Loading...
HomeMy WebLinkAboutPlan1' 4' MIN. 1' 6' MIN. TYPICAL CONCRETE GALLEY RETAIN -IT SPFClFICA TIONS: • CONCRETE -- 5,000 PSI, 28 DAYS • ASTM -A615 REBAR • H-20 DESIGN LOADING PER AASHTO HS -20-44 OPTIONS: • DETENTION / RETENTION / INFILTRATION • WATERTIGHT WITH MEMBRANES OR SEALANTS • INTEGRAL PRETREATMENT • FLOW CONTROL ON/OUT) • CHOICE OF ACCESSWAY TYPES SURVEYORS.COM 1 LEVEL SPREADER DETAILS 3-20 MIN. 6" SOIL COVER OVER STRUCTURE FILTER FABRIC 1"STONE OR SCREENED GRAVEL ID CAPACITY WEIGHT B (GAL) (CU.FT) (LBS.) 3'A 11212 161.1 10,995 B 1,268 169.1 9,885 C 1,324 176.5 8,775 D 1,268 16.9.1 9,885 4'A 1,625 216.7 12,330 B 1,703 227.1 10,707 C 1,781 237.5 9,228 D 1,703 227,1 101707 5'A 2,032 270.9 139,900 B 2,129 283,9 11,950 C 2,226 296.8 10,000 D 2,129 283.9 11,950 11AI! UBp 1#c11 I'D" Ff 7 L I J TYPICAL CORNER TYPICAL SIDE TYPICAL MIDDLE TYPICAL BAFFLE SECTION SECTION SECTION SECTION WRAP CONTINUOUS PIECE OF LINER PAD, WATERPROOF LIN7K GEOSYNTHETIC FABRIC FROM BOTTOM, UP SIDES AND A Y MINIMUM r / OVERHANG ON TOP. INLET/OUTLET PIPES TO BE 'BOOTED' WITH SAME MATERIAL TYPICAL I TYPICAL RETAIN IT`q CONSEAL CS -212 UNIT ` POLYLOFIN BACKED' (CORNER, SIDE, I EXTERIOR ,POINT WRAP MIDDLE) Q ALL TOP JOINTS LINER & BEDDING DETAIL FOR RETENTION NTS 7'rFIC1?i• FIRER BASE BEARING PLATES TO BE INSTALLED TO SUPPORT ALL STRUCTURE LEGS \n' I'= x` CRUSHED STONE (LEVELING COURSE) Q 95% COMPACTION \ � GEOTFJCTII.E FAHRIClMEMHRANE LINER 95% COMPACTION 5UHGRADE PRS OF SHARP OBJECTS -_ow Concrete Products P. (850) 653-5063 F. (860) 653-0257 www.arrow-concrete.com A B B B C o - N0. REVISIONS TO MY KNOWLEDGE AND BELIEF, THIS MAP J,S SUBSTANTIALLY CORRECT TO THE STANDARDS 0' CLASS "A2,' AS NO'TEf_) HEREON. 5TA51LIZE ENTIRE PILE WITH VEGETATION OR OOVER 2 SLOPE OR LE55 W W W WW W W W W V W V W W W W W W W W W W W MIN. SLOPE 57RAWBALE5 OR M',N. SLOPE SILT FENCE (ITEM 209.05) INSTALLATION NOTES I. AREA CHOSEN FOR 5TOCKPILIN5 OPERATIONS SHALL BE DRY AND STABLE. 2. MAXIMUM SLOPE OF 5TOCKPILE SHALL BE 1:2. 5. UPON COMPLETION OF 501L STOCKPILING, EACH PILE SHALL BE SURROUNDED WITH EITHER SILT FENCING OR 5TRAWBALE5, THEN 5TABI1 IZED WITH VEGETATION OR COVERED. 4. SEE SPECIFICATIONS FOR INSTALLATION OF SILT FENCE. SOIL STOGiGF I L I N NOT TO 5CALE ANTI -VORTEX SEDIMENT GUARD 2 12' CMP HAUNCHits ANTI—VORTEX TRASH GUARD (SEE DETAIL) 1L --'Z: PROPOSED GRADE PROPOSED SEDIMENT BASIN OVERFLOW (STANDPIPE) FULLER ENGINEERING 8c LAND SURVEYING, LLC 525 JOHN STREE'i BRIDGEPORT, CT. PH. 203-333-9465 EMAIL:INFOQFULLER CAP U N IT ADHERE TO TOP UNIT W/VERSA—LOK CONCRETE ADHESIVE — VERSA—LOK STANDARD MODULAR CONCRETE UNITS PVC PIPE INSTALLATION A =FOR SHALLOW INSTALLATIONS LESS THAN 3' CLASS I MATERIAL TO 8E EXTENDED UP TO ROAD ELEVATIONS. FOR INSTALLATIONS OVER 3' A=1' CLASS I ANGULAR 1/4- TO 1 1/2" - N0. REVISIONS DATE IMPERVIOUS FILL 12" DEEP DRAINAGE AGGREGATE 12" THICK MIN. �— 4" DIA. (MIN.) DRAIN PIPE -1 —111 ,' I 1 '/ -b -, 11 ' OUTLET 0 END OF WALL OR ® 40' CENTERS MAX. I I I Mi SLOPE TO DRAIN (1/8"/FT.) IMPERVIOUS FILL il.II,II�— GRANULAR LEVELING PAD 6" THICK MIN. GEOSYNTHETIC REINFORCEMENT SEE PROFILE DRAWINGS FOR LENGTH, TYPE, AND SPACING RETAINED BACKFILL III II ' APPROXIMATE EXCAVATION LINE (PER OSHA) REINFORCED BACKFILL COMPACTED 95% OF MAXIMUM STANDARD PROCTOR DENSITY TYPICAL SECTION—REINFORCED RETAINING WALL SCALE: 3/8"=i' 6" EXTRA STRENGTH CLAY PIPE TO BE INSTALLED IN ACCORDANCE WITH STANDARD DETAIL 2210 FLEXIBLE CONNECTION IN ACCORDANCE WITH STANDARD DETAIL 5510 OPENING TO BE CORE DRILLED SANITARY SEWER MAIN INITIAL 8,4 BEDDING ---EXISTING HOUSE .SERVICE WATERTIGHT CONNECTION AS PE SPECIFICATION (JOINTS, NEW TC MINIMUM SLOPE EXISTING SERVICE 1/4" PER FT. GRADE STONE. EMBEDMENT MATERIAL CRUSHED STONE SUB TRENCH DESIGN NOTES AND DETAILS OF PROPERTIES AT 1360 ROUTE 32 IN THE UNCASVILLE SECTION OF MONTVILLE, CT_. PREPARED FOR: CHARLES F. GAGER SCALE: AS SHOWN 27 JANUARY 2012 SHEET 9 of 11 CT 7976 APPROX. STREET LINE ,, FULLER ENGINEERING & LAND SURVEYING, LLC 525 JOHN STREET BRIDGEPORT, CT., PH. 2103-333-9465 EMAIL: INFO@FULLERSURVEYORS.COM SITE IMPROVEMENT PLAN FOR A 120 ROOM FOR PROPERTY LOCATED AT 1360 ROUTE 32 IN THE UNCASVILLE SECTION OF MONTVILLE, CONNECTICUT PREPARED FOR CHARLES F. GA JANUARY 27, 2012 Rev.: 03/20/12 3 m� ST Z `+rr G a� RIDG_ _ OR��E 32 ite E E R Y SCALE 1000 0 1000 SITE LOCATION MAP SCALE: 1" = 1000 FT. GER Ift NOTES: w W000LANo 1 } THIS SURVEY AND MAP HAVE BEEN PREPARED IN ACCORDANCE WITH THE "RECOMMENDED STANDARDS FOR SURVEYS AND MAPS IN THE STATE OF CONNECTICUT" AS ADOPTED FOR USE BY THE CONNECTICUT ASSOCIATION OF LAND SURVEYORS, INC. ON SEPTEMBER 24, 1992, EFFECTIVE DATE JANUARY 1, 1993. SAID STANDARDS ENACTED BY THE STATE OF CONNECTICUT (SECTIONS °Re 20-300b-1 THROUGH 2O -300b-20 OF THE STATE OF CONNECTICUT AGENCIES) EFFECTIVE JUNE 21, 1996. sr �E�NA�o z 2) THE TYPE OF SURVEY PERFORMED WITH RESPECT TO THE. BOUNDARY PERIMETER IS BUILDING LOCATION MAP, ZONING. 0 °R 3) THE BOUNDARY DETERMINATION CATEGORY IS DEPENDENT RESURVEY. 4) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "RIGHT OF WAY MAP, TOWN OF MONTVILLE, NORWICH—NEW LONDON ROAD FROM THE WHITMAN—YOUNG PROPERTY NORTHERLY ABOUT 6,200 FEET, ROUTE NO 12, SHEET NO. 1 OF 3", SCALE: 1"=40', DATED 1929, PREPARED BY THE CONNECTICUT STATE HIGHWAY DEPARTMENT. RIDGE ° 5) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "RIGHT OF WAY MAP, TOWN OF MONTVILLE, NORWICH—NEW LONDON ROAD FROM THE WHITMAN—YOUNG PROPERTY NORTHERLY ABOUT 6,200 ° FEET, ROUTE NO 12, SHEET NO. 2 OF 3, SCALE: 1"=40', DATED 1929, PREPARED BY THE CONNECTICUT STATE HIGHWAY DEPARTMENT. 6 REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "MAP OF RIGHT OF WAY OF CONNECTICUT LIGHT & POWER COMPANY, ACROSS THE PROPERTY OF FREDERICK W. & MINNIE B. STANLEY, TOWN OF MONTVILLE, COUNTY OF NEW LONDON, STATE OF CONNECTICUT", SCALE: 1"=200', DATED OCTOBER 1947, ON FILE IN THE OFFICE OF THE MONTVILLE TOWN CLERK. 32 7) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "PLAN OF PROPERTY OWNED BY RICHARD K. SHEPARD, IN THE TOWN OF MONTVILLE, REVISED PLAN", SCALE: 1"=100', DATED OCTOBER 1950, REVISED THROUGH MAY 1951, ON FILE IN THE OFFICE OF THE MONTVILLE TOWN CLERK. 8) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "PHASE II SEWERAGE PROGRAM, MONTVILLE, CONNECTICUT, CONTRACT B, ROUTE 32, SHEET B-4", SCALE: 1"=40', DATED APR. 1979, REVISED THROUGH 9-1-83, PREPARED BY LOUREIRO ENGINEERING ASSOCIATES. 9) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "PHASE II SEWERAGE PROGRAM, MONTVILLE, CONNECTICUT, CONTRACT B, ROUTE 32, SHEET B-5", SCALE: 1"=40', DATED APR. 1979, REVISED TANI ° THROUGH 9-1-83, PREPARED BY LOUREIRO ENGINEERING ASSOCIATES. z Ite 9T 10) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "PLAN MADE FOR MONTVILLE MEMORIAL POST 10060 VETERANS OF FOREIGN WARS OF THE UNITED STATES, INCORPORATED, ROUTE 32, SARAH T�RNe DRIVE, & RAYMOND HILL ROAD", SCALE: 1"=100', DATED JUNE 19, 1985, ON FILE IN THE OFFICE OF THE MONTVILLE TOWN CLERK. R 11) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "BOUNDARY AND TOPOGRAPHIC SURVEY PREPARED FOR MOHEGAN TRIBAL UTILITY AUTHORITY SHOWING LAND TO BE CONVEYED FROM MONTVILLE MEMORIAL POST 10060 VETERANS OF FOREIGN WARS OF THE UNITED STATES, INCORPORATED TO MTIC ACQUISITIONS, INC., ROUTE 32, MONTVILLE, CONNECTICUT, SHEET 1 OF 1", SCALE: 1 "=40', DATED AUG. 22, 2000, ON FILE IN THE OFFICE OF THE MONTVILLE TOWN CLERK. 1 1) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "THAMES BASIN REGIONAL WATER INTERCONNECTION PROJECT, ORIGINAL MONTVILLE PUMP STATION, CONN. ROUTE #32, MONTVILLE, CT., SHEET 1 OF 1 ", SCALE: 1"=20', DATED MAY 13, 2005, REVISED THROUGH 11-30-07, ON FILE IN THE OFFICE OF THE MONTVILLE TOWN CLERK. 12) WITH RESPECT TO HORIZONTAL DATA SHOWN HEREON THE ACCURACY CLASS IS "A-2". SCALE 1000 0 1000 13) WITH RESPECT TO TOPOGRAPHIC DATA SHOWN HEREON THE ACCURACY CLASS IS "T-2". / 14) ELEVATIONS ARE BASED UPON NGVD 1929 DATUM. 15) UNDERGROUND UTILITIES (INCLUDING STORM, SANITARY AND/OR COMBINATION SEWERS) SHOWN HEREON ARE COMPILED FROM VARIOUS SOURCES INCLUDING OBSERVATION OF SURFACE STRUCTURES, UTILITY COMPANY MAPS, MAPS OF THE TOWN OF MONTVILLE, AND MAPS OF THE CONNECTICUT DEPARTMENT OF TRANSPORTATION (f.k.a. THE CONNECTICUT HIGHWAY DEPARTMENT. S 30 . 04„ THE ACTUAL LOCATION, SIZE AND DEPTH SOF THE UNDERGROUND ,UTILITIES SHOWN HEREON MAY NOT BE AS INDICATED. ADDITIONAL UNDERGROUND UTILITIES MAY EXIST. PRIOR TO ANY W EXCAVATION OR CONSTRUCTION CONTACT CALL BEFORE YOU DIG": 1-800-922-4455. 2_) 39 16) FIELD FLAGGED WETLAND SOILS ARE AS DETERMINED BY ALEKSANDRA MOCK SOIL & WETLAND SCIENTIST (REFERENCE REPORT ENTITLED: "WETLAND DELINEATION FOR THE PROPERTY LOCATED AT / S 31.33,09, 1360 ROUTE 32, UNCASVILLE,CONNECTICUT", DATED JUNE 29 AND JULY 2, 2011.) w 193-95' 17) PROPERTY IS LOCATED INA �� C-2 ZONE DISTRICT. / W.F#1 19 W.F# 1 1 N � • N W.F#117 oo� Q • F#1 16 0 S ALONG THE CENTERLINE OF THE WATERCOURSESUBJECT 0 RIPARIAN RIG iTS. BEARINGS AND DISTANCESOF WATERCOURSE AS OF THE DATE OF THIS SURVEY AND ARE PROVIDEDO A MATICAL CLOSURE ONLY, • � N 12'44'31 " W 23.40' W. F# 139 N 63°51 '57" W, 22.79' — ' , • N 45.00'00" W, 6.89' N 16.03 05 E, 23.94 W.F#180 / W.F#115 W.F#11 • � � N 12'36'11" E 31.37' \ • ' W.F�61 � - ' ,� V•I.I #37 � W. F 138 • 1 /• N 33'02'39" E, 15.74' N 08'56'57" W .F �8 � W.F#62 W.F#181 . ..r PVV.F#177 45.56 � ` , / N 51'03'54" E, 10.65' W.F#179 W.F#182 Vti'.F#111 �d.F#145 W.F#72 \ F#63 a S •� N 51'04'22" E, 26.83' S 02'54'12" W E W. F# 1 14 �S�• 122.24 1-22"24" , E W.F 112 `, 7 W.F#36 N 1.43 #176 �g ..•► W . F • r"� • '� . W.F#1 1 1 Np LINE i• W.F#137 Vv F#67 \ \ - 11. ' / 5 6 , & 46 4N.F#183 � • W.F#175 W. F# 130 `� �►" Ft�,GGE� W�IA� W. F# 146 1J.. �9 - _ - -�� $ • BROOK ---BROOK _ �' .F 136 V X68 / q W � � '�tiV F 35 # f / W.F#71�W.F 70 jrWF ; 2 /�--- r= - W.F#2= S7 - BROOK BR • vV . F 4 BRIDGE N VV.F#66 l.F rF#22 \ 466>> / —229, •,-� # ��Y n �' �,^Y'.F W.F#185 W.F#184 • • Z �6 8 3 5 �� �2� E N 17'07 31 E N 26 53'27"'� F#34 W.F 33 187 F 156W.F#131 N 18 4 75.53~ VV.F 2 S �1 # W.F 32 #• # F 159 V' .F' 1 73 cD #171 N 2 3' 5 6 0 6 E 3.30 42.10 _ _� # �. 3g� �`�4ll�l # ,.� - / # J W W. F „ , w N 13'26 16 E 26.57 �2 lg•��'p 1 • F 157 cr � • •, • � W.F#26 w .� �;.F"!86 J�.F#150 # • •yam �/q�� W.F#8�/ N 29'24'25"E 8.94 — W.F#18 F#20 �i FL4G •�� 91 11' S 21'02'25" / o � .F 172 "V 4J . • N. , „ 1 -� . - .....,.Y C'ED �.. N.F-=,= 1 5 , p�� , W. F# 1 49 , ,,� `�.� # -`� T G N 46' 14'43" E 34.35 0 WE'/� 41 .70 , �� N. F# 1 55 W. F 1 58 W. co � 2 O � SND •��`�.--- • J, , � # # 1 60 z / — • 4a.F � � ' ..► F#7 ��� N 24°35'58" E 27.14' � / .V. F `� . � T � � -� \ CINE �•�, � � 9 � 148 �# 151 \ J. F# 1 4 • / i1i'p s W . F 15 ---� # 1 ,n � \/�`�# W.F#161 W.F 163 F 6 W.F 30 i 0000, ' • / # �G ' '... W. F# 1 6 `� # � � ' ,�4.F#147 W.F#153 V�.F#154 / F#13 / W.F#13 W.F#15 W.F�� , • � W.F#162 / �vv.F#5 .W.F#1 64 W.F#10 W.F#11 W. F# 12 W.F#1 33 Z W. F# 165 ,ro W.F#4 ' ct9n ; FOUNDATION REMAINS ARA(; W.F#134 W. F.co — o GREEN- — SE cs� ARAGv,E HOUSE FOUNDATION • REMAINS N 19'1730 E ® W.F#135 W.F#1 w N� x6 '54" E `` EXIST ' N 26'38 0)• � BOX CULVERT ® 437.1,3' N 4153.8 cd I � S 29'20'12,) W N 21'17 31 4.9 _ _ -- 1 - 6.36, ® N 68'41'32" W 0) 14.97' FULLER ENGINEERING & LAND SURVEYING, LLC 525 JOHN STREET BRIDGEPORT, CT. PH. 203-333-9465 EMAIL:INFO@FULLERSURVEYORS.COM TO MY KNOWLEDGE AND BELIEF, 1 IiS MAG IS SUBSTANTIALLY CORRECT TO THE STANDARDS OF CLASS "A2" AS NOTED HEREON. E ORY PI LUSKI P.E., I.S. # 12154 N 21' 16'55" E EX I ST. ® HYDT. ® — N73'1 18 8" W- 6.57' ® '-Gl CEMETE co LID+ S 18'23'06" W N 16.1700 E 47.1 S 23'35'38" W 3 48.50' MAP OF SURVEY OF PROPERTIES AT 1360 ROUTE 32 IN THE UNCASVILLE SECTION OF MONTVILLE, CT. PREPARED FOR: CHARLES F. GAGER SCALE: 1"=50' 27 JANUARY 2012 SHEET 1 of 11 50 0 50 140 150 GRAPHIC SCALE — FEET CT 7976 1 RE—ISSUE 3-20-1 z2 N0. REVISIONS DATE N73'1 18 8" W- 6.57' ® '-Gl CEMETE co LID+ S 18'23'06" W N 16.1700 E 47.1 S 23'35'38" W 3 48.50' MAP OF SURVEY OF PROPERTIES AT 1360 ROUTE 32 IN THE UNCASVILLE SECTION OF MONTVILLE, CT. PREPARED FOR: CHARLES F. GAGER SCALE: 1"=50' 27 JANUARY 2012 SHEET 1 of 11 50 0 50 140 150 GRAPHIC SCALE — FEET CT 7976 METAL DRIVE POST OR 2X2 WOOD STAKES ® 8'-0" MAX O.C. ATTACH SILT FABRIC ON UPHILL SIDE OF POSTS AND BACKFILL OVER FABRIC MIRAFI 10OX FILTER FABRIC AS MFG. BY MIRAFI INC., (800) 438-1855 OR APPROVED EQUAL SOIL TO BE RETAINED UNDISTURBED EARTH EXISTING AREA TO BE PROTECTED SILT FENCE DETAIL NOT TO SCALE VARIES (12' MIN.) CURB CUT OUT FOR DRIVEWAY APPROACH 1/4" PER FOOT PITCH — > 4' SIDEWALK VARIES CONCRETE �- CO BANK RUN GRAVEL EXPANSION JOINT CONCRETE d - BANK RUN GRAVEL SECTION OF CONCRETE DRIVEWAY APPROACH NOTE: SIDEWALK SHALL BE 6" THICK AT ALL DRIVEWAYS Ri CURB FORM FULLER ENGINEERING & LAND SURVEYING, LLC 525 JOHN STREET BRIDGEPORT, CT. PH. 203-333-94;5 EMAIL:INFO@FULLERSURVEYORS.COM 1" RADIUS i i02410KOSREQUIRED8" MINIMUM CT DOT 2" max,FILTER FABRIC GRADATION TABLE CONN. DOT ASTM ASTM 2" CRUSHED C-33 C-33 GRAVEL NO. 2 NO. 3 SQUARE MESH SIEVES % FINER % FINER % FINER 2 1/2 INCHES 100 90-100 100 2 INCHES 95-100 35-70 90-100 1 1/2 INCHES 35-70 0-15 35-70 1 1/4 INCHES 0-25 --- --- 1 INCHES 0-10 --- 0-15 3/4 INCHES --- 0-5 --- 1/2 INCHES --- --- 0-5 3/8 INCHES --- --- --- SOURCE: U.S. DEPARTMENT OF AGRICULTURE, SOIL CONSERVATION SERVICE, STORRS, CONNECTICUT. SANITARY SEWER ANTI -TRACKING PAD NOT TO SCALE „1141JI JOINT ROAD Note: Paving to be done in TWO COURSE BITUMINOUS CONC. PAV'T accordance with Article M. A 04.01 of the Standard CONSISTING OF Specifications for Roads 1 1 /2" BIT. CONC. CLASS 2 ON Bridges and Included Construction for the State of A 1 /2 BIT. CONC. BINDER COURSE Connecticut, State Highway Department, Form 810 6" PROCESSED AGGREGATE BASE (GRAVEL) 8 SUBBASE — BANK RUN GRAVEL E POINT OF APPLICATION OF ESTABLISHED GRADE TO MY KNOWLEDGE AND BELIEF, IBIS MAP IS SUBSTANTIALLY CORRECT TO THEE STANDARDS OF CLASS "A2" Aa NOTED HEREON. uGRY °ff. PIDLUSKI� R.L.S. # 12154 NOTES: 1) THIS SURVEY AND MAP HAVE BEEN PREPARED IN ACCORDANCE WITH THE "RECOMMENDED STANDARDS FOR SURVEYS AND MAPS IN THE STATE OF CONNECTICUT" AS ADOPTED FOR USE BY THE CONNECTICUT ASSOCIATION OF LAND SURVEYORS, INC. ON SEPTEMBER 24, 1992, EFFECTIVE DATE JANUARY 1, 1993. SAID STANDARDS ENACTED BY THE STATE OF CONNECTICUT (SECTIONS 20-300b-1 THRU 20-300b-20 OF THE STATE OF CONNECTICUT STATE AGENCIES) EFFECTIVE JUNE 21, 1996. 2) THE TYPE OF SURVEY PERFORMED, WITH RESPECT TO THE BOUNDARY PERIMETER, IS AN PERIMETER SURVEY. 3) THE BOUNDARY DETERMINATION CATEGORY IS DEPENDENT RESURVEY. 4) SOIL EROSION AND SEDIMENT CONTROLS (CONSTRUCTION ENTRANCES, FILTER FABRIC FENCES) ARE TO BE INSTALLED PRIOR TO SITE DISTURBANCE. SEDIMENT CONTROLS ARE TO BE INSTALLED DOWN GRADIENT OF CONTEMPLATED DISTURBANCE PRIOR TO SAID DISTURBANCE AND MAINTAINED IN GOOD CONDITION UNTIL UPGRADIENT AREA IS STABILIZED. 5) UPON FINAL SIT STABILIZATION REMAINING SOIL EROSION AND SEDIMENT CONTROLS (FILTER FABRIC FENCE, GRAVELANTI-TRACKING MAT, ETC.) ARE TO BE REMOVED FOR DISPOSAL OFF SITE IN AN APPROPRIATE LO ATION. 6) WITH RESPECT _Tq TOPOGRAPHIC DATA SHOWN HEREON THE ACCURACY CLASS IS T-2. 7) UNDERGROUND UTILITIES (INCLUDING STORM AND SANITARY SEWERS) SHOWN HEREON ARE COMPILED FROM VARIOUS SOURCES INCLUDING OBSERVATION OF SURFACE STRUCTURES, UTILITY COMPANY MAPS, MAPS OF THE TOWN OF MONTVILLE AND MAPS OF THE CONNECTICUT DEPARTMENT OF TRANSPORTATION THE ACTUAL LOCATION AND SIZE OF THE UNDERGROUND UTILITIES SHOWN HEREON MAY NOT BE AS INDICATED. ADDITIONAL UNDERGROUND UTILITIES MAY EXIST. PRIOR TO ANY EXCAVATION OR CONSTRUCTION CONTACT "CALL BEFORE YOU DIG": 1-800-922-4455. 8) ALL WORK TO PERFORMED TO APPLICABLE STANDARDS OF THE TOWN OF MONTVILLE AND THE STATE OF CONNECTICUT. NOTES AND DETAILS OF PROPERTIES AT 1360 ROUTE 32 IN THE UNCASVILLE SECTION OF MONTVILLE, CT. PREPARED FOR: CHARLES F. GAGER SCALE: AS SHOWN 27 JANUARY 2012 SHEET 10 of 11 CT 7976 1 LEGEND DESCRIPTION SYMBOL EXISTING CONTOUR 127 PROPOSED CONTOUR 1 RE -ISSUE 3-20—" N0. REVISIONS DATE NOTES AND DETAILS OF PROPERTIES AT 1360 ROUTE 32 IN THE UNCASVILLE SECTION OF MONTVILLE, CT. PREPARED FOR: CHARLES F. GAGER SCALE: AS SHOWN 27 JANUARY 2012 SHEET 10 of 11 CT 7976 1 LEGEND DESCRIPTION SYMBOL EXISTING CONTOUR 127 PROPOSED CONTOUR ANTI TRACKING PAD w ti 1 r FILTER FABRIC FENCE PROPOSED DRYWELL pW STORM SEWER SANITARY SEWER CATCH BASIN STONE WALL OPEN SPACE LIMIT GRAVITY STONE RETAINING WALL�� WETLAND FLAG WF 8 FLAGGED WETLAND LINE PHASE LINE SITE DISTURBANCE LIMIT SANITARY SEWER APPROXIMATE LIMITS OF TREE CANOPY SANITARY MANHOLE $Q LEVEL SPREADER WATER SERVICE LINE 2" (SANITARY) PRESSURE LINE GAS LINE TELE/ELEC/TELE (UG) TEMPORARY PROCESSING AREA UNDERDRAIN , ROOF LEADER GALLERIES CONSERVATION EASEMENT LIMIT DETENTION BASIN NOTES AND DETAILS OF PROPERTIES AT 1360 ROUTE 32 IN THE UNCASVILLE SECTION OF MONTVILLE, CT. PREPARED FOR: CHARLES F. GAGER SCALE: AS SHOWN 27 JANUARY 2012 SHEET 10 of 11 CT 7976 1 CONSTRUCTION SEQUENCE NARRATIVE MARRIOTT PLAZA PROPERTY OF CHARLES F. GAGER 1360 ROUTE 32 MONTVILLE, CT. 27 JANUARY 2012 THIS CONSTRUCTION SEQUENCE IS TO BE COORDINATED WITH THE LATEST "EROSION CONTROL NARRATIVE" DATED. IN ALL CASES OF APPARENT CONFLICTS WITH THIS DOCUMENT AND THE "EROSION CONTROL NARRATIVE", THE "EROSION CONTROL NARRATIVE" SHALL TAKE PRECEDENCE. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE TOWN, STATE, AND FEDERAL SPECIFICATIONS, REGULATIONS AND REQUIREMENTS. DISTURBANCE ACTIVITIES ARE TO BE LIMITED TO THOSE AREAS CONTAINED WITHIN THE AREA DESIGNATED AS "AREA SUBJECT TO CURRENT DEVELOPMENT". ACTIVITIES INVOLVING SITE DISTURBANCE IN AREAS OTHER THAN THOSE DESIGNATED AS "AREA SUBJECT TO CURRENT DEVELOPMENT" WILL REQUIRE SEPARATE APPLICATIONS, PERMITS, AND APPROVALS. 1. PRIOR TO COMMENCEMENT OF WORK A PRE -CONSTRUCTION MEETING SHALL BE HELD WITH THE TOWN OF MONTVILLE STAFF, PROJECT SITE MONITOR AND REPRESENTATIVES OF THE CONTRACTOR AND OWNER. 2. "CALL -BEFORE -YOU -DIG" SHALL BE NOTIFIED AND UNDERGROUND UTILITIES SHALL BE MARKED. 3. AN INDEPENDENT CONTRACTOR MAY BE UTILIZED TO MARK UNDERGROUND UTILITIES ON SITE AT THE CONTRACTOR/OWNER'S DISCRETION. 4. GRAVEL ANTI -TRACKING MAT CONSTRUCTION ENTRANCE SHALL BE INSTALLED. 5. DISTURBANCE LIMITS ARE TO BE FIELD STAKED. NO DISTURBANCE IS TO TAKE PLACE BEYOND THE LIMITS OF WORK SHOWN. 6. INSTALL FILTER FABRIC SEDIMENT BARMIER AT DISTURBANCE LIMITS. 7. PREPARE "TEMPORARY PROCESSING AREA". 8. REMOVE TREES, GRUB, STRIP TOPSOIL AND STORE ON SITE FOR FUTURE USE. (TOPSOIL IS NOT TO BE REMOVED FROM THE SITE UNTIL PROJECT COMPLETION.) 9. ROUGH GRADE SITE. (BLAST AS NECESSARY, SUBJECT TO ALL APPLICABLE RULES AND REGULATIONS, INCLUDING, BUT NOT LIMITED TO NOTIFICATION, MONITORING, AND PERMITTING.) 10. SUITABLE SOILS REMOVED FROM "CUT` AREAS MAY BE PLACED IN "FILL" AREAS. 11. COORDINATE INSTALLATION OF RETAINING WALLS (INCLUDING GEOGRID, FREE DRAINING MATERIALS, DRAINAGE, ETC.) WITH THE PLACEMENT OF FILL. 12. EXPOSED FACES IN "CUT" AREAS MAY BE EXPOSED ROCK, IF SAID ROCK FACES ARE DETERMINED TO BE STABILE. IF EXPOSED ROCK FACES ARE DETERMINED NOT TO BE STABILE (OR IF THERE IS NO EXPOSED ROCK FACE) PROPER RETAINING WALLS ARE TO BE INSTALLED. 13. THE SEGMENTED RETAINING WALLS DEPICTED HEREON ARE A SUGGESTED PRODUCT, NOT REQUIRED. THE DETAILS SHOWN ON THESE PLANS REPRESENT "TYPICAL" INSTALLATIONS. ACTUAL RETAINING WALLS WILL NEED TO BE DESIGNED BY A CONNECTICUT LICENSED ENGINEER AND APPROVED BY ALL APPROPRIATE AGENCIES. 14. INSTALL DETENTION GALLERIES, CATCH BASINS, WATER QUALITY ("STORMCEPTOR) CHAMBERS, AND STORM SEWERS. 15. POST -BLASTING SLOPES (AS APPLICABLE) ARE TO BE STABILIZED AS SOON AS PRACTICAL BEFORE UTILITY INSTALLATION. STABILIZE ALL SLOPES IMMEDIATELY AFTER THEIR ESTABLISHMENT. 16. COMMENCE BUILDING FOUNDATION WORK. 17. UTILITY CONSTRUCTION WILL COMMENCE WITH THE INSTALLATION OF THE STORM SEWER SYSTEM INCLUDING CATCH BASINS, WATER QUALITY CHAMBERS, ETC. TO DRAIN TO THE DETENTION/RETENTION GALLERIES. 18. INSTALL GRAVITY SANITARY SEWER. 19. INSTALL WATER MAINS (DOMESTIC, AND FIRE SUPPRESSION, IF REQUIRED). 20. INSTALL GAS MAIN. 21. INSTALL UNDERGROUND WIRED UTILITIES (TELEPHONE, ELECTRIC, CAN). 23. INSTALL BINDER COURSE FOR DRIVEWAYS AND PARKING LOTS. 24. INSTALL LANDSCAPING, LAWNS AND APPLY FINISH COURSE ON DRIVEWAYS AND PARKING LOTS. POST CONSTRUCTIVE OPERATION AND MAINTENANCE PLAN NARRATIVE 1. ALL CATCH BASIN SUMPS SHOULD BE INSPECTED ONCE A YEAR AND SEDIMENT REMOVED WHEN IT EXTENDS TO WITHIN SIX INCHES OF THE OUTLET' RIPE INVERT, NOT LESS THAT ONCE EVERY TWO YEARS. THE SEDIMENT SHALL BE DISPOSED OF IN AN APPROVED LOCATION. 2. THE WATER QUAUTY CHAMBERS SHALL BE INSPECTED ANNUALLY AND AFTER ANY SPILLAGE OF OIL, GAS, OR OTHER CONTAMINANT SPILLS IN THE PARKING AREA. SUBSEQUENT TO CONTAMINANT SPILLS, THE BASINS SHALL BE CLEANED IMMEDIATELY AND THE CONTENTS DISPOSED OF AT AN APPROVED OFF-SITE LOCATION. 3. THE PAVED SURFACES SHALL BE SWEPT AT LEAST ONCE IN THE SPRING. NOTES: REMOYL' ALL PLASTIC C.APM PROM ROOT CALL., IF PRESQLT DO NOT GUT CALK CUR1.Ar FROM amm or ROoT CALL Ser TOP OF ROOT PION 1 14 ALONE PINISHIM *RADS. IR001 A TOP LSI or VAIM ISMICCr, IF PINT. So OEM S111111 M LARK MULCH SOIL SALJAet TOP M41L H '4" vem or GOwoST, INSTALL MD MIX MOLA TIN* CAGKPILL MIX11m PRIPARIV PLNMNS CA414PILL MIXn4m SCARIFY ALL TAPORV SIDCS DO NOT IMAVATC LOVM THAN CALL M"K IT 19GAVATM 80 CA TM CALL OWTH DK. M" AM COMPACT TO PIM%I T srrn mwr. TYPICAL EVERGREEN TREE PLANTING wr TO SCALE FULLER ENGINEERING & LAND SURVEYING', LLC 55 JOHN STREET BRIDGEPORT, CT. P0. 203-333-9465 E�IAii:L:iNFO@FULLERSURVEYORS.COM EROSION CONTROL NARRATIVE MARRIOTT PLAZA PROPERTY OF CHARLES F. GAGER 1360 ROUTE 32 MONTVILLE, CT. 27 JANUARY 2012 THE SITE CONSISTS of 11.744 AC., INCLUDING 4.66 AC OF REGULATED AREA (50 FT. BUILDING SETBACK) OF WHICH 3.34 AC. ARE CONTAINED WITHIN THE 25 FT. WETLAND SETBACK. THE SITE CONTAINS 1.92 AC± OF WETLAND SOILS AND WATERCOURSES 1830 L.F.±). THE REGULATED AREAS ARE SITUATED PROXIMATE TO THE WESTERLY PROPERTY LINE (THE PROPERTY LINE IS DEFINED AS THE CENTER LINE OF THE WATERCOURSE) FOR THE NORTHERLY 2/3± OF THE PROPERTY AND MORE OR LESS BISECTS THE SOUTHERLY THIRD OF THE PROPERTY. THE SITE HAS GENERALLY ROLLING TOPOGRAPHY. WITH THE EXCEPTION OF A SMALL SECTION OF THE PROPERTY (CLOSEST TO ROUTE 32) HAS A FEW SCATTERED BUILDINGS (HOUSE, GREENHOUSES, MISCELLANEOUS OUT BUILDINGS) WHICH THE PROPERTY IS HEAVILY VEGETATED. THE PROPOSED DEVELOPMENT WILL ADD A SINGLE HOTEL BUILDING (APPROX. 18000 S.F.), TOGETHER WITH 1.54± AC. OF PAVED DRIVEWAYS AND PARKING AREAS. ROOF LEADER DRAINS ARE TO BE DIRECTED TO THE STORMWATER DETENTION SYSTEM. (THE SYSTEM HAS BEEN DESIGNED UTILIZING 4'X4' PRECAST CONCRETE GALLERIES, H2O REINFORCED. ACTUAL INSTALLATION MAY UTILIZE OTHER (PERFORMANCE) EQUIVALENT PRODUCTS, SUBJECT TO REVIEW AND APPROVAL BY THE TOWN OF MONTVILLE'S DESIGNATED ENGINEER.) RUNOFF FROM THE PAVED AREAS IS TO BE COLLECTED BY A SERIES OF CATCHBASINS, TO BE FITTED WITH 2' SUMPS AND SIPHON HOODS. CATCHBASINS ARE 'TO BE DIRECTED THROUGH WATER QUALITY CHAMBERS (STORMCEPTORS) DESIGNED TO REMOVE 87% OF TSS PRIOR TO DISCHARGE INTO TIME GALLERY DETENTION SYSTEM. THE GALLERY DETENTION SYSTEM HAS BEEN DESIGNED TO MITIGATE A 10 YEAR STORM EVENT. WITH RESPECT TO SOIL EROSION AND SEDIMENT CONTROLS: GENERAL CONDITIONS: 1) ALL SOIL EROSION AND SEDIMENT CONTROLS ARE TO BE INSTALLED AND MAINTAINED TO THE STANDARDS SPECIFIED IN "CONNECTICUT GUIDELINES FOR SOIL EROSION AND SEDIMENT CONTROL", 2002 EDITION, AT A MINIMUM. 2) ALL REQUIRED SOIL EROSION AND SEDIMENT CONTROL MEASURES ARE TO REMAIN IN PLACE, AND MAINTAINED IN GOOD CONDITION, UNTIL FINAL SITE STABILIZATION. 3) THIS DOCUMENT IS INTENDED TO EXPAND UPON AND BE USED IN CONJUNCTION WITH THE CONSTRUCTION SEQUENCE NARRATIVE . 4) SITE MONITOR IS TO REGULARLY INSPECT THE SITE AND ISSUE INSPECTION REPORTS AS DESCRIBED ON THE "SITE MONITOR RESPONSIBILITIES" SHEET. SOIL EROSION AND SEDIMENT_ CONTROLS; 5) INSTALL GRAVEL ANTI -TRACKING MAT CONSTRUCTION ENTRANCE AT SITE ENTRY FROM CT. RTE. 32. 6) INSTALL PERIMETER FILTER FABRIC FENCE SEDIMENT BARRIER AT DISTURBANCE LIMITS. 7) NQ aU DISTURBANCE IS TO BE CONDUCED UNTIL THE ABOVE HAVE BEEN INSTALLED AND INSPECTED. 8) STOCKPILE A MINIMUM OF 60 CU.YD. OF STONE 275 SQ.YD. OF GEOTEXTILE FABRIC (SUFFICIENT TO FULLY REPLACE THE GRAVEL ANTI -TRACKING MAT CONSTRUCTION ENTRANCE TWO TIMES) AND A MINIMUM OF 200 LINEAR FEET OF FILTER FABRIC FENCE SEDIMENT BARRIER (INCLUDING STAKES). 9) THE STOCKPILED STONE AND GEOTEXTILE FABRIC MAY BE UTILIZED TO REPLENISH OR REPLACE THE GRAVEL ANTI -TRACKING MAT CONSTRUCTION ENTRANCE THROUGHOUT THE PROJECT, BUT A MINIMUM OF 30 CU.YD. OF STONE 135 SQ.YD. OF GEOTEXTILE FABRIC (SUFFICIENT TO FULLY REPLACE THE GRAVEL ANTI -TRACKING MAT CONSTRUCTION ENTRANCE ONE TIME) SHALL BE MAINTAINED AVAILABLE ON SITE UNTIL THE BINDER COAT IS PLACED ON THE DRIVEWAY AND PARKING AREAS. 10) A MINIMUM OF 200 UNEAR FEET OF FILTER FABRIC FENCE SEDIMENT BARRIER (INCLUDING STAKES) IS TO BE MAINTAINED IN WORKING CONDITION ON SITE UNTIL FINAL SITE STABILIZATION. 11) TREE REMOVAL, CLEARING AND GRUBBING, MAY BE CONDUCTED, IN WHOLE OR IN PART SIMULTANEOUSLY WITH THE FOLLOWING. 12) ROUGH GRADE THE DEVELOPMENT AREA. 13) INSTALL CATCH BASINS AND STORM DRAINAGE SYSTEM. (SANITARY SEWERS AND UNDERGROUND UTILITIES MAY BE INSTALLED SIMULTANEOUSLY WITH THE CATCH BASINS AND STORM DRAINAGE SYSTEM, OR MAY BE INSTALLED LATER IN THE PROJECT. 14) UPON INSTALLATION OF CATCH BASINS, CATCH BASINS SHALL BE FITTED WITH "SILT SACKS". 15) "SILT SACKS" SHALL BE MAINTAINED IN GOOD CONDITION (CLEAN OR REPLACE AS NECESSARY) UNTIL UPGRADIENT AREAS HAVE BEEN STABILIZED. "SILT SACKS" SHALL BE MAINTAINED UNTIL BINDER COAT HAS BEEN PLACED ON THE DRIVEWAY AND PARKING AREAS. 16) INSTALL WATER QUALITY CHAMBERS (STORMCEPTORS). 17) INSTALL DETENTION SYSTEM (INCLUDING PIPING) 18) COMPLETE INSTALLATION OF REMAINING SANITARY SEWERS, STORM SEWERS AND UNDERGROUND UTILITIES. 19) REMOVE TOPSOIL AND STOCKPILE ON SITE WITHIN THE "TEMPORARY PROCESSING AREA". 20) EXCAVATE FOR FOUNDATION. 21) FOUNDATION EXCAVATION IS TO BE GRADED TO DIRECT SURFACE WATER AWAY FROM THE EXCAVATION. 22) DEWATERING (AS REQUIRED), WHETHER FROM GROUND WATER INFILTRATION OR FROM TRAPPED RUNOFF, OF FOUNDATION EXCAVATIONS IS TO BE VIA PUMP. 23) FOUNDATION EXCAVATION L5 b[Qj IQ BE DEWATERED BY GRAVITY. 24) SUMP FOR PUMPS (IF NECESSARY) TO BE LINED WITH WASHED GRAVEL OR CRUSHED STONE TO MINIMIZE SUSPENDED SOLIDS (SEDIMENT). 25) PUMP SHALL DISCHARGE INTO THE INTERNAL ROADWAY FOR COLLECTION BY CATCH BASINS. 26) PUMPS SHAL �0 DISCHARGE DIRECTLY INTO CATCH BASINS. 27) PUMP FOR EXCAVATION DEWATERING, IF REQUIRED, SHALL DISCHARGE INTO STORM WATER WORKS PART #9732 (5'X7') DEWATERING BAG TO BE LOCATED IN THE GUTTER OF THE PROPOSED ROADWAY. 28) DEWATERING BAG SHALL BE PLACED UPGRADIENT OF A CATCHBASIN FITTED WITH "SILT SACK". 29) DEWATERING BAG SHALL BE INSPECTED FOR ACCUMULATED SEDIMENT ON A REGULAR BASIS AND CLEANED AS REQUIRED. (AT A MINIMUM, DEWATERING BAG SHALL BE INSPECTED AND CLEANED UPON COMPLETION OF EACH EXCAVATION DEWATERING. 30) FINAL GRADE SITE. 31) UPON FINAL SITE STABILIZATION, REMOVE ALL REMAINING SOIL EROSION AND SEDIMENT CONTROLS FOR PROPER DISPOSAL OFF-SITE. 32) COMPLETE INSTALLATION OF REMAINING SANITARY SEWERS AND UNDERGROUND UTILITIES. 33) LOAM SEED AND MULCH REMAINING DISTURBED AREAS. 34) REMOVE REMAINING "SILT SACKS" FROM ALL CATCH BASINS AND PROPERLY DISPOSE OF OFF-SITE. 35) REMOVE ACCUMULATED SEDIMENT FROM CATCH BASINS, IF ANY, AND PROPERLY DISPOSE OF OFF- SITE. 36) INSPECT STORM SEWER LINES FOR ACCUMULATED SEDIMENT. CLEAN AND/OR FLUSH, AS REQUIRED. NOTES: REM" ALL PL.&AM 4 1041110 TAISS. DO NOT GUT NURL AP PROM 91VI25 OP BALL POHL7 : ALL PLASTIC WIPM PROM TRIS DAL." IF PRamr. Rs2I" TO V111 or V41M DAMCRT. IF Wr Tcr OP ROO'TDALL 1" SH EVOW CAlOX MLL.CoH AT Do OEM SOIL SAWK TOP w44LC44 �-�- 4" OEM OF GOb!'OST, INSTALL AM HX M% -AMNO CAM"LL MDMJM ,. PRJ:PNNW PLJWTINO MIXnM ~ fi WAAWY ALL TMR'RM SItMS DO HOT V"VATL L010M THMi DALL D". IF 9"VAM 11!LCH TM CALL IXI M CACXPILL MV COM■ACT TO PPM%-% T SCTTLsLr. x 5 KK TYFIICAL DECIDUOUS TREE PLANTING in LAWN AREA WT M SO&E 4' GONE RISER \/ARIES R15ER \/ARI E5 BASE 4' MIN. FRAME 4 411- MIN. "MIN. T b" MIN. CONCRETE OR BRICK INVERT NOTES: 1. Precast concrete manholes shall be used only for Sewer or 2. Drains 24" diameter or smaller. Sanitary Manholes shall have letters "Sewer" and Storm drain shall have letters "Drain" cast on the covers. The sanitary cover shall have vent holes. ADJUST TO GRADE WITH MAX. OF FOUR COURSES OF BRICK COVER WITH 1/499 TO 3/8" MASONRY CEMENT PLASTER. PRECAST REINFORCED CONCRETE MANHOLE ECCENTRIC CONE WELDED WIRE FABRIC (TYP.) LIFTING HOLES (TYP.) (FILL WITH MORTAR) PRECAST REINFORCED CONCRETE TONGUE AND GROOVE RISERS AS REQUIRED PREFORMED PLASTIC GASKET OR FLEXIBLE WATERTIGHT RUBBER GASKET 5" NALL COAT ALL EXTERIOR SURFACES WITH TWO COATS OF BITUMINOUS WATER- PROOFING. KNOCKOUTS, FOR PIPES MIN. 4" FROM TOP & BOTTOM OF BASE CONCRETE OR BRICK & MORTAR INVERT 5' OR 6' DIA. PRECAST BASES MAY BE USED WHEN REQUIRED DUE TO SIZE OR NUMBER OF PIPES AT THE MANHOLE. PRECAST REDUCERS WILL BE PLACED ABOVE THE 5' & 6' BASES AS DIRECTED BY THE ENGINEER. WALL THICKNESS TO INCREASE 1 " FOR EACH 1' OF INSIDE DIAMETER INCREASE. UNDISTURBED GRADE NOTES: 1. SEE FACE AND WEB MESH DETAILS FOR REINFORCEMENT GRID. 2. CHISELLED GRANITE STYLE HAS 4 DIFFERENT FACE PATTERNS ON 24-62 BLOCKS. INSTALL A, B, C, & D PATTERNS AT RANDOM IN WALL. 't N I:mxM ® ®� :r ® C3 ® N SIDE VIEW OM AT OP" 0;ac po88 I- M 11/r srm 8'-O~ PRECAST GALLERY AS LEVEL SPREADER W" " ecru NOTE: USE REINFORCED 24 SF UNITS BELOW TOP 12' IN GEOGRID REINFORCED WALLS. SEE FACE AND WEB MESH DETAILS FOR OPTIONAL REINFORCEMENT GRID. STONE STRONG 24-62 UNIT NOT TO SCALE STONE STRONG 24 SF RETAINING WALL TOP UNITMON STONE STRONG 24 SF RETAINING WALL U N IT UNIT FILL AUTOMtifIC SET BACK' (4" PER UNIT) WALL BASE (SEE DETAIL) ALTERNATE DRAIN TILE LOCATION DRAIN TILE 24 SF REINFORCED WALL CROSS SECTION, NOT TO SCALE NOTES AND DETAILS OF PROPERTIES AT 1360 ROUTE 32 N THE UNCASVILLE SECTION OF MONTVILLE, CT. PREPARED FOR: TO MY KNOWLEDGE AND BELIEF, CHARLES F. GAGER THIS MAP IS SUBSTANTIALLY CGRRFCT TO THE STANDARDS OF Cia1S5 "A2" AS NOTED HEREON. SCALE: AS SHOWN 27 JANUARY 2012 SHEET 11 of 11 E� GCRY Fi. PIDLUSKI .G� P.E., R.L.S. # 12154 CT 7976 SCALE 1000 0 1000 1� S 30 04„W 2.39,, S 31'33'49» VV i 19 NOTES: 1 THIS SURVEY AND MAP HAVE BEEN PREPARED IN ACCORDANCE WITH THE "RECOMMENDED STANDARDS FOR SURVEYS AND MAPS IN THE STATE OF CONNECTICUT" AS ADOPTED FOR USE BY THE CONNECTICUT ASSOCIATION OF LAND SURVEYORS, INC. ON SEPTEMBER 24, 1992, EFFECTIVE DATE JANUARY 1, 1993. SAID STANDARDS ENACTED BY THE STATE OF CONNECTICUT (SECTIONS 20-300b-1 THROUGH 20-300b-20 OF THE STATE OF CONNECTICUT AGENCIES) EFFECTIVE JUNE 21, 1996. 2) THE TYPE OF SURVEY PERFORMED WITH RESPECT TO THE BOUNDARY PERIMETER IS BUILDING LOCATION MAP, ZONING. 3) THE BOUNDARY DETERMINATION CATEGORY IS DEPENDENT RESURVEY. 4) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "RIGHT OF WAY MAP, TOWN OF MONTVILLE, NORWICH—NEW LONDON ROAD FROM THE WHITMAN—YOUNG PROPERTY NORTHERLY ABOUT 6,200 FEET, ROUTE NO 12, SHEET NO. 1 OF 3", SCALE: 1"=40', DATED 1929, PREPARED BY THE CONNECTICUT STATE HIGHWAY DEPARTMENT. 5) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "RIGHT OF WAY MAP, TOWN OF MONTVILLE, NORWICH—NEW LONDON ROAD FROM THE WHITMAN—YOUNG PROPERTY NORTHERLY ABOUT 6,200 FEET, ROUTE NO 12, SHEET NO. 2 OF 3", SCALE: 1"=40', DATED 1929, PREPARED BY THE CONNECTICUT STATE HIGHWAY DEPARTMENT. 6) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "MAP OF RIGHT OF WAY OF CONNECTICUT LIGHT & POWER COMPANY, ACROSS THE PROPERTY OF FREDERICK W. & MINNIE B. STANLEY, TOWN OF MONTVILLE, COUNTY OF NEW LONDON, STATE OF CONNECTICUT SCALE: 1"=200', DATED OCTOBER 1947, ON FILE IN THE OFFICE OF THE MONTVILLE TOWN CLERK. 7) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "PLAN OF PROPERTY OWNED BY RICHARD K. SHEPARD, IN THE TOWN OF MONTVILLE, REVISED PLAN", SCALE: 1"=100', DATED OCTOBER 1950, REVISED THROUGH MAY 1951, ON FILE IN THE OFFICE OF THE MONTVILLE TOWN CLERK. 8) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "PHASE 11 SEWERAGE PROGRAM, MONTVILLE, CONNECTICUT, CONTRACT 8, ROUTE 32, SHEET B-4", SCALE: 1"=40', DATED APR. 1979, REVISED THROUGH 9-1-83, PREPARED BY LOUREIRO ENGINEERING ASSOCIATES. 9) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "PHASE 11 SEWERAGE PROGRAM, MONTVILLE, CONNECTICUT, CONTRACT 8, ROUTE 32, SHEET B-5", SCALE: 1"=40', DATED APR. 1979, REVISED THROUGH 9-1-83, PREPARED BY LOUREIRO ENGINEERING ASSOCIATES. 10) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "PLAN MADE FOR MONTVILLE MEMORIAL POST 10060 VETERANS OF FOREIGN WARS OF THE UNITED STATES, INCORPORATED, ROUTE 32, SARAH DRIVE, & RAYMOND HILL ROAD", SCALE: 1"=100', DATED JUNE 19, 1985, ON FILE IN THE OFFICE OF THE MONTVILLE TOWN CLERK. 11) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "BOUNDARY AND TOPOGRAPHIC SURVEY PREPARED FOR MOHEGAN TRIBAL UTILITY AUTHORITY SHOWING LAND TO BE CONVEYED FROM MONTVILLE MEMORIAL POST 10060 VETERANS OF FOREIGN WARS OF THE UNITED STATES, INCORPORATED TO MTIC ACQUISITIONS, INC., ROUTE 32, MONTVILLE, CONNECTICUT, SHEET 1 OF 1", SCALE: 1"=40', DATED AUG. 22, 2000, ON FILE IN THE OFFICE OF THE MONTVILLE TOWN CLERK. 11) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "THAMES BASIN REGIONAL WATER INTERCONNECTION PROJECT, ORIGINAL MONTVILLE PUMP STATION, CONN. ROUTE #32, MONTVILLE, CT., SHEET 1 OF 1 SCALE: 1"=20', DATED MAY 13, 2005, REVISED THROUGH 11-30-07, ON FILE IN THE OFFICE OF THE MONTVILLE TOWN CLERK. 12) WITH RESPECT TO HORIZONTAL DATA SHOWN HEREON THE ACCURACY CLASS IS "A-2 13) WITH RESPECT TO TOPOGRAPHIC DATA SHOWN HEREON THE ACCURACY CLASS IS ""r-2 14) ELEVATIONS ARE BASED UPON NGVD 1929 DATUM. 15) UNDERGROUND UTILITIES (INCLUDING STORM, SANITARY AND/OR COMBINATION SEWERS) SHOWN HEREON ARE COMPILED FROM VARIOUS SOURCES INCLUDING OBSERVATION OF SURFACE STRUCTURES, UTILITY COMPANY MAPS, MAPS OF THE TOWN OF MONTVILLE, AND MAPS OF THE CONNECTICUT DEPARTMENT OF TRANSPORTATION (f.k.a. THE CONNECTICUT HIGHWAY DEPARTMENT. THE ACTUAL LOCATION, SIZE AND DEPTH OF THE UNDERGROUND UTILITIES SHOWN HEREON MAY NOT BE AS INDICATED. ADDITIONAL UNDERGROUND UTILITIES MAY EXIST. PRIOR TO ANY EXCAVATION OR CONSTRUCTION CONTACT "CALL BEFORE YOU DIG": 1-800-922-4455. 16) FIELD FLAGGED WETLAND SOILS ARE AS DETERMINED BY ALEKSANDRA MOCK SOIL & WETLAND SCIENTIST (REFERENCE REPORT ENTITLED: "WETLAND DELINEATION FOR THE PROPERTY LOCATED AT 1360 ROUTE 32, UNCASVILLE, CONNECTICUT", DATED JUNE 29 AND JULY 2, 2011.) W.F# 119 17) PROPERTY IS LOCATED IN A "C-2" ZONE DISTRICT. W.F#1 I A\ Ilk N G Wl F# 1 17 o W. F#161 TE: LINE OF TITLE I ALONG THE CENTERLINE OF THE A� N 0 S WATERCOURSE AND IS SUBJECT TO RIPARIAN RIGHTS, BEARINGS AND DISTANCES APPROXIMATE CENTERLINE OF WATERCOURSE AS OF THE DATE OF THIS SURVEY AND ARE PROVIDED FOR MATHEMAnCAL CLOSURE ONLY, THEY ARE NOT THE LINE OF 1ITLE. N 12-44'31 " W, 23.40' N 63*51'57" W, 22,79' ti 6,0000ZNW. F # 1 cl N 16-03'05" E, 23.94' W. F# 180 N 45*0000" W, 6.89' W. F Ll 1 5"\'l- N 12*36'11 E 31.3 7-' W. F# 1 1 cu') F# 61 ;W.k #37 W. F' IM O W 33'02'39' E,,/l 5.74 N d8'5(3'5-;" W Ob .-PW. F# 17 7 tK W. F# 6 2 4�.56' vow, 18 00� 3'54" E, 10. a 51 *0 6P'/ 40 A i 1� �b C.)1,�, W.F#63 W,�F# 182 N' 4000o 51*04'22' 83 CD F_ 26. # 1 14 W.F#1 1 1 W.F#14f-- a W.F#72 S' 02'54'12" 4" W. F '41. F�, 1 12 122.24, <�]F#31 40 Jor - *I - 46%43 W.F#17 6 \N,,,F 7' -, - 0 U0 �J, oft -so \6 F# 1 1 1 #13 -09 ;�W. F # 6 7 17-0 Llt4 W.F#183 CD , �j 0 1 tl �oe W.F# 130 GED 00�1 F7 BROOK V�F#.l 46 W. F #6 S �,F�l 36 i ' 1� , 5 -100' oR-ftb 00 11 �N' F# 31 �.F#70 00 .7-7- 2" # J W. F 4 j OK W. F # I V1 L r _• #2 BRIDGE B RO 'IV W.F#66, 84 F I vv. '3 4 E 187 vv N 17'07 '31 wft'� 1 1 0N 2�- t W. F# 1 81_ W\ F # W.F# 131 . I z �#33 53 2;" — -�-Z _1111� � . F,,# 171 N 23*56'06" E 3.3 N 1 w W.F# F# 156 ------ — t / j - 1 '1'73 V . F tt 0 38. 4- • '26'16" E 2��/t7 ------ W. R# 3 2 r N 13 Vl A__ # , F W,F# 150 F# 1,57 • L/b.94 F� 2 6 W, F co N 29*24'25" W. F# 18 W,F#20 9 CD gr;rD, -� tt S 21*02 25 F# 17,2 7 2'2� 41,70' 4'43" �,,�'�3 4.3 5 -0 F# 149 w # 15 5 N 46* 1 • 7 N '35'58" 27.14' W 148 #151 vv.5 #.-I w-, 7%,. 7,�—, (7yp f -7VP—F# 24 '��W F #6 "W. F#2 6'1F#163 15 4 W ,F W.F# r 0-110 lz W. # 14 W. 11 F " f" 7 - - _', W. F 16 x# i YJ w 4il_5 3 W. WF w Ary �RI X W. F# I Ile, W.F#164 , W# 12 Z W.F#j 133 J .. .. ... .... 03 W. J 0-) z 00 W:eF#4 FOUNDATION REMAINS fRAG Jl..... ....... 6C N .... ... .... . ........ -------- . ......... 7- ------ 03 W. F# 1,344 W.F. �l / / I- , I I / I I - - .1 7' q GREEN— 7 7 7 77- 7 ­7� 7 HOUSE RAG HOUSE FOUNDATION z CO -TE E 1,37' REMAINS 0 .FA X s 18*23'' 6 J��5/ / I N ------ G6 - EXIOT 4 W .13 ___ I X I" ­`EN/16-17',06" E 47.1 - 38" W S 23*35' BO�(CUL\%RT 437.1Y N X1`16`55" E 47.03' 4153.8' 48.50' S 2,§ 20'1 - ............................ 2 IA N- 2117 31 E T6 Tlill ...........N 73-18 1p 16.57 Cli 0) 0 1 O U�T E i3 2 ,�, RQUTE�'32 R ,� 1 00 1 J, i'EXIST.- _ _j_-� 'J N 68*41'32" W HYDT. 14.9 7' FULLER ENGINEERING & LAND SURVEYING, LLC 525 JOHN STREET BRIDGEPORT, CT. PH. 203-3,33-9465 EMAIL:INFO@FU LLERSURVEYORS.COM TO MY KNOWLEDGE AND BELIEF, THIS M.ikP IS SUBSTANTIALLY CORRECT TO THE STANDARDS OF CLASS "A2" AS NOTED HEREON. Eel MAP OF TOPOGRAPHIC SURVEY OF PROPERTIES AT 1360 ROUTE 32 IN THE UNCASVILLE SECTION OF MONTVILLE, CT. PREPARED FOR: CHARLES F. GAGER SCALE: 1 ))=50) 27 JANUARY 2012 SHEET 2 of 1 50 0 50 100 150 GRAPHIC SCALE — FEET CT 7976 1 RE—ISSUE D3-20-12 N0. REVISIONS DATE MAP OF TOPOGRAPHIC SURVEY OF PROPERTIES AT 1360 ROUTE 32 IN THE UNCASVILLE SECTION OF MONTVILLE, CT. PREPARED FOR: CHARLES F. GAGER SCALE: 1 ))=50) 27 JANUARY 2012 SHEET 2 of 1 50 0 50 100 150 GRAPHIC SCALE — FEET CT 7976 / SCALE 1000 0 1000 VV. F#134 W. F# 130 ® / ® W.F#135 W.F#1 EXIST 4x6' BOX CULVERT DEVELOPMENT STANDARDS C-2 Zone District STANDARD REQUIREMENT EXISTING PROPOSED COMMENTS 1 ADD TURNOUT, STOP SIGN/BAR 3-20-1 Minimum Lot Area 80000 S.F. 468041 ± S.F. 468041 ± S.F. Minimum Lot Frontage 200 Ft. 1604± FT. 1604± FT. Maybe reduced to 100 Ft. by Commission (re: Sect. 11.A.5) Minimum Building Setbacks Front Yard 50 Ft. 7.7 FT. 51.0 FT. Side Yard 30 Ft. 144 FT. 457 FT. May be reduced to 0 Ft. by Commission (re: Sect. 11.A.6) Rear Yard (to Residential Zone) 50 Ft. N.A. N.A. Rear Yard (to Commercial or Residential Zone) 30 Ft. 183± FT. 63± FT. Maximum Height 70 Ft. 20± FT. 66± FT. May be waived by Commission (re: Sect. 11.A.7) Building Area 0.7% 4.2% No Standard Lot Coverage 1.2% 18.9% No Standard N - ROUTE 32 FULLER ENGINEERING & LAND SURVEYING, LLC 525 JOHN STREET BRIDGEPORT, CT. PH. 203-333-9465 EMAIL-.INFO@FULLERSURVEYORS.COM S 3 j °33,Og,, W EXISTING GUIDERAIL TO BE REMOVED -- PROPOSED DECELLERATION LANE TO MY KNOWLEDGE AND BELIEF, THIS MAP IS SUBSTAN`TIeALLY CIORREC,T TO THE STANDARDS OF CLASS "A2" AS NOTED HEREON. G`REGO 'H. PIDLUSKI P.E., .L.S. # 12154 NOTES: 1) THIS SURVEY AND MAP HAVE BEEN PREPARED IN ACCORDANCE WITH THE "RECOMMENDED STANDARDS FOR SURVEYS AND MAPS IN THE STATE OF CONNECTICUT" AS ADOPTED FOR USE BY THE CONNECTICUT ASSOCIATION OF LAND SURVEYORS, INC. ON SEPTEMBER 24, 1992, EFFECTIVE DATE JANUARY 1, 1993. SAID STANDARDS ENACTED BY THE STATE OF CONNECTICUT (SECTIONS 20-300b-1 THROUGH 2O -300b-20 OF THE STATE OF CONNECTICUT AGENCIES) EFFECTIVE JUNE 21, 1996. 2) THE TYPE OF SURVEY PERFORMED WITH RESPECT TO THE BOUNDARY PERIMETER IS BUILDING LOCATION MAP, ZONING. 3) THE BOUNDARY DETERMINATION CATEGORY IS DEPENDENT RESURVEY. 4) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "RIGHT OF WAY MAP, TOWN OF MONTVILLE, NORWICH -NEW LONDON ROAD FROM THE WHITMAN -YOUNG PROPERTY NORTHERLY ABOUT 6,200 FEET, ROUTE NO 12, SHEET NO. 1 OF 3", SCALE: 1"=40', DATED 1929, PREPARED BY THE CONNECTICUT STATE HIGHWAY DEPARTMENT. 5) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "RIGHT OF WAY MAP, TOWN OF MONTVILLE, NORWICH -NEW LONDON ROAD FROM THE WHITMAN -YOUNG PROPERTY NORTHERLY ABOUT 6,200 FEET, ROUTE NO 12, SHEET NO. 2 OF 3", SCALE: 1 "=40', DATED 1929, PREPARED BY THE CONNECTICUT STATE HIGHWAY DEPARTMENT. 6) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "MAP OF RIGHT OF WAY OF CONNECTICUT LIGHT & POWER COMPANY, ACROSS THE PROPERTY OF FREDERICK W. & MINNIE B. STANLEY, TOWN OF MONTVILLE, COUNTY OF NEW LONDON, STATE OF CONNECTICUT", SCALE: 1 "=200', DATED OCTOBER 1947, ON FILE IN THE OFFICE OF THE MONTVILLE TOWN CLERK. 7) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "PLAN OF PROPERTY OWNED BY RICHARD K. SHEPARD, IN THE TOWN OF MONTVILLE, REVISED PLAN", SCALE: 1"=100', DATED OCTOBER 1950, REVISED THROUGH MAY 1951, ON FILE IN THE OFFICE OF THE MONTVILLE TOWN CLERK. 8) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "PHASE II SEWERAGE PROGRAM, MONTVILLE, CONNECTICUT, CONTRACT B, ROUTE 32, SHEET B-4", SCALE: 1"=40', DATED APR. 1979, REVISED THROUGH 9-1-83, PREPARED BY LOUREIRO ENGINEERING ASSOCIATES. 9) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "PHASE II SEWERAGE PROGRAM, MONTVILLE, CONNECTICUT, CONTRACT 8, ROUTE 32, SHEET B-5", SCALE: 1"=40', DATED APR. 1979, REVISED THROUGH 9-1-83, PREPARED BY LOUREIRO ENGINEERING ASSOCIATES. 10) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "PLAN MADE FOR MONTVILLE MEMORIAL POST 10060 VETERANS OF FOREIGN WARS OF THE UNITED STATES, INCORPORATED, ROUTE 32, SARAH DRIVE, & RAYMOND HILL ROAD", SCALE: 1"=100', DATED JUNE 19, 1985, ON FILE IN THE OFFICE OF THE MONTVILLE TOWN CLERK. 1 1) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "BOUNDARY AND TOPOGRAPHIC SURVEY PREPARED FOR MOHEGAN TRIBAL UTILITY AUTHORITY SHOWING LAND TO BE CONVEYED FROM MONTVILLE MEMORIAL POST 10060 VETERANS OF FOREIGN WARS OF THE UNITED STATES, INCORPORATED TO MTIC ACQUISITIONS, INC., ROUTE 32, MONTVILLE, CONNECTICUT, SHEET 1 OF 1", SCALE: 1"=40', DATED AUG. 22, 2000s ON FILE IN THE OFFICE OF THE MONTVILLE TOWN CLERK. 1 1) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "THAMES BASIN REGIONAL WATER INTERCONNECTION PROJECT, ORIGINAL MONTVILLE PUMP STATION, CONN. ROUTE #32, MONTVILLE, CT., SHEET 1 OF 1 ", SCALE: 1"=20', DATED MAY 13, 2005, REVISED THROUGH 11-30-07, ON FILE IN THE OFFICE OF THE MONTVILLE TOWN CLERK. 12) WITH RESPECT TO HORIZONTAL DATA SHOWN HEREON THE ACCURACY CLASS IS "A-209. 13) WITH RESPECT TO TOPOGRAPHIC DATA SHOWN HEREON THE ACCURACY CLASS IS "T-299 . 1-4) ELEVATIONS ARE BASED UPON NGVD 1929 DATUM. 15) UNDERGROUND UTILITIES (INCLUDING STORM, SANITARY AND/OR COMBINATION SEWERS) SHOWN HEREON ARE COMPILED FROM VARIOUS SOURCES INCLUDING OBSERVATION OF SURFACE STRUCTURES, UTILITY COMPANY MAPS, MAPS OF THE TOWN OF MONTVILLE, AND MAPS OF THE CONNECTICUT DEPARTMENT OF TRANSPORTATION (f.k.a. THE CONNECTICUT HIGHWAY DEPARTMENT. THE ACTUAL LOCATION, SIZE AND DEPTH OF THE UNDERGROUND UTILITIES SHOWN HEREON MAY NOT BE AS INDICATED. ADDITIONAL UNDERGROUND UTILITIES MAY EXIST. PRIOR TO ANY EXCAVATION OR CONSTRUCTION CONTACT "CALL BEFORE YOU DIG": 1-800-922-4455. +6) FIELD FLAGGED WETLAND SOILS ARE AS DETERMINED BY ALEKSANDRA MOCH, SOIL & WETLAND SCIENTIST (REFERENCE REPORT ENTITLED: "WETLAND DELINEATION FOR THE PROPERTY LOCATED AT 1360 ROUTE 32, UNCASVILLE, CONNECTICUT , DATED JUNE 29 AND JULY 2, 2011.) 17) PROPERTY IS LOCATED IN A "C-2" ZONE DISTRICT. EMlMlE■■�yJ DoT APPROXIMATE CENTERLINE 1:4 OF TRAVEL WAY PROPOSED 4' WIDE SIDEWALK EXISTING GUIDERAIL TO REMAIN XI IU rr 6.57' N 12°44'31 " W, 23.40' / N 16'03'05" E, 23.94' W. F# 18 56'57" W 45 ' F W.F 8 ...1W. .5 6W.F#181 • ... # 177 /W.F#179 <#182 4„ E .000>1 N 11' 22 2 • X6.43 1� �" W.F#176 ZZIN.F#183 OoO • W.F#175 BR • W. F_ 4 ° �15bZ F#156 / F#173 W.F#171 • W. F# 1 50 F#157 • v • W.F#149 W.F 155 W.F#172 # W. F# 1 58 ^ W. # 16 0 �# 151 • W W.F#161 W.F W. .000,LA • N W.F#162 / .W.F#164 -S 23°35'38" 48.50' OVERALL PROPOSED PLOT PLAN OF PROPERTIES 1360 ROUTE 32 N THE UNCASVILLE SECTION OF MONTVILLE, CT. PREPARED FOR: CHARLESF.GAGR SCALE: 1° =50' 27 JANUARY 2012 SHEET 3 of 11 50 0 50 100 150 GRAPHIC SCALE - FEET CT 7976 t�� a a 1 ADD TURNOUT, STOP SIGN/BAR 3-20-1 NO. REVISIONS DATE XI IU rr 6.57' N 12°44'31 " W, 23.40' / N 16'03'05" E, 23.94' W. F# 18 56'57" W 45 ' F W.F 8 ...1W. .5 6W.F#181 • ... # 177 /W.F#179 <#182 4„ E .000>1 N 11' 22 2 • X6.43 1� �" W.F#176 ZZIN.F#183 OoO • W.F#175 BR • W. F_ 4 ° �15bZ F#156 / F#173 W.F#171 • W. F# 1 50 F#157 • v • W.F#149 W.F 155 W.F#172 # W. F# 1 58 ^ W. # 16 0 �# 151 • W W.F#161 W.F W. .000,LA • N W.F#162 / .W.F#164 -S 23°35'38" 48.50' OVERALL PROPOSED PLOT PLAN OF PROPERTIES 1360 ROUTE 32 N THE UNCASVILLE SECTION OF MONTVILLE, CT. PREPARED FOR: CHARLESF.GAGR SCALE: 1° =50' 27 JANUARY 2012 SHEET 3 of 11 50 0 50 100 150 GRAPHIC SCALE - FEET CT 7976 t�� a a / SCALE 1000 0 1000 DEVELOPMENT STANDARDS C-2 Zone District I STANDARD REQUIREMENT EXISTING PROPOSED COMMENTS TELE./CATV in INFORMATION OF AREA SUBJECT REVISIONS DATE Minimum Lot Area 80000 S.F. 468041 ± S.F. 468041 ± S.F. Zo Minimum Lot Frontage 200 Ft. 1604± FT. 1604± FT. Maybe reduced to 100 Ft. by Commission (re: Sect. 11.A.5) Minimum Building Setbacks (CB �C (SEE NOTES) n Front Yard 50 Ft. 7.7 FT. 51.0 FT. I Side Yard 30 Ft. 144 FT. 457 FT. May be reduced to 0 Ft. by Commission (re: Sect. 11.A.6) Rear Yard (to Residential Zone) 50 Ft. N.A. N.A. Rear Yard (to Commercial or Residential Zone) 30 Ft. 183± FT. 63± FT. S 23'35'38" 48.50' Maximum Height 70 Ft. 20± FT. 66± FT. May be waived by Commission (re: Sect. 11.A.7) Building Area 0.7% 4.2% No Standard Lot Coverage 1.2% 18.9% No Standard NOTES: 1) THIS SURVEY AND MAP HAVE BEEN PREPARED IN ACCORDANCE WITH THE "RECOMMENDED STANDARDS FOR SURVEYS AND MAPS IN THE STATE OF CONNECTICUT" AS ADOPTED FOR USE BY THE CONNECTICUT ASSOCIATION OF LAND SURVEYORS, INC. ON SEPTEMBER 24, 1992, EFFECTIVE DATE JANUARY 1, 1993, SAID STANDARDS ENACTED BY THE STATE OF CONNECTICUT (SECTIONS 20-300b-1 THROUGH 2O -300b-20 OF THE STATE OF CONNECTICUT AGENCIES) EFFECTIVE JUNE 21, 1996. 2) THE TYPE OF SURVEY PERFORMED WITH RESPECT TO THE BOUNDARY PERIMETER IS BUILDING LOCATION MAP, ZONING. 3) THE BOUNDARY DETERMINATION CATEGORY IS DEPENDENT RESURVEY. 4) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "RIGHT OF WAY MAP, TOWN OF MONTVILLE, NORWICH—NEW LONDON ROAD FROM THE WHITMAN—YOUNG PROPERTY NORTHERLY ABOUT 6,200 FEET, ROUTE NO 12, SHEET NO. 1 OF 3", SCALE: 1"=40', DATED 1929, PREPARED BY THE CONNECTICUT STATE HIGHWAY DEPARTMENT. 5) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "RIGHT OF WAY MAP, TOWN OF MONTVILLE, NORWICH—NEW LONDON ROAD FROM THE WHITMAN—YOUNG PROPERTY NORTHERLY ABOUT 6,200 FEET, ROUTE NO 12, SHEET NO. 2 OF 3", SCALE: 1"=40', DATED 1929, PREPARED BY THE CONNECTICUT STATE HIGHWAY DEPARTMENT. 6) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "MAP OF RIGHT OF WAY OF CONNECTICUT LIGHT & POWER COMPANY, ACROSS THE PROPERTY OF FREDERICK W. & MINNIE B. STANLEY, TOWN OF MONTVILLE, COUNTY OF NEW LONDON, STATE OF CONNECTICUT", SCALE: 1 "=200', DATED OCTOBER 1947, ON FILE IN THE OFFICE OF THE MONTVILLE TOWN CLERK. 7) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "PLAN OF PROPERTY OWNED BY RICHARD K. SHEPARD, IN THE TOWN OF MONTVILLE, REVISED PLAN", SCALE: 1"=100', DATED OCTOBER 1950, REVISED THROUGH MAY 1951, ON FILE IN THE OFFICE OF THE MONTVILLE TOWN CLERK. 8) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "PHASE II SEWERAGE PROGRAM, MONTVILLE, CONNECTICUT, CONTRACT B, ROUTE 32, SHEET B-4", SCALE: 1"=40', DATED APR. 1979, REVISED THROUGH 9-1-83, PREPARED BY LOUREIRO ENGINEERING ASSOCIATES. 9) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "PHASE II SEWERAGE PROGRAM, MONTVILLE, CONNECTICUT, CONTRACT B, ROUTE 32, SHEET B-5", SCALE: 1"=40', DATED APR. 1979, REVISED THROUGH 9-1-83, PREPARED BY LOUREIRO ENGINEERING ASSOCIATES. 10) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "PLAN MADE FOR MONTVILLE MEMORIAL POST 10060 VETERANS OF FOREIGN WARS OF THE UNITED STATES, INCORPORATED, ROUTE 32, SARAH DRIVE, & RAYMOND HILL ROAD", SCALE: 1"=100', DATED JUNE 19, 1985, ON FILE IN THE OFFICE OF THE MONTVILLE TOWN CLERK. 11) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "BOUNDARY AND TOPOGRAPHIC SURVEY PREPARED FOR MOHEGAN TRIBAL UTILITY AUTHORITY SHOWING LAND TO BE CONVEYED FROM MONTVILLE MEMORIAL POST 10060 VETERANS OF FOREIGN WARS OF THE UNITED STATES, INCORPORATED TO MTIC ACQUISITIONS, INC., ROUTE 32, MONTVILLE, CONNECTICUT, SHEET 1 OF 1 SCALE: 1"=40', DATED AUG. 22, 2000, ON FILE IN THE OFFICE OF THE MONTVILLE TOWN CLERK. 1 1) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "THAMES BASIN REGIONAL WATER INTERCONNECTION PROJECT, ORIGINAL MONTVILLE PUMP STATION, CONN. ROUTE #32, MONTVILLE, CT., SHEET 1 OF 1 ", SCALE: 1"=20', DATED MAY 13, 2005, REVISED THROUGH 11-30-07, ON FILE IN THE OFFICE OF THE MONTVILLE TOWN CLERK. 12) WITH RESPECT TO HORIZONTAL DATA SHOWN HEREON THE ACCURACY CLASS IS "A-2". 13) WITH RESPECT TO TOPOGRAPHIC DATA SHOWN HEREON THE ACCURACY CLASS IS "T-2". 14) ELEVATIONS ARE BASED UPON NGVD 1929 DATUM. 15) UNDERGROUND UTILITIES (INCLUDING STORM, SANITARY AND/OR COMBINATION SEWERS) SHOWN HEREON ARE COMPILED FROM VARIOUS SOURCES INCLUDING OBSERVATION OF SURFACE STRUCTURES, UTILITY COMPANY MAPS, MAPS OF THE TOWN OF MONTVILLE, AND MAPS OF THE CONNECTICUT DEPARTMENT OF TRANSPORTATION (f.k.a. THE CONNECTICUT HIGHWAY DEPARTMENT. THE ACTUAL LOCATION, SIZE AND DEPTH OF THE UNDERGROUND UTILITIES SHOWN HEREON MAY NOT BE AS INDICATED. ADDITIONAL UNDERGROUND UTILITIES MAY EXIST. PRIOR TO ANY S 31.3309„ EXCAVATION OR CONSTRUCTION CONTACT "CALL BEFORE YOU DIG": 1-800-922-4455. 193 9 W 16) FIELD FLAGGED WETLAND SOILS ARE AS DETERMINED BY ALEKSANDRA MOCK SOIL & WETLAND SCIENTIST (REFERENCE REPORT ENTITLED: "WETLAND DELINEATION FOR THE PROPERTY LOCATED AT W.F#119 1360 ROUTE 32, UNCASVILLE, CONNECTICUT is, DATED JUNE 29 AND JULY 29 2011.) REAR 17) PROPERTY IS LOCATED IN A "C-2" ZONE DISTRICT. eUIZDING SETBACK W.F# 1 1 w d- N c,'-� 1 �% •� N P, • � / W.F#11 / !I � W. F# 1 16 • N 63'51'57" W, 22.79' 41 N 45'00'00 W 6 89' N 12'44'31 " W, 23.40' / N 16'03'05" E, 23.94' / W. F# 18 / . / N N 12'36' 1 1" E 31.37' 1 __--- � W.F 61 W.F 138 / �- �- # W.F#37 „ / / / - - � N 33'02'39" E, 15.74' N 08°56 57 W W 8 ....1W•F 177 � / 45.5 6 W . F#181 ...... # � W.F#62 N 51'03'54" E, 10.65' / W.F#17 ��1, �O `• _ �-- 4- W. 2 -� W.F#63 \.. N 5 , „ �W.F#182 F#1 14 W. F# 1 JW. W. F# 1 5 / S S ° 1 04 22 E, 26.83 / S 02 54 22.24' / , 24„ E �. F=' 1 1 2 � 3� W.F#36 1'22• •► / \ q.6.43 , .ate W.F# 176 1N.F#1 1 1 LIN� F#137 •__.. WE[LANO-�• a . W.F#67 �_ = •� 85I \ \ \ �- �- V.F#183 W.F#175 W . F 130 `� GED 1. F b . .� # OK - -_ FLAG,,.. W W. F # 1 4 6 W. . F'� 6 _Q, I� W a . 8R0 �L►� . F# 136 tr_� F#35 • B O W.F#711L 0 �; l/2 --�� 8 OK -� N r F#22 �62��) W.F �4 c� BRIDGE-�°�' i .F# `�, 29' s . �� r'S �� !y `E� W. F# 185 W. F# 184 � / 2 06" 1 E N 26.5327„� F ti W.F#34 U 159 W.F#131 „ N 18'48 3-5 -�� 22 E N 17°5 53' E #21 • F�/ �/ W.F#33 # 1 87 F# 156 # V N 23'56 06 E 3.3 42.10' ATF �' ',%.F#2 S 3 �� W F#32 / F#173 NI.F 171 'W.F# N 13 26 16 E 26.57 SJ 8 X2'16„ /.F 157 • W W.F#8 N 29'24'25” E 8.94' W.F ' 18 / / W.F#26 W 9 •) W.F#186 / W.F#1 50 #• o # 1. LAGG" .� 1 S 21 02 25 r, '' �� % N 46' 14 E 34.35' . "' • „ 1,10%ED W 41 .70 a . F# 188 W.F# 149 `�I/ W.F# 172 09 2 L F 12 RC @ h wwoo-F#7 �� N 24.35 E 27.14 • / W. F '� SAN N . N 0 �9 r 1 48 I4-' 1 51 W. F 1 55 W. F 158 /� W. 1 60 7�'p r n / 1 �„ W.F#15' W F# 161 W.F �0 / PROP CB ,.F#29 �� � F#6 �� No V.F#14 _� _ • ____--�— � • --�•-_ 4,T__._= F'�2,�°I� PROP CB -�— �Q I • PROP CB — r F. 118.4 ��� @i (C8 5) T.F. 117.6 W ; �� F 1 4 7 i _ • • / _ • W. F# 1 b CB 2 PROP C8 INV. 109.07 GQ T.F. 117.6 INV. 111.0 \ ' # W N • �� # W. F 1 W. F 1 F 1 3 � � .�' • # # � / T.F. 116.0 (CB 3) • ( ) � INV. 109.77 • • INV. 107.92 T.F. 118. '�2 0 # W.F#5 ---- —� • ...�J un u�.� INV. 108.47 c AC,`� W.F#1 62 / I / —� b^J • F# 1 2 I REFUSE PRO CB 100 L F. 12 R 1. °k W. F# 133 / �25' WETLA AREA TCF 1 ,13. INV. 108. 9 / /� SETBACK PROP STORMCEPTOR c va STC 900 ' \ I 4 L.F. 15" RCP T.F. t 116.1 W. F# 4 50 WETLAND 10% NV 10 @ . 0 2 o o SETBACK BASE (HEIGHT) _ F OORELE ATIO 10 .5�yP)EXISTING BUILDING L 12" (min.)EPTH OF awe - x _... ___ STRUCTURES WITHIN AREA T��yp•) i — _ SUBJECT TO DEVELOPMENT FENCE AT IO F SEDfMEAR AO XT ' In. HIG H N I (FTILIZN IT" IEL AS ETAI ( in. 10' DOWN tp ENT ASIN DURI G BACK SPREADER sD' Ro TO BE REMOVED (TYP)•) ALL GRADIENT OF VEL 2� Gj _ PROP / ° �`, F 'r BUILDING ���� ,� SITE W. F 1 34 ��•cK Q@i PROP SAN. MH SIGN / W.F#2 �° se•sAI - `�IOQPROP CB _ INV. 10.1.8 (CB 3) • =� ft P ST MH PR P C 1 V 5.0 111 L.F. 18" RCP (� 0,9% PROP S7 MH C (STMH 1) (C 14) T.F. 115 B T.F. 1'i3. T.F 11INV. 108.27 17 L.F. 12" N 19 17 30 E (sTMH a) ' T.F. 84.0 _ PROP ST MHI INV. 102.84 IN i i L RCP @ 1.0°k a6 L F. 12 RC 1. F 187 L.F. 18" RCP (� 3.2% (STMH 2 C W.F#135 PROP ST MH , T.F. 104.2 t t c-', 26.3 , „ (STMH 3) INV. 99.02 EXIST 4'x6' N 8 5 4 E , T.F. 90.0 166 L.F. 18" ° -� v 1 BOX CULVERT �$AN 43 7.13 � Rcq;@ 10.2% �'�► / --— �M 120 L.F. 8" 29'20'1,x" � I. � 4 11�� ','J�11����� ROP SAN MHPROPOS® F L.F. 15' RCP @ 1 PROP STORMCEPTOR STC 900 T.F. 116.1 PROP CB (c 10) T. 1 5 9 IN . 17.93 50 qCk \ -j0 C • W . F # 1 64 1 SBgC Z PROPOSED BUILDING K / 00 CD W. F# 1 65 PROPOSED 5 WIDE SIDEWALK I \ IPROPOSED PORTCOCHERE I PROP SAN. MH T L (SANMH 1) PROP CB T.F. 117.5 IN 1 Q8.6 (CB 9j N� ;o : 50 L.F. 12 97 I op.CB (TYP 04 r� L. .12"RCP61. °k H " RCP @ 1.0° 14' N 21'16'55," E o_ 6 . 1 0-J6 (SANMH 3) STOP SIGN I RCP @ )4% 100.0'/ 1 85' ROUTE 32 yam. � DQ FULLER ENGINEERING & LAND SURVEYING, LLC 525 JOHN STREET' BRIDGEPORT, CT. PH. 203-333-9465 EMAIL: IN FO@FULLERSURVEYORS.COM EXIST CB 7.19 (FIELD VERIFY) T.F. 104.5 INV. 99.0 PROPOSED PROP CB 16 PROP B (CB 12) PROPOSED CROS T.F. 115.0 ,�B 107i .- ROUTE 3 2 STOP BAR L.F. 12 " INV. 108.21 , pro [a 0 — SM 41 ' 32" W SAN SAN SAN UN 14.97' EXISTING GUIDERAIL PROPOSE[) GAS TO BE REMO 'S1. PROPOSED 8" WATER-/ PROPOSED DECELLERATION LANE TO MY KNOWLEDGE AND BELIEF, THIS MAP IS SUBSTANTIALLY" CORRECT TO THE, STANDARDS OF CLASS "A2" AS NOTED HEREON. �- GREG 1-I. PIDLUSKI P.E ,, .L.S. # 12154 0 3 CROSS GRADE WITHIN CTDOI R.O.W. NOT TO EXCE 1:4 SAN SM PROPOSED 4' WIDE SIDEWALK EXISTING GUIDERAIL TO REMAIN PROPOSED N 7,3'18'18 " W Pqd-%E0WfrY 0 TERLINE 6.57' OF TRAVEL WVAY SAN I PROPOSED ---.4 Imo--- SEE SHEET 4 FOR DETAILED 1 TELE./CATV in INFORMATION OF AREA SUBJECT REVISIONS DATE (UG) o Q1 I TO CURRENT DEVELOPMENT ILDNG SETBCK — Zo _ SQMACK 50 FRONT (CB �C (SEE NOTES) n "D nA 1 1 6 ' CEMETE I S 18' 23' 06" W N 16' 17'00" E47. --------- illillillillilllllllll1111 247.03' S 23'35'38" 48.50' ' SAN SAN SAN 0 3 CROSS GRADE WITHIN CTDOI R.O.W. NOT TO EXCE 1:4 SAN SM PROPOSED 4' WIDE SIDEWALK EXISTING GUIDERAIL TO REMAIN PROPOSED N 7,3'18'18 " W Pqd-%E0WfrY 0 TERLINE 6.57' OF TRAVEL WVAY SAN 'C OVERALL PROPOSED PLOT PLAN OF PROPERTIES 1360 ROUTE 32 IN THE UNCASVILLE SECTION OF MONTVILLE, CT. PREPARED FOR, - CHAR S F. GAGER SCALE: 1))-50) 27 JANUARY 2012 SHEET 3 of 11 sa o so ,oa ,sa low I canawc scnLe -Feer CT 7976 1 ADD TURNOUT, STOP SIGN/BAR UTILITIES, STORM & SAN SEWERS 3-20-12 N0. REVISIONS DATE 'C OVERALL PROPOSED PLOT PLAN OF PROPERTIES 1360 ROUTE 32 IN THE UNCASVILLE SECTION OF MONTVILLE, CT. PREPARED FOR, - CHAR S F. GAGER SCALE: 1))-50) 27 JANUARY 2012 SHEET 3 of 11 sa o so ,oa ,sa low I canawc scnLe -Feer CT 7976 w � PARKING REQUIREMENTS: NOTES: PER SECTION 19.3.10 1) THIS SURVEY AND MAP HAVE BEEN PREPARED IN ACCORDANCE WITH THE "RECOMMENDED STANDARDS FOR SURVEYS AND MAPS IN THE STATE OF CONNECTICUT" AS ADOPTED FOR USE BY THE CONNECTICUT cmnASSOCIATION OF LAND SURVEYORS, INC. ON SEPTEMBER 24, 1992, EFFECTIVE DATE JANUARY 1, 1993. SAID STANDARDS ENACTED BY THE STATE OF CONNECTICUT (SECTIONS 20-300b-1 THROUGH (1) ONE SPACE PER EACH ROOM = 120 SPACES 20-300b-20 OF THE STATE OF CONNECTICUT AGENCIES) EFFECTIVE JUNE 21, 1996. z 2) THE TYPE OF SURVEY PERFORMED WITH RESPECT TO THE BOUNDARY PERIMETER IS BUILDING LOCATION MAP, ZONING. CD PLUS 3) THE BOUNDARY DETERMINATION CATEGORY IS DEPENDENT RESURVEY. 4) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "RIGHT OF WAY MAP, TOWN OF MONTVILLE, NORWICH -NEW LONDON ROAD FROM THE WHITMAN -YOUNG PROPERTY NORTHERLY ABOUT 6,200 FEET, ROUTE NO RDG c (1) ONE SPACE FOR EACH (2) TWO EMPLOYEES 12, SHEET NO. 1 OF 3", SCALE: 1 "=40', DATED 1929, PREPARED BY THE CONNECTICUT STATE HIGHWAY DEPARTMENT. (ESTIMATED MAX EMPLOYEES = 20) = 10 SPACES 5) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "RIGHT OF WAY MAP, TOWN OF MONTVILLE, NORWICH -NEW LONDON ROAD FROM THE WHITMAN -YOUNG PROPERTY NORTHERLY ABOUT 6,200 FEET, ROUTE NO 12, SHEET NO. 2 OF 3", SCALE: 1 "=40', DATED 1929, PREPARED BY THE CONNECTICUT STATE HIGHWAY DEPARTMENT. TOTAL SPACES REQUIRED = 130 6) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "MAP OF RIGHT OF WAY OF CONNECTICUT LIGHT &POWER COMPANY, ACROSS THE PROPERTY OF FREDERICK W. & MINNIE B. STANLEY, TOWN OF TOTAL SPACES PROVIDED 136 (SEE PARKING TABULATIONS) MONTVILLE, COUNTY OF NEW LONDON, STATE OF CONNECTICUT SCALE: 1 "=200', DATED OCTOBER 1947, ON FILE IN THE OFFICE OF THE MONTVILLE TOWN CLERK. 32 7) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "PLAN OF PROPERTY OWNED BY RICHARD K. SHEPARD, IN THE TOWN OF MONTVILLE, REVISED PLAN", SCALE: 1"=100', DATED OCTOBER 1950, REVISED THROUGH MAY 1951, ON FILE IN THE OFFICE OF THE MONTVILLE TOWN CLERK. PARKING TABULATIONS: 8) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "PHASE II SEWERAGE PROGRAM, MONTVILLE, CONNECTICUT, CONTRACT B, ROUTE 32, SHEET B-4", SCALE: 1 "=40', DATED APR. 1979, REVISED THROUGH 9-1-83, PREPARED BY LOUREIRO ENGINEERING ASSOCIATES. T STANDARD PARKING SPACES (9x20) 130 9) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "PHASE II SEWERAGE PROGRAM, MONTVILLE, CONNECTICUT, CONTRACT B, ROUTE 32, SHEET B-5", SCALE: 1"=40', DATED APR. 1979, REVISED THROUGH ACCESSIBLE PARKING SPACES 4 9-1-83, PREPARED BY LOUREIRO ENGINEERING ASSOCIATES. ZACCESSIBLE VAN PARKING SPACES 2 Re� 10) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: PLAN MADE FOR MONTVILLE MEMORIAL POST 10060 VETERANS OF FOREIGN WARS OF THE UNITED STATES, INCORPORATED, ROUTE 32, SARAH DRIVE, & ° �ti TOTAL SPACES 136 �T RNE RAYMOND HALL ROAD , SCALE: 1"=100', DATED JUNE 19, 1985, ON FILE IN THE OFFICE OF THE MONTVILLE TOWN CLERK. R °R 1 1) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "BOUNDARY AND TOPOGRAPHIC SURVEY PREPARED FOR MOHEGAN TRIBAL UTILITY AUTHORITY SHOWING LAND TO BE CONVEYED FROM MONTVILLE MEMORIAL Y m POST 10060 VETERANS OF FOREIGN WARS OF THE UNITED STATES, INCORPORATED TO MTIC ACQUISITIONS, INC., ROUTE 32, MONTVILLE, CONNECTICUT, SHEET 1 OF 1", SCALE: 1"=40', DATED AUG. 22, 2000, ON FILE IN THE OFFICE OF THE MONTVILLE TOWN CLERK. 1 1) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "THAMES BASIN REGIONAL WATER INTERCONNECTION PROJECT, ORIGINAL MONTVILLE PUMP STATION, CONN. ROUTE #32, MONTVILLE, CT., SHEET 1 OF 1 -30-07, ON FILE IN THE OFFICE OF THE MONTVILLE TOWN CLERK. SCALE: 1"=20$, DATED MAY 13, 2005, REVISED THROUGH 11 12) WITH RESPECT TO HORIZONTAL DATA SHOWN HEREON THE ACCURACY CLASS IS "A-2". SCALE 13) WITH RESPECT TO TOPOGRAPHIC DATA SHOWN HEREON THE ACCURACY CLASS IS "T-2". 1000 0 1000 14) ELEVATIONS ARE BASED UPON NGVD 1929 DATUM. 15) UNDERGROUND UTILITIES (INCLUDING STORM, SANITARY AND/OR COMBINATION SEWERS) SHOWN HEREON ARE COMPILED FROM VARIOUS SOURCES INCLUDING OBSERVATION OF SURFACE STRUCTURES, UTILITY COMPANY MAPS, MAPS OF THE TOWN OF MONTVILLE, AND MAPS OF THE CONNECTICUT DEPARTMENT OF TRANSPORTATION (f.k.a. THE CONNECTICUT HIGHWAY DEPARTMENT. THE ACTUAL LOCATION, SIZE AND DEPTH OF THE UNDERG UND UTILITIES SHOWN HEREON MAY NOT BE AS INDICATED. ADDITIONAL UNDERGROUND UTILITIES MAY EXIST. PRIOR TO ANY EXCAVATION OR CONSTRUCTION CONTACT "CALL BEFORE YOU DIG": 17800-922-4455. o� 16) FIELD FLAGGED WET ND SOILS ARE AS DETERMINED BY ALEKSANDRA MOCH, SOIL & WETLAND SCIENTIST (REFERENCE REPORT ENTITLED: "WETLAND DELINEATION FOR THE PROPERTY LOCATED AT 1360 ROUTE ' W.F 1 39 N 63051 '57" W) 22.79' 32, UNCASVILLE, CONNECTICUT", DATED JUNE 29 AND JULY 2, 2011.) # 17 P ERT CATED IN A #:,(2/-2" ZONE DISTRICT. • �� N 45° 00' 00" W, 6.89' - 18) SEE OVERALL PROPOSED P T PLAN FOR SETBACK INFORMATION. .F 11 �/ a � N 12°36'11 E 31.37' # � W.F#61 W.F#37 )W.F 138 _z/ a • N 33°02'39" E, 15.74' W.F#62 • N 51°03'54" E, 10.65' W. F# 1 1 1 W. F# 1 45 W. F# 2 ° S N 51004'22" E, 26.83 .F 112 ° g.1 s`3°7 W.F'36 y W. 137 • • W.F#b7 - • W. F 69 W. F# 146 \ .F#136 W.F#b8 F # 35 \ _-ni 00 W.F 71 W.F#70 �1 Z W.F 2 S�° ' /V W. F# 6 6 cq .. 29 0 >> ° N • ° ASF % W . F 3 4 ?ZAA,,p6 N 17 Q7 31 E 26 53 27 1i"2� # W.F 33 N 23°56 06 E 3.30' N 18048,35" 75.53 00 p�, FT #2 s W. 3z ° 4 2.10 cis `� 3g ° lNE- # N 13026 16 E 26.57 J �2'76>> W. F# �c 97 N 29°2425 E 8.94' W.F# 18 W.F;;i20 LAG `� •�- � 7' S 21002'25" a GED W �'' 41.70 PLANTING AREAu N 46014 , E 34.35' _.. • ® 135 134 � 3 � ���' ° F - 1, I a P (' 11� �32� 131 130 1291 128 127 ( 6i 125 124 (12� 122 ®P L N 24 35 8 E 2 7.1 4 VV I,. i /V�P • W. # �/ (15) STANDARD SPACES at 9'x 2 OW.F#29 �a �- 1\ W.F#- ' •ti 1 �I F 1 6 \ `\ G H H A I ^0 • IF 1 W. F# 15 clq ETI11DT F-) W. F# 10 W. F# 1 1 ' W . F 1 2 REFUSE 70 ; 691 68 67 ; 66 <64 (63 62 61 60 59 58 57 56 55) 54 53 52 51 `50 49AREA CC���.��,o�00002C�O�20�CUPL 25' WETLAND PROPOSE E gN SETBACK LIG TU E (TYP L SEE " (23) STANDARD SPACES at 9'x20' `�� PROPOSED 4' 7 ENLARGEMENT unnr cmnnIni v ADD SAN SEWER, UTILITIES, TURNOUT, STOP SIGN/BAR 50 (WETLAND) N0. REVISIONS DATE (71 -' THUS SHEET(24)STANDARD p cV SPACES at 9'x20' BUILDING 2 � _x Q p, SPL I ®I,PL SSETBACK BASE WA LL 73 (25 } 26) 27 �; 30 31 32 (33 34 35 36 37 38 39 40 41 43 44 (� 46 (D47 (48) �--+ TB�CK 0' (VVI71AIVP) DG B,gck �- STANDARD SPACE at Wx20' POLg LIGHT F ,TORE (TYP •) PARKING AREA ENLARGEMENT TOP WALL 07 W AREA OF CTyP.) 'S AREA OF SCALE: 1 "=10' . HI 1 2 21 20 ,18 �17J t�6 15 14 13 12 11 10 O O O O !PL PROPOSED ® DEVELOPME( DEVELOPMENT K FtK5 A P- oI` r BACK LL o ALL !' `®' 4" WHITE PAINTED PORTCOCHERE T (2jjS D SPACES at 9 x20 STRIPE 78� • 7 S -TA N B� D �' SPACES t 9'x2 i ( USE 24 STANDAR SPACES at 9'x20' - PL & PL _ 80 81 1 82 83; 8�4 `, 86 87 8 I i,89 91 92 93 (94 95 96 97 98 X99 101 102 103 104 105 ( 6i 107 (108 109;' 11 111;112 113 114 115 MAI 12 0 ®PL 2 0 SAN � SAN FULLER ENGINEERING & LAND SURVEYING, LLC 5 5 JOHN STREET B IDGEPORT, CT. P1-1. 203-333-94E5 E ArI.0NFO@FULLERSURVEYORS.COM 4.9 Al tA* PROPOSED STOP SIGN PROPOSED CROSSWALK PROPOSED STOP BAR - SAN N 68041'32 W 14.97' EXISTING GUIDERAIL TO BE REMOVEB- PRl1PR'1CF'D SAN - 100.0' SAN r SAN 0 HANIDICAR PORKINiG ,ARE .5'. 10' .5'. 10' . 8' . 8', 8' . 8' .5' 10'.5'. 10' CATCH BAS I N 118 116 117 119 120 121 77/ (TYP) c\A Chi. Chi.14 Chi. i� VAN VAN { 1 15' I® 15' 1 16' 1 16' 1 15' 1 15' N 21016'55 E ��6 1 0 CROSS GRADE\WITHIN CTDOT D /'1 1A/ ninT rC:vrC-Gn 1 .n ROUTE 3UILDING SETBACK (SEE NOTES) - /EXIST. SAN SAN SAN _ SAN SAN TO MY KNOWLEDGE AND BELIE', THIS BIA S SUBSTANTIALLY CORRECT 17, 0 THE STANDARDS OF CLAvS "A2.1 AS NOTED HEREON. 'EGO -` PIDLUSKI P.E., S. # 12154 32 `�� PROPOSED 4' unnr cmnnIni v - /EXIST. SAN SAN SAN _ SAN SAN TO MY KNOWLEDGE AND BELIE', THIS BIA S SUBSTANTIALLY CORRECT 17, 0 THE STANDARDS OF CLAvS "A2.1 AS NOTED HEREON. 'EGO -` PIDLUSKI P.E., S. # 12154 N 73018'1 6.57' PROPOSED PLOT PLAN OF PROPERTIES AT 1360 ROUTE 32 N THE UNCASVILLE SECTION OF MONTVILLE, CT. PREPARED FOR: CHARLES F. GAGER SCALE: 1"=30' 27 JANUARY 2012 30 SHEAT 4 yof 11 bo so GRAPHIC SCALE - FEET CT 7976 v 1 ADD SAN SEWER, UTILITIES, TURNOUT, STOP SIGN/BAR 3-20-1 N0. REVISIONS DATE N 73018'1 6.57' PROPOSED PLOT PLAN OF PROPERTIES AT 1360 ROUTE 32 N THE UNCASVILLE SECTION OF MONTVILLE, CT. PREPARED FOR: CHARLES F. GAGER SCALE: 1"=30' 27 JANUARY 2012 30 SHEAT 4 yof 11 bo so GRAPHIC SCALE - FEET CT 7976 v v NOTES: h 1) THIS SURVEY AND MAP HAVE BEEN PREPARED IN ACCORDANCE WITH THE "RECOMMENDED STANDARDS FOR SURVEYS AND MAPS IN THE STATE OF CONNECTICUT" AS ADOPTED FOR USE BY THE m� CONNECTICUT ASSOCIATION OF LAND SURVEYORS, INC. ON SEPTEMBER 24, 1992, EFFECTIVE DATE JANUARY 1, 1993. SAID STANDARDS ENACTED BY THE STATE OF CONNECTICUT SECTIONS �� RiVE sr. 1 20-300b-1 THROUGH 2O -300b-20 OF THE STATE OF CONNECTICUT AGENCIES) EFFECTIVE JUNE 21, 1996. �E�NgKo 2) THE TYPE OF SURVEY PERFORMED WITH RESPECT TO THE BOUNDARY PERIMETER IS BUILDING LOCATION MAP, ZONING. Q c 3) THE BOUNDARY DETERMINATION CATEGORY IS DEPENDENT RESURVEY. 4) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "RIGHT OF WAY MAP, TOWN OF MONTVILLE, NORWICH—NEW LONDON ROAD FROM THE WHITMAN—YOUNG PROPERTY NORTHERLY ABOUT 6,200 FEET, ROUTE NO 12, SHEET NO. 1 OF 3", SCALE: 1"=40', DATED 1929, PREPARED BY THE CONNECTICUT STATE HIGHWAY DEPARTMENT. RIDGE 5) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "RIGHT OF WAY MAP, TOWN OF MONTVILLE, NORWICH—NEW LONDON ROAD FROM THE WHITMAN—YOUNG PROPERTY NORTHERLY ABOUT 6,200 FEET ROUTE NO 12 SHEET NO. 2 OF 3" SCALE: 1 "=40' DATED 1929 PREPARED BY THE CONNECTICUT STATE HIGHWAY DEPARTMENT. 6) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "MAP OF RIGHT OF WAY OF CONNECTICUT LIGHT & POWER COMPANY, ACROSS THE PROPERTY OF FREDERICK W. & MINNIE B. STANLEY, TOWN OF MONTVILLE, COUNTY OF NEW LONDON, STATE OF CONNECTICUT", SCALE: 1"=200', DATED OCTOBER 1947, ON FILE IN THE OFFICE OF THE MONTVILLE TOWN CLERK. 32 7) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "PLAN OF PROPERTY OWNED BY RICHARD K. SHEPARD, IN THE TOWN OF MONTVILLE, REVISED PLAN", SCALE: 1"=100', DATED OCTOBER 1950, REVISED THROUGH MAY 1951, ON FILE IN THE OFFICE OF THE MONTVILLE TOWN CLERK. 8) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "PHASE II SEWERAGE PROGRAM, MONTVILLE, CONNECTICUT, CONTRACT B, ROUTE 32, SHEET B-4", SCALE: 1 "=4', DATED APR. 1979, REVISED P THROUGH 9-1-83, PREPARED BY LOUREIRO ENGINEERING ASSOCIATES. A 9) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "PHASE II SEWERAGE PROGRAM, MONTVILLE, CONNECTICUT, CONTRACT B, ROUTE 32, SHEET B-5", SCALE: 1"=40', DATED APR. 1979, REVISED T ° Z THROUGH 9-1-83, PREPARED BY LOUREIRO ENGINEERING ASSOCIATES. moo. I e 10) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "PLAN MADE FOR MONTVILLE MEMORIAL POST 10060 VETERANS OF FOREIGN WARS OF THE UNITED STATES, INCORPORATED, ROUTE 32, SARAH DRIVE, & RAYMOND HILL ROAD", SCALE: 1 "=100', DATED JUNE 19, 1985, ON FILE IN THE OFFICE OF THE MONTVILLE TOWN CLERK. R m 11) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "BOUNDARY AND TOPOGRAPHIC SURVEY PREPARED FOR MOHEGAN TRIBAL UTILITY AUTHORITY SHOWING LAND TO BE CONVEYED FROM MONTVILLE MEMORIAL POST 10060 VETERANS OF FOREIGN WARS OF THE UNITED STATES, INCORPORATED TO MTIC ACQUISITIONS, INC., ROUTE 32, MONTVILLE, CONNECTICUT, SHEET 1 OF 1", SCALE: 1 "=40', DATED AUG. 22, 2000, ON FILE IN THE OFFICE OF THE MONTVILLE TOWN CLERK. 11) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "THAMES BASIN REGIONAL WATER INTERCONNECTION PROJECT, ORIGINAL MONTVILLE PUMP STATION, CONN. ROUTE 32, MONTVILLE, CT., SHEET 1 OF 1 ", SCALE: 1"=20', DATED MAY 13, 2005, REVISED THROUGH 11-30-07, ON FILE IN THE OFFICE OF THE MONTVILLE TOWN CLERK. SCALE 12) WITH RESPECT TO HORIZONTAL DATA SHOWN HEREON THE ACCURACY CLASS IS "A-2". 13) WITH RESPECT TO TOPOGRAPHIC DATA SHOWN HEREON THE ACCURACY CLASS IS "T-2". 1000 0 1000 14) ELEVATIONS ARE BASED UPON NGVD 1929 DATUM. 15) UNDERGROUND UTILITIES (INCLUDING STORM SANITARY AND/OR COMBINATION SEWERS) SHOWN HEREON ARE COMPILED FROM VARIOUS SOURCES INCLUDING OBSERVATION OF SURFACE R. ,k.. STRUCTURES, UTILITY COMPANY MAPS, MAPS OF THE TOWN OF MONTVILLE, AND MAPS OF THE CONNECTICUT DEPARTMENT OF TRANSPORTATION (f.k.a. THE CONNECTICUT HIGHWAY DEPARTMENT. • j " THE ACTUAL LOCATION, SIZE AND DEPTH OF THE UNDERGROUND UTILITIES SHOWN HEREON MAY NOT BE AS INDICATED. ADDITIONAL UNDERGROUND UTILITIES MAY EXIST. PRIOR TO ANY EXCAVATION OR CONSTRUCTION CONTACT "CALL BEFORE YOU DIG": 1-800-922-4455. 16) FJLD FLAGGED WETLAND SOILS ARE AS DETERMINED BY ALEKSANDRA MOCH, SOIL & WETLAND SCIENTIST (REFERENCE REPORT ENTITLED: "WETLAND DELINEATION FOR THE PROPERTY LOCATED AT 360 ROUTE 32, UNCASVILLE, CONNECTICUT", DATED JUNE 29 AND JULY 2, 2011.) F r "P N 63051'57 W, 2? . 79' R,; 17) PROPERTY IS LOCATED IN A "C-2" ZONE DISTRICT. W. F- 1 39- /18) SEE OVE LL PROPOSED PLOT PLAN FOR SETBACK INFORMATION. N 45°00'00 W, 6.89' 19) LOCATIpll STOCKPILE AREA DEPICTED HEREON IS SUGGEST. ACTUAL LOCATIONS OF STOCKPILES MAY VARY DURING CONSTRUCTION, AS NECESSARY, DUE TO SITE CONDITIONS. . F# 1 10 h N 12036'1 1 E 31.37' , .C ` W. F- 1 38 f, j N W. � #37 t� W F 62 a a z `4 _ w� � ,��� 1 ° 0,"54" E, 10.6 5' E. _- W F- 2 —n `1..� —\ F# W. E-# 1 1 1 W. F 1 45 51 °04 22 E, 26.83 'U . F 1 1 2 \ % ti W 3 6 __ wM :� , F W, F 1 3 7 �E --E W F- 6 y / S M�WF69 • 1 46 S _w_W. F 68 �fnI I � W F 1 3 6 # F# 315 W. E ' 1 �°. 70 °�� 01 L � • � �W. F #23 7- W. r BR00 # Yt,a — GL 5 I- # 6 21 _ - W F 66 I c 7 �/ • S J ►/� \I - 4 90�>>° 1" E N 2° �ti W 4 '�TZ� �5 22 E N E W .#33 N 23 56 06 E 3.36 •5 Orr C S kQ\/ 3 1 a a / 4 ,— . 1 F �(1 v �q� N N 13 2 6 1 6 E 2 ,."57' r - i~ �. - � • E 3g at 29 24 25 E .94 -- W # 18 W #20 ` F� ` , - = 9 ta _ F= a N 46" 14 E - .---41. - � G�� 7 S 21,002'25--- N v .. �4.35 _ - SET _ �y N 24° 35 8 E 27.14 # / W . 1 4 — �_� o. # _ �. — — SILTATION FENCE 11- �._ - –;' _ v. Og _go loom F -- ma"_ AT U RBANC� L ` �� W. F- v_. # • 5 # I --- 6 77" F X1..18. 11 MID) BW --- __.. _ --- --- - i�A N -, !_� i . , TW PROPOSED RETAINING WA MIR W. F- 10 W .F- 1 1 D ✓ 113.1 ------ _. __ - J" ,F _ OUB l7 SE �EF118. � w. f r! A AEA — �, _ f - D WETLAND 1 :6 _ rr _ r r 1.8.3 Q SETBACK �� , - �:1 - r ~ 13.3 na F --- F,, PROROSED . ... ...,... rte, " ; � 'x. ,'"f/ ,~,✓` L � ,- rw~.W FF . --_ _ _�._ _ E 1 19� 0 , 50 (WETLAND) BUILDING �. - SETBA Kw, rM ' BAS E ALL r (YP) AOF'♦ " TOP WALLw. 1 4 — w_ - D ELO P M E N '' (yP) r ; 42" in. HIO HA -IN f , y LINk.�ENCE AT 0F,! ` t WALL � . BACK R ET WALL --- , r,. z- STO K P I L E JAREA I — - ' ~ fJf// ✓ / 17.9 13.1 - 5.9 t r r f t '~ +} 1 z ° 3 � Tw TW ._.♦ ,� � � 103: + Jl 1 � 15. MEMON , f FULLER.,,,ENGINIE-RW)G & LAND SURVEYING, LLC 525 JOHN STREET BRIDGEPORT, CT. PH. 203-333-94E5 EMAIL: IN FO@FU LLERSURVEYORS.COM 14.97 ) TO MY KNOWLEDGE AND BELIEF, THIS MAP IS SUBSTANTIALLY CORRtL.CT 0-0 THE STANDARDS OF CLASS "A2" AS NOTED HEREON. , y 0 . PIDLUSKI E. � . .S. # 12154 AREA 01F DEVELCAPN1ENJ "30' BUILDING SETBACK' (SEE NOTES)` -� TW l I r - i `1 GRADING PLAN OF PROPERTIES AT 1360 ROUTE 32 IN THE UNCASVILLE SECTION OF MONTVILLE, CT. PREPARED FOR: CHARLES F. GAGER SCALE: 1 "=30' 27 JANUARY 2012 SHEET 5 of 11 30 0 30 60 90 GRAPHIC SCALE — FEET CT 7976 1 ADD SAN SEWER, UTILITIES, TURNOUT, STOP SIGN/BAR 3-20-12 N0. REVISIONS DATE AREA 01F DEVELCAPN1ENJ "30' BUILDING SETBACK' (SEE NOTES)` -� TW l I r - i `1 GRADING PLAN OF PROPERTIES AT 1360 ROUTE 32 IN THE UNCASVILLE SECTION OF MONTVILLE, CT. PREPARED FOR: CHARLES F. GAGER SCALE: 1 "=30' 27 JANUARY 2012 SHEET 5 of 11 30 0 30 60 90 GRAPHIC SCALE — FEET CT 7976 1000 0 1000 14) ELEVATIONS ARE BASED UPON NGVD 1929 DATUM. a 15) UNDERG OUND UTILITIES (INCLUDING STORM, SANITARY AND/OR COMBINATION SEWERS) SHOWN HEREON ARE COMPILED FROM VARIOUS SOURCES INCLUDING OBSERVATION OF SURFACE W STRU RES, UTILITY COMPANY MAPS, MAPS OF THE TOWN OF MONTVILLE, AND MAPS OF THE CONNECTICUT DEPARTMENT OF TRANSPORTATION (f.k.a. THE CONNECTICUT HIGHWAY DEPARTMENT. .ryry /'W. THE ACTUAL LOCATION, SIZE AND DEPTH OF THE UNDERGROUND UTILITIES SHOWN HEREON MAY NOT BE AS INDICATED. ADDITIONAL UNDERGROUND UTILITIES MAY EXIST. PRIOR TO ANY N 63°51 '57 W, 22.79XCAVATION OR CONSTRUCTION CONTACT "CALL BEFORE YOU DIG": 1-800-922-4455._10.0#139 � � is .F#1 10 ' N 45°00'00" W, 6.89' -�' -- — FIELD FLAGGE WETLAND SOILS ARE AS DETERMINED BY /ALL WAIN MA MOCH, SOIL &WETLAND SCIENTIST (REFERENCE REPORT ENTITLED: WETLAND DELINEATION FOR THE PROPERTY LOCATED AT �� o� 1360 ROUT 32, UNC VILLE, CONNECTICUT", DAT JUNE 29 AND JULY 2, 2011.) v . F 138 ,4 W.F#111 F 112 # 13 7 W: F.# 13 6 N 12 36 1 1 E 31 .� / 17) PROPERTY IS LOCATED A C-2 ZONE U101 Ilia t l ` t 1,8) SEE ERALL PROPO LAN FOR SEBA . TION. ISI - 3 3 0 2j ' 74 VV F#62 v . � ' �'3 9 E 1 5 J --� #63 / T s W. 2 F N 4 22 E, 26.83' W.�#145 � � ` 1 W.IF# 3 6' 1+ n ,-F#,l 46 F 6 W . F �4. _ W. F# 6 -17 —: F# W.F#68S ' 3�5 i 7 O ... f W. F # 2 NL\,/V. F # 6 6 F # o< 229 , own --oft IS i,�,il 0 3W. 34 ' T -22 � N 17 2 7 E W. F# vv. h� 3 3 r �5 5 N 1 4 8 5 _ � il, N 23"56'06"E .3 1 �._ 3 5.� 0 __.� '� 4 10 _w _ FS 8 ° /n' 2 N 13 2 6 1 6 E 2 5 7 �' ~ �- �2 - y 6 >> ° ..-�,--� � �r �� - �W .y F 2I N 29024'25 E /J , - .94 1 I Q - S M 21002'25 41 N 4 6 14 E 4.3 / fi ,i 3 L. F. 12"- RCP 1.o°gin - - . 7 0 5 @ 1 ET - 17 , W. 19 N 2 4° 3 5' 8 " 2 7.1 4' / W . F#-1--_7 # _r /r — - _- \ _--- -- --, __ ._w . I/�� - �, yy r _ W F1 � 1 4 ,' ``.. 1, i �X 000, PROP CB ..F. 118 W. F�� 1 6 / (CB 2) Z PROP CB " INV. 109 w T.F.- 110.0 W. F# I W. F # 1J - - INV. 107.92 T.F.118.PIPTAINING 3 J -- INV 108 47 W. • fs f� _ # W. F# 1 1 _ r. W e F 1 2 82 L.F. 12" RCP @ 1.0% EFUSE PROP CB � -� Y» 1 13.1 --10 L.F. 12" RCS" @ 1.0%. ... __ 1 1 �. . -----` C ,� 1 AREA- _ � TCF 1) .� 25 WETLAND - _ 113.1 ' $.99" � � _ - X18 SETBACK1 � � •o _j V_ QP STORMCEPTOR @� C900 Q`h ;. 7�L.F. ` 15" RCP . " y -- % F. 106.37 ooF 50 WETLAND) BUILDI-NG",RL-1 Al ._ 4�j ' 40'X1 __SETBACK _ BASE ALL - (5' IGHT _ a f I. OOR ELEVATION 102.5 LEADER DP.AINS' O LY (TYP•) _ n_ ROOF TOP: �iVALL (UTILIZE AREA OF (TYP•) /42 !n. HIGF HAIN "RETAIN -IT" FIELD AS LINK,,`FENCE AT OF , SEDIMENT BASIN DURING 0 BACK WALL .,_ RET WALL �=4 L.F. 15" RCP @ 0% �.`°, 1 , (Typ.`�T - PROP PROP STORMCEPTOR NOTES: h 1) THIS SURVEY AND MAP HAVE BEEN PREPARED IN ACCORDANCE WITH THE "RECOMMENDED STANDARDS FOR SURVEYS AND MAPS IN THE STATE OF CONNECTICUT" AS ADOPTED FOR USE BY THE m� CONNECTICUT ASSOCIATION OF LAND SURVEYORS, INC. ON SEPTEMBER 24, 1992, EFFECTIVE DATE JANUARY 1, 1993. SAID STANDARDS ENACTED BY THE STATE OF CONNECTICUT SECTIONS °R�e 1 20-300b-1 THROUGH 2O -300b-20 OF THE STATE OF CONNECTICUT AGENCIES) EFFECTIVE JUNE 21, 1996. Sr BERNA�° 2) THE TYPE OF SURVEY PERFORMED WITH RESPECT TO THE BOUNDARY PERIMETER IS BUILDING LOCATION MAP, ZONING. z CD 3) THE BOUNDARY DETERMINATION CATEGORY IS DEPENDENT RESURVEY. 4) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "RIGHT OF WAY MAP, TOWN OF MONTVILLE, NORWICH—NEW LONDON ROAD FROM THE WHITMAN—YOUNG PROPERTY NORTHERLY ABOUT 6,200 FEET, ROUTE NO 12, SHEET NO. 1 OF 3", SCALE: 1"=40', DATED 1929, PREPARED BY THE CONNECTICUT STATE HIGHWAY DEPARTMENT. R!°�E 5) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "RIGHT OF WAY MAP, TOWN OF MONTVILLE, NORWICH—NEW LONDON ROAD FROM THE WHITMAN—YOUNG PROPERTY NORTHERLY ABOUT 6,200 OR`1E FEET, ROUTE NO 12, SHEET NO. 2 OF 3", SCALE: 1 "=40', DATED 1929, PREPARED BY THE CONNECTICUT STATE HIGHWAY DEPARTMENT. 6 REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "MAP OF RIGHT OF WAY OF CONNECTICUT LIGHT & POWER COMPANY, ACROSS THE PROPERTY OF FREDERICK W. & MINNIE B. STANLEY, TOWN OF MONTVILLE, COUNTY OF NEW LONDON, STATE OF CONNECTICUT", SCALE: 1"=200', DATED OCTOBER 1947, ON FILE IN THE OFFICE OF THE MONTVILLE TOWN CLERK. 32 7) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "PLAN OF PROPERTY OWNED BY RICHARD K. SHEPARD, IN THE TOWN OF MONTVILLE, REVISED PLAN", SCALE: 1"=100', DATED OCTOBER PROP ST MH INV, 102.84 1950, REVISED THROUGH MAY 1951, ON FILE IN THE OFFICE OF THE MONTVILLE TOWN CLERK. 8) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "PHASE II SEWERAGE PROGRAM, MONTVILLE, CONNECTICUT, CONTRACT B, ROUTE 32, SHEET B-4", SCALE: 1"=40', DATED APR. 1979, REVISED P OP ST MH THROUGH 9-1-83, PREPARED BY LOUREIRO ENGINEERING ASSOCIATES. T 9) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "PHASE it SEWERAGE PROGRAM, MONTVILLE, CONNECTICUT, CONTRACT B, ROUTE 32, SHEET B-5", SCALE: 1"=40', DATED APR. 1979, REVISED T ° Z THROUGH 9-1-83, PREPARED BY LOUREIRO ENGINEERING ASSOCIATES. tea. I e 10) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "PLAN MADE FOR MONTVILLE MEMORIAL POST 10060 VETERANS OF FOREIGN WARS OF THE UNITED STATES, INCORPORATED, ROUTE 32, SARAH E J DRIVE, & RAYMOND HILL ROAD", SCALE: 1"=100', DATED JUNE 19, 1985, ON FILE IN THE OFFICE OF THE MONTVILLE TOWN CLERK. R °� 1 1) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "BOUNDARY AND TOPOGRAPHIC SURVEY PREPARED FOR MOHEGAN TRIBAL UTILITY AUTHORITY SHOWING LAND TO BE CONVEYED FROM m MONTVILLE MEMORIAL POST 10060 VETERANS OF FOREIGN WARS OF THE UNITED STATES, INCORPORATED TO MTIC ACQUISITIONS, INC., ROUTE 32, MONTVILLE, CONNECTICUT, SHEET 1 OF 1", SCALE: 1 "=40', DATED AUG. 22, 2000, ON FILE IN THE OFFICE OF THE MONTVILLE TOWN CLERK. 1 1) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "THAMES BASIN REGIONAL WATER INTERCONNECTION PROJECT, ORIGINAL MONTVILLE PUMP STATION, CONN. ROUTE #32, MONTVILLE, CT., SHEET 12) 1 OF 1 ", SCALE: 1"=20', DATED MAY 13, 2005, REVISED THROUGH 11-30-07, ON FILE IN THE OFFICE OF THE MONTVILLE TOWN CLERK. WITH RESPECT TO HORIZONTAL DATA SHOWN HEREON THE ACCURACY CLASS IS "A-2". SCALE 13) WITH RESPECT TO TOPOGRAPHIC DATA SHOWN HEREON THE ACCURACY CLASS IS "T- 1000 0 1000 14) ELEVATIONS ARE BASED UPON NGVD 1929 DATUM. a 15) UNDERG OUND UTILITIES (INCLUDING STORM, SANITARY AND/OR COMBINATION SEWERS) SHOWN HEREON ARE COMPILED FROM VARIOUS SOURCES INCLUDING OBSERVATION OF SURFACE W STRU RES, UTILITY COMPANY MAPS, MAPS OF THE TOWN OF MONTVILLE, AND MAPS OF THE CONNECTICUT DEPARTMENT OF TRANSPORTATION (f.k.a. THE CONNECTICUT HIGHWAY DEPARTMENT. .ryry /'W. THE ACTUAL LOCATION, SIZE AND DEPTH OF THE UNDERGROUND UTILITIES SHOWN HEREON MAY NOT BE AS INDICATED. ADDITIONAL UNDERGROUND UTILITIES MAY EXIST. PRIOR TO ANY N 63°51 '57 W, 22.79XCAVATION OR CONSTRUCTION CONTACT "CALL BEFORE YOU DIG": 1-800-922-4455._10.0#139 � � is .F#1 10 ' N 45°00'00" W, 6.89' -�' -- — FIELD FLAGGE WETLAND SOILS ARE AS DETERMINED BY /ALL WAIN MA MOCH, SOIL &WETLAND SCIENTIST (REFERENCE REPORT ENTITLED: WETLAND DELINEATION FOR THE PROPERTY LOCATED AT �� o� 1360 ROUT 32, UNC VILLE, CONNECTICUT", DAT JUNE 29 AND JULY 2, 2011.) v . F 138 ,4 W.F#111 F 112 # 13 7 W: F.# 13 6 N 12 36 1 1 E 31 .� / 17) PROPERTY IS LOCATED A C-2 ZONE U101 Ilia t l ` t 1,8) SEE ERALL PROPO LAN FOR SEBA . TION. ISI - 3 3 0 2j ' 74 VV F#62 v . � ' �'3 9 E 1 5 J --� #63 / T s W. 2 F N 4 22 E, 26.83' W.�#145 � � ` 1 W.IF# 3 6' 1+ n ,-F#,l 46 F 6 W . F �4. _ W. F# 6 -17 —: F# W.F#68S ' 3�5 i 7 O ... f W. F # 2 NL\,/V. F # 6 6 F # o< 229 , own --oft IS i,�,il 0 3W. 34 ' T -22 � N 17 2 7 E W. F# vv. h� 3 3 r �5 5 N 1 4 8 5 _ � il, N 23"56'06"E .3 1 �._ 3 5.� 0 __.� '� 4 10 _w _ FS 8 ° /n' 2 N 13 2 6 1 6 E 2 5 7 �' ~ �- �2 - y 6 >> ° ..-�,--� � �r �� - �W .y F 2I N 29024'25 E /J , - .94 1 I Q - S M 21002'25 41 N 4 6 14 E 4.3 / fi ,i 3 L. F. 12"- RCP 1.o°gin - - . 7 0 5 @ 1 ET - 17 , W. 19 N 2 4° 3 5' 8 " 2 7.1 4' / W . F#-1--_7 # _r /r — - _- \ _--- -- --, __ ._w . I/�� - �, yy r _ W F1 � 1 4 ,' ``.. 1, i �X 000, PROP CB ..F. 118 W. F�� 1 6 / (CB 2) Z PROP CB " INV. 109 w T.F.- 110.0 W. F# I W. F # 1J - - INV. 107.92 T.F.118.PIPTAINING 3 J -- INV 108 47 W. • fs f� _ # W. F# 1 1 _ r. W e F 1 2 82 L.F. 12" RCP @ 1.0% EFUSE PROP CB � -� Y» 1 13.1 --10 L.F. 12" RCS" @ 1.0%. ... __ 1 1 �. . -----` C ,� 1 AREA- _ � TCF 1) .� 25 WETLAND - _ 113.1 ' $.99" � � _ - X18 SETBACK1 � � •o _j V_ QP STORMCEPTOR @� C900 Q`h ;. 7�L.F. ` 15" RCP . " y -- % F. 106.37 ooF 50 WETLAND) BUILDI-NG",RL-1 Al ._ 4�j ' 40'X1 __SETBACK _ BASE ALL - (5' IGHT _ a f I. OOR ELEVATION 102.5 LEADER DP.AINS' O LY (TYP•) _ n_ ROOF TOP: �iVALL (UTILIZE AREA OF (TYP•) /42 !n. HIGF HAIN "RETAIN -IT" FIELD AS LINK,,`FENCE AT OF , SEDIMENT BASIN DURING 0 BACK WALL .,_ RET WALL �=4 L.F. 15" RCP @ 0% �.`°, 1 , (Typ.`�T - PROP PROP STORMCEPTOR FULLER ENGINEERING & LAND SURVEYING, LLC 525 JOHN STREET BRIDGEPORT, CT. PH. 203-333-9465 EMAIL: I NFO@FU LLERSURVEYORS.COM TO MY KNOWLEDGE AND BELIEF, THIS MAP IS SUBSTANTIALLY CORRECT TO THE STANDARDS OF CLASS "A2" AS NOTED HEREON. P.E., # 12154 ,� i ,— - PROP C _ •�---(cBs) 9 ` — W . F �,Zf --_ 21 (CB 5) T.F. 117.6 1 1 '' W T.F. 117.6 --- INV. D re \ BW 1Z S , F ROPOSED—BUILDING— J u. 118 . PROPOSED. ,,"PROPOSED PO _RTCOCHER TELE./CATV _ _ - - , I - UG) ­ 30' 30' 13 U I L D I N 0 "SETBACK w ROP CB PROP CB �`-- --- PROP c6 ,J (SEE NOTES -)l _.._.. (CB ,8)� (CB 7) f , F. 117. T.F. 117.6 F 109.97' - QP. \\� 4._ T.F. 117.9 .04 INV. 111.88 / I N 4� i Iv"i 17. H ; 1 17/ 17.6 -- 1 A° ° '...-12�+,RCP @ 41 L.F. 12" RCP � .1.0% -- — 5G L.F. BBV - i ." TW: 118. BW 1 1 -}- �� ___ _...__ ___..__._. � 138. MINIM N 2� 1 x,55" ,r r=7T f KVI—'VJtU UHJ PROPOSED 8" WATER 1 ADD SAN SEWER, UTILITIES, TURNOUT, STOP SIGN/BAR 3-20-1 Y REVISIONS DATE PROP �T MM (STM 1) T.F. 113.7- PROP ST MH INV, 102.84 (STMH 2) OP ST MH T.F. 104.2 - r 9tH7:7)., __.a INV. 99.02 3cl 166 L.F. 18" RCPf@ 10.2°fo J FULLER ENGINEERING & LAND SURVEYING, LLC 525 JOHN STREET BRIDGEPORT, CT. PH. 203-333-9465 EMAIL: I NFO@FU LLERSURVEYORS.COM TO MY KNOWLEDGE AND BELIEF, THIS MAP IS SUBSTANTIALLY CORRECT TO THE STANDARDS OF CLASS "A2" AS NOTED HEREON. P.E., # 12154 ,� i ,— - PROP C _ •�---(cBs) 9 ` — W . F �,Zf --_ 21 (CB 5) T.F. 117.6 1 1 '' W T.F. 117.6 --- INV. D re \ BW 1Z S , F ROPOSED—BUILDING— J u. 118 . PROPOSED. ,,"PROPOSED PO _RTCOCHER TELE./CATV _ _ - - , I - UG) ­ 30' 30' 13 U I L D I N 0 "SETBACK w ROP CB PROP CB �`-- --- PROP c6 ,J (SEE NOTES -)l _.._.. (CB ,8)� (CB 7) f , F. 117. T.F. 117.6 F 109.97' - QP. \\� 4._ T.F. 117.9 .04 INV. 111.88 / I N 4� i Iv"i 17. H ; 1 17/ 17.6 -- 1 A° ° '...-12�+,RCP @ 41 L.F. 12" RCP � .1.0% -- — 5G L.F. BBV - i ." TW: 118. BW 1 1 -}- �� ___ _...__ ___..__._. � 138. MINIM N 2� 1 x,55" ,r r=7T f KVI—'VJtU UHJ PROPOSED 8" WATER 5 7'�'d' GRADING & UTILITY PLAN � OF PROPERTIES AT 1360 ROUTE 32 IN THE UNCASVILLE SECTION OF !§AN MONTVILLE, CT. \ PREPARED FOR, - CHAR S F. GAGER SCALE: 1"=30' 27 JANUARY 2012 30 S H F�T 6 gof 11 so so GRAPHIC SCALE — FEET CT 7976 1 ADD SAN SEWER, UTILITIES, TURNOUT, STOP SIGN/BAR 3-20-1 N0. REVISIONS DATE 5 7'�'d' GRADING & UTILITY PLAN � OF PROPERTIES AT 1360 ROUTE 32 IN THE UNCASVILLE SECTION OF !§AN MONTVILLE, CT. \ PREPARED FOR, - CHAR S F. GAGER SCALE: 1"=30' 27 JANUARY 2012 30 S H F�T 6 gof 11 so so GRAPHIC SCALE — FEET CT 7976 W. F# 1 1 1 F 1 12ff PLANT LIST KEY QTY BOTANICAL NAME COMMON NAME SIZE AR 12 ACER RUBRUM 'OCTOBER GLORY OCTOBER GLORY RED MAPLE 4 1/2" CALIPER PS 21 PINUS STROBUS EASTERN WHITE PINE 6'-7' HEIGHT TC 11 TSUGA CANADENSIS CANADIAN HEMLOCK 6'-7' HEIGHT CC 2 CERCIS CANADENSIS EASTERN REDBUD 3 1/3" CAL. PC 13 PYRUS CALLERYANA 'CHANTICLEER' CHANTICLEER PEAR 3 1/3" CAL. N 23056'06" E 3.36`} _ N 13026 16 " E 2 �,. 5 7' N 29024'25 E .94' N 41T E, -34.35 N 24035' 8" E 27.14' ` W. Fi# 14 2 `Q MO.. Now W. F# 1 f W. # I o w.7#1 W F, 1 2 _-___.,j _ 25' WETLAND w _ SETBACK �r �t X50' (WETLAND) r BUILDING S ETB... W r o ` y SASE ALL f / TOP WALL (Ty p BAC K WALL Lit (TYP.) rf % f I LAWN AREA i► O FULLER ENGINEERING & LAND SURVEYING, LLC 5 5 JOHN STREET BTIDGEPORT, CT. PFI. 203-333-9465 EN4,A,.I.L:INFO@FULLERSURVEYORS.COM / Wawa,o own EXISTING GUIDERAIL Tn n r n r-► i eN% irn NOTES: 1) THIS SURVEY AND MAP HAVE BEEN PREPARED IN ACCORDANCE WITH THE "RECOMMENDED STANDARDS FOR SURVEYS AND MAPS IN THE STATE OF CONNECTICUT" AS ADOPTED FOR USE BY THE CONNECTICUT ASSOCIATION OF LAND SURVEYORS, INC. ON SEPTEMBER 24, 1992, EFFECTIVE DATE JANUARY 1, 1993. SAfD STANDARDS ENACTED BY THE STATE OF CONNECTICUT (SECTIONS 20-300b-1 THROUGH 2O -300b-20 OF THE STATE OF CONNECTICUT AGENCIES) EFFECTIVE JUNE 21, 1996. 2) THE TYPE OF SURVEY PERFORMED WITH RESPECT TO THE BOUNDARY PERIMETER IS BUILDING LOCATION MAP, ZONING. 3) THE BOUNDARY DETERMINATION CATEGORY IS DEPENDENT RESURVEY. 4) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "RIGHT OF WAY MAP, TOWN OF MONTVILLE, NORWICH -NEW LONDON ROAD FROM THE WHITMAN -YOUNG PROPERTY NORTHERLY ABOUT 6,200 FEET, ROUTE NO 12, SHEET NO. 1 OF 3", SCALE: 1"=40', DATED 1929, PREPARED BY THE CONNECTICUT STATE HIGHWAY DEPARTMENT. 5) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "RIGHT OF WAY MAP, TOWN OF MONTVILLE, NORWICH -NEW LONDON ROAD FROM THE WHITMAN -YOUNG PROPERTY NORTHERLY ABOUT 6,200 FEET, ROUTE NO 12, SHEET NO. 2 OF 3", SCALE: 1"=40', DATED 1929, PREPARED BY THE CONNECTICUT STATE HIGHWAY DEPARTMENT. 6) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "MAP OF RIGHT OF WAY OF CONNECTICUT LIGHT & POWER COMPANY, ACROSS THE PROPERTY OF FREDERICK W. & MINNIE B. STANLEY, TOWN OF MONTVILLE, COUNTY OF NEW LONDON, STATE OF CONNECTICUT", SCALE: 1"=200', DATED OCTOBER 1947, ON FILE IN THE OFFICE OF THE MONTVILLE TOWN CLERK. 7) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "PLAN OF PROPERTY OWNED BY RICHARD K. SHEPARD, IN THE TOWN OF MONTVILLE, REVISED PLAN", SCALE: 1"=100', DATED OCTOBER 1950, REVISED THROUGH MAY 1951, ON FILE IN THE OFFICE OF THE MONTVILLE TOWN CLERK. 8) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "PHASE II SEWERAGE PROGRAM, MONTVILLE, CONNECTICUT, CONTRACT B, ROUTE 32, SHEET B-4", SCALE: 1"=40', DATED APR. 1979, REVISED THROUGH 9-1-83, PREPARED BY LOUREIRO ENGINEERING ASSOCIATES. 9) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "PHASE II SEWERAGE PROGRAM, MONTVILLE, CONNECTICUT, CONTRACT B, ROUTE 32, SHEET B-5", SCALE: 1 "=40', DATED APR. 1979, REVISED THROUGH 9-1-83, PREPARED BY LOUREIRO ENGINEERING ASSOCIATES. 10) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "PLAN MADE FOR MONTVILLE MEMORIAL POST 10060 VETERANS OF FOREIGN WARS OF THE UNITED STATES, INCORPORATED, ROUTE 32, SARAH DRIVE, & RAYMOND HILL ROAD", SCALE: 1"=100', DATED JUNE 19, 1985, ON FILE IN THE OFFICE OF THE MONTVILLE TOWN CLERK. 1 1) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "BOUNDARY AND TOPOGRAPHIC SURVEY PREPARED FOR MOHEGAN TRIBAL UTILITY AUTHORITY SHOWING LAND TO BE CONVEYED FROM MONTVILLE MEMORIAL POST 10060 VETERANS OF FOREIGN WARS OF THE UNITED STATES, INCORPORATED TO MTIC ACQUISITIONS, INC., ROUTE 32, MONTVILLE, CONNECTICUT, SHEET 1 OF 1", SCALE: 1"=40', DATED AUG. 22, 2000, ON FILE IN THE OFFICE OF THE MONTVILLE TOWN CLERK. 11) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "THAMES BASIN REGIONAL WATER INTERCONNECTION PROJECT, ORIGINAL MONTVILLE PUMP STATION, CONN. ROUTE #32, MONTVILLE, CT., SHEET 1 OF 1 ", SCALE: 1"=20', DATED MAY 13, 2005, REVISED THROUGH 11-30-07, ON FILE IN THE OFFICE OF THE MONTVILLE TOWN CLERK. 12) WITH RESPECT TO HORIZONTAL DATA SHOWN HEREON THE ACCURACY CLASS IS "A-2". 13) WITH RESPECT TO TOPOGRAPHIC DATA SHOWN HEREON THE ACCURACY CLASS IS "T-2". 14) ELEVATIONS ARE BASED UPON NGVD 1929 DATUM. 15) UNDERGROUND UTILITIES (INCLUDING STORM, SANITARY AND/OR COMBINATION SEWERS) SHOWN HEREON ARE COMPILED FROM VARIOUS SOURCES INCLUDING OBSERVATION OF SURFACE STRUCTURES, UTILITY COMPANY MAPS, MAPS OF THE TOWN OF MONTVILLE, AND MAPS OF THE CONNECTICUT DEPARTMENT OF TRANSPORTATION (f.k.a. THE CONNECTICUT HIGHWAY DEPARTMENT. THE ACTUAL LOCATION, SIZE AND DEPTH OF THE UNDERGROUND UTILITIES SHOWN HEREON MAY NOT BE AS INDICATED. ADDITIONAL UNDERGROUND UTILITIES MAY EXIST. PRIOR TO ANY EXCAVATI N OR CONSTRUCTION CONTACT "CALL BEFORE YOU DIG "• 1-800-922-4455. 16) FIELD LAGGED WETLAND SOILS ARE AS DETERMINED BY ALEKSANDRA MOCK SOIL & WETLAND SCIENTIST (REFERENCE REPORT ENTITLED: "WETLAND DELINEATION FOR THE PROPERTY LOCATED AT 1366 ROUTE 32, UNCASVILLE, CONNECTICUT", DATED JUNE 29 AND JULY 2, 2011.) 17) PROPERTY IS LOCATED IN A "C-2" ZONE DISTRICT. --4 - SEE OVERALL ,PSROPOSED PLOT PLAN FOR SETBACK INFORMATION. QTmV DT A NTmTNTO NTnrPVQ i I . VCftlr T i nr- I IVIV VI' MLL. V I ILI I T LIIVCJ r-MIUM 1 V f'11V T I -LAN 1 1"11 W'h F# 61 4 f`r I `i % EXCAVATION. `� 3 7 2. ALL PLANT MATERIAL MUST CONFORM TO THE REQUIREMENTS IN THE ' , ! >> , �` PLANT LIST AND THE STANDARDS OF THE AMERICAN ASSOCIATION OF I` ° 33 02.139 E, /1 5.74 NURSERYMEN FOR EXTRA HEAVY GRADE UNLESS OTHERWISE SPECIFIED. ALL SPECIES MUST BE TRUE TO NAME AND SIZE. INVESTIGATE SOURCES 51-0� 54 E) 10. 6 5-' OF SUPPLY AND BE CERTAIN IT WILL BE POSSIBLE TO PROVIDE ALL PLANT MATERIAL SPECIFIED IN THE QUALITY AND QUANTITY REQUIRED S N 51°0=4'22" E, 26.83 PRIOR TO BIDDING. \S3a41 1 i' ! 3. ALL UPPER PLANTING AREAS WITHIN THE RETAINING WALLS SHALL BE W . r # 3 E I ,� MULCHED. 4. SEE DETAIL SHEETS FOR PLANTING DETAILS. F#35 F #"'2'- 7 6 T 1P W #34,`,-`•4A�V W�#33 II a 4 �.� �� W . F;# 3 2 TO MY KNOWLEDGE AND BELiEF, THIS MAP IS SUBSTAN LILLY CORRECT TO THE STANDARDS OF CLASS "A2" AS NOTED HEREON. GrR`EG()R'Y ,+ __BOL KI P.E Rl S. # 12154 VJ " HYDT. ' s jA Qonp- INN � (31 Ps 1MM 1 '. 33-20-`__ � I REVISIONS 131 is I (a)it EXISTING GUIDERAIL Tn n r n r-► i eN% irn NOTES: 1) THIS SURVEY AND MAP HAVE BEEN PREPARED IN ACCORDANCE WITH THE "RECOMMENDED STANDARDS FOR SURVEYS AND MAPS IN THE STATE OF CONNECTICUT" AS ADOPTED FOR USE BY THE CONNECTICUT ASSOCIATION OF LAND SURVEYORS, INC. ON SEPTEMBER 24, 1992, EFFECTIVE DATE JANUARY 1, 1993. SAfD STANDARDS ENACTED BY THE STATE OF CONNECTICUT (SECTIONS 20-300b-1 THROUGH 2O -300b-20 OF THE STATE OF CONNECTICUT AGENCIES) EFFECTIVE JUNE 21, 1996. 2) THE TYPE OF SURVEY PERFORMED WITH RESPECT TO THE BOUNDARY PERIMETER IS BUILDING LOCATION MAP, ZONING. 3) THE BOUNDARY DETERMINATION CATEGORY IS DEPENDENT RESURVEY. 4) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "RIGHT OF WAY MAP, TOWN OF MONTVILLE, NORWICH -NEW LONDON ROAD FROM THE WHITMAN -YOUNG PROPERTY NORTHERLY ABOUT 6,200 FEET, ROUTE NO 12, SHEET NO. 1 OF 3", SCALE: 1"=40', DATED 1929, PREPARED BY THE CONNECTICUT STATE HIGHWAY DEPARTMENT. 5) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "RIGHT OF WAY MAP, TOWN OF MONTVILLE, NORWICH -NEW LONDON ROAD FROM THE WHITMAN -YOUNG PROPERTY NORTHERLY ABOUT 6,200 FEET, ROUTE NO 12, SHEET NO. 2 OF 3", SCALE: 1"=40', DATED 1929, PREPARED BY THE CONNECTICUT STATE HIGHWAY DEPARTMENT. 6) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "MAP OF RIGHT OF WAY OF CONNECTICUT LIGHT & POWER COMPANY, ACROSS THE PROPERTY OF FREDERICK W. & MINNIE B. STANLEY, TOWN OF MONTVILLE, COUNTY OF NEW LONDON, STATE OF CONNECTICUT", SCALE: 1"=200', DATED OCTOBER 1947, ON FILE IN THE OFFICE OF THE MONTVILLE TOWN CLERK. 7) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "PLAN OF PROPERTY OWNED BY RICHARD K. SHEPARD, IN THE TOWN OF MONTVILLE, REVISED PLAN", SCALE: 1"=100', DATED OCTOBER 1950, REVISED THROUGH MAY 1951, ON FILE IN THE OFFICE OF THE MONTVILLE TOWN CLERK. 8) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "PHASE II SEWERAGE PROGRAM, MONTVILLE, CONNECTICUT, CONTRACT B, ROUTE 32, SHEET B-4", SCALE: 1"=40', DATED APR. 1979, REVISED THROUGH 9-1-83, PREPARED BY LOUREIRO ENGINEERING ASSOCIATES. 9) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "PHASE II SEWERAGE PROGRAM, MONTVILLE, CONNECTICUT, CONTRACT B, ROUTE 32, SHEET B-5", SCALE: 1 "=40', DATED APR. 1979, REVISED THROUGH 9-1-83, PREPARED BY LOUREIRO ENGINEERING ASSOCIATES. 10) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "PLAN MADE FOR MONTVILLE MEMORIAL POST 10060 VETERANS OF FOREIGN WARS OF THE UNITED STATES, INCORPORATED, ROUTE 32, SARAH DRIVE, & RAYMOND HILL ROAD", SCALE: 1"=100', DATED JUNE 19, 1985, ON FILE IN THE OFFICE OF THE MONTVILLE TOWN CLERK. 1 1) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "BOUNDARY AND TOPOGRAPHIC SURVEY PREPARED FOR MOHEGAN TRIBAL UTILITY AUTHORITY SHOWING LAND TO BE CONVEYED FROM MONTVILLE MEMORIAL POST 10060 VETERANS OF FOREIGN WARS OF THE UNITED STATES, INCORPORATED TO MTIC ACQUISITIONS, INC., ROUTE 32, MONTVILLE, CONNECTICUT, SHEET 1 OF 1", SCALE: 1"=40', DATED AUG. 22, 2000, ON FILE IN THE OFFICE OF THE MONTVILLE TOWN CLERK. 11) REFERENCE IS MADE TO A CERTAIN MAP ENTITLED: "THAMES BASIN REGIONAL WATER INTERCONNECTION PROJECT, ORIGINAL MONTVILLE PUMP STATION, CONN. ROUTE #32, MONTVILLE, CT., SHEET 1 OF 1 ", SCALE: 1"=20', DATED MAY 13, 2005, REVISED THROUGH 11-30-07, ON FILE IN THE OFFICE OF THE MONTVILLE TOWN CLERK. 12) WITH RESPECT TO HORIZONTAL DATA SHOWN HEREON THE ACCURACY CLASS IS "A-2". 13) WITH RESPECT TO TOPOGRAPHIC DATA SHOWN HEREON THE ACCURACY CLASS IS "T-2". 14) ELEVATIONS ARE BASED UPON NGVD 1929 DATUM. 15) UNDERGROUND UTILITIES (INCLUDING STORM, SANITARY AND/OR COMBINATION SEWERS) SHOWN HEREON ARE COMPILED FROM VARIOUS SOURCES INCLUDING OBSERVATION OF SURFACE STRUCTURES, UTILITY COMPANY MAPS, MAPS OF THE TOWN OF MONTVILLE, AND MAPS OF THE CONNECTICUT DEPARTMENT OF TRANSPORTATION (f.k.a. THE CONNECTICUT HIGHWAY DEPARTMENT. THE ACTUAL LOCATION, SIZE AND DEPTH OF THE UNDERGROUND UTILITIES SHOWN HEREON MAY NOT BE AS INDICATED. ADDITIONAL UNDERGROUND UTILITIES MAY EXIST. PRIOR TO ANY EXCAVATI N OR CONSTRUCTION CONTACT "CALL BEFORE YOU DIG "• 1-800-922-4455. 16) FIELD LAGGED WETLAND SOILS ARE AS DETERMINED BY ALEKSANDRA MOCK SOIL & WETLAND SCIENTIST (REFERENCE REPORT ENTITLED: "WETLAND DELINEATION FOR THE PROPERTY LOCATED AT 1366 ROUTE 32, UNCASVILLE, CONNECTICUT", DATED JUNE 29 AND JULY 2, 2011.) 17) PROPERTY IS LOCATED IN A "C-2" ZONE DISTRICT. --4 - SEE OVERALL ,PSROPOSED PLOT PLAN FOR SETBACK INFORMATION. QTmV DT A NTmTNTO NTnrPVQ i I . VCftlr T i nr- I IVIV VI' MLL. V I ILI I T LIIVCJ r-MIUM 1 V f'11V T I -LAN 1 1"11 W'h F# 61 4 f`r I `i % EXCAVATION. `� 3 7 2. ALL PLANT MATERIAL MUST CONFORM TO THE REQUIREMENTS IN THE ' , ! >> , �` PLANT LIST AND THE STANDARDS OF THE AMERICAN ASSOCIATION OF I` ° 33 02.139 E, /1 5.74 NURSERYMEN FOR EXTRA HEAVY GRADE UNLESS OTHERWISE SPECIFIED. ALL SPECIES MUST BE TRUE TO NAME AND SIZE. INVESTIGATE SOURCES 51-0� 54 E) 10. 6 5-' OF SUPPLY AND BE CERTAIN IT WILL BE POSSIBLE TO PROVIDE ALL PLANT MATERIAL SPECIFIED IN THE QUALITY AND QUANTITY REQUIRED S N 51°0=4'22" E, 26.83 PRIOR TO BIDDING. \S3a41 1 i' ! 3. ALL UPPER PLANTING AREAS WITHIN THE RETAINING WALLS SHALL BE W . r # 3 E I ,� MULCHED. 4. SEE DETAIL SHEETS FOR PLANTING DETAILS. F#35 F #"'2'- 7 6 T 1P W #34,`,-`•4A�V W�#33 II a 4 �.� �� W . F;# 3 2 TO MY KNOWLEDGE AND BELiEF, THIS MAP IS SUBSTAN LILLY CORRECT TO THE STANDARDS OF CLASS "A2" AS NOTED HEREON. GrR`EG()R'Y ,+ __BOL KI P.E Rl S. # 12154 VJ " HYDT. ' s jA Qonp- BA�KND � l Owr P) Seraqci� *J '� I'. In�� SETBACK (.EE NOTES) - PROPOSED LANDSCAPE PLAN - - --„ >3•,,'- OF PROPERTIES AT 6S7 1360 ROUTE 32 -' - -- -- - IN THE UNCASVILLE SECTION OF MONTVILLE, CT. PREPARED FOR: CHARLES F. GAGER SCALE: 1"__30, 27 JANUARY 2012 30 S H E,ET 7 yof 11 sa 90 GRAPHIC SCALE - FEET CT 7976 1 ADD TURNOUT, STOP SIGN/BAR 33-20-`__ N0. I REVISIONS DATE BA�KND � l Owr P) Seraqci� *J '� I'. In�� SETBACK (.EE NOTES) - PROPOSED LANDSCAPE PLAN - - --„ >3•,,'- OF PROPERTIES AT 6S7 1360 ROUTE 32 -' - -- -- - IN THE UNCASVILLE SECTION OF MONTVILLE, CT. PREPARED FOR: CHARLES F. GAGER SCALE: 1"__30, 27 JANUARY 2012 30 S H E,ET 7 yof 11 sa 90 GRAPHIC SCALE - FEET CT 7976 PLACE SILT SACK FILTER BENEATH RIM OF CATCH BASIN OVER LAP 12" ALL AROUND, DRAINAGE STRUCTURE (LEAVE TOP OF FRAME HIGH IF FINISHED GRADE NOT ESTABLISHED) NOTE: 1. REPLACE SILT SACKS AS REQUIRED TO PROVIDE PROPER FILTRATION. SILT SACK CATCH. BASIN FILTER NOT TO SCALE FULLER ENGINEERING & LAND SURVEYING, LLC 525 JOHN STREET BRIDGEPORT, CT. PH. 203-333-9;-65 EMAIL:INFO@FULLERSURVEYORS.COM TO MY KNOWLEDGE AND BELIEF, THIS MAS' IS SUBSTANTIALLY CORRECT TO THE STANDARDS OF ;LASS "A2" Aa NOTED; HEREON. .: �. 0 _ H:� PIDLTJSKI P:.; R.L.S. # 12154 SUMP CATC H B) TRANSITION T RiWk.er MAiERIALS•" Concrete Pipe Division CONFIGURATION DETAIL TYPICAL INSTALLATION STC 900 Precast Concrete Stormc4tor 1" PVC ANTI—SIPHON RE—ISSUE (900 U.S. Gallon Capacity) PIPE ADAPTER '. da DAT` Stormceptor REMOVABLE WATERTIGHT—"— „ ACCESS PORT, 6 OPENING 4 '° . 'd a• Frame and Cover -�— 32"0 I a Grade Adjusters to ' Suit Finished Grade " 24"0 Outlet a . ANTI—SIPHON DEVICE ,'; .. Pip d 6" ' 30" 0 Oil Port "0 Orifice SNOUT OIL—DERIS Plate 4 4 HOOD d ' 72"0Q 44 OIL—DERIS o Stormceptor • OUTLET . A Insert Outlet PIPE a Inlet Outlet d Inlet ir A 6"0 a a . Q . A : Orifice ° a Plate OUTLET PIPE (HIDDEN) d Access opening "0 Oil •aa � d • �' � Drop Tee � (See note #2 Port MOUNTING FLANGE SEE :a Inlet Pipe 24"0 Drop NOTE* SOLIDS SETTLE ON Outlet Pip " BOTTOM Plan View dd J811 FRONT VIEW SIDE VIEW f' a�.iY:f tR :., 41. , ' } 4 i'C�1 r;,•..''.v � ..a:r; M. 1v.14.1�t.w wr4'•Ii •.•�`.• r`K .7 r•.: �: ,:5 i�!J.\+;r4''�i li• d a Section Thru Chamber .1 .4 d. • V, d G d ' d *NOTE — SUMP DEPTH OF 36"MIN FOR < OR = 12" DIA. SNOUT OIL—WATER—DEBRIS SEPARATOR OUTLET. FOR OUTLETS > OR = 15", DEPTH = 2.5-3XDIA. Notes: 1. The Use Of Flexible Connection is Recommended at The Inlet and Outlet Where Applicable. 2. The Cover Should be Positioned Over The Outlet Drop Pipe and The Oil Port. 3. The Stormceptor System is protected by one or more of the following U.S. Patents: #4985148, INSTALLATION DETAIL #5498331, #5725760, #5753115, #5849181, #6068765, #6371690. NOTES: 4. Contact a Concrete Pipe Division representative for further details not listed on this drawing. E'nkgr Q28 1.) ALL HOODS AND TRAPS FOR CATCH BASIN AND WATER QUALITY STRUCTURES SHALL BE DETAIL8 AS MANUFACTURED BY: BEST MANAGEMENTPRODUCTS, INC. 53 MT.ARCHER RD. FOAM GASKET W LYME, CT. 06371 PSA BACK NG (860) 434-0277 (TRIM TO LENGTH OR PRE—APPROVED EQUAL 2.) ALL HOODS SHALL BE CONSTRUCTED OF GLASS REINFORCED RESIGN COMPOSITE WITH ISO GEL COAT EXTERIOR FINISH WITH A MIN. 0.125" LAMINATE THICKNESS MOUNTING FLANGE 3.) ALL HOODS SHALL EQUIPPED A WATERTIGHT ACCESS PORT,A MOUNTING FLANGE, AND AN ANTI—SIPHON VENT AS. DRAWN. (SEE CONFIGURATION DETAIL 4,) THE SIZE AND POSITION OF THE HOOD SHALL BE DETERMINED BY THE OUTLET PIPE SIZE e AS PER MANUFACTURES RECOMMENDATION. 5.) THE BOTTOM OF THE HOOD SHALL EXTEND DOWNWARD DISTANCE EQUAL TO J THE OUTLET PIPE DIAMETER WITH A MIN. DISTANCE OF 6" FOR PIPES <12" I.D. d INSTALLATION NOTE: 6.) THE ANTI—SIPHON VENT SHALL EXTEND ABOVE THE HOOD BY MIN. OF 3" AND A MAX. POSITION HOOD SUCH THAT OF 24" ACCORDING TO STRUCTURE CONFIGURATION.a BOTTOM FLANGE IS A .' ANCHOR W/ BOLT DISTANCE OF OUTLET 7.) THE SURFACE OF THE STRUCTURE WHERE THE HOOD IS MOUNTED SHALL BE FINISHED (SEE DETAIL A) PIPE DIAMETER (MIN.) SMOOTH AND FREE OF LOOSE MATERIAL. BELOW THE PIPE INVERT. 8.) THE HOOD SHALL BE SECURELY ATTACHED TO STRUCTURE WALL WITH J" STAINLESS d MIN. DISTANCE FOR STEEL BOLTS AND OIL RESISTANT GASKET AS SUPPLIED BY MANUFACTURE. (SEE PIPES <12"L.D. IS 6" INSTALLATION DETAIL.) 9.) INSTALLATION INSTRUCTIONS SHALL BE FURNISHED WITH MANUFACTURER SUPPLIED INSTALLATION KIT. D INSTALLATION KIT SHALL INCLUDE: DETAIL A A.) INSTALLATION INSTRUCTIONS 8.) PVC ANTI—SIPHON VENT PIPE AND ADAPTER C.) OIL—RESISTANT CRUSHED CELL FOAM GASKET WITH PSA BACKING a a 1 / D D.) J" STAINLESS STEEL BOLTS 4 E.) ANCHOR SHIELDS .•Q d DRILLED ANCHOR HOLE SHIELD GASKET COMPRESSED EXPANSION CONE STAINLESS BETWEEN HOOD (NARROW END OUT) BOLT AND STRUCTURE (SEE DETAIL 8) HOOD SPECIFICATION FOR CATCH BASIN AND WATER QUALITY STRUCTURES PLACE SILT SACK FILTER BENEATH RIM OF CATCH BASIN OVER LAP 12" ALL AROUND, DRAINAGE STRUCTURE (LEAVE TOP OF FRAME HIGH IF FINISHED GRADE NOT ESTABLISHED) NOTE: 1. REPLACE SILT SACKS AS REQUIRED TO PROVIDE PROPER FILTRATION. SILT SACK CATCH. BASIN FILTER NOT TO SCALE FULLER ENGINEERING & LAND SURVEYING, LLC 525 JOHN STREET BRIDGEPORT, CT. PH. 203-333-9;-65 EMAIL:INFO@FULLERSURVEYORS.COM TO MY KNOWLEDGE AND BELIEF, THIS MAS' IS SUBSTANTIALLY CORRECT TO THE STANDARDS OF ;LASS "A2" Aa NOTED; HEREON. .: �. 0 _ H:� PIDLTJSKI P:.; R.L.S. # 12154 SUMP CATC H B) TRANSITION T AVERAGE WEIGHT 1750 LBS. COMPLETE AS SHOWN ON HIGHWAY DEPARTMENT STANDARD #228-8 CONNECTICUT STATE HIGHWAY DEPT. (CATCH BASIN TYPE "BC") AVERAGE WEIGHT 1325 LBS. COMPLETE AS SHOWN ON HIGHWAY DEPARTMENT STANDARD 228—C 1 RE—ISSUE 3-20— N0. REVISIONS DAT` AVERAGE WEIGHT 1750 LBS. COMPLETE AS SHOWN ON HIGHWAY DEPARTMENT STANDARD #228-8 CONNECTICUT STATE HIGHWAY DEPT. (CATCH BASIN TYPE "BC") AVERAGE WEIGHT 1325 LBS. COMPLETE AS SHOWN ON HIGHWAY DEPARTMENT STANDARD 228—C ��• as 3/!' e• 46 V 34 >I/+• AVERAGE WEIGHT 1750 LBS. COMPLETE AS SHOWN ON HIGHWAY DEPARTMENT STANDARD #228-8 CONNECTICUT STATE HIGHWAY DEPT. (CATCH BASIN TYPE "BC") AVERAGE WEIGHT 1325 LBS. COMPLETE AS SHOWN ON HIGHWAY DEPARTMENT STANDARD 228—C CONNECTICUT STATE HIGHWAY DEPT. STANDARD TYPE "CL" NOTES AND DETAILS OF PROPERTIES AT 1360 ROUTE 32 N THE UNCASVILLE SECTION OF MONTVILLE, CT. PREPARED FOR: CHARLES F. GAGER SCALE: AS SHOWN 27 JANUARY 2012 SHEET 8 of 11 CT 7976 Ir 34 >I/+• �r Oe 3/4' CONNECTICUT STATE HIGHWAY DEPT. STANDARD TYPE "CL" NOTES AND DETAILS OF PROPERTIES AT 1360 ROUTE 32 N THE UNCASVILLE SECTION OF MONTVILLE, CT. PREPARED FOR: CHARLES F. GAGER SCALE: AS SHOWN 27 JANUARY 2012 SHEET 8 of 11 CT 7976