Loading...
HomeMy WebLinkAboutSite PlanPROPOSED TURF REINFORCEMENT GRAVEL STORAGE MAT (12'x LENGTH) DOWNSTREAM AREA OF LEVEL SPREADER �-�-- — 2.0' ,S a.N :. •�a: �..t': ::,.,�,:a.,,:t. • � : ♦., � L L— L_ L_ L_ L— L_ L_ L_ LL L ��_ �a.. •,sem •� r,• .;,.+s..t.:a.�.•»:.: :% �• • \ • L_ L- L_ DIRECTIONL- OF FLJOIU w«... •+ • • _ ..• A'. _ L_ L— L- L_ L_ L, L_ L_ L_ Q as ,,*,. Y� •.►J 1,•,a� i=„: '• •• ,•••a, ...��: : a •,t ,_+a - y f :• :.•� - �.l :....• LLLLLLLL L_ L— L— L_ L L� L_ _ •�.. L- L_ L_ L_ L L_ L_ L� LLLLL LL PROPOSED WOVEN PROPOSED LEVEL LIP OF GEOTEXTILE UNDER STONE SPREADER - UNIFORM HEIGH & ZERO GRADE OVER LENGTF 0%_ 33% r-"11- 4% T ---j 2.0' 25.0' PROPOSED GRADING OR EXISTING (VARIE) — — 31 .a . ,J•.y.,.y, Bt _.9 •,� '► .j ata r.� � • t• • PROPOSED 1/4” CRUSHED STONE 12" ---'PROPOSED WOVEN THICK x LENGTH GEOTEXTILE UNDER STONE ELEVATION VIEW LEVEL SPREADER DETAIL SCALE: 1"=1' POST -CONSTRUCTION REQUIREMENTS NOTE AFTER CONSTRUCTION IS COMPLETED AND ACCEPTED BY THE OWNER, IT SHALL BE THE RESPONSIBILITY OF THE OWNER TO MAINTAIN ALL DRAINAGE STRUCTURES. IN ADDITION, THE FOLLOWING INSPECTION AND MAINTENANCE GUIDELINES SHALL BE THE RESPONSIBILTY OF THE OWNER, BEGINNING THE FIRST YEAR PERIOD FOLLOWING CONSTRUCTION COMPLETION AND ACCEPTANCE, AND SHALL BE FOLLOWED EACH YEAR THEREAFTER: 1. DRAINAGE AND OTHER PAVED AREAS: INSPECT ON A REGULAR BASIS NOT TO EXCEED WEEKLY FOR LITTER AND DEBRIS. 01000, 00000, s � Y rj - .. z�-., z y.-3 288 Btu r CI jti CD / DONOVAN C. AINNA LEE i'Q /F /0 f / Ad / M �BUTLERT= VN'; I2i�z ELK RANCH LLC ' 1000'e �`� 4 LI LIGHT INDUSTRIAL ZONING REQUIREMENTS TABLE SE ON REGULATION LI REQUIREMENTS EXISTING PROPOSED ] 4 MINIMUM LOT SIZE 80,000 SF 3341142 SF 334,142 SF 1 MINIMUM LOT FRONTAGE 200' 400.21' 400.21' 1 MINIMUM FRONT YARD 50' NA 54.6' 16 MINIMUM SIDSi RD 30' NA 74.9, 285.1 MINIMUM REAR , • RD 50'T0 RESIDENTM NA 30' TO COMMERCL OR INDUSTRIAL 387.0' J7 1 MAXIMUM Rj!!"G HEIGHT 50NA >50' GRAPHIC SCALE 40 0 20 40 So ( IN FEET ) 1 inch = 40 ft. DATE REVISION 5/24/2017 REV 1: Conditions Of Approval 160 M13L: 1/14/'6 tip 1/14/5 DEED: VOLUME 587 PAGE 769 AREA: 334,:142 SF = 7.67 AC FLOOD ZONE: ZONE X PER FIRM MAP # 0901iC0337G EFFECTIVE DATE: JULY 18, 20i Office: (860) 536-7390 Fax: (860) 536-1644 LL SITE PLAN J U L 3 1 2 0 1 L..� PREPARED FOR ERIC LOMBARDI 240 & 252 BUTLERTOWN RQAD OAKDALE, CONNECTICUT X 1231 �Ii - - - - ` FNS 9 t �k - i : . 18859 V. GREGG T. FEDUS P.E. hiN, P� vFREE CT. LICENSE NO. 21231 -n TLE: LAND S0 bV CT o. 18859 i � I GERWIPv — MEREEN L.L.C. 4 `a • 17 INDUSTRIAL DRIVE P.O. BOX 539 w y WATERFORD, CONNECTICUT 06385 " TEL. (860)442-2201 FAX. (860)442-2205 _ C� SCALE: V = 40' SHEET 1 OF 2 Nre., \ ,9W 914. DATE: MAY 4, 2017 JOB NO. 15-064 X 1231 �Ii - - - - ` FNS 9 t �k - i : . 18859 V. GREGG T. FEDUS P.E. hiN, P� vFREE CT. LICENSE NO. 21231 -n TLE: LAND S0 bV CT o. 18859 i � I GERWIPv — MEREEN L.L.C. 4 `a • 17 INDUSTRIAL DRIVE P.O. BOX 539 w y WATERFORD, CONNECTICUT 06385 " TEL. (860)442-2201 FAX. (860)442-2205 _ C� 1. PURPOSE ALL CONSTRUCTION ACTIVITIES INVOLVING THE REMOVAL OR DISTURBANCE OF SOILS ARE TO BE PROVIDED WITH APPROPRIATE PROTECTIVE MEASURES TO MINIMIZE EROSION AND CONTAIN SEDIMENT DISPOSITION WITHIN THE AREA UNDER DEVELOPMENT. THE MINIMUM STANDARD FOR INDIVIDUAL MEASURES SHALL BE THOSE OUTLINED IN THE 'CONNECTICUT C;UIDELINES FOR SOIL EROSION AND SEDIMENT CONTROL 2002 EDITION AS AMENDED TO DATE. THOSE METHODS DEEMED MOST EFFECTIVE FOR THIS PROJECT ARE DESCRIBED HEREIN. 2. INSTALLATION REQUIREMENTS A. OTHER THAN CONSTRUCTION SPECIFICALLY SHOWN ON THESE APPROVED PLANS, NO ACTIVITIES SHALL BE CONDUCTED WITHIN DESIGNATED WETLAND AREAS, WATERCOURSES, FLOOD PLAINS OR WITHIN CHANNEL ENCROACHMENT LINES WITHOUT THE PRIOR APPROVAL OF THE TOWN PLANNING AND ZONING COMMISSION AND INLAND WETLANDS COMMISSION. B. WHERE FEASIBLE, NATURAL VEGETATION SHALL BE RETAINED AND PROTECTED. C. ONLY THE SMALLEST PRACTICAL AREA OF LAND SHALL BE EXPOSED AT ANY ONE TIME DURING CONSTRUCTION. U. PRIOR TO THE START OF CONSTRUCTION, TEMPORARY BALED HAY EROSION CHECKS, SEDIMENTATION FENCES AND OTHER APPROVED SEDIMENT CONTROL MEASURES SHALL BE IN PLACE WHERE SHOWN ON THESE PLANS AND AT OTHER LOCATIONS WHERE DEEMED NECESSARY. E. WHEN LAND IS EXPOSED DURING DEVELOPMENT, THE PERIOD OF EXPOSURE SHALL BE KEPT TO A MINIMUM, INSTALLING PERMANENT AND FINAL VEGETATION, STRUCTURES, ETC. AT THE EARLIEST POSSIBLE OPPORTUNITY. F. CONSTRUCTION EQUIPMENT SHALL NOT UNNECESSARILY CROSS LIVE STREAMS EXCEPT BY MEANS OF BRIDGES, CULVERTS OR OTHER APPROVED MEANS. G. ALL TEMPORARY EROSION AND SEDIMENT CONTROLS SHALL REMAIN IN PLACE AND BE MAINTAINED REGULARLY IN PROPER FUNCTIONING CONDITION, UNTIL ALL AREAS EXPOSED DURING SITE CONSTRUCTION HAVE BEEN SUITABLY STABILIZED WITH PAVEMENT, PERMANENT STRUCTURES AND/OR FINAL VEGETATIVE COVER. H. ADEQUATE PROVISIONS SHALL BE MADE TO PREVENT SURFACE WATER FROM DAMAGING THE CUT FACE OF EXCAVATIONS OR THE SLOPING SURFACES OF FILLS. I. FILL SHALL BE PLACED AND COMPACTED SO AS TO MINIMIZE SLIDING OR EROSION OF THE SOIL. ANGLE FIRST STAKE INTO ADJACENT BALE AND SECURE WITH SECOND STAKE HAY BALES TIGHTLY STACKED CR OFFSET CORNERS AS SHOWN WOOD STAKES OR METAL REBAR 4" MINIUMUM I As require 2°' STONE FILTER FABRIC ANTI -TRACKING PAD NOT TO SCALE HAY E STEP 1 SET POSTS AND EXCAVATE A 6"x6" TRENCH. SET POSTS DOWNSLOPE. STEP 2 STAPLE THE WIRE MESH FENCING TO END POSTS. FILTER FABRIC -j COMPACTED BACKFILL STEP 3 STEP 4 ATTACH FILTER FABRIC TO THE WIRE FENCING BACKFILL THE TRENCH AND COMPACT THE AND EXTEND IT TO THE TRENCH. EXCAVATED SOIL SILT FENCE DETAIL NOT TO SCALE FLOOD ZONE: ZONE X PER FIRM MAP # 09011C0337G EFFECTIVE DATE: JULY 18, 2011 GRAPHIC SCALE 40 0 20 40 80 ( IN FEET ) 1 inch = 40 ft. DATE REVISION''` .�� ¢Ci 6G T�A� X5/24/2017 REV 1: Conditions Of Approval g v, �` NO. 21231 'POENISO , J0 a At1381191120% GREGG T. FEDUS P.E. CT. LICENSE NO. 21231 Iso I t6ISftl,t EROSION CONTROL PLAN I�j 31 PREPARED FOR By ERIC LOMBARDI 240 & 252 BUTLERTOWN ROAD OAKDALE, CONNECTICUT SCALE: 1" = 40' SHEET 2 OF 2 DATE: MAY 41) 2017 JOB NO. 15-064 Fl `I N 88 Ivy JOF I ll?gs t1EkEN TITLE: LAND SURVEYOR CT No. 18859 GER WICK - MEREEN L.L.C. 17 INDUSTRIAL DRIVE P.O. BOX 539 WATERFORD, CONNECTICUT 06385 TEL. (860)442-2201 FAX. (860)442-2205 SOIL EROSIC SOIL. EROSION AND SEDIMENT CONTROL PLAN NARRATIVE ALL ADJACENT I THE SITE CONTRACTOR MUST FOLLOW ALL GUIDELINES SET FORTH IN THE MANUAL ENTITLED "2002 CONNECTICUT GUIDELINES FOR EROSION AND S SOIL EROSION AND SEDIMENT CONTROL" PUBLISHED BY THE CONNECTICUT COUNCIL ON SOIL AND WATER CONSERVATION IN COOPERATION WITH THE CONNECTICUT DEPARTMENT OF ENVIRONMENTAL PROTECTION. THIS MANUAL IS ALSO KNOWN AS DEP ALL CONSTRUC IN ADDITION THTE SITE CONTRACTOR MUST FOLLOW TOWN OF MONTVILLE ZONING AND SUBDIVISION REGULATIONS, MONITORED, Mi BULLETIN 34. TOWN EMERGRNCY STANDARDS AND SPECIFICATIONS, CTDOT FORM 816 WHERE APPLICABLE. 50% OF THE ST E & S CONTROL'. PROJECT DESCRIPTION ADDITIONAL ER THE APPLICANT PROPOSES TO USE THE SITE AS OUTDOOR STORAGE AREA AND PROPOSED FUTURE 50'x 100' BUILDING WITH A 5' WALK CONTRACTOR. - AND PARKING. SEDIMENT CON EROSION AND SEDIMENT CONTROLS SHALL BE INSTALLED PRIOR TO CONSTRUCTION ACTIVITIES. E & S CONTROLS SHALL BE REMOVAL AND I ALL AND REPAIRED OR REPLACED AS NEEDED THROUGHOUT THE CONSTRUCTION DURATION. ALL E & S CONTROLS SHALL BE ALL EROSION Al MAINTAINED REMOVED AND PROPERLY DISPOSED OF AS SOON AS THE SITE IS COMPLETELY STABILIZED. REPAIRED OR RI ALL ACCUMULAI CONSTRUCTION SEQUENCE THAT ARE NOT 1. SCHEDULE PRE -CONSTRUCTION MEETING WITH OWNER, CONTRACTOR, ENGINEER AND APPLICABLE 'TOWN STAFF'. THE PERMITTEE 2. LAND SURVEYOR SHALL MARK OUT CLEARING LIMITS AND 50' WETLANDS BUFFER. WETLANDS PER PREVENT POLLL 3. INSTALL EROSION AND SEDIMENT CONTROL MEASURES. OF ANY PROBLE THE AUTHORIZI 4. CLEAR AND GRUB WITHIN CLEARING LIMITS. THE RESPONSI THIS PROJECT 5. STOCKPILE TOPSOIL FOR RE -USE. TOWN AS S001 6. ROUGH GRADE SITE TO SUB GRADE. VEGETATIVE Tl SCARIFY ALL Al 7, CONSTRUCT STORMWATER BASIN. GRASS SEED, L 8. CONSTRUCT SWALE ALONG NORTHERN BOUNDARY. PERMANENT SE CREEPING RE 9. FINISH GRADE ALONG SOUTHERN BOUNDARY. REDTOP TALL FESCUE 10. LOAM, SEED & MULCH AREAS AS DESCRIBED IN 7, 8 & 9 OF SEQUENCE. TOTAL 11. TRUCK IN GRAVEL FOR STORAGE AREA. GRADE AND COMPACT FROM BASIN (WEST TO EAST) TO BUTLERTOWN ROAD. FERTILIZER: 10-10-10 APF 12. INSTALL CHAINLINK FENCE. LIMESTONE: APPLY AT 15 13. PAVE DRIVEWAY APRONS, MULCHING: SPREAD HAY LAND DISTURBANCE TARGET FOR 1. ALL EXISTING VEGETATION OUTSIDE OF THE CLEARING LIMITS SHALL BE PROTECTED. EXISTING VEGETATION SHALL BE REMOVED ONLY IN AREAS NECESSARY FOR SITE CONSTRUCTION ACTIVITIES. ANY ADDITIONAL CLEARING OUTSIDE OF THE PROPOSED SEEDING DATE CLEARING LIMITS SHALL BE APPROVED BY TOWN STAFF PRIOR TO CLEARING, AS APPLICABLE. SEEDING DA SEED GERMI 2. ALL AREAS SHAM REMAIN UNDISTURBED UNTIL IMMEDIATELY PRIOR TO SITE DEVELOPMENT. GERMINATIC 3. ALL CONSTRUCTION EQUIPMENT, MATERIALS AND STOCKPILES SHALL NOT BE PLACED OUTSIDE OF THE DISTURBED AREAS. 0 PROTECT 4. THE DEVELOPER SHALL BE RESPONSIBLE FOR THE CLEANING OF ANY NEARBY STREETS, AS ORDERED BY THE TOWN BECOMES WI OR STATE, OF ANY SOIL OR DEBRIS FROM THE SITE CONSTRUCTION ACTIVITIES. 5. ALL TREES, BRUSH, STUMPS, WOOD CHIPS OR OTHER ORGANIC MATTER SHALL BE DISPOSED OF PROPERLY OFF-SITE. WOOD CHIPS MAY BE USED AS A SILTATION BARRIER DURING CONSTRUCTION AND SPREAD AFTER SITE IS STABILIZED. NO ORGANIC MATTER INCLUDING TREES, BRUSH AND STUMPS SHALL BE BURIED ON-SITE. STRIPPING AND STOCKPILING ALL STOCKPILES THAT CONSIST OF ERODIBLE MATERIALS SHALL BE LOCATED WITHIN AREAS AS SHOWN ON THE SITE PLAN AND SURROUNDED BY A SILTATION BARRIER. ANY STOCKPILE THAT WILL REMAIN UNDISTURBED FOR A PERIOD LONGER THAN 30 DAYS SHALL BE SEEDED WITH A TEMPORARY GRASS SEED MIXTURE TO PREVENT EXCESSIVE EROSION AND SEDIMENTATION. TRENCH EXCAVATION AND BACKFILL THE CONTRACTOR SHALL PROPERLY MAINTAIN ALL BACKFILLED EXCAVATIONS. ANY DEPRESSIONS DUE TO SETTLING IN THESE AREAS SHALL BE FILLED AND RESEEDED AS NECESSARY. THE WIDTH OF ALL EXCAVATED TRENCHES SHALL BE KEPT AS NARROW AS PRACTICABLE TO ACCOMMODATE THE WORK. ALL MATERIALS EXCAVATED FROM TRENCHES SHALL BE STOCKPILED AND USED AS TRENCH BACKFILL MATERIAL UNLESS IT IS DETERMINED TO BE UNSUITABLE BY THE ENGINEER. EXCESS MATERIALS SHALL BE PROPERLY DISPOSED OF BY THE CONTRACTOR. EROSION CONTROL 1. PURPOSE ALL CONSTRUCTION ACTIVITIES INVOLVING THE REMOVAL OR DISTURBANCE OF SOILS ARE TO BE PROVIDED WITH APPROPRIATE PROTECTIVE MEASURES TO MINIMIZE EROSION AND CONTAIN SEDIMENT DISPOSITION WITHIN THE AREA UNDER DEVELOPMENT. THE MINIMUM STANDARD FOR INDIVIDUAL MEASURES SHALL BE THOSE OUTLINED IN THE 'CONNECTICUT C;UIDELINES FOR SOIL EROSION AND SEDIMENT CONTROL 2002 EDITION AS AMENDED TO DATE. THOSE METHODS DEEMED MOST EFFECTIVE FOR THIS PROJECT ARE DESCRIBED HEREIN. 2. INSTALLATION REQUIREMENTS A. OTHER THAN CONSTRUCTION SPECIFICALLY SHOWN ON THESE APPROVED PLANS, NO ACTIVITIES SHALL BE CONDUCTED WITHIN DESIGNATED WETLAND AREAS, WATERCOURSES, FLOOD PLAINS OR WITHIN CHANNEL ENCROACHMENT LINES WITHOUT THE PRIOR APPROVAL OF THE TOWN PLANNING AND ZONING COMMISSION AND INLAND WETLANDS COMMISSION. B. WHERE FEASIBLE, NATURAL VEGETATION SHALL BE RETAINED AND PROTECTED. C. ONLY THE SMALLEST PRACTICAL AREA OF LAND SHALL BE EXPOSED AT ANY ONE TIME DURING CONSTRUCTION. U. PRIOR TO THE START OF CONSTRUCTION, TEMPORARY BALED HAY EROSION CHECKS, SEDIMENTATION FENCES AND OTHER APPROVED SEDIMENT CONTROL MEASURES SHALL BE IN PLACE WHERE SHOWN ON THESE PLANS AND AT OTHER LOCATIONS WHERE DEEMED NECESSARY. E. WHEN LAND IS EXPOSED DURING DEVELOPMENT, THE PERIOD OF EXPOSURE SHALL BE KEPT TO A MINIMUM, INSTALLING PERMANENT AND FINAL VEGETATION, STRUCTURES, ETC. AT THE EARLIEST POSSIBLE OPPORTUNITY. F. CONSTRUCTION EQUIPMENT SHALL NOT UNNECESSARILY CROSS LIVE STREAMS EXCEPT BY MEANS OF BRIDGES, CULVERTS OR OTHER APPROVED MEANS. G. ALL TEMPORARY EROSION AND SEDIMENT CONTROLS SHALL REMAIN IN PLACE AND BE MAINTAINED REGULARLY IN PROPER FUNCTIONING CONDITION, UNTIL ALL AREAS EXPOSED DURING SITE CONSTRUCTION HAVE BEEN SUITABLY STABILIZED WITH PAVEMENT, PERMANENT STRUCTURES AND/OR FINAL VEGETATIVE COVER. H. ADEQUATE PROVISIONS SHALL BE MADE TO PREVENT SURFACE WATER FROM DAMAGING THE CUT FACE OF EXCAVATIONS OR THE SLOPING SURFACES OF FILLS. I. FILL SHALL BE PLACED AND COMPACTED SO AS TO MINIMIZE SLIDING OR EROSION OF THE SOIL. ANGLE FIRST STAKE INTO ADJACENT BALE AND SECURE WITH SECOND STAKE HAY BALES TIGHTLY STACKED CR OFFSET CORNERS AS SHOWN WOOD STAKES OR METAL REBAR 4" MINIUMUM I As require 2°' STONE FILTER FABRIC ANTI -TRACKING PAD NOT TO SCALE HAY E STEP 1 SET POSTS AND EXCAVATE A 6"x6" TRENCH. SET POSTS DOWNSLOPE. STEP 2 STAPLE THE WIRE MESH FENCING TO END POSTS. FILTER FABRIC -j COMPACTED BACKFILL STEP 3 STEP 4 ATTACH FILTER FABRIC TO THE WIRE FENCING BACKFILL THE TRENCH AND COMPACT THE AND EXTEND IT TO THE TRENCH. EXCAVATED SOIL SILT FENCE DETAIL NOT TO SCALE FLOOD ZONE: ZONE X PER FIRM MAP # 09011C0337G EFFECTIVE DATE: JULY 18, 2011 GRAPHIC SCALE 40 0 20 40 80 ( IN FEET ) 1 inch = 40 ft. DATE REVISION''` .�� ¢Ci 6G T�A� X5/24/2017 REV 1: Conditions Of Approval g v, �` NO. 21231 'POENISO , J0 a At1381191120% GREGG T. FEDUS P.E. CT. LICENSE NO. 21231 Iso I t6ISftl,t EROSION CONTROL PLAN I�j 31 PREPARED FOR By ERIC LOMBARDI 240 & 252 BUTLERTOWN ROAD OAKDALE, CONNECTICUT SCALE: 1" = 40' SHEET 2 OF 2 DATE: MAY 41) 2017 JOB NO. 15-064 Fl `I N 88 Ivy JOF I ll?gs t1EkEN TITLE: LAND SURVEYOR CT No. 18859 GER WICK - MEREEN L.L.C. 17 INDUSTRIAL DRIVE P.O. BOX 539 WATERFORD, CONNECTICUT 06385 TEL. (860)442-2201 FAX. (860)442-2205