Loading...
HomeMy WebLinkAboutAs_BuiltDEEP TEST PIT & PERCOLATION TEST DATA SANITARY DESIGN CRITERIA sr TP #1, TP #2 AND TP #3 WERE WITNESSED BY WENDY MIS OF THE UNCAS HEALTH DISTRICT PROPOSED 3 BEDROOM HOUSE ON 5/3/90. ALL PITS WERE DUG AND PERCOLATION TEST WAS PERFORMED ON 5/3/90. DESIGN PERCOLATION RATE = 10.1 - 20 MINUTES/INCH TP #1 0" - 6" TOPSOIL/LOAM WITH ROCKS AND BOULDERS It 36" YELLOW-BROWN SANDY LOAM WITH ROCKS AND BOULDERS 6 - uji 1. 36" - 93" MEDIUM -COARSE SAND (COMPACT) NO LEDGE, GROUNDWATER AT 68", MOTTLING AT 38" TP #2 0" - 6" TOPSOIL WITII ROCKS AND BOULDERS 6" - �13" - LIGHT BROWN FINE SILTY LOAM WITH ROCKS AND BOULDERS 23" - 36" LIGHT;.BROWN FIRM FINE SILTY LOAM WITH ROCKS AND BOULDERS 36" - 65" GREY BROWN FINE. SILTY SAND 65" - 94" W GREY MEDIUM -COARSE SAND (COMPACT) NO LEDGE, GROUNDWATER AT 62", MOTTLING AT 36" TP #3 0" - 5" TOPSOIL WITH ROCKS AND BOULDERS 5" - 35" LIGHT BROWN SANDY LOAM WITH ROCKS AND BOULDERS 35" - 96" GREY MEDIUM -COARSE SAND (COMPACT) WITH POCKETS OF GREY FINE. SILTY SAND NO LEDG'F., GROUNDWATER AT 55", MOTTLING AT 38" i TP #4 0" - 6" TOPSOIL WITH ROCKS AND BOULDERS 6" - 42" LIGHT BROWN SILTY LOAM WITH ROCKS AND BOULDERS 42" - 66" GREY MEDIUM -COARSE SAND (COMPACT) NO LEDGE, GROUNDWATER AT 48", MOTTLING AT 38" i P-1 PPPC OT.ATTC1N BATF A'13'•'" DF.PTII — 12.0 MINUTES/INCH LEACHING TRENCHES 12' ON CENTER M 1 i PROPOSED GRADE 1 1 361 I /,,—LOAM TOAPREVENT PONDING . 74 v APPROVED .' -cam 2 FILTER FABRIC BACKFILL —"� I • cog na 4r'PERFORATED PVC ' -� _ oQgo - oo0p PIPE (HOLES DOWN) �-, ° =N1z A9�_ o ' I SIZE STONE oao� -{� moa O �0 0 00 -- G�V��'' c� o (� 18MINIMUMTO GROUNDWATER 48" MIN IMUM OR MOTTLING TO LEDGE .r TYPICAL LEACHING TRENCH CROSS SECTION DETAIL NOT TO SCALE t"SOLID PVC PRECAST CONCRETE )UTLET PIPE TO DISTRIBUTION BOX (OR JEXT LEACHING APPROVED EQUAL) INSTALLED TRENCH WITH HIGHEST KNOCKOUT (INVERT) USED AS HIGH LEVEL OUTLET TO DISCHARGE �\ , .1 .. •, .. , •., .� EFFLUENT TO NEXT LEACHING TRENCH 4 PERFORATED PVC INLET `3 PIPE FROM LEACHING TRENCH a SET DISTRIBUTION BOX LEVEL ON BROKEN STONE OVERFLOW DISTRIBUTION BOX DETAIL NOT TO SCALE LEGEND -- — — — 80 — — — -- EXISTING CONTOUR o� PROPOSED CONTOUR t 83. So PROPOSED SPOT GRADE i�TP'ej DEEP TEST PIT LOCATION +p-1 PERCOLATION TEST LOCATION DUE TO DISTORTION DURING RI'PROIA'CTION , i lI I I'I:IC�'I' ;LAY NOT SCALE EXACTLY. ALI, DiMENSI.ONS SHOWN OVEILRULE' SCALING. IF THERE ARE ANY DISCIZEI'ANG i E:I , CONTAC LEACHING AREA REQUIRED = 675 SF EFFECTIVE DESIGN: 1,000 CALLON SEPTIC TANK AND 2 ROWS OF 113 LF TOTALLING 226 LF QF 3' WIDE, 18" HIGH LEACHING TRENCHES BY SERIAL DISTRIBUTION LEACHING AREA PROVIDED: 226 LF X 3 SF/LF = 678 SF EFFECTIVE 1.00% RESERVE AREA PROVIDED G L E ATS D A L E LOT # (05 r (Exi5Ti LOT 1* (4 Q �A, Oq / / -N / 17 /� /' �a / f moo" � h``a� �'�'• � r �' - / 4ul / J / FUTUILE/ J , /Zo' D►a I i Above GOD" � / INV / / IA) V ?9.50 OUT P� / oUlL MA12.1L. / / / 41' Sot1n Pv� FooTiJ�V v12.A1�1 / SPIV -E IA1 10" 0A1L j % /1>vd 6Z 50.15 (ASW/KED) 0VE2FLOW 9 - gox INV 80.50 %A1 INV 0o.&,-7 OUT / / l >8U11...D1111C� SI;.TPbACIL I-IA)F- BSMT CB CIP CONC D -BOX DIA ELEV EXIST FF INV IP MIN MON PERF PVC PROP RET TF TYP ABBREVIATIONS U[ I ✓ L[ 1 Ll 1 CATCH BASIN CAST IRON PIPE CONCRETE DISTRIBUTION BOX DIAMETER ELEVATION EXISTING FINISH FLOOR INVERT IRON PIPE MINIMUM MONUMENT PERFORATED POLYVINYL CHLORIDE PIPE PROPOSED RETAINING TOP OF FRAME TYPICAL • AQP � I •'f N W —�-- E S w J co TF 81.41 CFS TF 81.30 8Z 85 qo uji 1 LOT 1* (4 Q �A, Oq / / -N / 17 /� /' �a / f moo" � h``a� �'�'• � r �' - / 4ul / J / FUTUILE/ J , /Zo' D►a I i Above GOD" � / INV / / IA) V ?9.50 OUT P� / oUlL MA12.1L. / / / 41' Sot1n Pv� FooTiJ�V v12.A1�1 / SPIV -E IA1 10" 0A1L j % /1>vd 6Z 50.15 (ASW/KED) 0VE2FLOW 9 - gox INV 80.50 %A1 INV 0o.&,-7 OUT / / l >8U11...D1111C� SI;.TPbACIL I-IA)F- BSMT CB CIP CONC D -BOX DIA ELEV EXIST FF INV IP MIN MON PERF PVC PROP RET TF TYP ABBREVIATIONS U[ I ✓ L[ 1 Ll 1 CATCH BASIN CAST IRON PIPE CONCRETE DISTRIBUTION BOX DIAMETER ELEVATION EXISTING FINISH FLOOR INVERT IRON PIPE MINIMUM MONUMENT PERFORATED POLYVINYL CHLORIDE PIPE PROPOSED RETAINING TOP OF FRAME TYPICAL • AQP � I •'f N W —�-- E S w J co TF 81.41 CFS TF 81.30 8Z 85 qo cry TF 10).3Z C?, TF 101.45 NOTES 1. BOUNDARY CONFIGURATION AND ADJOINERS TAKEN FROM PLAN TITLED: "PHASE II LOTS 16 T1IRU 26 GREYSTONE ESTATES SUBDIVISION PROPERTY OF GREYSTONE ASSOCIATES OLD COLCHESTER ROAD & MOXLEY ROAD, MONTVILLE, CONNECTICUT SCALE 1"=100' SEPT 2.9, 1987 SHEET 3 OF 14 REVISED TO 4/26/88" BY DICESARE BENTLEY ENGINEERS INC. 2. ELEVATIONS BASED ON ASSUMED DATUM. 3. SITE IS LOCATED IN A R-120 ZONE. 4. FOR E�ACT HOUSE DIMENSIONS, SEE BUILDING PLANS. 5. ALL UNDERGROUND UTILITY LOCATIONS ARE APPROXIMATE AND SUBJECT TO FIELD VERIFICATION. I 6. NOTIF' "CALL BEFORE YOU DIG" AT 1-800-922-4455 AT LEAST 48 HOURS PRIOR TOEXCAV TION, COORDINATE CONNECTIONS WITH UTILITY COMPANIES. 7. T.—MARE NO EXISTING WELLS WITHIN 75' OF ANY PART OF THE PROPOSED SUBSURFACE SEWAGE DISPOSAL SYSTEM AS DEPICTED ON THIS PLAN. SITZ: REPARATION PROCEDURE FOR TILE INSTALLATION OF THE NEW SEWAGE DISPOSAL SYSTEM: A. IN�TALL SEDIMENT FENCE AT LOCATIONS SHOWN. B. IN 'PALL LEACIIING TRENCHES PER PLAN. C. INSTALL BACKFILL AS REQUIRED TO INSURE THAT THE FINAL GRADE 15 FEET .FROM THE LEACHING TRENCHES IS AT LEAST THE SAME ELEVATION AS TOP OF THE RE PECTIVE LEACHING TRENCH. COVER WITH 12 INCITES OF LOAM, GRADE TO PR VENT PONDING AND SEED WITII GRASS TO STABILIZE. I D. AFTER AREAS HAVE BEEN PERMANENTLY ST'AB'ILIZED, REMOVE SEDIMENT FENCE. THIS MAP IS C� i AND OTHER SCSI AS AN ACCUR AS A MORE At 4 uji m ui J ' W F u o LL o � w D, cry TF 10).3Z C?, TF 101.45 NOTES 1. BOUNDARY CONFIGURATION AND ADJOINERS TAKEN FROM PLAN TITLED: "PHASE II LOTS 16 T1IRU 26 GREYSTONE ESTATES SUBDIVISION PROPERTY OF GREYSTONE ASSOCIATES OLD COLCHESTER ROAD & MOXLEY ROAD, MONTVILLE, CONNECTICUT SCALE 1"=100' SEPT 2.9, 1987 SHEET 3 OF 14 REVISED TO 4/26/88" BY DICESARE BENTLEY ENGINEERS INC. 2. ELEVATIONS BASED ON ASSUMED DATUM. 3. SITE IS LOCATED IN A R-120 ZONE. 4. FOR E�ACT HOUSE DIMENSIONS, SEE BUILDING PLANS. 5. ALL UNDERGROUND UTILITY LOCATIONS ARE APPROXIMATE AND SUBJECT TO FIELD VERIFICATION. I 6. NOTIF' "CALL BEFORE YOU DIG" AT 1-800-922-4455 AT LEAST 48 HOURS PRIOR TOEXCAV TION, COORDINATE CONNECTIONS WITH UTILITY COMPANIES. 7. T.—MARE NO EXISTING WELLS WITHIN 75' OF ANY PART OF THE PROPOSED SUBSURFACE SEWAGE DISPOSAL SYSTEM AS DEPICTED ON THIS PLAN. SITZ: REPARATION PROCEDURE FOR TILE INSTALLATION OF THE NEW SEWAGE DISPOSAL SYSTEM: A. IN�TALL SEDIMENT FENCE AT LOCATIONS SHOWN. B. IN 'PALL LEACIIING TRENCHES PER PLAN. C. INSTALL BACKFILL AS REQUIRED TO INSURE THAT THE FINAL GRADE 15 FEET .FROM THE LEACHING TRENCHES IS AT LEAST THE SAME ELEVATION AS TOP OF THE RE PECTIVE LEACHING TRENCH. COVER WITH 12 INCITES OF LOAM, GRADE TO PR VENT PONDING AND SEED WITII GRASS TO STABILIZE. I D. AFTER AREAS HAVE BEEN PERMANENTLY ST'AB'ILIZED, REMOVE SEDIMENT FENCE. THIS MAP IS C� i AND OTHER SCSI AS AN ACCUR AS A MORE At 4