Loading...
HomeMy WebLinkAboutSite PlanNOTES; 1, PRECAST CONCRETE CURBING SHALL CONFORM TO SECTION 882 AND M,03,01 OF THE STATE OF CONNECTICUT STANDARD SPECIFICATIONS 2, BITUMINOUS CONCRETE LIP CURBING SHALL CONFORM TO SECTION 885 AND SECTION M,04 OF THE STATE OF CONNECTICUT STANDARD SPECIFICATIONS ---- BITUMINOUS CURB -BACKFILL WITH 6" SCREENED LOAM, FERTILIZER, LIME, MULCH AND CONWED STRAWNETTING 6" -3' Compacted Thickness Connecticut D.D.T. Ctass 2 Bitumirmus Mix per CT DDT Standard Specification FORM 815 Materials 4' COMPACTED Section M,04, PROCESSED AGGR, BASE 2' COMPACTED GRAVEL SUBBASE ADJUSTMENT EXIST, SUBGRADE PARKING AREAS CU R B SECTION SCALE: N.T.S. GRASS SEED MIX INSTRUCTIONS: 1. ALL DISTURBED AND OPEN AREAS SHALL F31.'_ SEEDED AS FOLLOWS: A) GRADE AND FINISH RAKE EXISTING SUBGRADE. TOP DRESS WITH SCREENED LOAM AND FINISH RAKE LOAM, B) RAKE IN GRANULAR LIME AT A RATE OF 40 LBS PER 1,000 SQ.FT.. C) RAKE IN STARTER FERTILIZER (5-10-5) AT A RATE OF 10 LBS PER 5,000 SQ.F-T. D) SPREAD AND RAKE IN LOFT'S LOW MAINTENANCE GRASS SEED MIX E) COVER ENTIRE AREA WITH AN EVEN COVERING OF HAY MULCH. F) ROLL ENTIRE SEEDED AREA WITH HAND ROLLER. G) STAPLE "CONWED STRAW NETTING" OVER ENTIRE SEEDED AREA WITH A 18" MIN OVERLAP. NETTING AVAILABLE FROM HART SEED COMPANY 1-800-529-2537 H) WATER SEEDED AREAS APPROPRIATELY UNTIL ESTABLISHED. 1) REMOVE NETTING AND STAPLES IN LATE SPRING AFTER GRASS IS ESTABLISHED. 2. WATER ALL SEEDED AREAS WITHIN 24 HOURS OF PLANTING AND AS MANY 'TIMES THEREAFTER0 SUSTAIN HEALTHY CONDITIONS WITH SPECIAL ATTENTION TO WATERING DURING HOT DRY PERIOD& PARCEL 2 0 PARCEL I EXISTING OVERHEAD UTILITIES • EXISTING EDGE OF PAVEMENT PUMP HOUSE ALLOW OPE-NING ---- IN CURBING FOR J ' RUCK ACCESS TO PUMP i-IOUSE., SPEED BUMP SNET `5,33­_­� SPEED BUMP J SNET N ok #3532 ER DO NOT ENT ONE-WAY ONLY �o 4 SIGN 7 0 13CLC ;& EXISTING BRICK LIGHT POSTS 12-00 PROPOSED SCREEN PLANTINGS ITYP) ------ IL U) 11X3 9. Sr A nPT CT PIN 0 SPEED BUMP 04 \7 - - --------- Z�, :z ELF C I z z DO NOT ENTER 0 N E -- "NAY ONLY NTiNC S"IFT, 130LDIN BROU - DOWNSPO tj HAYEALES ANU LIMIT Ut S*P'L,- am r 0� COWITRUCTION LINE i 'vF_ mp) yING IST-.DENCF tjtTN 1BE0 To PAR I & NT AND PLA CO�4c RQ PP Or FUE� TANK FILLER PROPOSED SCREEN PLAN1 INGS (T 0 W 4- >< P 2 OVERHE UTILITIES ET #21965 ro SPEED BUM TOTAL PARKING SPACES = 93 UNDERGROUND FUEL TANK FILLER 2 of Cu OutsIde -B.0 2"D SPEED B I,i C 1 DOM? - D, M? Raymond F. Cherenzic, P.E_., L.S. P,O. Box 513 Groton Office 25 Ledward Avenue 500 Bridge Street Westerly, RI 02891 Groton, CT, 06340 (401) 596-7747 (860) 405-1900 FAX (401) 596-3610 FAX (860) 405--1990 http://www.cherenzio.com/ email: cherenzia@cherenzio.com 1BCLC LOCATIONMAI SCALE: 1 -= 1,201 X 2x 3' 1 ) DISTURBANCE OF SOIL, SURFACES IS REGULATED BY STATE LAW. ALL WORK CH K BY Strike LOCATED MAILBOX KIOSK TO PREVENT OR MINIMIZE SOIL, EROSION. 2'i FL 11 \*/ ( i Bales pirced THE RESPONSIBILITY OF THE LAND OWNER, DEVELOPER AND EXCAVATION on the coril.-ur NAME, ADDRESS, AND TELEPHONENI NUMBER OF THE IND RESPONSIBLE FOR THIS WORK (INCLUDING ANY CHANGES). A PRE ---CONSTRUCTION CONFERENCE WITH THE TOWN STAFF IS REQUIRED PRIOR TO ANY S,-rWORK OR DISTURBANCE. 3) Excavated Trunch FySEP�lc -TING EROSION AND SEDIMENT CONTROL" (1985), AS AMENDED AS A GUIDE IN -yp4K CO -VERS Compacted (Typ) L A N HAY BALE I' TLmTiA Backfill OFFICE BUILDING, HARTFORD, CONN., 06106. 4) INFORM ALL CONSTRUCTION SITE WORKERS ABOUT THE MAJOR PROVISIONS 1. B es shall be piaced ir a singt& row, kengthwise, j k k 11� STAKED HAYBALE DETAIL. oriented along the corltote,. Alth en(7,1's bales tig�-,tty ab, ttir-,,Q one anotio-,er_ 5'1 THE CONTRACTOR SHALL SCHEDULE ALL OPERATIONS 10 'LIMIT c oadI I 1�� )'cent SCALEi N.T.S. 6' OR THE TI Eill'', N-7 THE CONTRAG-TOR IS RESPONSIBLE M Z/ ---- 11 INSPE Tj-CiN, -"�,ELPAIR OR REPLA(,Dif-NT nF ER0qIr" F S 2, Bates _-;hall be entrenchect and Joackf'!'kted. A trench '7) INSPECT AND RFPAIR SEDIMENT CONTROL DEVICES AT THE shat1k be excavated 'he width of' a bate and the -iE CONT AC TOR SHAI 1 NO'r1rY THE ENGII`-,JE_ EP 0'7 LIN .,S.21, TlcP Af—rCRY tr?ngth of the proposed barrier to CA minim�m if CCI. _1ROL PL" AND SHALL_ ADDITIONAL Vr1'ASfJRF,S A� Di E ON �,N REG T ED. 9) depth of 4 Inches, V R E, DE ONLY 'yVTH THE WRITTEN APPROVA' OF THE 1;:,NG.!t4ErA;_'1ER 3. Eacr-, bate shall be secure!v anchoreci' by at teast 10) SOIL EROSIDN SEDIMENT CONTROL NOTES two (2) stakes, AS rG'1;_7N[7JRAL. FILL WITH�N LAWN AND LANDSCAPE AREAS. 4� between bales sha'U �,e we ri ,Ni �i straw The d, gags 1. Unnecessary clearing of any vegetation or ground cover wilt be avoided, Any ciisturbeo to prevent water "r-rom escaping oetween the bates area left unvegetated for more than five days will be covered with a hay or straw miAch to minimize erosion material, 5, sL.� c r, g,t The 1�)orrler shalt be exteno'eci -4-c El that -jFie bottoms of the end bates are higher in 2. Following final grading, ati, disturbed areas will be covered with 6' Loam and seeded as e top p 0,j� eLevat(.�)r,, than th bate I e ged, reseed;ng Y, tL occur c -scribeci in seeding notes, If any seeded areas are disturbed or damaged, as to assur-e that sediment tfacien rur-o'c U ;`tow described below, If any seeded areas are disturbed or damaged, reseeding wilt occur as either through or over the barriet-, but not soon as possible, ,-,.round it, If final grading occurs past October 15, disturbed areas wItL be seeded with winter rye- grass and mulched with hay or straw at a rate of 1.5 - 2 tons per acre. HAY BALE INSPEUTIDN 3. Any proposed vegetation which has not survived one growing seam will be reptaced. I 1, insr-,,ectIon shaft be made aft,, eac ir� storm 4, All suitable material excavated for roadway construction to be used etsewhere on site. event and repair or replace­ent shotk be mulde Unsuitable material witl be removed from the site and deposited In a suitabite tocatlor. promptty as needed, 5, All construction activity to occur between March 15 and October 15- to avoid adverse 2, ctepno; jt of accumulated sediment behind the Impacts on, Intermit -tent stream flow, bales is necessary if 112 of the original height of the bates, becomes fitted in with sediment, TOTAL PARKING SPACES = 93 UNDERGROUND FUEL TANK FILLER 2 of Cu OutsIde -B.0 2"D SPEED B I,i C 1 DOM? - D, M? Raymond F. Cherenzic, P.E_., L.S. P,O. Box 513 Groton Office 25 Ledward Avenue 500 Bridge Street Westerly, RI 02891 Groton, CT, 06340 (401) 596-7747 (860) 405-1900 FAX (401) 596-3610 FAX (860) 405--1990 http://www.cherenzio.com/ email: cherenzia@cherenzio.com 1BCLC LOCATIONMAI SCALE: 1 -= 1,201 PLAN REV&ONS EROSION AND SEDIMENT CONTROL - GENERAL NOTES 1 ) DISTURBANCE OF SOIL, SURFACES IS REGULATED BY STATE LAW. ALL WORK CH K BY SHALL. COMPLY WITH AN APPROVED "EROSION AND SEDIMENT CONTROL PLAN" LOCATED MAILBOX KIOSK TO PREVENT OR MINIMIZE SOIL, EROSION. 2'i THE INSTALLATION AND MAINTENANCE OF EROSION CONTROL DEVICES IS THE RESPONSIBILITY OF THE LAND OWNER, DEVELOPER AND EXCAVATION CONTRACTOR. TOWN OFFICIALS SHALL BE NOTIFIED IN WRITING OF THE NAME, ADDRESS, AND TELEPHONENI NUMBER OF THE IND RESPONSIBLE FOR THIS WORK (INCLUDING ANY CHANGES). A PRE ---CONSTRUCTION CONFERENCE WITH THE TOWN STAFF IS REQUIRED PRIOR TO ANY S,-rWORK OR DISTURBANCE. 3) THE CONTRACTOR SHALL USE THE "CONNECTICUT GUIDELINES FOR SOIL FySEP�lc -TING EROSION AND SEDIMENT CONTROL" (1985), AS AMENDED AS A GUIDE IN -yp4K CO -VERS CONSTRUC'TING THE EROSION AND SEDIMENT CONTROLS AS INDICATED ON (Typ) THESE PLANS. TFIVE GUIDELINES MAY BE OBTAINED FROM THE CONNECTICUT COUNCIL ON SOIL AND WATER CONSERVATION, STATE OFFICE BUILDING, HARTFORD, CONN., 06106. 4) INFORM ALL CONSTRUCTION SITE WORKERS ABOUT THE MAJOR PROVISIONS OF THE EROSION AND SEDIMENT CONTROL PLAN AND SEEK THEIR COOPERATION IN A AVOIDING THE DISTURBANCE OF THESF' CONTROL MEASURES. 5'1 THE CONTRACTOR SHALL SCHEDULE ALL OPERATIONS 10 'LIMIT DISTURBANCE TO THE SMALLEST PRACTICAL AREA FOR- TF -I- SHORTEST POSSIBLE TIME. 6' OR THE TI Eill'', N-7 THE CONTRAG-TOR IS RESPONSIBLE M Z/ ---- 11 INSPE Tj-CiN, -"�,ELPAIR OR REPLA(,Dif-NT nF ER0qIr" F S INSURE PROPER OPERATION. '7) INSPECT AND RFPAIR SEDIMENT CONTROL DEVICES AT THE END OF EACH WORKING DAY AND AFTER EVERY P't[dINST01",,4. -iE CONT AC TOR SHAI 1 NO'r1rY THE ENGII`-,JE_ EP 0'7 LIN .,S.21, TlcP Af—rCRY EpO&ON CONDITIONS NOT CONTROLLED BY THE ErP,'OSKUN AND SIECIIME:,r'41T if CCI. _1ROL PL" AND SHALL_ ADDITIONAL Vr1'ASfJRF,S A� Di E ON �,N REG T ED. 9) r-iELD "'HANGE'73 TO THE EROSION AND SEDIMENT COt'.11RO)i PL,4,N S4 LL BE rI- V R E, DE ONLY 'yVTH THE WRITTEN APPROVA' OF THE 1;:,NG.!t4ErA;_'1ER RI-FERRAL, At -,I'D APPROVAL OF TH`E TOWN STAFF. 10) ACCiU Y U L,",TEO SEDIMENT REMOVED FROM EROSION CO' TROL DEVIC't-S IS TO BE SPRE> D AND STABILIZED tN LEVEL, EROSION RESiSTANI'l LOCATIONS AS rG'1;_7N[7JRAL. FILL WITH�N LAWN AND LANDSCAPE AREAS. 11) AIL DISTURBED AREAS NOT COVERED BY BUILDINGS, PAVEMENI OR WOOD CHIPS SHALL BE PLANTED WFFH GRASS ON 6" THICKNE'S'z TO -'SOIL. PLAN REV&ONS DATE DESCRIPTION DWN BY CH K BY 11/15/02 LOCATED MAILBOX KIOSK RF -C SURVEY NOTES 1, Reference is made to the following plan: "PROPERTY SURVEY PL -AN, 'VILLAG'E APARTMENTS, PROPERTY 01- r BEAU COEUR ASSOCiATES, JIEROMIE ROAD MONTVILLE, ' "T Prepared By, Angus L. fv4cDonolld Gary Sharp & Associates, Inc. Old Saybrook, CT, Dated December 8, 1999 2, North arrow orientation is ti sed upon the [)Ian mentioned' in note 1 above, PAVING ]PLAN SHOWING PROPOSED TRAFFIC F"LOW. AND CURB ING 13REPARED FOR VILLAGE APA1_-_,',TMENTS JEROME ROM.) PARCEL I MONTVILLE, CONNECTICUT SCAIDE: 1, is = 3 0, DRA.IVN' BY: CJS:: NOVEM'BER, 12, 2002 CfIECK fid'": ND1.1 30 0 30 60 90 Feet ---------------- CIIERENZIA. & ASSOCIATES, jj'D. WESTERIN, RHODE ISLAND SHEET: 1. OF I JOB NO�: 202210 FILE NO.: