Loading...
HomeMy WebLinkAboutSite DevelopmentONING COMPLIANCE TABLE: WRP-160 TEM REQUIRED • • OVIDED jMINIMUM LOT AREA 160,000 SF HDPE HIGH DENSITY POLYETHYLENE PIPE 839,592± SF MINIMUM LOT •# 1 . THIS SURVEY HAS BEEN PREPARED PURSUANT TO THE REGULATIONS OF CONNECTICUT STATE FF FINISH FLOOR ;, L* MINIMUM FRONT .•D 75 FT BSMT BASEMENT 279 FT MINIMUM SIDE A'1 30 FT CB CATCH BASIN 35 FT MINIMUM :• YARD CL TF TOP OF FRAME i 2 i BUILDING HEIGHT 35 FT INV INVERT <35 FT WATER SUPPLYM PRIVATE SANITARY SSDS i, *MINIMUM LOT FRONTAGE MAY BE REDUCED TO NO LESS THAN 50' FOR LOTS FACING A CIRCULAR TURNAROUND AT THE END OF A DEAD END STREET PER SECTION 4.10.2 OF THE TOWN OF MONTVILLE ZONING REGULATIONS. MC R=60.00' L=84.42' TAN=50.90' A =so 37'06" N/F CMI)=77.63' CH BRG=N89'09'59 "E Ralph L. Lamb Kathleen M. Larne i Volume 561, Page 205 CB Type "C" TF= 411.21 Inv 15" HDPE=405.6 Mr Drainage Easement In Favor of The Town Of Montville Per Reference Map 1 N��3g�24�� ' Conc 137.91 Mon Rec Inv 15" HDPE (Full of Debris) PERCOLATIONTEST RESULTS NOTE: PERCOLATION TEST RESULTS WERE TAKEN FROM REFERENCE MAP 1. LOT 5 - PERCOLATION TEST DATA: TOTAL DEPTH - 28" PRESOAK AT 9:22 AM 10:24 - 15" 10:26 - 17..125" 10:28 - 18.5" 10:30 - 19.25" 10:32 - 20„ 10:34 - 21" 10:36 - 22.5" 10.38 23.5" 10:40 24" 10:41 - 26.5" 17 MINE 11.5 IN = 1.5 MIN/IN FERC. RATE: 1 - 10 MIN. Conc Mon Rec J am*1e'S Wa% 1 Conc Mon Rec - Brush Line PRLVIDE AND MAINTAIN `t ^T7 -TRACKING PAD AT SITE ENTRANCE ('SEE DETAIL) �n l a od 1101431HOMI TEST HOLES RECORDED BY AMANDA ACHMATOW & ROBERT RUSSO, C.S.S. ON NOVEMBER 19, 2002. TN 5A 90" TOTAL DEPTH 0"---90" FINE TO VERY FINE GRAY, GRAY BROWN, BROWN SAND *SAND & GRAVEL IN NORTH SIDE OF CORNER NO BEDROCK 87" WATER 44" MOTTLING TFC j5B 84" TOTAL DEPTH 0"-56" LIGHT BROWN, GRAY BROWN SAND 56".-84" GRAY BROWN, DARK BROWN SAND & GRAVEL NO TOPSOIL NO BEDROCK NO WATER NO MOTTLING TH j5C 96" TOTAL DEPTH O"_9" YELLOW BROWN SANDY LOAM TOPSOIL 9"-77" PALE BROWN FINE SAND 77"--96" DARK GRAY SAND SATURATED NO BEDROCK NO WATER 48" MOTTLING jH j5D 114" TOTAL DEPTH O"-13" YELLOW BROWN SANDY LOAM TOPSOIL 13"--43" MEDIUM TO FINE PALE BROWN SAND 43"-114" DARK GRAY, GRAY BROWN FINE SAND NO BEDROCK 97" WATER 43" MOTTLING N/ Barry E. Ellison Jr. Lynora Ellison Edge of Volume 5631 Page 371 Mowed Lawn Transformer WIDEN EXISTING GRAVEL DRIVE TO 12' (MIN.) AS NEEDED 55' OF 4" SCHED 40 PVC S = 1/4" PER FT (MIN.) S84 32'13"E _ 294.21' vvv #350 Limits of Conservation Easement Per Reference ,Mop 1 LEGE:1 ABBREVIATIONS Inland Wetlands NIF MORE OR LESS. GTD TYP TYPICAL x 4'V.J PVC POLYVINYL CHLORIDE X 410.0 HDPE HIGH DENSITY POLYETHYLENE PIPE - SF SQUARE FEET 1 . THIS SURVEY HAS BEEN PREPARED PURSUANT TO THE REGULATIONS OF CONNECTICUT STATE FF FINISH FLOOR U �DPOPOSED CINTOUR BSMT BASEMENT C PROPOSO TIM LINE z CB CATCH BASIN Q MONUMENT CL TF TOP OF FRAME i 2 i CATCH BASIf v, INV INVERT `t' PERCOLAT'Ot TEST HOLE LOCATION AND TOPOGRAPHIC SURVEY BASED ON DEPENDENT SURVEY AND CONFORMS TO SCHED SCHEDULE w LF LINEAR FEET S SLOPE C) Pi�= HH HANDHOL.E ce- 0, CO LU p HHT HAN'DHOL.E TELECOMMUNICATIONS W// WITH 2. NORTH ORIENTATION DEPICTED HEREON IS BASED UPON REFERENCE MAP 1. WF WETLAND FLAG ,#1 CONC CONCRETE �- MON MONUMENT REC RECOVERED `v w O �i CL � 2019 BOUNDARIES LLC 4. THE LOCATIONS OF UNDERGROUND UTILITIES AS SHOWN HEREON ARE BASED ON THE LOCATION THIS DRAWING IS THE PROPERTY OF BOUNDARIES LLC AND HAS BEEN SPECIFICALLY PREPARED FOR THE OWNER OF THIS PROJECT, AT THIS SITE, AND IS NOT TO BE 4--J DUPLICATED OR USED IN PART OR WHOLE FOR ANY OTHER PURPOSE, PROJECT, LOCATION U OR OWNER WITHOUT THE EXPRESSED WRITTEN CONSENT OF BOUNDARIES LLC. Inland Wetlands NIF NOW of FORIERLY GTD 'J '"'J i✓ ✓7411::, W x 4'V.J �_X i'"�'G �Pu ---EVA TION X 410.0 PRDPCS L D 307 ELEVAT70N - BUILDING SE3ACK LINE 1 . THIS SURVEY HAS BEEN PREPARED PURSUANT TO THE REGULATIONS OF CONNECTICUT STATE EXISTING COITOUR �DPOPOSED CINTOUR TREE LWE PROPOSO TIM LINE • ANGLE POW El MONUMENT 0 FENCE POST i 2 i CATCH BASIf DEEP TEST IOL L `t' PERCOLAT'Ot TEST HOLE LOCATION AND TOPOGRAPHIC SURVEY BASED ON DEPENDENT SURVEY AND CONFORMS TO A HORIZONTAL CLASS A-2 AND TOPOGRAPHIC CLASS T-2 ACCURACY STANDARDS. IT IS INTENDED DDC- Pi�= Know whan below. Call beforeyou t IV Fence Post w/Wetlands Plaque WF #345 Limits of Wetlands Per Reference Mop 1 SANITARY DESIGN CRITERIA & ML_SS CALCULATIONS PROPOSED 4 -BEDROOM HOUSE DESIGN PERCOLATIO14 RATE = 1.5 MINUTES/INCH LEACHING AREA REQUIRED = 577.5 SF EFFECTIVE DESIGN: 1,125 (MIN) GALLON CONCRETE SEPTIC TANK AND 2 ROWS OF 97' OF 12" HIGH, 4' WIDE LEACHING TRENCHES WITH ENDS CONNECTED LEACHING AREA PROVIDED = 97 LF X 2 X 3.0 SF/LF = 582 SF EFFECTIVE 1009 RESERVE AREA PROVIDED (2 ROWS OF 96.25' OF 12" HIGH, 4' WIDE LEACHING TRENCHES' WITH ENDS CONNECTED) HYDRAULIC GRADIENT = 2.69 DEPTH OF RECEIVING SOIL = 43" HYDRAULIC FACTOR = 28 FLOW FACTOR FOR 4 BEDROOMS = 1.75 PERCOLATION FACTOR FOR UP TO 10.0 MIN/INCH = 1.0 MLSS REQUIRED - 49' MLSS PROVIDED = 97' SI~NCF1��IARIC ,� Southeast Comer ` 1,125 GALLON (MIN) CONCRETE SEPTIC TANK W1 (2) g of Conc Pad ACCESS MANHOLES TO WITHIN 12" OF FINISHED GRADE 50 &.(e° /mond Elev=413.14 INV 410.58 IN eg ,,ted Wetlands PROPOSED UNDERGROUND INV 410.33 OUT \ R ' UTILITY SERVICE Q � ti 27 OF 4 SCHED 40 PVC- ,,� Limits of Wetlands S = 1/4 " PER F7` (MIN.) `, - -- ; `\ Per Reference Map 1 PROPOSED GRAVEL "T • DRIVEWAY (SEE DETAIL) ;: 7-7:_ _ - - _ \ \ `amu _ SANITARY \ \ �� FEASIBLE LOCATION FOR TEMPORARY INV 411.15 \ \ TOPSOIL STOCKPILE WnH SEDIMENT FENCE BARRIER OF 4' WIDE, 12" DEEP INV 409.17 IN ;0" WITH WITH ENDS CONNECTED INV" 409.00 OUT (3) � � � �,\ sfs 01 LL L TRENCHES = 408.50 R ' .: 41�> ��\ \ DO ff (SEE DETAIL) , TH5B �. , a ¢72 ELEVATION 10' 409.5 (TYP) 410.50 Stock Pile,�-- FEASIBLE LOCATION FOR FUTURE IN -GROUND POOL 0 SCS 7�/.. D -BOX (SURROUNDED W/ :.� '4'£S c`� , rr \ ,� c� r\ r 12" CRUSHED STONE) 4 \� o r � � / \ o M INV 409.00 IN �\ �\ ® r , %�X 41(} ,r, INV 409.00 OUT (2) r �" THSC 7' OF 4'° PVC ' 408 ss'j c-' \ ? _ 0.000 _-406,2 Stat s a PROVIDE: AND MAINTAIN CONTINUOUS \ � \ Pile \ � � 9 SEDIMENT FENCE BARRIER,iWOOD CHIP `d �, `-,, =' PROPOSE -? . BERM THROUGHOUT COZY UCTION `\ tKDtS' .y DRILLED (520"-*) (TYP) WELL ��?` ` 75' i - Well Radius `.-- 4" PVC FOOTING DRAIN TO DAYLIGHT 'j S = 114 PER FT (MIN.) Fence PostInland - r� Wetlands w/Wetlands Plaque 11 - -.- - - FOOTING DRAIN OUTLET r- Limits of Conservation WF W/RODENT SCREEN Easement Per #340 �_�� Reference Map 1 o co o . o 4� Q GRAPHIC SCALE sfl so 15 p 30 ( IN FEET 1 inch = 30 ft r--4: 20003' � � i �' l _ 1 JEFFRD �, P.E - LICENSE NO. DATE LOCATION MAP SCALE. 1"-1000' Q L SURVEY NOTES 1 . THIS SURVEY HAS BEEN PREPARED PURSUANT TO THE REGULATIONS OF CONNECTICUT STATE v ID AGENCIES SECTIONS 20-3008-1 THROUGH 2O -300B-20 AND THE "STANDARDS FOR SURVEYS AND ,MAPS IN THE STATE OF CONNECTICUT" AS ADOPTED FOR USE BY THE CONNECTICUT LU ASSOCIATION OF LAND .SURVEYORS, INC. ON SEPTEMBER 26, 1996. IT IS AN IMPROVEMENT ?C> co cr_u LOCATION AND TOPOGRAPHIC SURVEY BASED ON DEPENDENT SURVEY AND CONFORMS TO HORIZONTAL CLASS A-2 AND TOPOGRAPHIC CLASS T-2 ACCURACY STANDARDS. IT IS INTENDED 0- TO BE USED FOR SITE DEVELOPMENT 0, CO Uj -1 v �-- c- SCALE. 1"-1000' SURVEY NOTES 1 . THIS SURVEY HAS BEEN PREPARED PURSUANT TO THE REGULATIONS OF CONNECTICUT STATE AGENCIES SECTIONS 20-3008-1 THROUGH 2O -300B-20 AND THE "STANDARDS FOR SURVEYS AND ,MAPS IN THE STATE OF CONNECTICUT" AS ADOPTED FOR USE BY THE CONNECTICUT ASSOCIATION OF LAND .SURVEYORS, INC. ON SEPTEMBER 26, 1996. IT IS AN IMPROVEMENT LOCATION AND TOPOGRAPHIC SURVEY BASED ON DEPENDENT SURVEY AND CONFORMS TO HORIZONTAL CLASS A-2 AND TOPOGRAPHIC CLASS T-2 ACCURACY STANDARDS. IT IS INTENDED TO BE USED FOR SITE DEVELOPMENT 2. NORTH ORIENTATION DEPICTED HEREON IS BASED UPON REFERENCE MAP 1. 3. VERTICAL DATUM DEPICTED HEREON IS APPROXIMATE NORTH AMERICAN VERTICAL DATUM 1988 (NAVD88) BASED GLOBAL POSITIONING SYSTEM OBSERVATIONS USING GEOIDE12B ON FEBRUARY 7, 2019. (� �i 4. THE LOCATIONS OF UNDERGROUND UTILITIES AS SHOWN HEREON ARE BASED ON THE LOCATION 4--J OF ABOVE GROUND STRUCTURES AND RECORD DRAWINGS PROVIDED BY OTHERS. NO EXCAVATIONS WERE MADE DURING THE PROGRESS OF THIS SURVEY TO LOCATE BURIED UTILITIES/STRUCTURES. ALL SUBTERRANEAN FEATURES AND IMPROVEMENTS MAY NOT BE DEPICTED OR NOTED HEREON. THE LOCATIONS OF UNDERGROUND UTILITIES/STRUCTURES MAY ®. , VARY FROM LOCATIONS SHOWN HEREON. ADDITIONAL BURIED UTILITIESISTRUCTURES MAY BF ENCOUNTERED. CONTACT "CALL BEFORE YOU DIG" AT LEAST 48 HOURS PRIOR TO ANY EXCA „>rATION OPERATIONS. 5. THE FIELD SURVEY WAS COMPLETED ON FEBRUARY 7, 2019. LAND RECORD AND RELATED RESFARCH WAS COMPLETED ON FEBRUARY 15, 2019.'"" o 6. RECORD TITLE TO THE SUBJECT PROPERTY MAY BE REFERENCED TO A WARRANTY DEED FROM LAND DEVELOPMENT, LLC TO JEFFREY C. BREHLER AND LORI E. BREHLER RECORDED MAY E 4-JRMD 15, 2,017 IN THE TOWN OF MONTVILLE LAND RECORDS VOLUME PAGE m®..� C 625, 1039. * i o 7. SUBJECT PROPERTY IS ZONED WATER RESOURCE PROTECTION WRP-160. 0 h0. �"`� CO REFERENCE MAP 4-J > 1. BOUNDARY & TOPOGRAPHIC SURVEY AND SUBDIVISION PLAN, PREPARED FOR VENUTI ENTERPRISE DEERRIDGE SUBDIVISION, ROUTE 82 AND OLD COLCHESTER ROAD EXT., MONTVILLE CONNECTICUT, SHEETS 2 & 6, DATED DECEMBER 2002, PREPARED BY: CLA ENGINEERS, INC.j Ln E C: so - AWN#. "TO MY KNOWLEDGE AN LIEF THIS MAP IS SUBSTANTIALLY CORRECT AS NOTED EREDN." 70016 is JR. L.S. LICENSE NO. DATE I February 20 9 i •: I.D. NO. 19-2682 Revisions V1 1 EXISTING GRADE APPROXIMATE TOPSOIL DEPTH PROPOSED GRADE SLOPE SELECT FILL 0 2H.1 V PER DEEP TEST HOLE #5D (MAX) TO EXISTING SUBSOIL 412 10' (MIN) 412 - - ® 5s 410 - - __ - - - _ s.... -4-:7 ® 6" MIN _ ""- _""- 410 408 408 _..._ .-.... �... �-. _®.. _._. �.. 18" MIN � ®.� � 406 406 ._._ __.. -- �....-...®_ 404 ZAPPROXIMATE 404 MOTTLING ELEVATION 12" X 4' LEACHING TRENCHES (TYP) LIMIT OF SELECT FILL TO BE PLACED ELEVATION = 400.50 (MIN.) PER DEEP TEST HOLE 15D BOTTOM ELEV 408.50 (DEPTH VARIES - EXISTING TOPSOIL TO BE REMOVED) 8' ON CENTER 10' TO TOP X48-"-- PROPOSED GRADE, OF EMBANKMENT GRADE TO PREVENT PONDING I 6" BACKFILL (MIN) i �� !ETF NON -WOVEN j FABRIC FILTER APPROVED FILL AS MIN. 12" FI II " f� APPROVED STONE AGGREGATE REQUIRED (SEE 6 (MIN) (SEE SANITARY NOTE #7) SANITARY NOTES #6 -3 �-- x__111=41r=11 -� 1 t ®EEE-+ F 18" MIN. TO GROUNDWATER AND #10) 4" PERF PVC OR MOTTLING <z- 48" MIN. TO LEDGE 11 " STONE LEACHING TRENCH NOT TO SCALE PROVIDE ACCESS MANHOLES 20 WITHIN FINISHED 12" OF FINISHED GRADE AT INLET AND GRADE OUTLET MINIMUM 17"---,,, DIAMETER MANHOLE (GASKETED) INLET INLET BAFFLE--_ 213 REQUIRED CAPACI T"- 1,125 GALLON (MIN.) SEPTIC TANK (TESTED WATERTIGHT) LENGTH NOT GREATER THAN 4 TIMES WIDTH OR DEPTH SEPTIC TANK DETAIL NOT TO SCALE ti a L3 da , 15-112-- PLAN 5-112"-PLAN i 1 �--2-114" a E-2-112" NOTE: USE 4HDBOX BY SECTION JOLLEY PRECAST, INC. OR APPROVED EQUAL D -BOX DETAIL NOT TO SCALE Q 2018 BOUNDARIES LLC THFS DRAWING IS THE PROPERTY OF BOUNDARIES LLC AND HAS BEEN SPECIFICALLY PREPARED FOR THE OWNER OF THIS PROJECT. AT THIS SITE, AND IS NOT TO BE DUPLICATED OR USED IN PART OR WHOLE FOR ANY OTHER PURPOSE, PROJE(; , LOCATION OR OWNER WITHOUT THE EXPRESSED WRITTEN' CONSENT OF BOUNDARIES LLC. MINIMUM 17" DIAMETER MANHOLE (GASKETED) ,�- MARKINGS OUTLET OUTLET FILTER DEVICE 113 REQUIRED CAPACITY y 2-112" BIT: CONC.. PAVEMENT (MIN.) SUITABLE COMPACTED Z_j����� fi" PROCESSED SUL3G 'ADE_ GRAVEL (MIN.) SECTION VIEW 14� DRIVEWAY TRAVEL SURFACE ./ SEE SECTION VIEW 5;� BITUMINOUS 8' RADIUS CONCRETE (TYP.) NOT TO SCALE - 4" TOP COURSE - ROLLED BANK RUN GRAVEL CONFORMING TO CT DOT FORM 816 M.02.03 AND M.02.06 GRADATION "C" OR COMPACTED 1-114" PROCESSED TRAPROCK MIX 40 00 0. aa. ' 91 4 0. _d d _ C O 0 0 0�,0 O 0 0`'c 0 0,__,0-0-0,__,0-0c 0 8" BINDER COURSE - ROLLED 0 O O BANK RUN GRAVEL. CONFORMING ' C 0 0 raam6g .03 , 0 C COMPACTED SUITABLE:0U 0[ SUBGRADE TRAFFIC N GRAVEL SUK"'FACE 3 s� ``'^+.. tltlaa❑tl❑aDo❑ °❑„O❑ ❑-_❑❑ ❑a❑4 °❑o4 tl°atltl❑a� a❑❑aQDaoa❑4a❑tlo tl❑ ❑❑0aaa❑❑❑a a❑tl❑a®a❑oO Q❑❑❑❑❑00 aaa a o❑ ❑ I ' -R= 10' MIN ( df a ❑ ❑oaado❑❑ a❑o❑ooa ❑❑Ua❑❑aotlaa0g0aoo❑aa❑❑ 4❑❑tO❑0 ❑a{CT. DOT #3 STOKE6'- 000000000000000000000o MINIMUM 12' OR `-FILTER FABRIC AS RE4UIRED ANTI -TRACKING PAD NOT TO SCALE FILTER FENCE 12" MIN. DEPTH 1. THIS SEPTIC SYSTEM INSTALLATION INCLUDING ALL MATERIALS (PIPING, SEPTIC TANK, STONE, FILL, ETC.) USED FOR THIS SEPTIC SYSTEM SHALL CONFORM TO THE CURRENT EDITION/REVISION OF THE `TECHNICAL STANDARDS FOR SUBSURFACE SEWAGE DISPOSAL SYSTEMS" REVISED JANUARY 1, 2018 OF THE CONNECTICUT PUBLIC HEALTH CODE BY THE STATE OF CONNECTICUT DEPARTMENT OF PUBLIC HEALTH. 2. THE PROPOSED HOUSE SEWER FROM THE BUILDING TO THE SEPTIC TANK SHALL BE SCHEDULE 40 PVC ASTM D 17851ASTM D 2665 OR APPROVED EQUAL AND INDICATED IN TABLE NO. 2 OF "TECHNICAL STANDARDS FOR SUBSURFACE SEWAGE DISPOSAL SYSTEMS" ALL OTHER SEWER PIPE FOR THIS SEPTIC SYSTEM SHALL BE 4" PVC ASTM D3034, SDR 35 WITH RUBBER COMPRESSION GASKET OR BELL AND SPIGOT OR APPROVED EQUAL. J. THERE ARE NO WELLS (POTABLE, GEOTHERMAL, OR IRRIGATION) WITHIN 75' OF THE PROPOSED SEPTIC SYSTEM. THERE ARE NO SEPTIC SYSTEMS WITHIN 75' OF THE PROPOSED WELL. 4. THERE SHALL BE NO STUMPS BURIED ON SITE OR BOULDERS BURIED WITHIN 50' DOWN GRADIENT OF THE SEPTIC SYSTEM. SHOULD ANY SIGNIFICANT VARIATIONS FROM THE TEST HOLE DATA BE ENCOUNTERED DURING EXCAVATIONS (LEDGE, GROUNDWATER, MOTTLING, SOIL TYPE, ETC.), THE DESIGN ENGINEER SHALL BE NOTIFIED PRIOR TO INSTALLATION OF THE SEPTIC SYSTEM. 5. ALL EXISTING UTILITIES ARE APPROXIMATE ONLY. THE CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS AND ELEVATIONS PRIOR TO ANY CONSTRUCTION. CONTRACTOR SHALL CONTACT "CALL -BEFORE -YOU -DIG" AT 1-800-922-4455 AT LEAST 48 HOURS PRIOR TO ANY EXCAVATION. 6. IF REQUIRED THE PROPOSED FILL FOR THIS SEPTIC SYSTEM SHALL MEET THE FOLLOWING SPECIFICATIONS: A. 1007. OF FILL SHALL PASS THROUGH A 3" SIEVE. B. MAXIMUM 7. OF GRAVEL (BETWEEN 114 & 3" SIEVE) = 457.. C. GRADATION OF FILL WITHOUT THE GRAVEL SHALL MEET THE FOLLOWING CRITERIA: SIEVE SIZE 7. PASSING (WET) % PASSING(DRY) #4 1007. 10070 #10 70 - 100% 70 - 1007. #40 10 - 507.* 10 - 75% #100 0-207. 0-57 #2030 0-57. 0-2.57. D. * PERCENT PASSING THE #40 WET SIEVE CAN BE INCREASED TO NO GREATER THAN 757. IF THE PERCENT PASSING THE #100 SIEVE DOES NOT EXCEED 107' AND THE #200 SIEVE DOES NOT EXCEED 59.x. E: PERCOLATION RATE AFTER PLACEMENT AND COMPACTION SHALL BE FASTER THAN OR EQUAL TO 10.0 MINUTES/INCH. A WET OR DRY SIEVE ANALYSIS MAY BE REQUIRED PRIOR TO FILL PLACEMENT TO VERIFY THAT IT MEETS THESE SPECIFICATIONS. THE FILL SHALL BE APPROVED BY THE LOCAL HEALTH DISTRICT/DEPARTMENT OR DESIGN ENGINEER PRIOR TO ITS PLACEMENT ON SITE. 7. APPROVED STONE AGGREGATE MANS CRUSHED OR BROKEN STONE, OR CRUSHED AND UNCRUSHED GRAVEL MEETING THE GRADATION FOR NO. 4 (1!14" STONE) OR NO. 6 P14" STONE) AGGREGATE PER DEPARTMENT OF' TRANSPORTATION FORM 816 SPECIFICATION M.01.01 (OR LATEST SPECIFICATION), AND THE #40 AND #200 SIEVE GRADATION STIPULATED IN SECTION V111 A, BASED ON A WET SIEVE ANALYSIS. STONE AGGREGATE SHALL BE FREE OF SILT, DIRT OR DEBRIS, AND SHALL SHOW A LOSS OF ABRASION OF NOT MORE THAN 507. USING AASHTO METHOD T-96, AND WHEN TESTED FOR SOUNDNESS USING AASHTO METHOD T-104 NOT HAVE A LOSS OF MORE THAN 15% AT THE END OF 5 CYCLES. NO. 4 AGGREGATE NO. 6 AGGREGATE* SIEVE SIZE % PASSING % PASSING 2 INCH 1007. NIA 1.5 INCH 90 - 1009 NIA 1 INCH 20 - 55% 1007 314 INCH 0 - 15Z 90 - 100% 112 INCH NIA 20 - 55% 318 INCH 0 - 5.9 0 - 15% #4 N/A 0 - 57 #40 0 - 3. 0 - 13% #200 0 - 1.57. 0 - 1.5% * NO. 6 AGGREGATE IS ONLY APPROVED TO BE USED FOR LEACHING TRENCHES AND PROPRIETARY SYSTEMS ONLY. 8. NO DEVIATION FROM THE APPROVED DESIGN PLAN SHALL BE ALLOWED WITHOUT PRIOR WRITTEN APPROVAL FROM THE LOCAL HEALTH DISTRICTIDEPARTMENT AND THE DESIGN ENGINEER. 9. THE SEPTIC TANK SHALL BE PRECAST CONCRETE UNLESS OTHERWISE AUTHORIZED BY THE DESIGN ENGINEER. 10. SITE PREPARATION PROCEDURE FOR THE INSTALLATION OF THE PROPOSED SEPTIC SYSTEM- A. STRIP ALL TOPSOIL, VEGETATION AND ORGANIC MATERIAL IN THE AREA OF, AND 5' SURROUNDING, THE PRIMARY LEACHING TRENCHES. B. EXCAVATE TO DESIGN ELEVATION PER PLAN. USING A HEAVY RAKE OR EQUAL, THOROUGHLY SCARIFY AND ROUGHEN UP THE EXPOSED SUBSOIL. PREVENT ANY VEHICULAR TRAFFIC, BACKHOE, TRUCKS, ETC. FROM SMOOTHINGICOMPACTING THIS EXPOSED SUBSOIL. C. INSTALL SEPTIC SYSTEM PER PLAN USING APPROVED STONE AGGREGATE AS INDICATED IN NOTE #7. D. COVER SYSTEM WITH APPROVED FILTER FABRIC AND A MINIMUM OF 6" OF LOAM IN LAWN AREAS. GRADE TO PREVENT PONDING AND SEED WITH GRASS TO STABILIZE. THE FINISHED GRADE 40' FROM ANY PART OF THE PROPOSEL ' EACH06 TRENCHES SHALL BE AT LEAST THE SAME ELEVATION AS THE TOP OF THE RESPECTIVE LEACHING TRENCH. E. ACCESS MANHOLES AT THE INLET BAFFLE AND AT THE OUTLET FILTER OF THE SEPTIC TANK SHALL BE INSTALLED TO WITHIN 12" OF FINISHED GRADE, 11. FOR EXACT HOUSE- AND GARAGE DIMENSIONS, SE BUILDING PLANS. 12. BENCHMARK TO BE LOCATED IN THE AREA OF DEVELOPMENT PRIOR TO THE START OF CONSTRUCTION. 13. PRIOR TO CONSTRUCTION, THE HOUSE AND GARAGE, AND SEPTIC SYSTEM SHALL BE STAKED OUT BY A LICENSED LAND SURVEYOR. NARRATIVE CONNECTICUT.THIS PROPOSAL INVOLVES A 19.J± ACRE PROPERTY IDENTIFIED AS 10 JAMIE'S WAY IN THE TOWN OF PROPERTY PART OF A 2002 SUBDIVISION GRADING.UNDEVELOPED. THERE IS AN EXISTING GRAVEL DRIVEWAY ON THE SITE. THE PROPOSAL INVOLVES THE CONSTRUCTION OF A NEW 4 -BEDROOM RESIDENCE WITH ATTACHED J -CAR GARAGE AND ALL RELATED SITE IMPROVEMENTS INCLUDING A NEW SUBSURFACE SANITARY DISPOSAL SYSTEM, A NEW DRILLED WELL, AND SITE THE CURRENT ZONING DESIGNATION OF THE SUBJECT PROPERTY IS WRP-160 (WATER RESOURCE PROTECTION ZONE). THERE ARE INLAND WETLANDS OR WATERCOURSES LOCATED UPON OR WITHIN 50' OF THE SUBJECT PARCEL. NO PART OF THE CONSTRUCTION AND GRADING WILL TAKE PLACE WITHIN THE 50' i _. Y D As t PROPOSED TOPSOIL I ' t ON i' REUSE IN CONJUNCTIONGRADING STABILIZATION AND FOR STABILIZING AREAS OUTSIDE OF BUILDINGS, CIRCULATION AND PARKING ARE4S AFTER GRADING IS COMPLETED, A 4-" MINIMUM DEPTH OF TOPSOIL WILL BE PLACED AND SEEDED 41�1 GRASS AND ) FOR PERMANENT d r SEDIMENT FENCE ANDIOR WOOD CHIP BERMS WILL BE dLLED AT LOCATIONS SHOWN PRIOR TO PERMANENTLYANY EARTHWORK OPERATIONS. THESE MEASURES WILL BE MAINTAINED UNTIL ALL DISTURBED AREAS HAVE BEEN COMPLETECONSTRUCTION OF THE PROPOSED BUILDINGS IS INTENDED TO COMMENCE IN SPRING 2019 AND BE BY NECESSARY1. SECURE ALL LOCAL, FEDERAL 2. INSTAL' SEDIMENT FENCE AND R WOOD CHIP BERM IN SPECIFIED LOCATIONS AS SHOWN DOWNGRADIENT OF PROPOSED DEVELOPMENT AREA. STRIP TOPSOIL FROM DEVELOPMENT AREA AND STOCKPILE AT AN APPROVED ,. LATER REUSE. SEED TOPSOIL STOCKPILE RYEGRASS FOR TEMPORARY STABILIZATION. J. PERFORM ALL NECESSARY GRADING FOR BUILDING AND SUBSURFACE SANITARY DISPOSAL SYSTEM. 4. INSTALL UTILITY CONDUIT. CONSTRUCT HOUSE AND GARAGE, INSTALL SUBSURFACE SEWAGE DISPOSAL SYSTEM AND WATER SUPPLY WELL. PERFORM FINAL SITE GRADING. 5, AT COMPLE17ON OF CONSTRUCTION, LOAM ALL DISTURBED AREAS (4- MINIMUM), SEED WITH GRASS AND MULCH. AFTER ALL AREAS HAVE BEEN PERMANENTLY STABILIZED, REMOVE EROSION CONTROL 2000 JEFFREY DE W '- �.x LICENSE N0. DATE _. CONTROLS NO CONSTRUCTION SHALL PROCEED UNTIL PROPER SEDIMENTATION AND EROSION CONTROL MEASURES HAVE BEEN INSTALLED AS THE SEQUENCE OF CONSTRUCTION NECESSI TA TES. ALL TEMPORARY FILL, STORAGE OR STOCKPILE AREAS SHALL BE PROPERLY STABILIZED TO PREVENT EROSION AND SUITABLY CONTAINED TO PREVENT TURBID RUNOFF. ALL AREAS AFFECTED BY TEMPORARY FILLS MUST BE RESTORED TO THEIR ORIGINAL CONTOURS AND REVEGETATED WITH SUITABLE VEGETATION. THE USE OF TEMPORARY FILL ANDIOR EXCAVATION SHALL BE MINIMIZED TO ONLY THAT AREA REQUIRED TO PERFORM THE WORK. DUMPING OF OIL OR OTHER DELETERIOUS MATERIALS ON THE GROUND IS FORBIDDEN. THE DEVELOPER OR CONTRACTOR SHALL PROVIDE A MEANS OF CATCHING, RETAINING AND PROPERLY DISPOSING OF DRAINED OIL, REMOVED OIL FILTERS, OR OTHER DELETERIOUS MATERIAL FROM EQUIPMENT USED ON SITE. VEHICLE MAINTENANCE SHALL BE COMPLETED OFF SITE. ALL OIL SPILLS SHALL BE IMMEDIATELY REPORTED TO THE DEPARTMENT OF ENERGY AND ENVIRONMENTAL PROTECTION/HAZARDOUS MATERIALS OFFICE. FAILURE TO DO SO MAY RESULT IN THE IMPOSITION OF FINES UNDER THE APPLICABLE CONNECTICUT GENERAL STATUTES. EVERY PRECAUTION SHALL BE TAKEN DURING CONSTRUCTION TO PREVENT AND MINIMIZE THE DEGRADATION OF THE EXISTING WATER QUALITY. ALL ACTIVITIES SHALL BE IN CONFORMANCE TO AND CONSISTENT WITH ALL APPLICABLE WATER QUALITY STANDARDS AND MANAGEMENT PRACTICES AS SET FORTH BY LOCAL, STATE AND FEDERAL AGENCIES. DURING THE PERIOD OF CONSTRUCTION, THE CONTRACTOR IS RESPONSIBLE FOR ALL EROSION AND SEDIMENT CONTROL MEASURES, SAID MEASURES SHALL BE INSPECTED WEEKLY AND AFTER EACH RAINSTORM. ACCUMULATED DEPOSITS OF SEDIMENT AND SILT SHALL BE PERIODICALLY REMOVED FROM THE UPSTREAM SIDE OF THE EROSION AND SEDIMENT CONTROL BARRIERS, AND UPON ESTABLISHMENT OF PERMANENT VEGETATIVE COVER. SUCH MATERIALS REMOVED SHALL BE SPREAD AND STABILIZED IN NON -WETLAND AREAS WHICH ARE NOT SUBJECT TO EROSION, OR WHICH ARE NOT TO BE PAVED OR BUILT UPON. WOOD CHIP BERMS, SEDIMENT FENCE AND OTHER EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REPAIRED, CLEANED AND/OR REPLACED AS NECESSARY THROUGHOUT THE CONSTRUCTION PERIOD IN ORDER TO MAINTAIN COMPLETE AND INTEGRAL EROSION AND SEDIMENT CONTROL PROTECTION. ONCE IN PLACE, ALL EROSION AND SEDIMENT CONTROL FACILITIES AND MEASURES ARE TO REMAIN IN PLACE AND IN PROPER CONDITION AND BE CONTINUOUSLY MAINTAINED UNTIL FINAL GRADING HAS BEEN COMPLETED, ALL DISTURBED AREAS UPGRADIENT OF SAID FACILITIES HAVE BEEN PERMANENTLY STABILIZED, AND ALL NEWLY GRASSED AREAS HAVE HAD AT LEAST TWO MOWINGS. FOLLOWING SUCH PERMANENT STABILIZATION, THE FACILITIES SHALL BE DISMANTLED, REMOVED, AND DISPOSED OF IN AN APPROVED MANNER. ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES BEYOND THOSE SHOWN ON THE 'PLANS OR PRESCRIBED HEREIN SHALL BE PUT IN PLACE, WHENEVER NECESSARY, TO ADDRESS FIELD CONDITIONS ANDIOR AS ORDERED BY THE TOWN STAFF OR THEIR DESIGNATED AGENT. DISTURBANCE OF THE LAND SHALL BE LIMITED TO THE MINIMUM EXTENT NECESSARY TO COMPLETE THE PROPOSED DEVELOPMENT ALL EXISTING TREES AND SHRUBS SHALL BE CONSERVED WHERE POSSIBLE, EXCEPT THOSE WHOSE REMOVAL IS REQUIRED TO PERFORM THE PROPOSED WORK. THE LIMITS OF DISTURBANCE SHALL BE ESTABLISHED IN THE FIELD PRIOR TO STARTING ANY ACTUAL CONSTRUCTION ACTIVITIES AND SHALL BE GENERALLY AS DEPICTED ON THIS PLAN. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSPECTING THE SITE IN ACCORDANCE WITH THE PROCEDURES AS OUTLINED IN THE "GENERAL PERMIT FOR THE DISCHARGE OF STORMWATER AND DEWATERING WASTEWATERS FROM CONSTRUCTION ACTIVITIES" AS ADOPTED BY THE DEPARTMENT OF ENERGY AND ENVIRONMENTAL PROTECTION, EFFECTIVE ON OCTOBER 1, 2013. THE CONTRACTOR SHALL INSPECT ALL DISTURBED AREAS OF CONSTRUCTION ACTIVITY THAT HAVE NOT BEEN FINALLY STABILIZED, STRUCTURAL CONTROL MEASURES, AND LOCATIONS WHERE VEHICLES ENTER OR EXIT THE SITE AT LEAST ONCE EVERY SEVEN CALENDAR DAYS AND WITHIN 24 HOURS OF THE END OF ALL RAIN EVENTS. WHERE SITES HAVE BEEN TEMPORARILY OR FINALLY STABILIZED, SUCH INSPECTION SHALL BE CONDUCTED AT LEAST ONCE EMERY MONTH FOR THREE CONSECUTIVE' MONTHS. DURING CONSTRUCTION AND IMMEDIATELY FOLLOWING CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR SITE INSPECTION AND MAINTENANCE TO ASSURE PROPER PERFORMANCE OF THE SEDIMENTATION AND EROSION CONTROL SYSTEM. INSPECTING AND MAINTAINING SHALL INCLUDE, AT A MINIMUM, THE FOLLOWING: * INSPECTION OF ALL SEDIMENT FENCE, WOOD CHIP BERMS AND STAKED HAY BALES, REMOVE ACCUMULATED SEDIMENT IF REQUIRED (GREATER THAN 4" DEPTH) * INSPECTION OF ANTI -TRACKING PAD, REMOVE, DISPOSE AND REPLACE IF PAD IS NO LONGER FUNCTIONAL IN THE CATCHMENT OF SEDIMENTS FROM VEHICULARITRUCK TRAFFIC. * INSPECTION OF ALL DRIVEWAY AND PARKING AREAS AFTER PAVING, REMOVE ACCUMULATED SEDIMENT AND ANY LITTERIDEBRIS. DISTURBED AREAS AND AREAS USED FOR STORAGE OF MATERIALS THAT ARE EXPOSED TO PRECIPITATION SHALL BE INSPECTED FOR EVIDENCE OF, OR THE POTENTIAL FOR, POLLUTANTS ENTERING THE DRAINAGE SYSTEM. EROSION AND SEDIMENT CONTROL MEASURES IDENTIFIED IN THE PLAN SILL BE INSPECTED TO INSURE" THAT THEY ARE OPERATING CORRECTLY. DISCHARGE LOCATIONS OR POINTS SHALL BE INSPECTED TO ASCERTAIN WHETHER EROSION CONTROL MEASURES ARE EFFECTIVE IN PREVENTING SIGNIFICANT IMPACTS TO DOWNSTREAM WATERS. LOCATIONS WHERE VEHICLES ENTER OR EXIT THE SITE SHALL BE INSPECTED FOR EVIDENCE OF OFF-SITE SEDIMENT TRACKING. THE CON'-RACTOR SHALL APPOINT AN AGENT WHO SHALL BE PERSONALLY RESPONSIBLE FOR IMPLEMENTING THIS EROSION AND SEDIMENT CONTROL PLAN AND ENFORCING THE PRESCRIBED SAFEGUARDS DURING THE CONSTRUCTION PERIOD. THIS RESPONSIBILITY INCLUDES THE INSTALLATION AND MAINTENANCE OF CONTROL MEASURES THROUGHOUT THE CONSTRUCTION PERIOD, INFORMING ALL PARTIES ENGAGED ON THE CONSTRUCTION SITE OF THE REQUIREMENTS AND OBJECTIVES OF THE PLAN, NOTIFYING THE PROPER TOWN AGENCIES AND OFFICIALS OF ANY TRANSFER OF THIS RESPONSIBILITY, AND CONVEYING A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN IF THE TITLE OF THE LAND IS TRANSFERRED TO A THIRD PARTY. mbi [0- IVI-W-1 I 1. ALL UTILITIES ARE APPROh'IMATE. CONTRACTOR TO VERIFY ALL UTILITIES PRIOR TO CONSTRUCTION. CONTACT "CALL--BEFORE-YOU-DIG" AT 1-800-922-4455 AT LEAST 72 HOURS PRIOR TO ANY EXCAVATION, 2. THE RESPONSIBLE PARTY FOR THE INSTALLATION AND MAINTENANCE OF ALL EROSION CONTROL MEASURES IS THE SITE CONTRACTOR. 3. THE "2002 CONNECTICUT GUIDELINES FOR SOIL EROSION AND SEDIMENT CONTROL" BY THE CONNECTICUT COUNCIL ON SOIL AND WATER CONSERVATION IN COOPERATION WITH THE CONNECTICUT DEPARTMENT OF ENVIRONMENTAL PROTECTION, CT DEEP BULLETIN 34, SHALL BE USED FOR INSTALLING AND MAINTAINING ALL EROSION CONTROL MEASURES. THE PROPERTY OWNER SHALL INSTALL ADDITIONAL MEASURES AS NECESSARY IF DIRECTED BY' THE ENGINEER OR TOWN STAFF. 4. SEEDING FOR PERMANENT STABILIZATION SHALL BE COMPLETED BETWEEN APRIL 15 THROUGH JUNE 15 OR BETWEEN AUGUST 15 THROUGH SEPTEMBER 15. IF SEEDING CANNOT BE COMPLETED WITI IW THESE TIMES, APPLICATION OF TEMPORARY MULCH WILL BE CONDUCTED UNTIL THEN NEXT SEECING PERIOD. SEED MIXTURE SHALL BE AS FOLLOWS: KENTUCKY BLUEGRASS 20 LBSIACRE OR 0.45 LBS/1,000 S.F. CREEPING RED FESCUE 20 LBS/ACRE OR 0.45 LBS/1,000 S.F. PERENNIAL RYEGRASS 5 LBSIACRE OR 0.10 LBS/1,000 S.F. 5. MULCH SHALL BE A GOOD QUALITY HAY OR STRAW AND SHALL BE APPLIED AT A RATE OF APPROXIMATELY' 2-3 BALES/1,000 SF. 6. ALL EROSION CONTROL MEASURES SHALL BE INSPECTED WITHIN 24 HOURS AFTER RAIN EVENTS WITH GREATER THAN 0.5" OF RAINFALL IN A 24-HOUR PERIOD, AND REPAIRED OR REPLACED AS NECESARY TO INSURE COMPLIANCE WITH THE APPROVED SOIL EROSION AND SEDIMENT CONTROL PLAM - r) � 10 � Q yL fa o vs ca � ;c> CL 10 ACO Ln u V O ._ CL u OWN ® y"" > ce$ 4-J ud �_ 06 ro 0 CL cn 4 -J4 -j Ll ..Ln 4_j E C ru SCALE: As Noted DATE: February 2019 JOB I.D. NO. 1-282 Revisions SHEET NO. 2