HomeMy WebLinkAboutPlot PlanC)
WN (CONT.) ip5ANNOIQNCRIIER,162'X2"X48" WOOD POST D M5T PIT AND PERCOLATION JE5I _..RsF=5UL25, _UA9Y D L.15
@ 8' ON CENTER (MIN) INDUSTRIAL NETTING, SNOW FENCE C. SUITABLE FILL MUST HAVE A PERCOLATION RATE OF 10.0 MINUTPROPOSED4BEHOU'-A 1 REFERENCE IS MADE TO PLANS TITLED ES/INCH OR 0ORWOVENWIREFENCEFORSUPPORTTESTPITS #9 AND #10 WERE DUG ON 1-27-88 AND FASTER TO BE ACCEPTABLE AFTER PLACEMENT AND COMPACTION. IF FILL IS U C:) DESIGN PERCOLATION RATE 1 0 -- 10 MINUTES/INCH 0 OJWITNESSEDBYSANDYPANDORA, MONTVILLE SANITARIAN. ()N 4
LE A. PLAN SET: "LOCHDALE ESTATES PROPERTY OF BERNARD BARNETT & HAROLD D. BATT UNACCEPTABLE. IT MUST BE REMOVED AND REPLACED WITH SUITABLE FILL. C)
9-91 AND ACHING AREA REQUIRED 660 SF EFFECTIVF <
0
m gin„
TEST PITS #127 AND #128 WERE DUG ON 1 MON
WITNESSED BY CONNIE DINERMAN OR RAY ANDREWS DESIGN 1,250 GALLON SEPTIC TANK WITH 2 ROWS OF 110 LF (TOTAL 220 LF) FOR PROPERTY LOCATED AT FORSYTH ROAD AND JEFFREY MANOR DRIVE TVILLE,
J
OF THE UNCAS HEALTH DISTRICT. OF 18" HIGH, 3' )NIDE LEACHING TRENCHES WITH ENDS CONNECTED CONNECTICUT JANUARY 1992 JOB NO. 87-4-80" BY TOTAL TECHNOLOGY, INC. D. INSTALL SYSTEM PER PLAN. _J Z % I0
FILTER FABRIC P-9 AND P-10 WERE PERFORMED ON 2-9-88, LEACHING AREA PROVIDED. 2 x 110 LF x 3 'FAF = 660 SF EFFECTIVE REVISED TO 7/9/92
P -41A WAS PERFORMED ON 6-20-91 100% RESERVE AREA PROVIDED E. COVER SYSTEM WITH 12 INCHES OF LOAM, GRADE TO PREVENT PONDING, AND
B "LOT LAYOUT - PHASE 1 LOCHDALE ESTATES PROPERTY OF BERNARD BARNETT SEED WITH GRASS TO STABILIZE. THE FINAL GRADE 15 FEET FROM THE o< pn
Z, L_ HAROLD D. BATT FORSYTH ROAD AND JEFFREY MANOR DRIVE MONTVILLE LEACHING TRENCHES SHALL BE AT LEAST THE SAME ELEVATION AS TOP OF
CONNECTICUT" SCALE: 1"=100' FEBRUARY 1993 BY TOTAL TECHNOLOGY, INC. THE RESPECTIVE LEACHING TRENCH. g
TP 9 MINIMUM LEACHING 5Y5TEM 5PREAD0" 8" TOPSOIL 2. ELEVATIONS BASED ON NATIONAL GEODETIC VERTICAL DATUM (NGVD). F. THE BLASTING OF LEDGE IS STRICTLY PROHIBITED IN AREA OF THE NEW
8" - 25" DARK YELLOWISH -BROWN FINE SANDY LOAM SEPTIC SYSTEM.
25" - 96" OLIVE -COARSE SAND, COMPACT LICULATION 3. ALL UTILITIES ARE APPROXIMATE. CONTRACTOR TO VERIFY ALL UTILITIES mGREYLOAMYMEDIUM
RE S ONTTLINGAT25 -30" 7. SEPTIC SYSTEM INSTALLATION SHALL CONFORM TO THE CURRENT EDITIONVI INOLEDGE, GROUNDWATER AT 55", MO (LOCATION AND ELEVATION) PRIOR TO CONSTRUCTION. CONTRACTOR SHALL CONTACT
P'N T E IN"` E
NOT TO SCALE
LEACHING TRENCHES 12' ON CENTER—1
I
PROPOSED (
APPROVED I
1 "SIZE STON
APPROVED F
IF REQUIRE[
18"MINIMUM
GROUNDWAl
OR MOTTLIN
LEACHING TRENCH
NOT TO SCALE
11pMM1[612A
SEED, GRADE
2EVENT PONDING
R FABRIC
RFORATED PVC
HOLES DOWN)
VIMUM TO LEDGE
5 SANITARY PIPE
520- - E)(15TINQ CONTOUR
PROP05ED CONTOUR
ZBUILDINGSETBACK, LINE
5525.5 PROP05ED SPOT GRADE
BITUMINOUS CONCRETE UP CUR13
135MT BASEMENT
CATCH BASIN
CIF CAST IRON PIPE
CPP CORRUGATED PLASTIC PIPE
D- BOX DISTRIBUTION BOX
LLEV ELEVATION
FF PIN15HF-0 FLOOR
FT FEET
INV INVERT
MIN MINIMUM
MH MANHOLE
PtQF PEP_F0QATE0
PROF' PQOPOSED
Pvf- POLYVINYL (CHLORIDE PIPE
5L0PIt_
5A[\4 SANITARY
SF SQUARE FEET
r: TOP OF FRAME
Ti'F TYPICAL
16 A INLAND WETLAND FLAC4 LOCATION AND NUMBER
TP
E
I C, DEEP TEST PIT LOCATION AND NUMBER
F 10 PERCOLATION TEST LOCATION AND NUMBf-R.
DUE TO DISTORTION DURING REPRODUCTION, THIS PRINT MAY NOT
SCALE EXACTLY. ALL DIMENSIONS SHOWN OVI 'RULE SCALING. IF
THERE ARE ANY 0150REPANCIE5, CONTACT ENGINEER.
Mims
O" - 8" TOPSOIL
8. - 36" DARK YELLOWISH -BROWN FINE SANDY LOAM, STONES
36" - 90 OLIVE -GREY LOAMY MEDIUM SAND, COMPACT
NO LEDGE, GROUNDWATER AT 60", MOTTLING AT 30"
TP_#1 27
0" - 10" TOPSOIL
10" - 36" LIGHT BROWN FINE SANDY LOAM
36" - 84" GREY -BROWN FIRM MEDIUM -FINE SAND, TRACE OF GRAVEL
LEDGE, GROUNDWATER AT 36", MOTTLING AT 30"
TP_#1 28
0. - 10" TOPSOIL
10" - 36" LIGHT BROWN FINE SANDY LOAM
36" - 74" GREY -BROWN MEDIUM -FINE SAND, TRACE OF GRAVEL
NO LEDGE, GROUNDWATER AT 36", MOTTLING AT 30"
P-9 PERCOLATION RATE AT 26" DEPTH = 10.0 MINUTES/INCH
P-10 PERCOLATION RATE AT 28" DEPTH = 10.0 MINUTES/INCH
P -41A PERCOLATION RATE AT 26" DEPTH = 6.0 MINUTES/INCH
DEPTH TO RESTRICTIVE LAYER = 25" "
CALL BEFORE YOU DIG' AT 1-800-922-4455 AT LEAST 72 HOURS PRIOR TO ANY OF THE "PUBLIC HEALTH CODE OF THE STATE OF CONNECTICUT BY THE STATE OF
EXCAVATION. CONNECTICUT DEPARTMENT OF HEALTH SERVICES. ALL MATERIALS (PIPING, SEPTIC
ISMAHYDRAULICGRADIENT5± % TANK, STONE, FILL) USED FOR THE SEPTIC SYSTEM SHALL CONFORM TO THE CURRENT A4mr,
21"
HYDRAULIC FACTOR (HF) 34 EDI4. THIS SITE IS LOCATED IN A R-40 ZONE. TION/REVISION OF THE "TECHNICAL STANDARDS FOR THE DESIGN AND CONSTRUCTION
FLOW FACTOR (FF) FOR 4 BEDROOMS = 2.0 OF SUBSURFACE SEWAGE DISPOSAL SYSTEMS".
PERCOLATION RATE 10.0 MINUTES/INCH 5. FOR EXACT HOUSE DIMENSIONS, SEE BUILDING PLANS,
PERCOLATION FACTOR (PF) = 1.2 8. PROPOSED HOUSE SEWER SHALL BE CAST IRON PIPE OR APPROVED EQUAL. ALL OTHER kMLSS = (HF) x (FF) x (PF) 6. SITE PREPARATION PROCEDURE FOR THE INSTALLATION OF THE NEW SEWAGE81,6' SEWER PIPE FOR THIS SEPTIC SYSTEM SHALL BE 4" PVC ASTM D3033 OR D3034
LEACHING SYSTEM SPREAD PROVIDED 110' DISPOSAL SYSTEM: WITH RUBBER COMPRESSION GASKET BELL AND SPIGOT OR APPROVED EQUAL.
A. STRIP ALL TOPSOIL, VEGETATION AND ORGANIC MATERIAL IN AREA OF 5 FEET 9. NO DEVIATION FROM THE APPROVED DESIGN PLAN SHALL BE ALLOWED WITHOUT PRIOR
SURROUNDING NEW PRIMARY LEACHING TRENCHES. APPROVAL FROM THE UNCAS HEALTH DISTRICT AND DESIGN ENGINEER. 3, E
wr
4B. PLACE AND COMPACT SUITABLE FILL MATERIAL (CLEAN BANK RUN GRAVEL) IN 10. TOPOGRAPHY TAKEN FROM PLANS REFERENCED IN NOTE #1.A.I W121kklikK
12 INCH LAYERS IN THE AREA OF THE PRIMARY LEACHING TRENCHES UP TO AT rv)
LEAST THE ELEVATION OF THE TOP OF THE TRENCHES.
2'_1
C-)
T75Tef-tT H A
LO CHnAlL -- -=` ____ ____ /-
FUT1jk)F ----- rCk ----- l
5TOem PIPE5FUTU91t 5— ce
TF 517-25
FLIT(Jk) INV 513.01(W)
INV 512-20(5) MH—,
FUTUkt C8 INV 512.00(f-)
TF 517,255ANPIPE
INV 513.41(5)
INV 513.3 1 (t) CPP iPHA5FFLITUeF'_
STPEET LJNr F-u-Tu9t SCLC
PHA5E
163
520
2CiZ0 ao 5t;
mmomw
GRAPHIC 5CALE IN FEET
CHF -CL WORt U51NQ)
Gn
0 , 1\ 1
C
DESERVE "?
vow
110
TP#9TP* 127
PDOU+P-4IA+ VC
o Nl\ 11
114v 1521.17 OUT t
INV 521.00
C')
BENCt
5PIrE INS014D
4 f-LEVATIOISOLID 'PIRO?
PVCC F (OFFo1PCPAIA
1995 TOTAL TECHNOLOGY INC.
These drawings are the property
of the Engineer and have been
specifically prepared for the owner
of this_ project, at this site, and
are not to be duplicated or used
in part or whole for any other
purpose, project, location or owner
without the expressed written
consent of the Engineer.
OF Z_ I
TH115 MAP 15 COMPILED FROM OTHER MAP5, DEED DIMEN51ON5
ND OTHER 5OU9.Ct-5 OF IN FORMATION, NOT TO BE CON5TRUED
AN ACCURATE 5URVEY AND 5UBJECT TO FINAL CHANQE5 JOB NO,
87-4-80.3
k5 A MORE ACCURATE 5URVEY MAY DI5CL05F_.
LO
z) Z
d
z
z
LD
r414
E-4
FZ4
W E c,
z
0
OF Z_ I
TH115 MAP 15 COMPILED FROM OTHER MAP5, DEED DIMEN51ON5
ND OTHER 5OU9.Ct-5 OF IN FORMATION, NOT TO BE CON5TRUED
AN ACCURATE 5URVEY AND 5UBJECT TO FINAL CHANQE5 JOB NO,
87-4-80.3
k5 A MORE ACCURATE 5URVEY MAY DI5CL05F_.