HomeMy WebLinkAboutSite PlanE
IN
INV
HANDICAP i
I�
5' CONC.
WITH CO
CLA
14
Deciduous Shade Trees
FP Fraxir us Pennsylvanica "Marshalls Seedless" Marshalls Seedless Ash
Shrubs
JC Juniperus Conferta "Emerald Sea" Emerald Sea Shore Juniper
Rp Rhod. poukanensis 'Compacta' Compact Korean Azalea
Clethra Alnifolia Sweet Pepper Bush
2-2\" Cal. 2 1 5/27/08, Health I
No. Date
18-24" Spd. 3
2 gal. 8
16 gal. 40
Chesterfield
D
Pond
r
8G OD O I'�F
� T�yti O
PROJECT
SITE
LOCATION MAP
ZONNG COMPLIANCE CHART
ZONING DISTRICT: LI
Lake
r Kononmoe
�F
d �S�
ITEM
REQUIRED
PROPOSED
LOT AREA
80,000 S.F.
220,547.6 S.F.
LOT FRONTAGE
200 FT
240 FT
FRONT YARD SETBACK
50 FT
62 FT
SIDE YARD SETBACK
30 FT
32 FT.
REAR YARD SETBACK
30 FT.
FT,
BLDG HEIGHTS
50 FT
24. FT
PARKING SPACES
15
15
_PARKING REQUIREMENTS:
1,500 SF OFFICE ® 1 SPACE/250 SF
8,500 SF WAREHOUSE 0 1 SPACE/1000 SF =
TOTAL SPACES =
20' 0 20' W#
SCALE: 1 "=20'
6 SPACES
8.5 SPACES
15 SPACES
yi 1 'UN1 1 1`00$
U U L.
1!!C
A n9ineere Inc.
IVIL • STRUCTURAL SURVEYING
t. Comments 317 Main Street Norwich, Connecticut
Revision (860) 886-1966 Fax (880) 886-9165
Project No.
LOT 9 - LOMBARDI BUSINESS PARK CIA -4322
Proj. Engineer
315 BUTLERTOWNROAD DateE.M.B.
:
Montville, Connecticut MARCH 2008
Sheet No.
Lot Layout: Lot 9
P 4f
0
R o �
M IN� 0Q deo 4!�j O
0 0 0 Qd d Qo
4 MIN. DEPTH
og� " °R
2" STONE PS SNAO ,MVM
12, MSN
FILTER FABRIC
OVER STRIPPED GROUND
(TOPSOIL REMOVED)
CONSTRUCTION ENTRANCE
NOT TO SCALE
SHOULDER OR PAVEMENT 9"
PAVED SURFACE R=2"
IN PARKING AREA
2 1/2" BIT.I CONC.� 6„ r1" 45,
8"� GRAVEL BASE
BITUMINOUS CONCRETE
PAVEMENT & LIP CURBING
NOT TO SCALE
WIDTH AS REQUIRED
TOOLED JOINT
6"
R=1/4"
PAVEMENT FINISHED GRADE
FINISH GRADE
6" d a Id .7 . a 5" CONCRETE SIDEWALK
0
20" " 8" GRAVEL FILL
0 e
0' 0
10'
8" GRAVEL FILL
• ,' NOTE:
' MAXIMUM SPACING OF JOINTS 25 FT. - y;, :. ''' ' •' ,�• ^%��"
• • 8" JOINT SHALL CONSIST OF BITUMINOUS ��� ®-�
FILLER APPROVED BY THE ENGINEER. of L6w
CONCRETE SIDEWALK WITH CURBING DETAIL CHAINS LINK ENCLOSURE
•' VERTICAL SLATS '
12"
5'x10' CONCRETE SLAB
(PITCH 1 /4"/ft. TO REAR)
CHAIN LINK FENCE/DUMPSTER ENCLOSURE
NOT TO SCALE
3"
2
3 5/8-
FRONT ELEVATION
DOUBLE SWING GATE
TIE WIRES AT 12" CENTERS
1-5/8"
3/8" TRUSS
RODS (TYP.}�
TYPE "C" CATCH BASIN DETAIL
NOT TO SCALE
w of
RKRO01 01
01
0A 000 .40,10,400,
LE POUR
TO SLE
2" CRUSH STONE
F.
;'fie —•—a. • t t • �f�'�--TQC t tie . w t s�
•' � �,:� ,.&�•.:V •s y 7.•r;. ..� ,� �.•^' .. ;y•' �: tt a•. t} ,yi �• •• Fir.. •�^y.•a,. D. .y• -
�8" COMPACTED GROVEL BASE
STONE PARKING AREA DETAIL
NOT TO SCALE
.•a�� ���� i1��- --cif
••• !1 N •
x'0 s • �, ����
�7r� * fir,, f� • ! • : ��!��,.�� �������ir�� '
.414
CLA
2:1 SLOPE, GRAVEL FILTER
STONE CHECK DAM
NOT TO SCALE
1/4-0/4" STRETCHER
5 ( 5 _
r
SECTION EXPOSED
AGGREGATE
FINISH
i
FLAT LOW
1
INSTALL HANDICAPPED
PARKING SIGN (TYP.)
PAINTED _
LINES, 3"
WIDE (TYP-)
i
PAINTED UNIVERSAL
HANDICAP SYMBOL
4 HEIGHT &CENTERED i
10 5
TYPICAL HANDICAP PARKING SPACE
NOT TO SCALE
TAPERED CURB SECTION UNIFORM SLOPE
10% PITCH
NOTE:
ALL CONCRETE CURB RAMPS SHALL HAVE A EXPOSED AGGREGATE FINISH SURFACE
TO PROVIDE A DETECTABLE WARNING TEXTURE AS REQUIRED BY SECTION 4.27 OF
ANSI A117.1-1986.
CURB RAMP DETAIL
NOT TO SCALE
2"x2"x48" WOOD STAKE
FILTER FABRIC WITH
WOVEN WIRE FENCE,
INDUSTRIAL NETTING,
OR SNOW FENCE
FOR SUPPORT
COMPACTED BACKFILL
100• l�
FLOW
12" MIN.
NATIVE SOIL
SILT FENCE SECTION
NOT TO SCALE
20'
2'-6" IN PAVED
AREAS
RESERVED
THIS SIGN TYPICAL AT PARKING
ALL ACCESSIBLE PARKING
R7-8
SPACES
®
THIS SIGN TYPICAL AT
tD
CO
CO
M
12'x8'
M
WORDING AS REQUIRED
12'x9'
BY STATE OR LOCAL LAW
tj
"U"—CHANNEL
POST (2—lbs./ft.)
0 10"
0
0
`,
TOP OF FRAME
2 "
W/CONCRETE I!
u
0
M
2 "
OF CONCRETE I�
#4 BARS 4'-0" LG.
CROSS SLOPE AS
PER CROSS SECTION
t8"
1/2"
.�.. 2 13/16"
11 1/2"
3 13/16'
"
=•
"
PRECAST CONC. UNIT
(O.O.T. STANDARD)
12"
2'-2 3/8""
w
PRECAST CONC.o
MASONRY UNITS
OR PRECAST RISERS
2 13/16"
7 13/16"
POURED CONC. OR
•
PRECAST SUMP
'�.
to
8"
3' _0"
8,
4'-4"
SIDE ELEVATION
TYPE "C" CATCH BASIN DETAIL
NOT TO SCALE
w of
RKRO01 01
01
0A 000 .40,10,400,
LE POUR
TO SLE
2" CRUSH STONE
F.
;'fie —•—a. • t t • �f�'�--TQC t tie . w t s�
•' � �,:� ,.&�•.:V •s y 7.•r;. ..� ,� �.•^' .. ;y•' �: tt a•. t} ,yi �• •• Fir.. •�^y.•a,. D. .y• -
�8" COMPACTED GROVEL BASE
STONE PARKING AREA DETAIL
NOT TO SCALE
.•a�� ���� i1��- --cif
••• !1 N •
x'0 s • �, ����
�7r� * fir,, f� • ! • : ��!��,.�� �������ir�� '
.414
CLA
2:1 SLOPE, GRAVEL FILTER
STONE CHECK DAM
NOT TO SCALE
1/4-0/4" STRETCHER
5 ( 5 _
r
SECTION EXPOSED
AGGREGATE
FINISH
i
FLAT LOW
1
INSTALL HANDICAPPED
PARKING SIGN (TYP.)
PAINTED _
LINES, 3"
WIDE (TYP-)
i
PAINTED UNIVERSAL
HANDICAP SYMBOL
4 HEIGHT &CENTERED i
10 5
TYPICAL HANDICAP PARKING SPACE
NOT TO SCALE
TAPERED CURB SECTION UNIFORM SLOPE
10% PITCH
NOTE:
ALL CONCRETE CURB RAMPS SHALL HAVE A EXPOSED AGGREGATE FINISH SURFACE
TO PROVIDE A DETECTABLE WARNING TEXTURE AS REQUIRED BY SECTION 4.27 OF
ANSI A117.1-1986.
CURB RAMP DETAIL
NOT TO SCALE
2"x2"x48" WOOD STAKE
FILTER FABRIC WITH
WOVEN WIRE FENCE,
INDUSTRIAL NETTING,
OR SNOW FENCE
FOR SUPPORT
COMPACTED BACKFILL
100• l�
FLOW
12" MIN.
NATIVE SOIL
SILT FENCE SECTION
NOT TO SCALE
20'
2'-6" IN PAVED
AREAS
RESERVED
THIS SIGN TYPICAL AT PARKING
ALL ACCESSIBLE PARKING
R7-8
SPACES
®
THIS SIGN TYPICAL AT
ALL VAN ACCESSIBLE
PARKING SPACES
ACC1 SIME
12'x8'
PENALTY SIGN WITH
WORDING AS REQUIRED
12'x9'
BY STATE OR LOCAL LAW
"U"—CHANNEL
POST (2—lbs./ft.)
4" PIPE BOLLARD PAINTED
`,
TRAFFIC YELLOW, FILLED
5
W/CONCRETE I!
u
0
M
SLOPE TOP
OF CONCRETE I�
3500 P.S.I. e , ;
P.C. CONCRETE '' ;a.• 3' o
; L N
0. •
1 •-6" At
ACCESSIBLE PARKING SIGN
N.T.S.
ACCESSIBLE PARKING SIGN
NOT TO SCALE
71 Of
LUMINAIRE 150 WATT HIGH
PRESSURE BY MWC LIGHTING
SANTA ANA, CALIFORNIA OR
APPROVED EQUAL
4" SQUARE ALUMINUM POLE
BY MAIC LIGHTING
SANTA ANA, CALIFORNIA OR
APPROVED EQUAL
FINISHED GRADE
CONCRETE FOOTING AND BASE
�. w. ■ • •■ �■ • _.MDARD
REMOTE MOUNTED
SIMPLEX CONTROL
PANEL. TO BE INSTALLED
IN THE HOUSE JUNCTION BOX,
STRUCT. PLASTIC
24" OPENING IN CHAMBER
TOP. PROVIDE MANHOLE
EXTENSION RINGS
& COVER TO GRADE
FLOAT -
6" THK CONCRETE BRACKET
PUMP CHAMBER
.- 48" .
DIA.
1250 GAL. '.
SEPTIC TANK
(SEE DETAIL)
1 1 2" DIA. PVC_
EF LUENT HOSE
HIGH WATER "ALARM"
PUMP "ON" LEVEL --7
PUMP "OFF" LEVEL _
NOT TO SCALE
VA%JXTENSION
PUMP CHAMBER DETAIL
H-20 LOADING
NOT TO SCALE
NOTE
1. DUAL PUMPS MUST BE ALTERNATING
2. PUMP DOSE VOLUME TO BE 15 CF.
EROSION CONTROL 8 SEDIMENTATION NARRATIVE
1. PRIOR TO THE INSTALLATION OF ANY EROSION AND SEDIMENT CONTROL MEASURES,
THE OWNER AND CONTRACTOR SHALL MEET WITH THE TOWN OF MONTVILLE
WETLANDS OFFICER.
2. THE EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED PRIOR TO
SITE DISTURBANCE. ADDITIONAL EROSION & SEDIMENT CONTROL MEASURES SHALL
BE INSTALLED IF DETERMINED TO BE NECESSARY BY THE WETLANDS OFFICER.
3. THE CONTRACTOR SHALL CONTACT THE WETLANDS OFFICER FOR INSPECTION OF
THE SEDIMENT AND EROSION CONTROL MEASURES, PRIOR TO SITE DISTURBANCE.
CONSTRUCTION SHALL NOT BEGIN UNTIL SUCH TIME AS THE WETLANDS OFFICER
HAS REVIEWED AND APPROVED THE INSTALLATION OF THE SEDIMENTATION AND
EROSION CONTROL MEASURES.
4. CONTRACTOR TO INSPECT ALL EROSION AND SEDIMENT CONTROL MEASURES AT
LEAST WEEKLY AND AFTER EVERY STORM EVENT AND REPAIR AND MAINTAIN AS
NECESSARY.
5. CLEARING AND GRUBBING OF THE AREA TO BE GRADED. TOPSOIL TO BE REMOVED
AND STOCKPILED IN AN AREA AS SHOWN ON THE PLANS.
6. STAKED HAY BALE SILT BARRIERS OR SILT FENCE SHALL BE INSTALLED AROUND
ANY TEMPORARY STOCKPILE AREAS.
7. TOPSOIL SHALL BE RE-APPLIED TO PROVIDE A MINIMUM DEPTH OF FOUR INCHES.
8. ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED. ALL EROSION AND
SEDIMENTATION CONTROL MEASURES SHALL REMAIN IN PLACE UNTIL VEGETATION
IS RE-ESTABLISHED.
9. SEEDING SHOULD TAKE PLACE BETWEEN APRIL 1 AND JUNE 1 OR AUGUST 15 AND
OCTOBER 1.
10. THE FOLLOWING SEEDING MIXTURES SHALL BE PROVIDED ON ALL DISTURBED
AREAS:
KENTUCKY BLUE GRASS 20 LB's/AC
CREEPING RED FESCUE 20 LB's/AC
PERENNIAL RYEGRASS 5 LB's/AC
11. UNFORESEEN PROBLEMS WHICH ARE ENCOUNTERED IN THE FIELD SHALL BE SOLVED
ACCORDING TO CONNECTICUT GUIDELINES FOR SOIL EROSION AND SEDIMENT
CONTROL.
12. THERE IS A SMALL AMOUNT OF SEDIMENT PRESENT WHERE THE BUILDING ADDITION
IS PROPOSED, DUE TO VEHICLE RINSING. THE VEHICLE REPAIR WILL BE
ELIMINATED PRIOR TO THE CONSTRUCTION OF THE BUILDING ADDITION.
POLLUTION PREVENTION PLAN
1. POLLUTION PREVENTION TEAM
THE OWNERS WILL BE RESPONSIBLE FOR CARRYING OUT THE PROVISIONS
OF THIS PLAN.
2. SWEEPING
PARKING LOTS, SIDEWALKS AND OTHER IMPERVIOUS SURFACES SHALL BE
SWEPT CLEAN OF SAND AND LITTER AND ANY OTHER POLLUTANTS AT LEAST
TWICE A YEAR.
A. BETWEEN NOVEMBER 15 AND DECEMBER 15 (AFTER LEAF FALL)
B. DURING APRIL (AFTER SNOW MELT)
3. OUTSIDE STORAGE
ACCESSORIES OR EQUIPMENT STORED OUTSIDE SHALL BE COVERED OR
MAINTAINED TO MINIMIZE POSSIBILITY OF THESE MATERIALS OR THEIR
RESIDUE PASSING TO STORM WATER.
4. WASHING
NO WASHING VEHICLES OR EQUIPMENT IN PARKING AREAS.
5. SPILL OR ACCIDENTAL DISCHARGE
COMPLY WITH STATE AND FEDERAL REGULATIONS TO CONTAIN AND CLEAN UP
ANY SPILL OR DISCHARGE AND DISPOSE OF MATERIALS AT AN APPROVED FACILITY.
CONTACT CONNECTICUT DEP OIL AND CHEMICAL SPILL RESPONSE DIVISION
(860) 424-3338
IN THE EVENT A SPILL OCCURS THE FOLLOWING STEPS SHOULD BE
PERFORMED AS SOON AS POSSIBLE:
A. STOP THE SOURCE OF THE SPILL
B. CONTAIN THE SPILL
C. COVER SPILL WITH ABSORBENT MATERIAL SUCH AS KITTY LITER, SAWDUST
OR OIL ABSORBENT PADS. DO NOT USE STRAW.
D. DISPOSE OF ABSORBER IN ACCORDANCE WITH LOCAL AND STATE REGULATIONS.
6. BEST MANAGEMENT PRACTICES FOR FUTURE UPKEEP OF THE SITE WILL INCLUDE
NON -CHEMICAL LAWN CARE &MINIMAL USE OF FERTILIZERS, DE-ICING OR WINTER
OPERATIONS WITHOUT THE USE OF CALCIUM, AND NO EXTERIOR WASHING OF VEHICLES
OR DISCHARGING OF INTERIOR WASH WATER. THE WASH AREA WITHIN THE BUILDING
WILL HAVE A 100% RECYCLED SYSTEM WITH NO DISCHARGE.
6 1/2"
4WEEP HOLE TO BE
DRILLED IN THE BOTTOM LUMINAIRE 250 WATT HIGH
OF THE FORCEMAN
12'-0" PRESSURE BY MWC LIGHTING
SANTA ANA, CALIFORNIA OR
APPROVED EQUAL
BUILDING MOUNTED LIGHTING FIXTURE
NOT TO SCALE
GLA Engineers, Inc.
CIVIL STRUCTURAL SURVEYING
317 Main Street Norwich,
1 5/27/08 Health Dept. Comments Connecticut
No. Date Revision (860) 886-1966 Fax (860) 886-9165
Project No.
LOT 9 - LOMBARDI BUSINESS PARK CIA -4322
Proj. Engineer
E.M.B.
315 BUTLERTOWNREAD Date
Montville, Connecticut Sheeeet No 008
D@tells
Ln
d'
et
0
000
Z3
4+
410
14
CL
r—I
m
i i
dom
.... r r= iti• fit! r
"r
r
j gra t r
II / PROPOSED
III WELL
1 � /
P
POSE
P{MARS PTIS
I
/ PROPO EDmom
/ i r r r
1�
WELL
\ /
— --
mom
...... -- — / 1
Al
PROPOSED t '
PRIMARY SEPTIC i
I ( SYSTEM
:
y r.
11
/
..... .:.:.................................. r.......• .:,.: n.2 { „ ., . ., .... ........ ray �'>�•• �,..?•.:,; :
....... ... a.. .• �};i-Vii,•::.
r:
y
..... r. .......:.;.n::v..:....::::::: n............... .. ..... ::::::: vx ., •v,..,..: •�...,..'t�.Xr•RiJIZf., .. r .. : ,:. -\. J-1\-,. +-\, J.
... ..5: v::h.:................................:.........:fr F• nv:,.....r ... -., .. .. .. .:• T��. r\`9..: 't\ , \ a
.. ..... n, �.. x..v ........::: ::::v::::::::::.v•: ::n::..:. ....r r:::::: :•::::.•:V ...,...........n :,•s,;,;: ., .. .. �, :.,• :n: �Sv` �r :h.r
....... n. }.:::::::: w .........:............. r...... -.:..-.-.-f. •: •:?•rr:::::::: w:::: •.v, •:-. :•�.. .: , v , , .. .- i, :. ,�^-} '�5. 3� '�:+',^'.nV' r,. .,{'�•:.-tir"..y,.
v iv?
i^
q \ N
��•.;���
e
,A.
i...ry
♦
J
\:
..............:::::
•}:::::::::555::.......- ...v.:...:::::.?4i
I
r
\ 4
2�
♦ h
\
h /
T 3
h..
{
i
w
\
1j i•�V
\
4
I
o {_
N
x•
yr
1
,
Y �5:
N
}
Y
J±
J
/1
h.
t.
C.
.:4v )y \i •
i
:::4:5}-v-;::::.:::: 45:v:{•SY::ii:•i}?: :Y:.v. •::•:n:vr: ....: :: v
t.
/
♦' n
l Y`
a
"r
.....:::?.>:?o5i:::::•} •555:; 4i::. •r... •:: }-::: ..
.'
\ })
r'V, .
j
:. a..
a;
h.?
I •<f
.r
:..<:..;
•
co
T'V
\ ,N
.t: r•
:fir
Y.ti i
\v
:.S
»r-
.. ::::: :...:...'?{;r,-:::: :45:4;•5:,:4}?:•:
.,,vi: .♦,' ..\fix
x �•�
11
■
s t:'
.,i
\
� w
/
P •S.
s C
w
/
1
1
~'•Yv.
I
k
}y•rr.
.{:•}55x:: 4. 4........:::: ?..:
a`r °
`:rhe::•-: 4 ± �;Y • :..
'sl is • •,> '<--. F • 'k.,:, /
};555:..:.:....; •.. n'
u
1
1
..::.: .;.; :.::..}:•...::::.:.
......... ?4}: •;.:... ................. :..:: •.?:a;::::45}}55:•5::?:: ....y .,:4Y>q:••,:,5;:::::55;;>:: ^.,'
n„
:.�:::::. :: w::.v.� •::.: :.•:n....., v.:...::::i.•:4}x•};{.: T'?ri:?�.}: nv:.i{{v:;{v5;{?•}555:5: ..-. }•.., :.. .+!i:. -. \t
<\
Y
F 4 IY' k
/
:.v:.:::: r4.4:• :;vnv:::4}:{•:{;:::4ti{::::: •.v{4y":..5}i:
}
• x .
: 455:45:•551:::: vr.•.:v:::.. rn•:Fvn:: :':' ::::
{J;% .. n.. v:::,:;: ....• ?55:x:%iY:.:55:•};•}?• :::::• :��v:\.=• �_ �.
w:rvv:.:•:v.:::::•:4i:•i: {4vr.•.v::.:-5:5- .:. ..,•. ,±. .. Y,J, .\i TY .Vv\. :5:\r
vy
':�::: Y::�i .:4:;.v... ::::,v: n•::: nv;:nwrnv::: .....-...: ''.- .:. ..... 4:•: .... , :::: .r,
h
ti' -•c
::::.:....-+v: }: i5::;: v::: n:4::4: ii}:vi555:-is i::: �:?%vi :i ::ir•::�
}r .. 5.v:::.v::::::;::::4v::v: n.:::.::::.:..:.,ry:?::: r: i'?v'4'•5i 45}11`11'1 r5r:
1
/ r
t
I
--
amm
mow
1
t
"f
:1
r
`\
1
PROPOSED
PRIMARY SEPTIC
} SYSTEM
' ► 1
ffi
I
�11 PROPOSED
I I WELL \
1l 1 •
I 11
\I j
15.1
,
<
\ '
Chesterf I e l d
Davis
pond
ti�� � RNER
0 oti
A
z
F�To
PROJECT
SITE
LOCATION MAP
SCALE: ,•=, 000•
40 0 40 80
FE mom
MEMO
SCALE: 1"=40'
Lake
Konomos
ATF
A Engineers, Inc.
CIVIL ® STRUCTURAL • SURVEYING
1 5/27/op Health Dept. Comments 317 Main Street Norwich, Connecticut
(860) 886-1966 Fax (860) 886-9185
No. Date Revision
Project No.
LOT 9 - LOMBARDI BUSINESS PARK CLA-4322
Proj. Engineer
E.M.B.
315 BUTLERTOWN ROAD Date:
Montville, Connecticut MARCH 2008
Sheet No.
Lot Layout: Lot 9 Overall
INSTALL
i
i
EXIJT. CB
TF -230.4
INV.i227.8
PROVIDE
SILTF'ENCE
i
INV.=25.93
INV.=2 7.46
INV.=28.25
TF�23
INV. 22
PROVIDE
SILTFENCE��
I EX
TF
INV.
LOT 9
TEST HOLE DATA:
TEST HOLES RECORDED BY ROBERT RUSSO
DEPTH
ON APRIL 2004
PRESOAK AT
TH #9A
79" TOTAL DEPTH
12:46
0-6" Topsoil Dark brown fine sandy loam
90 GPD
6-27" Subsoil yellow brown sandy loam with silt
and
27-78" brown and gray sandy loam with silt and
stones mottles
NO BEDROCK
WATER 76"
- 17"
MOTTLING 0 27"
1:06
TH #9B
79" TOTAL DEPTH
1/2"
0-16" Topsoil Dark gray fine sandy loam
- 18"
16-27" Subsoil strong brown sandy loam with silt
and stones
27-79" Brown strong brown and gray sandy loam
with silt
and stones mottles
- 19"
NO BEDROCK
1:26
WATER 67"
1/2"
MOTTLING c 27"
- 19
TH #9C
73" TOTAL DEPTH
1:36
0-6" Topsoil Dark brown fine sandy loam
6-24 Subsoil strong brown sandy loam with
silt and stones
24-73" Brown strong brown and gray sandy loam with silt and
stones mottle
- 20
NO BEDROCK
USE LAST 30
WATER 67"
i
MOTTLING ® 24"
30 MIN / 1.5 IN = 20 MIN/IN
TH #9 D
88" TOTAL DEPTH
RATE =
0-5" Topsoil Dark brown fine sandy loam
5-24" Subsoil yellow brown sandy loam with silt and
stones
25-88" Brown and gray sandy loam with silt and
stones
NO BEDROCK
WATER 68"
MOTTLING 0 24"
PERC TEST DATA
TOTAL
DEPTH
- 24"
PRESOAK AT
10:55
12:46
- 13"
90 GPD
12:51
- 15"
18.5 EMPLOYEES X 35 GPD/EMPLOYEE
15:56
- 16"
1:01
- 17"
1:06
- 17
1/2"
1:11
- 18"
1:16
- 18
3/4"
1:21
- 19"
1:26
- 19
1/2"
1:31
- 19
3/4"
1:36
- 20"
1:41
- 20
1/4"
1:46
- 20
1/2"
USE LAST 30
MINUTES
FROM
1:16 TO 1:46 - 1.5" DROP
30 MIN / 1.5 IN = 20 MIN/IN
PERC
RATE =
10 TO 20 MIN/IN
DESIGN DATA
PRIMARY SYSTEM:
PERCOLATION RATE: 10 TO 20 MIN/IN
(20 MIN/IN)
900 SF OFFICE/200 SF/EMPLOYEE =
4.5 EMPLOYEES
4.5 EMPLOYEE X 20 GPD/EMPLOYEE =
90 GPD
9,250 WAREHOUSE/500 SF/EMPLOYEE
= 18.5 EMPLOYEES
18.5 EMPLOYEES X 35 GPD/EMPLOYEE
= 647.5 GPD
APPLICATION RATE: 1.2 GPD / SF
REQ. EFFECTIVE LEACHING AREA=(737.5 GPD)/(1.2 GPD/SF)=614.5 SF
USE A 12" CONC. GALLERY
EFFECTIVE LEACHING AREA OF TRENCH
= 5.9 SF/LF
LENGTH OF TRENCH REQUIRED=(614.5
SF)/(5.9 SF/LF)=104 LF
DEPTH TO RESTRICTIVE LAYER: 24"
SLOPE: 2.5%
HF=48 FF=2.5 PF=1.5
MLSS=(48)(2.5)(1.5)=180 LF
USE ONE ROW OF 188 LF
LEACHING AREA PROVIDED = 1,109 SF
RESERVE SYSTEM:
USE SAME DESIGN AS PRIMARY SYSTEM
4 3/4 of
INLET
WF 1-65 I
r
1 ..
1 WF#1-64
r / I 64 LF-12;/CO�C. GALLERY
�
ELEV. Y1.5 BOTTOM OF TRENCH
I
D -OX r±;
�IOVAN=232. 5 IN
y INV.OUT=2 2.0 OUT WF#1-63
PUMP CH MBER - H-20 LOADING
I TF=233.8
H D INV. =22 .5 IN 4" PVC
INV.=2 .8 OUT 2" PVC
SETTLING CHAMBER
INV.=32.7 IN -2" PVC
N y INV. 232.45 OUT -4" PVC CO
M
J
60 LF -12 CONC. GALLERY
ELEV. 231.5 BOTTOM OF
TRENCH
/
)2" FORCEMAIN - PVC /
ASTM D2241
PROVIDE 2" RIGID WF# 1-61
INSULATION /
1250 GAL SEPTIC TANK - H-20 LOADI't_
W/MANHOLE COVER TO GRADE - TF= 0
INV.IN=227.4
INV.OUT=227.15
D -BOX
INV.IN=232.05 IN
SEPTIC SYSTEM NOTES:
1. THE BUILDING, SYSTEM AND WELL ARE TO BE STAKED
BY A LICENSED SURVEYOR PRIOR TO THE START
OF CONSTRUCTION.
2. MANUFACTURER TO CERTIFY THE SEPTIC TANK WATERTIGHT.
3. A BENCHMARK IS TO BE SET, NOTED ON THE PLAN, AND PROVIDED
TO UNCAS HEALTH DISTRICT, PRIOR TO THE START OF CONSTRUCTION.
4. AFTER THE FILL IS PLACED AND COMPACTED, IT MUST BE
PERC TESTED PRIOR TO INSTALLATION OF THE SYSTEM.
5. PLANS FOR ALL RENTAL AREAS MUST BE REVIEWED AND APPROVED
BY UNCAS HEALTH DISTRICT.
6. THE WATER USAGE FOR THE FACILITY MUST BE MONITORED. THE WATER
METER READINGS MUST BE PROVIDED TO THE UNCAS HEALTH DISTRICT
ON A QUARTERLY BASIS. THE WELL WITHDRAWAL RATE MUST BE LIMITED
TO LESS THAN 10 GPM.
7. FINAL BUILDING PLANS MUST BE SUBMITTED TO THE UNCAS HEALTH
DISTRICT FOR REVIEW AND APPROVAL OF THE INTERNAL PLUMBING
COMPONENTS.
8. NO FOOTING DRAIN ARE PROPOSED.
9. PRIOR TO OBTAINING PERMIT FOR INSTALLATION OF SEPTIC SYSTEM, ADDITIONAL
TEST HOLES MUST BE DUG IN THE MIDDLE OF THE SYSTEM AND AT NORTH
END OF THE PRIMARY SYSTEM.
PROVIDE 24" COVERINLET TEE
0 _\ 0
TO GRADE
2" FORCE MAIN (TYP.)
INV.OUT +3
24»
A
6" 9„
4
INV.OUT=232.0 OUT yyF#1-60 � 4" OUTLET PIPE (NP.)
IMATCH D -BOX #1 INVERT
PRIMARY SEPTIC P /
l SYSTEMWF#1_591 2'�2' CONCRETE STRUCTURE
RESERVE SEPTIC � � I CONCRETE MINIMUM STRENGTH - 4,000 P.S.I. O 28 DAYS
h ,
SYSTEM I STEEL REINFORCEMENT -ASTM A-615-75, GRADE 60, 1" MIN. COVER
I PRECAST CONCRETE W/1-1-20 LOADING
wF#, -5$ �� � I SETTLING CHAMBER
64 LF -12" CONC. GALLERY
I NOT TO SCALE
ELEV. 231.5 BOTTOM OF
TRENCH
WF#1-57
PROVIDE
SILTPENCE / \�
WF#1-56 � I
-�-I �- 8" NP. 2 PLACES
a
N
TYP. 3 PLACES
PLAN VIEW
18"DIA.
COVER
CROSS SECTION VIEW
1,250 GALLON SEPTIC TANK
H-20 LOADING
NOT TO SCALE
OUTLET
4" L.P. P.V.C. PIPE SEAL
-i- OUTLET
OUTLET FILTER
DEVICE
12"
FILTER FABRIC PRECAST CONCRETE 4'x8'x2'
6" MIN. LEACHING GALLERY
COVER HS -20 LOADING
INVERT
lmffil?b�k
4' ON1
1 " DIAMETER
6CRUSHED STONE
12" CONCRETE LEACHING GALLERY TENCH
NOT TO SCALE
20' 0 20'
SCALE: 1 "=20'
CLA Engineers Inc.
CIVIL • STRUCTURAL • SURVEYING
1 5/27/08 Health Dept. Comments 317 Main Street Norwich, Connecticut
No. Date Revision (860) 888-1966 Fax (860) 886-9165
Project No.
LOT 9 - LOMBARDI BUSINESS PARK CIA -4322
Proj. Engineer
315 BUTLERTOWN ROAD DateE.M.B.
:
Montville Connecticut BCH 2008
, Sheet No.
Septic / Grading Plan