 7D LOT #34 LOCHDALE DRIVE0I MONTVILLE, CONNECTICUT C—HANDLER, P:gin L_vlf_--FR 84 KHN(73 n IMIL qgWW% Wpm I%Ww Architecture, Engineering on SurveyingRAMW 110 BROADWAY NORWICK 063eO FAX 860-886-7801 I