Loading...
HomeMy WebLinkAboutAs-BuiltGEN! Am m4pursims-korTnu TV -ST 12LKI rV1rTrryr.n D%gP-yW r �Vy Ale" PIT 31 0-611 TOPSOIL r pwf. No$. m" 6-2311 ORANGE BROWN VERY FINE SANDY SILTY LOAM 23-9611 CRAY VERY FINE SILTY SANDY LOAM MOTTLING AT 36 WATER AT 7244 To Not Lower Tf*Vh PIT 32 0-611 of TOPSOIL SANDY SILTY LOAM 6-23 ORANGE BROWN VERY FINE 23-59" GRAY SANDY LOAM 59-82" GRAY SANDY GRAVEL ReyRrs-ed 1 MOTTLING AT 3614 •-3gx WATER AT 8211 0-6 TOPSOIL PIT A 6-23" TAN SILTY LOAM 23-30" GRAY SILTY SANDY MOTTLED LOAM PIT FULL OF WATER AT 30 tR 4' 'I- L,?A, 0-811 TOPSOIL PIT B 8-24- DuI.,L TAN SILTY LOAM FINE SAND RAY SILTIVERY SAND. 51-83" ORANGE FINE MEDIUM SILTY f-V(l F)Jxl 471 MOTTLING AT 29 GROUNDWATER AT 43 LEDGE AT 83 roPSOIL -� i PIT C E 8_29 DULL TAN SILTY LOAM -)241 GRAY FINE SAND SILT/VERY 29- SANDS 52-81" ORANGE AT 2911 MOTTLING CROUNDWATER AT 36 r............ r O P S O T L LOAM F.P 9-27 BROWN/ORANGE SILTY 1, 1). LOTS OF FLAT ROrK 27-80" GRAY MOTTLED FTNF SILT SAN 16, > BOULDERS Aif q— t5 M01"I'LING AT 3�,+ -lRoONY)WATER 36 N )ROXIMAT173,Y AN 14 5OR 5 Pvc w "FRcOLATION Trstr WAS DO(, TO A DEPTH OF APT 11i DTSTRTCrT T!iF A L' PIT C ANT) D. PER 1,HF, UNCAS HF 1, 0 (7 ATE D H BETWEEN W A S A 1, FW A Y NUTES PER TNCH 0VTjJLT ?ktPF OLATION RATE WAS 13. MI THE MI STA13TT-,T7,FD PERC A SEE 004 13 > 6EVATION DATA El 126.43 4" C I P INV ,Z�) FDN: (SLOPE MIN 4" PER FT) 4 CIP ..:. s ,.�- \ 2 18 R)06T CUKTAv PRAo4 -sEs 1250 GALLON TWO COMPARTMENT SEPTIC TANK Y/ IN INV - 128.05 hrl INV. 127.80 OUT PIPE 41 - 4" SDR 35 PVC 4A (D SPLITTER "Do' BOX INV. 127.70 IN INV. 127-60 OUT -4 35 -P-VC 'PIPE ST) 10 CATCH SAS114j, *1A REVERSED "D"- BOY INV. 127.60 IN AND TO TRENCH .80 OVERFLOW INV 12,7 10 t 4 SDR 35 PVC PIPE G�LEN CR#,5 i�rL nm iz it Py 13o)( 4 JWV. 126. ft I)J\I. IZ5.% 0%JT A 7 7Z" LrT L5ACHw6r 11m)4CAEc4 'All 130-nUT-1 Or- -WEN CA E49N/ Vb-50 PIPE Fink) Ll%.r,6 177 -bo (Di 9 ' xr-x cP4 Aj (� -rgew LP E14P caloacTOR P 7NCAr"SV. 16,50 E: F40k) J-11JS IZ'7-60 Now Ar XACHIIJ& -MEACHF-C> 5DTjm or "rgrNt; Flu*v. IZV,86 -4kCHhj(3 -TRENc� 0qj) C-VNX1S4C-r-0k Z4 44- '770 09'3-7 OF -m 1VSjC*, ELAW. l7q.J5 R 25 PIPE. Fi-W LANAE IZ5. 45 4LV- 331(017 10 g 94- 1c) 4 .3.5 Pic- C- 0 P F- 7 -f. 10*0 P 1W 1?!5.95 Izz J#zo m t3017Vj D;: -Tr-r, P IT . J 51E CT 1� i 177 Z 0 Dk? 11 Z 0*0 MOW Amaw SAW ]So, (min) above high ground water(mottling) LEGEND PROPERTY LINE BUILDING SETBACX LINE DEEP TEST PIT LOCATION PERCOLATION TEST PIT LOC. EXISTING CONTOUR PVtOPOSED CONTOUR PROPOSED SPOT GRADE' 4 -70 Septic Took 1 BOUNDARY INFORMATION TAKEN FROM SUBDIVISION.0 PLACE RAYMOND HILL ROAD MONTVILLE k a swkve-c'y1"& co1vsu47AA17.S' GLEN CRAG ESTATES GLEN CRAG SCALL CONNECTICUT, SCALE V, = 60 FEB 24, 1988. ey 2. THIS LOT WAS TOPOED TO TWO FOOT CONTOURS AND A BENCH MARK WAS SET ON MAY BY CONNECTICUT SURVEYING CONSULTANTS, JaHN R. STOCK, L - S 4, 1990- 3. ALL r*- EVATIONS REFER TO NATIONAL GEODETIC VERTICAL DATUM(APPROXIMATE) (N.G.V.D.) 1929. 4. DEEP TEST HOLES 31 & 32 WERE TAKEN FROM THE SUBDIVISION PLANS. DEEP TITLE TEST HOLES A, B, C, & D AND THE PERCOLATION TEST WERE OBSERVED AND 199,0- 1-07- 9 GL A✓C RA 6- 4':57^7" S REt-ORDED BY THE UNCAS HEALTH DISTRICT (WENDY S. MIS) ON MAY 2, 5. BASED ON THE DEEP TEST PIT DATA (HIGH SEASONAL GROUNDWATER) AN ENGINEERED SEPTTC SYSTEM IS REQUIRED ON THIS LOT. 6. TOPSOIL SHALL BE STRIPPED FROM THE SEPTIC SYSTEM AREA AND STOCKPILED ON SITE FOR REUSE. 7. AT THE TIME OF THE DESIGN OF THF SEPTIC SYSTEM ON THIS LOT, THERE WERE NO EXISTING LEACHING SYSTEMS WITHIN 75# OF THE PROPOSED WELL PROPOSED LOCATION AND THERE WERE NO EXISTING WELLS WITHIN 75' Of THE LEACHING SYSTEM LOCATION. 8. FILL IN THE . SEPTIC SYSTEM AREA AND WITHIN 15, OF THE SEPTIC SYSTEM AREA SHALL BE CLEAN SELECT GRANULAR SOIL SUITABLE FOR LEACHING SYSTEM INSTALLATION. 9 DUE TO THE CLOSE PROXIMITY OF THE FOUNDATION TO BUILDING SETBACK LINES AND THE SEASONAL HIGH GROUNDWATER CONDITION, THE FOUNDATION AND SEPTIC SYSTEM SHALL BE STAKED OUT BOTH HORIZONTALLY AND VERTICALLY RY A LISCENSED LAND SURVEYOR. 10. THIS DESIGN WAS SELECTED TO MINIMIZE'' INITIAL SITE DEVELOPMENT IS DOWN COSTS. IT IS RECOGNIZED THAT THE PRIMARY LEACHING AREA. GRADIENT FROM THE RESERVE LEACHING AREA. IN THE EVENT THAT UTILIZATION OF THE RESERVE AREA IS REQUIRED AT A LATER DATE, THF INSTALLATION OF A SEWERAGE EFFLUENT PUMP WILL BE REQUIRED. 11. PER THE DE R, A CURTAIN DRAIN WAS INSTALLED AS NOTED DURING ROAD CONSTRUCTION. 12. ALL NEW 4" PERFORATED PVC PIPE SHALL BE INSTALLED A MINIMUM OF 25' FROM THE SEPTIC SYS'T'EM. 13. THE PROPOSED FOUNDATION OUTLET DRAIN WAS SELECTED TO "DAYLIGHT" BETWEEN AS SHOWN TO AVOID EXISTING UNDERGROUND UTILITIES LOCATED THE CURB AND STREET LINE. THE LOCATION OP THE ?6CP01ZA-'e,0 COrrA"kJ PPAI -tj i S -1"D 4"€ C, I AIU SANITARY DESIGN CRITERIA A. FOUR BEDROOM HOME WITH FULL BASEMENT. PER OWNER, THERE WILL BE NO TUBS GREATER THAN 100 GALLONS IN SI B. 1250 GALLON, TWO C014PARTMENT SEPTIC TANK REQUIRED C. STABILIZED AND DESIGN PERCOLATION RATE: 10.1 to 20.0 MINUTES PER INCH D. 900SF EFFECTIVE LEACHING AREA REQUIRED S-Y$TEM -- ----------- 4V NC r'-- S T, CTET) -MP PR-TMARY-- low ALTERNATIVE Dr G. 1006 RESERVE AREA REQUIRED F: 6:FF'=-,:.-rNE LEALIAIwGr A-.fzr=A, PRONPOE-C) Z- 7.7' -7 41Y SF Z x 359"LP Y. = *.sic totx 1 00 5F NOTE 77HIS PLAN AAS OEEN Fe4151-T -TD 7-INCCPR POWE UNCAS AEAcr'HRiCT commvkrs WU 5191 go, -TEST F ITC, E rF SHAZJ. I ,3L DuffsAND \47NIESS's V BY 7NE PEAi.78 DSTRICT PRIDR -rO 15GUMCE OF A PSQMr mtxkrot,e Slope L�J Each Set of Trenches Ltv*l [BUTION SYSTEM PROPOSED ENGIN99RED SEPTIC SYSTEM 'DTON LOT 9 GLEN CRAG RSTATRS GLEN t1W PLACE MONTVILLE* CO*N. PREPAIM POR RICHARD AND CkItOL Valtoull MAY 1990 1", 30 I. I swkve-c'y1"& co1vsu47AA17.S' v5 67t'z:-/N0 0e, C;:1e0TON, C7-, C>6740 C:20.3) 44.5-'e;2-76 SCALL ey *At* CK0. TITLE 1-07- 9 GL A✓C RA 6- 4':57^7" S