Loading...
HomeMy WebLinkAboutSite PlanL Y E 0 J O i r r-1 Q1 3 E 0 J Q0 e--I O r- U W 0 a 1. PURPOSE ALL CONSTRUCTION ACTIVITIES INVOLVING THE REMOVAL OR DISTURBANCE OF SOILS ARE TO BE PROVIDED WITH APPROPRIATE PROTECTIVE MEASURES TO MINIMIZE EROSION AND CONTAIN SEDIMENT DISPOSITION WITHIN THE AREA UNDER DEVELOPMENT. THE MINIMUM STANDARD FOR INDIVIDUAL MEASURES SHALL BE THOSE OUTLINED IN THE'CONNECTICUT GUIDELINES FOR SOIL €ROSION AND SEDIMENT CONTROL 2002 EDITION AS AMENDED TO DATE. THOSE METHODS DEEMED MOST EFFECTIVE FOR THIS PROJECT ARE DESCRIBED HEREIN. 2. INSTALLATION REQUIREMENTS A. OTHER THAN CONSTRUCTION SPECIFICALLY SHOWN ON THESE APPROVED PLANS, NO ACTIVITIES SHALL BE CONDUCTED WITHIN DESIGNATED WETLAND AREAS, WATERCOURSES, FLOOD PLAINS OR WITHIN CHANNEL ENCROACHMENT LINES WITHOUT THE PRIOR APPROVAL OF THE TOWN PLANNING AND ZONING COMMISSION AND INLAND WETLANDS COMMISSION. B. WHERE FEASIBLE, NATURAL VEGETATION SHALL BE RETAINED AND PROTECTED. C. ONLY THE SMALLEST PRACTICAL AREA OF LAND SHALL BE EXPOSED AT ANY ONE TIME DURING CONSTRUCTION. D. PRIOR TO THE START OF CONSTRUCTION, TEMPORARY BALED HAY EROSION CHECKS, SEDIMENTATION FENCES AND OTHER APPROVED SEDIMENT CONTROL MEASURES SHALL BE IN PLACE WHERE SHOWN ON THESE PLANS AND AT OTHER LOCATIONS WHERE DEEMED NECESSARY. E. WHEN LAND IS EXPOSED DURING DEVELOPMENT, THE PERIOD OF EXPOSURE SHALL BE KEPT TO A MINIMUM, INSTALLING PERMANENT AND FINAL VEGETATION, STRUCTURES, ETC. AT THE EARLIEST POSSIBLE OPPORTUNITY. F. CONSTRUCTION EQUIPMENT SHALL NOT UNNECESSARILY CROSS LIVE STREAMS EXCEPT BY MEANS OF BRIDGES, CULVERTS OR OTHER APPROVED MEANS. G. ALL TEMPORARY EROSION AND SEDIMENT CONTROLS SHALL REMAIN IN PLACE AND BE MAINTAINED REGULARLY TN PROPER FUNCTIONING CONDITION, UNTIL ALL AREAS EXPOSED DURING SITE CONSTRUCTION HAVE BEEN SUITABLY STABILIZED WITH PAVEMENT, PERMANENT STRUCTURES AND/OR FINAL VEGETATIVE COVER. H. ADEQUATE PROVISIONS SHALL BE MADE TO PREVENT SURFACE WATER FROM DAMAGING THE CUT FACE OF EXCAVATIONS OR THE SLOPING SURFACES OF FILLS. I. FILL SHALL BE PLACED AND COMPACTED SO AS TO MINIMIZE SLIDING OR EROSION OF THE SOIL. ANGLE FIRST STAKE INTO ADJACENT BALE AND SECURE WITH SECOND STAKE HAY BALES TIGHTLY STACKED OR OFFSET CORNERS AS SHOWN WOOD STAKES OR METAL REBAR HAY E STEP 1 SET POSTS AND EXCAVATE A 6"x6" TRENCH. SET POSTS DOWNSLOPE. FILTER F STEP 2 STAPLE THE WIRE MESH FENCING TO END POSTS. COMPACTED BACKFILL STEP 3 STEP 4 ATTACH FILTER FABRIC TO THE WIRE FENCING BACKFILL THE TRENCH AND COMPACT THE AND EXTEND IT TO THE TRENCH. EXCAVATED SOIL. SILT FENCE DETAIL NOT TO SCALE 1 CVVV LVIYC. LVIrC /% I -L -I% 11N-1 1 -UW V7V11WJJ/ V EROSION CONTROL PLAN EFFECTIVE DATE: JULY , 2011 PREPARED FOR ERIC LOMBARDI GRAPHIC SCALE 240 & 252 BUTLERTOWN ROAD 40 0 20 40 so 160 OAKDALE, CONNECTICUT ( IN FEET ) SCALE: 1" = 40' SHEET 2 OF 2 1 inch = 40 ft DATE: MAY 4, 2017 JOB NO. 15-064 SOIL EROSION AND SEDIMENT CONTROLSALL SOIL EROSION AND SEDIMENT CONTROL PLAN NARRATIVE ADJACENT PROPERTIES AND RECEIVING WATERCOURSES AND / OR WETLAND AREAS SHALL BE ADEQUATELY PROTECTED FROM SOIL THE SITE CONTRACTOR MUST FOLLOW ALL GUIDELINES SET FORTH IN THE MANUAL ENTITLED "2002 CONNECTICUT GUIDELINES FOR EROSION AND SEDIMENTATION BOTH DURING AND AFTER CONSTRUCTION. SOIL EROSION AND SEDIMENT CONTROL" PUBLISHED BY THE CONNECTICUT COUNCIL ON SOIL AND WATER CONSERVATION IN COOPERATION WITH THE CONNECTICUT DEPARTMENT OF ENVIRONMENTAL PROTECTION. THIS MANUAL IS ALSO KNOWN AS DEP ALL CONSTRUCTION SITE RUNOFF SHALL BE ROUTED INTERNALLY TO STORMWATER MANAGMENT AREA. SEDIMENT SHALL BE BULLETIN 34. IN ADDITION THTE SITE CONTRACTOR MUST FOLLOW TOWN OF MONTVILLE ZONING AND SUBDMSION REGULATIONS, MONITORED, MAINTAINED AND REMOVED AFTER EACH STORM EVENT IN EXCESS OF 1" OF RAINFALL OR WHEN THE CAPACITY EXCEEDS 50% OF THE STORAGE VOLUME. EROSION AND SEDIMENT CONTROLS SHALL BE INSPECTED WEEKLY AND AFTER ALL RAINFALL EVENTS. TOWN EMERGRNCY STANDARDS AND SPECIFICATIONS, CTDOT FORM 816 WHERE APPLICABLE. E & S CONTROLS SHALL BE REPAIRED OR REPLACED AS NECESSARY WITHIN 24 HOURS THROUGHOUT THE CONSTRUCTION DURATION. PROJECT DESCRIPTION ADDITIONAL EROSION AND SEDIMENT CONTROLS MAY BE REQUIRED BY THE TOWN AND SHALL BE INSTALLED AND MAINTAINED BY THE THE APPLICANT PROPOSES TO USE THE SITE AS OUTDOOR STORAGE AREA AND PROPOSED FUTURE 50' x 100' BUILDING WITH A 5' WALK CONTRACTOR. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER INSTALLATION AND MAINTENANCE OF ALL EROSION AND AND PARKING. SEDIMENT CONTROLS BEFORE, DURING AND AFTER CONSTRUCTION. THE CONTRACTOR IS ALSO RESPONSIBLE FOR THE PROPER ALL EROSION AND SEDIMENT CONTROLS SHALL BE INSTALLED PRIOR TO CONSTRUCTION ACTIVITIES. E & S CONTROLS SHALL BE REMOVAL AND DISPOSAL OF ALL EROSION AND SEDIMENT CONTROLS ONCE THE SITE IS COMPLETELY STABILIZED. ALL EROSION AND SEDIMENT CONTROLS SHALL BE INSPECTED WEEKLY AND AFTER ALL RAINFALL EVENTS. E & S CONTROLS SHALL BE MAINTAINED AND REPAIRED OR REPLACED AS NEEDED THROUGHOUT THE CONSTRUCTION DURATION. ALL E & S CONTROLS SHALL BE REPAIRED OR REPLACED AS NECESSARY WITHIN 24 HOURS THROUGHOUT THE CONSTRUCTION DURATION. REMOVED AND PROPERLY DISPOSED OF AS SOON AS THE SITE IS COMPLETELY STABILIZED. ALL ACCUMULATED SEDIMENTS AT ALL EROSION AND SEDIMENT CONTROLS SHALL BE PERIODICALLY REMOVED AND SPREAD IN AREAS CONSTRUCTION SEQUENCE THAT ARE NOT SUBJECT TO EROSION. 1. SCHEDULE PRE -CONSTRUCTION MEETING WITH OWNER, CONTRACTOR, ENGINEER AND APPLICABLE TOWN STAFF. THE PERMITTEE SHALL EMPLOY BEST MANAGEMENT PRACTICES, CONSISTENT WITH THE TERMS AND CONDITIONS OF THE INLAND 2. LAND SURVEYOR SHALL MARK OUT CLEARING LIMITS AND 50' WETLANDS BUFFER. WETLANDS PERMIT, TO CONTROL STORMWATER DISCHARGES AND TO PREVENT EROSION AND SEDIMENTATION AND TO OTHERWISE PREVENT POLLUTION OF WETLANDS OR WATERCOURSES. THE PERMITTEE SHALL IMMEDIATELY INFORM THE TOWN WETLANDS OFFICER 3. INSTALL EROSION AND SEDIMENT CONTROL MEASURES. OF ANY PROBLEMS INVOLVING WETLANDS OR WATERCOURSES THAT HAVE DEVELOPED IN THE COURSE OF, OR THAT ARE CAUSED BY, THE AUTHORIZED WORK. 4. CLEAR AND GRUB WITHIN CLEARING LIMITS. THE RESPONSIBLE CONTACT PERSON FOR THE INSTALLATION AND MAINTENANCE OR EROSION AND SEDIMENTATION CONTROLS ON THIS PROJECT WILL BE THE SITE CONTRACTOR. THE CONTACT INFORMATION FOR THE CONTRACTOR WILL BE MADE AVAILABLE TO THE 5. STOCKPILE TOPSOIL FOR RF -USE. TOWN AS SOON AS IT IS AVAILABLE. 6. ROUGH GRADE SITE TO SUB GRADE. V13GETATIVE TURF ESTABLISHMENT PROCEDURE SCARIFY ALL AREAS TO BE TOPSOILED AND SEEDED. APPLY A MINIMUM OF 4 INCHES OF TOPSOIL ON ALL AREAS TO BE SEEDED. APPLY 7. CONSTRUCT STORMWATER BASIN. GRASS SEED, LIME, FERTILIZER AND MULCH ACCORDING TO THE FOLLOWING SCHEDULE: 8. CONSTRUCT SWALE ALONG NORTHERN BOUNDARY. PERMANENT SEED MIXTURE: CREEPING RED FESCUE 2.4 LBS. PER 1,000 SQ. FT. 9. FINISH GRADE ALONG SOUTHERN BOUNDARY. REDTOP 0.2 TALL FESCUE 2.4 10. LOAM, SEED & MULCH AREAS AS DESCRIBED IN 7, 8 & 9 OF SEQUENCE. TOTAL 5.0 11. TRUCK IN GRAVEL FOR STORAGE AREA. GRADE AND COMPACT FROM BASIN (WEST TO EAST) TO BUTLERTOWN ROAD. FEIMI IZER: 10-10-10 APPLY AT 7.5 LBS. PER 1,000 SQ. FT. 12. INSTALL CHAINLINK FENCE_ LIMESTONE: APPLY AT 150 LBS. PER 1,000 SQ. FT. 13. PAVE DRIVEWAY APRONS. MIA.CHING: SPREAD HAY OR STRAW OVER ALL AREAS AFTER SEEDING. USE 11/2 TO 2 BALES PER 1,000 SQ. FT. LAND DISTURBANCE TAROT FOR 100% COVERAGE. ANCHOR BY USING NETTING OR TRACKING AS NECESSARY. 1. ALL EXISTING VEGETATION OUTSIDE OF THE CLEARING LIMITS SHALL BE PROTECTED. EXISTING VEGETATION SHALL BE REMOVED ONLY IN AREAS NECESSARY FOR SITE CONSTRUCTION ACTIVITIES. ANY ADDITIONAL CLEARING OUTSIDE OF THE PROPOSED SEEDING DATES: SEEDING DATES IN CONNECTICUT ARE NORMALLY APRIL 1 THROUGH JUNE 15 AND AUGUST 15 THROUGH OCTOBER 1. CLEARING LIMITS SHALL BE APPROVED BY TOWN STAFF PRIOR TO CLEARING, AS APPLICABLE. SEED GERMINATION NORMALLY CANNOT BE EXPECTED FROM NOVEMBER THROUGH FEBRUARY. IF ADEQUATE SEED 2. ALL AREAS SHALL REMAIN UNDISTURBED UNTIL IMMEDIATELY PRIOR TO SITE DEVELOPMENT. GERMINATION IS NOT POSSIBLE DUE TO TIME OF YEAR CONSTRAINTS, MULCHING SHALL BE ADEQUATELY PROVIDED 3. ALL CONSTRUCTION EQUIPMENT, MATERIALS AND STOCKPILES SHALL NOT BE PLACED OUTSIDE OF THE DISTURBED AREAS. TO PROTECT THE SEED FROM WIND AND SURFACE EROSION UNTIL THE WEATHER IMPROVES AND THE SEEDING 4. THE DEVELOPER SHALL BE RESPONSIBLE FOR THE CLEANING OF ANY NEARBY STREETS, AS ORDERED BY THE TOWN BECOMES WELL ESTABLISHED. OR STATE, OF ANY SOIL OR DEBRIS FROM THE SITE CONSTRUCTION ACTIVITIES. 5. ALL TREES, BRUSH, STUMPS, WOOD CHIPS OR OTHER ORGANIC MATTER SHAM BE DISPOSED OF PROPERLY OFF-SITE. WOOD EXISTING CHIPS MAY BE USED AS A SILTATION BARRIER DURING CONSTRUCTION AND SPREAD AFTER SITE IS STABILIZED. NO ORGANIC \ REBAR MATTER INCLUDING TREES, BRUSH AND STUMPS SHALL BE BURIED ON-SITE. IN ROOT � SF STRIPPING AND STOCKPILING 4 ALL STOCKPILES THAT CONSIST OF ERODIBLE MATERIALS SHALL BE LOCATED WITHIN AREAS AS SHOWN ON THE SITE PLAN AND WF 1 SURROUNDED BY A SILTATION BARRIER. ANY STOCKPILE THAT WILL REMAIN UNDISTURBED FOR A PERIOD LONGER THAN 30 DAYS SHALL BE SEEDED WITH A TEMPORARY GRASS SEED MIXTURE TO PREVENT EXCESSIVE EROSION AND SEDIMENTATION. � TRENCH EXCAVATION AND BACKFILL WF -2 THE CONTRACTOR SHALL PROPERLY MAINTAIN ALL BACKFILLED EXCAVATIONS. ANY DEPRESSIONS DUE TO SETTLING IN THESE AREAS s� SHALL BE FILLED AND RESEEDED AS NECESSARY. WF -3 THE WIDTH OF ALL EXCAVATED TRENCHES SHALL BE KEPT AS NARROW AS PRACTICABLE TO ACCOMMODATE THE WORK. ALL MATERIALS EXCAVATED FROM TRENCHES SHALL BE STOCKPILED AND USED AS TRENCH BACKFILL MATERIAL UNLESS IT IS DETERMINED TO BE UNSUITABLE BY THE ENGINEER. EXCESS MATERIALS SHALL BE PROPERLY DISPOSED OF BY THE CONTRACTOR. \ EROSION CONTROL s WE-_,, P_ � 1. PURPOSE ALL CONSTRUCTION ACTIVITIES INVOLVING THE REMOVAL OR DISTURBANCE OF SOILS ARE TO BE PROVIDED WITH APPROPRIATE PROTECTIVE MEASURES TO MINIMIZE EROSION AND CONTAIN SEDIMENT DISPOSITION WITHIN THE AREA UNDER DEVELOPMENT. THE MINIMUM STANDARD FOR INDIVIDUAL MEASURES SHALL BE THOSE OUTLINED IN THE'CONNECTICUT GUIDELINES FOR SOIL €ROSION AND SEDIMENT CONTROL 2002 EDITION AS AMENDED TO DATE. THOSE METHODS DEEMED MOST EFFECTIVE FOR THIS PROJECT ARE DESCRIBED HEREIN. 2. INSTALLATION REQUIREMENTS A. OTHER THAN CONSTRUCTION SPECIFICALLY SHOWN ON THESE APPROVED PLANS, NO ACTIVITIES SHALL BE CONDUCTED WITHIN DESIGNATED WETLAND AREAS, WATERCOURSES, FLOOD PLAINS OR WITHIN CHANNEL ENCROACHMENT LINES WITHOUT THE PRIOR APPROVAL OF THE TOWN PLANNING AND ZONING COMMISSION AND INLAND WETLANDS COMMISSION. B. WHERE FEASIBLE, NATURAL VEGETATION SHALL BE RETAINED AND PROTECTED. C. ONLY THE SMALLEST PRACTICAL AREA OF LAND SHALL BE EXPOSED AT ANY ONE TIME DURING CONSTRUCTION. D. PRIOR TO THE START OF CONSTRUCTION, TEMPORARY BALED HAY EROSION CHECKS, SEDIMENTATION FENCES AND OTHER APPROVED SEDIMENT CONTROL MEASURES SHALL BE IN PLACE WHERE SHOWN ON THESE PLANS AND AT OTHER LOCATIONS WHERE DEEMED NECESSARY. E. WHEN LAND IS EXPOSED DURING DEVELOPMENT, THE PERIOD OF EXPOSURE SHALL BE KEPT TO A MINIMUM, INSTALLING PERMANENT AND FINAL VEGETATION, STRUCTURES, ETC. AT THE EARLIEST POSSIBLE OPPORTUNITY. F. CONSTRUCTION EQUIPMENT SHALL NOT UNNECESSARILY CROSS LIVE STREAMS EXCEPT BY MEANS OF BRIDGES, CULVERTS OR OTHER APPROVED MEANS. G. ALL TEMPORARY EROSION AND SEDIMENT CONTROLS SHALL REMAIN IN PLACE AND BE MAINTAINED REGULARLY TN PROPER FUNCTIONING CONDITION, UNTIL ALL AREAS EXPOSED DURING SITE CONSTRUCTION HAVE BEEN SUITABLY STABILIZED WITH PAVEMENT, PERMANENT STRUCTURES AND/OR FINAL VEGETATIVE COVER. H. ADEQUATE PROVISIONS SHALL BE MADE TO PREVENT SURFACE WATER FROM DAMAGING THE CUT FACE OF EXCAVATIONS OR THE SLOPING SURFACES OF FILLS. I. FILL SHALL BE PLACED AND COMPACTED SO AS TO MINIMIZE SLIDING OR EROSION OF THE SOIL. ANGLE FIRST STAKE INTO ADJACENT BALE AND SECURE WITH SECOND STAKE HAY BALES TIGHTLY STACKED OR OFFSET CORNERS AS SHOWN WOOD STAKES OR METAL REBAR HAY E STEP 1 SET POSTS AND EXCAVATE A 6"x6" TRENCH. SET POSTS DOWNSLOPE. FILTER F STEP 2 STAPLE THE WIRE MESH FENCING TO END POSTS. COMPACTED BACKFILL STEP 3 STEP 4 ATTACH FILTER FABRIC TO THE WIRE FENCING BACKFILL THE TRENCH AND COMPACT THE AND EXTEND IT TO THE TRENCH. EXCAVATED SOIL. SILT FENCE DETAIL NOT TO SCALE 1 CVVV LVIYC. LVIrC /% I -L -I% 11N-1 1 -UW V7V11WJJ/ V EROSION CONTROL PLAN EFFECTIVE DATE: JULY , 2011 PREPARED FOR ERIC LOMBARDI GRAPHIC SCALE 240 & 252 BUTLERTOWN ROAD 40 0 20 40 so 160 OAKDALE, CONNECTICUT ( IN FEET ) SCALE: 1" = 40' SHEET 2 OF 2 1 inch = 40 ft DATE: MAY 4, 2017 JOB NO. 15-064 PROPOSED TURF REINFORCEMENT GRAVEL STORAGE MAT (12'x LENGTH) DOWNSTREAM AREA OF LEVEL SPREADER 2.0' --- SECTiM REQJLpnpN LI REQUIREMENTS EXISTING PROPOSED 13.4 MDmMUM LOT SIZE % l'-LLLLtLLLLL 334,142 SF 334,142 SF 13.5 MllGMUM LOT FRONTAGE 200' 400.21' 400.21' 13.6 MVdMUM FRONT YARD 50N DIRECTION :. •. •,.._ , ' . ,; • ~ « ,: z :.. •'' • L_ L_ L_ L_ L_ L_ L_ L_ L_ MDIIMUM SIDE YARD 30' NA OF FLOW �, �: •�••_'» : ; : :. _ : �' ;:•': ; •..:.: • • f' •. t y ; ' L_ L- L_ L_ L_ L_ L_ L_ L_ SW TO 30' TO COMMERCIAL OR INDUSTRIAL . _,� y� 387-p 13.7 MNQMUM BUILDING HEIGHT, LLLLLLLLI) NA 14 LLLLLLLL • t Z•'. !.f ir. i'• LLLLLLLL LLLLLLLL JLLLLLLLL g. :.LLLLLLLLL t" ,16 PROPOSED WOVEN GEOTEXTILE UNDER STONE PLAN VIEW PROPOSED LEVEL LIP OF SPREADER - UNIFORM HEIG# & ZERO GRADE OVER LENGTI o 0% 33% 4% 2.0' 25.0' PROPOSED GRADING OR EXISTING (VARIES) PROPOSED 1/4" CRUSHED STONE 12" THICK x LENGTH 3' K • S , + f PROPOSED WOVEN GEOTE MLE UNDER STONE ELEVATION VIEW LEVEL SPREADER DETAIL SCALE: I"=I' POST -CONSTRUCTION REQUIREMENTS NOTE AFTER CONSTRUCTION IS COMPLETED AND ACCEPTED BY THE OWNER, IT SHALL BE THE RESPONSIBILITY OF THE OWNER TO MAINTAIN ALL DRAINAGE STRUCTURES. IN ADDITION, THE FOLLOWING INSPECTION AND MAINTENANCE GUIDELINES SHALL BE THE RESPONSIBILTY OF THE OWNER, BEGINNING THE FIRST YEAR PERIOD FOLLOWING CONSTRUCTION COMPLETION AND ACCEPTANCE, AND SHALL BE FOLLOWED EACH YEAR THEREAFTER: 1. DRAINAGE AND OTHER PAVED AREAS: INSPECT ON A REGULAR BASIS NOT TO EXCEED WEEKLY FOR LITTER AND DEBRIS. 00000oz / 288 BUTLERTOWN ROAD / DONOVAN & ANNA LEE N/F M/B/L: 1 / 5 / B V301,430 MAILING ADDRESS 288 BUTLERTOWN ROAD / OAKDALE, CT 06370 /100 / / 11 SILVER FALLS ROAD / GLENN L. & SO' CARMEN SKINNER N/F �•,/ ,M/B/L: 1 / 7 V605/639 / MAILING ADDRESS 11 SILVER FALLS ROAD OAKDALE, CT 06370 / LLK KAINL.ti LU - 0 N/F 00000oz 00000 v SILVER FALLS ROAD MICHAEL A. AND & PATRICIA B. PALMER N/F M/B/L: 1/ 7 /A V621/692 MAILING ADDRESS 45 SILVER FALLS ROAD OAKDALE, CT 06370 LI LIGHT INDUSTRIAL ZONING REQUIREMENTS TABLE SECTiM REQJLpnpN LI REQUIREMENTS EXISTING PROPOSED 13.4 MDmMUM LOT SIZE 80,000 SF 334,142 SF 334,142 SF 13.5 MllGMUM LOT FRONTAGE 200' 400.21' 400.21' 13.6 MVdMUM FRONT YARD 50N NA 54.6 13.6 MDIIMUM SIDE YARD 30' NA 74.9 285.1 13.6 MINIMUM REAR YARD SW TO 30' TO COMMERCIAL OR INDUSTRIAL NA 387-p 13.7 MNQMUM BUILDING HEIGHT, 501 NA 40 DATE /24/2017 1: GRAPHIC SCALE 20 40 so ( IN FEET ) 1 inch = 40 ft REVISION 160 EFFECTIVE DATE: JULY 18,311 "x 1 JJ 1 A -ilk XX IN PREPARED FOR ERIC LOMBARDI 240 & 252 BUTLERTOWN ROAD OAKDALE, CONNECTICUT SCALE: 1" = 40' SHEET 1 OF 2 DATE: MAY 49, 2017 JOB NO. 15-064 OH�N q�Mia � N L D SURVEYOR No. 18859 GERWICK, — MEREEN L.L.C. 17 INDUSTRIAL DRIVE P.O. BOX 539 WATERFORD, CONNECTICUT 06385 TEL. (860)442-2201 FAX. (860)442-2205 0 NO. 21231 ' O •• GREGG T. FEDUS�''R. sees*`$ CT. LICENSE NO. 21231 TIT "x 1 JJ 1 A -ilk XX IN PREPARED FOR ERIC LOMBARDI 240 & 252 BUTLERTOWN ROAD OAKDALE, CONNECTICUT SCALE: 1" = 40' SHEET 1 OF 2 DATE: MAY 49, 2017 JOB NO. 15-064 OH�N q�Mia � N L D SURVEYOR No. 18859 GERWICK, — MEREEN L.L.C. 17 INDUSTRIAL DRIVE P.O. BOX 539 WATERFORD, CONNECTICUT 06385 TEL. (860)442-2201 FAX. (860)442-2205 0 C. ONLY THE SMALLEST PRACTICAL AREA OF LAND SHALL BE EXPOSED AT ANY ONE TIME DURING CONSTRUCTION. ANGLE FIRST STAKE IN' D. PRIOR TO THE START OF CONSTRUCTION, TEMPORARY BALED HAY EROSION CHECKS, ADJACENT BALE AND SECU SEDIMENTATION FENCES AND OTHER APPROVED SEDIMENT CONTROL MEASURES SHALL WITH SECOND STA BE IN PLACE WHERE SHOWN ON THESE PLANS AND AT OTHER LOCATIONS WHERE DEEMED NECESSARY. HAY BALES TIGHT E. WHEN LAND IS EXPOSED DURING DEVELOPMENT, THE PERIOD OF EXPOSURE SHALL BE STACKED OR OFFS KEPT TO A MINIMUM, INSTALLING PERMANENT AND FINAL VEGETATION, STRUCTURES, CORNERS AS SHO% ETC. AT THE EARLIEST POSSIBLE OPPORTUNITY. F. CONSTRUCTION EQUIPMENT SHALL NOT UNNECESSARILY CROSS LIVE STREAMS EXCEPT WOOD STAKES OR MET BY MEANS OF BRIDGES, CULVERTS OR OTHER APPROVED MEANS. REB, G. ALL TEMPORARY EROSION AND SEDIMENT CONTROLS SHALL REMAIN IN PLACE AND BE MAINTAINED REGULARLY IN PROPER FUNCTIONING CONDITION, UNTIL ALL AREAS EXPOSED DURING SITE CONSTRUCTION HAVE BEEN SUITABLY STABILIZED WITH PAVEMENT, PERMANENT STRUCTURES AND/OR FINAL VEGETATIVE COVER. HAI H. ADEQUATE PROVISIONS SHALL BE MADE TO PREVENT SURFACE WATER FROM DAMAGING THE CUT FACE OF EXCAVATIONS OR THE SLOPING SURFACES OF FILLS. I. FILL SHALL BE PLACED AND COMPACTED SO AS TO MINIMIZE SLIDING OR EROSION OF THE SOIL. STEP 1 SET POSTS AND EXCAVATE A 6"x6" TRENCH. SET POSTS DOWNSLOPE. FILTER F STEP 2 STAPLE THE WIRE MESH FENCING TO END POSTS. COMPACTED BACKFILL STEP 3 STEP 4 ATTACH FILTER FABRIC TO THE WIRE FENCING BACKFILL THE TRENCH AND COMPACT THE AND EXTEND IT TO THE TRENCH. EXCAVATED SOIL. SILT FENCE DETAIL NOT TO SCALE FLOOD ZONE: ZONE X PER FIRM MAP # 09011C0337G EFFECTIVE DATE: AtY 18, 2011 GRAPHIC SCALE 40 0 20 40 so 164 ( IN FEET) 1 inch = 40 ft. EROSION CONTROL PLAN PREPARED FOR ERIC LOMBARDI 240 & 252 BUTLERTOWN ROAD OAKDALE,CONNECTICUT SCALE: I" = 40' SHEET 2 OF 2 DATE: MAY 4, 2017 JOB NO. 15-064 501L ERC SOIL EROSION AND SEDIMENT CONTROL PLAN NARRATIVE ALL ADJACI THE SITE CONTRACTOR MUST FOLLOW ALL GUIDELINES SET FORTH IN THE MANUAL ENTITLED "2002 CONNECTICUT GUIDELINES FOR EROSION A SOIL EROSION AND SEDIMENT CONTROL" PUBLISHED BY THE CONNECTICUT COUNCIL ON SOIL AND WATER CONSERVATION IN COOPERATION WITH THE CONNECTICUT DEPARTMENT OF ENVIRONMENTAL PROTECTION. THIS MANUAL IS ALSO KNOWN AS DEP ALL CONST BULLETIN 34. IN ADDITION THTE SITE CONTRACTOR MUST FOLLOW TOWN OF MONTVILLE ZONING AND SUBDIVISION REGULATIONS, MONITORE TOWN EMERGRNCY STANDARDS AND SPECIFICATIONS, CTDOT FORM 816 WHERE APPLICABLE. 50% OF TF E&SCON] PROJECT DESCRIPTION THE APPLICANT PROPOSES TO USE THE SITE AS OUTDOOR STORAGE AREA AND PROPOSED FUTURE 50'x 100' BUILDING WITH A 5' WALK ADDITION) CONTRACT AND PARKING. SEDIMENT ALL EROSION AND SEDIMENT CONTROLS SHALL BE INSTALLED PRIOR TO CONSTRUCTION ACTIVITIES. E & S CONTROLS SHALL BE REMOVAL � MAINTAINED AND REPAIRED OR REPLACED AS NEEDED THROUGHOUT THE CONSTRUCTION DURATION. ALL E & S CONTROLS SHALL BE ALL EROSIC REMOVED AND PROPERLY DISPOSED OF AS SOON AS THE SITE IS COMPLETELY STABILIZED. REPAIRED t CONSTRUCTION SEQUENCE ALL ACCUM THAT ARE I 1. SCHEDULE PRE -CONSTRUCTION MEETING WITH OWNER, CONTRACTOR, ENGINEER AND APPLICABLE TOWN STAFF'. THE PERMI 2. LAND SURVEYOR SHALL MARK OUT CLEARING LIMITS AND 50' WETLANDS BUFFER. WETLANDS PREVENT P 3. INSTALL EROSION AND SEDIMENT CONTROL MEASURES. OF ANY PRI THE AUTHC 4. CLEAR AND GRUB WITHIN CLEARING LIMITS. THE RESP( 5. STOCKPILE TOPSOIL FOR RE -USE. THIS PROJ TOWN AS 6. ROUGH GRADE SITE TO SUB GRADE. VEGETATII 7. CONSTRUCT STORMWATER BASIN. SCARIFY AI GRASS SEE 8. CONSTRUCT SWALE ALONG NORTHERN BOUNDARY. PERMANEN CREEPIN 9. FINISH GRADE ALONG SOUTHERN BOUNDARY. REDTOP TALL FE! 10. LOAM, SEED & MULCH AREAS AS DESCRIBED IN 7, 8 & 9 OF SEQUENCE. TOTAL 11. TRUCK IN GRAVEL FOR STORAGE AREA. GRADE AND COMPACT FROM BASIN (WEST TO EAST) TO BUTLERTOWN ROAD. FERTILIZEI 10-10-10 12. INSTALL CHAINLINK FENCE. LIMESTONI APPLY A 13. PAVE DRIVEWAY APRONS. MULCHING SPREAD LAND DISTURBANCE TARGET 1. ALL EXISTING VEGETATION OUTSIDE OF THE CLEARING LIMITS SHALL BE PROTECTED. EXISTING VEGETATION SHALL BE REMOVED ONLY IN AREAS NECESSARY FOR SITE CONSTRUCTION ACTIVITIES. ANY ADDITIONAL CLEARING OUTSIDE OF THE PROPOSED SEEDING C CLEARING LIMITS SHALL BE APPROVED BY TOWN STAFF PRIOR TO CLEARING, AS APPLICABLE. SEEDING SEED GE 2. ALL AREAS SHALL REMAIN UNDISTURBED UNTIL IMMEDIATELY PRIOR TO SITE DEVELOPMENT. GERMINE 3. ALL CONSTRUCTION EQUIPMENT, MATERIALS AND STOCKPILES SHALL NOT BE PLACED OUTSIDE OF THE DISTURBED AREAS. TO PRO, 4. THE DEVELOPER SHALL BE RESPONSIBLE FOR THE CLEANING OF ANY NEARBY STREETS, AS ORDERED BY THE TOWN BECOME OR STATE, OF ANY SOIL OR DEBRIS FROM THE SITE CONSTRUCTION ACTIVITIES. 5. ALL TREES, BRUSH, STUMPS, WOOD CHIPS OR OTHER ORGANIC MATTER SHALL BE DISPOSED OF PROPERLY OFF-SITE. WOOD CHIPS MAY BE USED AS A SILTATION BARRIER DURING CONSTRUCTION AND SPREAD AFTER SITE IS STABILIZED. NO ORGANIC MATTER INCLUDING TREES, BRUSH AND STUMPS SHALL BE BURIED ON-SITE. STRIPPING AND STOCKPILING ALL STOCKPILES THAT COS'FSIST OF ERODIBLE MATERIALS SHALL BE LOCATED WITHIN AREAS AS SHOWN ON THE SITE PLAN AND SURROUNDED BY A SILTATION BARRIER. ANY STOCKPILE THAT WILL REMAIN UNDISTURBED FOR A PERIOD LONGER THAN 30 DAYS SHALL BE SEEDED WITH A TEMPORARY GRASS SEED MIXTURE TO PREVENT EXCESSIVE EROSION AND SEDIMENTATION. TRENCH EXCAVATION AND BACKFILL THE CONTRACTOR SHALL PROPERLY MAINTAIN ALL BACKFILLED EXCAVATIONS. ANY DEPRESSIONS DUE TO SETTLING IN THESE AREAS SHALL BE FILLED AND RESEEDED AS NECESSARY. THE WIDTH OF ALL EXCAVATED TRENCHES SHALL BE KEPT AS NARROW AS PRACTICABLE TO ACCOMMODATE THE WORK. ALL MATERIALS EXCAVATED FROM TRENCHES SHALL BE STOCKPILED AND USED AS TRENCH BACKFILL MATERIAL UNLESS IT IS DETERMINED TO BE UNSUITABLE BY THE ENGINEER. EXCESS MATERIALS SHALL BE PROPERLY DISPOSED OF BY THE CONTRACTOR. EROSION CONTROL 1. PURPOSE ALL CONSTRUCTION ACTIVITIES INVOLVING THE REMOVAL OR DISTURBANCE OF SOILS ARE TO BE PROVIDED WITH APPROPRIATE PROTECTIVE MEASURES TO MINIMIZE EROSION AND CONTAIN SEDIMENT DISPOSITION WITHIN THE AREA UNDER DEVELOPMENT. THE MINIMUM STANDARD FOR INDIVIDUAL MEASURES SHALL BE THOSE OUTLINED IN THE 'CONNECTICUT GUIDELINES FOR SOIL EROSION AND SEDIMENT CONTROL 2002 EDITION AS AMENDED TO DATE. THOSE METHODS DEEMED MOST EFFECTIVE FOR THIS PROJECT ARE DESCRIBED HEREIN. 2. INSTALLATION REQUIREMENTS A. OTHER THAN CONSTRUCTION SPECIFICALLY SHOWN ON THESE APPROVED PLANS, NO ACTIVITIES SHALL BE CONDUCTED WITHIN DESIGNATED WETLAND AREAS, WATERCOURSES, FLOOD PLAINS OR WITHIN CHANNEL ENCROACHMENT LINES WITHOUT THE PRIOR APPROVAL OF THE TOWN PLANNING AND ZONING COMMISSION AND INLAND WETLANDS COMMISSION. B. WHERE FEASIBLE, NATURAL VEGETATION SHALL BE RETAINED AND PROTECTED. C. ONLY THE SMALLEST PRACTICAL AREA OF LAND SHALL BE EXPOSED AT ANY ONE TIME DURING CONSTRUCTION. ANGLE FIRST STAKE IN' D. PRIOR TO THE START OF CONSTRUCTION, TEMPORARY BALED HAY EROSION CHECKS, ADJACENT BALE AND SECU SEDIMENTATION FENCES AND OTHER APPROVED SEDIMENT CONTROL MEASURES SHALL WITH SECOND STA BE IN PLACE WHERE SHOWN ON THESE PLANS AND AT OTHER LOCATIONS WHERE DEEMED NECESSARY. HAY BALES TIGHT E. WHEN LAND IS EXPOSED DURING DEVELOPMENT, THE PERIOD OF EXPOSURE SHALL BE STACKED OR OFFS KEPT TO A MINIMUM, INSTALLING PERMANENT AND FINAL VEGETATION, STRUCTURES, CORNERS AS SHO% ETC. AT THE EARLIEST POSSIBLE OPPORTUNITY. F. CONSTRUCTION EQUIPMENT SHALL NOT UNNECESSARILY CROSS LIVE STREAMS EXCEPT WOOD STAKES OR MET BY MEANS OF BRIDGES, CULVERTS OR OTHER APPROVED MEANS. REB, G. ALL TEMPORARY EROSION AND SEDIMENT CONTROLS SHALL REMAIN IN PLACE AND BE MAINTAINED REGULARLY IN PROPER FUNCTIONING CONDITION, UNTIL ALL AREAS EXPOSED DURING SITE CONSTRUCTION HAVE BEEN SUITABLY STABILIZED WITH PAVEMENT, PERMANENT STRUCTURES AND/OR FINAL VEGETATIVE COVER. HAI H. ADEQUATE PROVISIONS SHALL BE MADE TO PREVENT SURFACE WATER FROM DAMAGING THE CUT FACE OF EXCAVATIONS OR THE SLOPING SURFACES OF FILLS. I. FILL SHALL BE PLACED AND COMPACTED SO AS TO MINIMIZE SLIDING OR EROSION OF THE SOIL. STEP 1 SET POSTS AND EXCAVATE A 6"x6" TRENCH. SET POSTS DOWNSLOPE. FILTER F STEP 2 STAPLE THE WIRE MESH FENCING TO END POSTS. COMPACTED BACKFILL STEP 3 STEP 4 ATTACH FILTER FABRIC TO THE WIRE FENCING BACKFILL THE TRENCH AND COMPACT THE AND EXTEND IT TO THE TRENCH. EXCAVATED SOIL. SILT FENCE DETAIL NOT TO SCALE FLOOD ZONE: ZONE X PER FIRM MAP # 09011C0337G EFFECTIVE DATE: AtY 18, 2011 GRAPHIC SCALE 40 0 20 40 so 164 ( IN FEET) 1 inch = 40 ft. EROSION CONTROL PLAN PREPARED FOR ERIC LOMBARDI 240 & 252 BUTLERTOWN ROAD OAKDALE,CONNECTICUT SCALE: I" = 40' SHEET 2 OF 2 DATE: MAY 4, 2017 JOB NO. 15-064