Loading...
HomeMy WebLinkAboutSite Planti to 0 ni rn 0 0 N 0i T T T LU - YI H J W U - z k d J w H H co 0 T 0 J co T LO vt c) 0 c� 0 I 0 TL [- 0 J co T LO Cz 0 0 0 cn 0 0 0 L c a� 0 .r -q - U) L cri != LIGHTING STANDARD (TYP) rWF#1-4"-) WETLAND LIMITS /& LIMIT OF CLEARING F#1 —43 rWF#1 —44 a. s LOT 10 � D wF#1-47 WF#1-48 PROPOSED WELL LOCATION CONC. PAD & WALKWAY 4' CRUSH STONE STRIP HANDICAP SPACE & VAN SPACE CRUSHED STONE STRIP Chesterf i e l d Davis Pond LOCATION MAS SCALE: 1 =1000 ZONING COMPLIANCE CHART ZONING DISTRICT: LI ITEM REQUIRED PROPOSED LOT AREA 80,000 S.F. 410,625± S.F. LOT FRONTAGE i 358± FT FRONT YARD SETBACK i5 51 FT v, W �> ; =`�' ., ° �� : �'(�� Lake REAR YARD SETBACK `b + Kononws LL - , -04��/`f �1C/TF r PARKING SPACES f,.r 21 r r PROJECT SITE LOCATION MAS SCALE: 1 =1000 ZONING COMPLIANCE CHART ZONING DISTRICT: LI ITEM REQUIRED PROPOSED LOT AREA 80,000 S.F. 410,625± S.F. LOT FRONTAGE 200 FT 358± FT FRONT YARD SETBACK 50 FT 51 FT SIDE YARD SETBACK 30 FT 31 FT. REAR YARD SETBACK 30 FT. FT. BLDG HEIGHTS 50 FT 24 FT PARKING SPACES 3 21 PARKING REQUIREMENTS: 200 SF OFFICE 0 1 SPACE/250 SF = 1 SPACES 10,000 SF WAREHOUSE 0 1 SPACE/1000 SF = 2 SPACES TOTAL SPACES = 3 SPACES EXTERIOR LIGHTING TO BE CONTAINED WITHIN THE SITE LANDSCAPE SCHEDULE . Common Name: Botanical Name Lc Leyland Cypress Cupressocyparis Leylandii 4'- 0" ht. 17 Rp Rhododendron Rhododendron (PJM Group) 2 gal. 6 JC Emerald Sea Shore Juniper Juniperous Conferta "Emerald Sea" 18 spd. 6 NOTES: 1. THE PROPERTY IS NOT LOCATED WITHIN THE LAKE KONOMOS WATERSHED 2. THE PROPERTY IS NOT WITHIN THE 100 YEAR FLOOD ZONE. THE WETLAND AREA OF THE SITE IS WITHIN THE 500 YEAR FLOOD ZONE — ZONE B. ENCLOSURE DUMPSTER AREA (SEE DETAIL) I HAVE DELINEATED THE WETLANDS ON THE PROPERTY IN THE FIELD AND HAVE REVIEWED THE WETLANDS AS SHOWN ON THE PLAN AND FIND THAT THEY SUBSTANTIALLY REPRESENT THE WETLANDS AS DELINEATED IN THE FIELD. ROBERT C. RUSSO DATE CERTIFIED SOIL SCIENTIST OV 20' 0 20' 40' - SCALE: 1 "=20' GREEN SITE DESIGN — LLC 317 Main Street Norwich, Connecticut (860) 892-1380 Fax (860) 886-91615 3 F0/23/0cG R'MTEM BURMNG 2 10/8/09 FUEL TANK 1 5/20/09 STAFF COMMENTS o. Date Revision Lot 10 Lombardi Business Park Project No. GSD -02 Proj. Engineer E.M.B. B & W PAVING & LANDSCAPE 305 BUTLERTOWN ROAD Date: APRIL 2009 Sheet No. Site Plan 4" MIN. DEPTH D Rpt` PEED Q =10 W 0 2" STONE $o, 4141, e � G 0- �? ��p�yN pR AS M`N`Mv�+ FILTER FABRIC OVER STRIPPED GROUND (TOPSOIL REMOVED) CONSTRUCTION ENTRANCE 4" OF 2" CRUSHED STONE 6" GRAVEL BASE NOT TO SCALE CRUSHED STONE STRIP 6" COMPACTED SILT BARRIER FILTER FABRIC (SIDES AND BOTTOM ) 6" PERFORATED PVC PIPE 1" CRUSHED STONE 4' WIDE CONMENT —�,.- PAVED PARKING AREA BASIL a T CRUSHED STOPS STRIP $ NOT TO SCALE IMPERVIOUS FABRIC MIRAFI 50OX GEOTEXTILE AMENT BASIN 2' —0" 6" °Q oao 1'-0" 1 1'-0 Al 6 MIN. " OF 1" CRUSHED STONE =NCH DEPTH VARIES — E INVERT ELEVATIONS GRADING PLAN STONE DRAINAGE TRENCH NOT TO SCALE SILT FENCE FILTER CLOTH — FLOW EMBED FILTER CLOTH, 00 8" MIN. INTO GROUND 4" POLLUTION PREVENTION PLAN 1. POLLUTION PREVENTION TEAM THE OWNERS WILL BE RESPONSIBLE FOR CARRYING OUT THE PROVISIONS OF THIS PLAN. 2. SWEEPING PARKING LOTS, SIDEWALKS AND OTHER IMPERVIOUS SURFACES SHALL BE SWEPT CLEAN OF SAND AND LITTER AND ANY OTHER POLLUTANTS AT LEAST TWICE A YEAR. A. BETWEEN NOVEMBER 15 AND DECEMBER 15 (AFTER LEAF FALL) B. DURING APRIL (AFTER SNOW MELT) 3. OUTSIDE STORAGE ACCESSORIES OR EQUIPMENT STORED OUTSIDE SHALL BE COVERED OR MAINTAINED TO MINIMIZE POSSIBILITY OF THESE MATERIALS OR THEIR RESIDUE PASSING TO STORM WATER. 4. WASHING NO WASHING VEHICLES OR EQUIPMENT IN PARKING AREAS. 5. MAINTENANCE AND INSPECTION A. MONTHLY INSPECTION OF STORM WATER STRUCTURES AND OUTFALLS. B. CLEAN SEDIMENT AND DEBRIS FROM STRUCTURES AND OUTFALLS ONCE A YEAR DURING APRIL. C. SUBMIT MAINTENANCE & INSPECTION REPORT TO THE PLANNING DEPARTMENT 6. VORTEC UNIT AND SEDIMENTATION BASIN A. MONTHLY INSPECTION OF SEPARATOR, IF OIL SPILL HAS OCCURRED, COMPLY WITH REQUIREMENTS UNDER SPILL OR ACCIDENTAL DISCHARGE B. CLEAN SEDIMENT AND DEBRIS FROM STRUCTURE ONCE A YEAR, DURING APRIL 7. SPILL OR ACCIDENTAL DISCHARGE COMPLY WITH STATE AND FEDERAL REGULATIONS TO CONTAIN AND CLEAN UP ANY SPILL OR DISCHARGE AND DISPOSE OF MATERIALS AT AN APPROVED FACILITY. CONTACT CONNECTICUT DEP OIL AND CHEMICAL SPILL RESPONSE DIVISION (860) 424-3338 IN THE EVENT A SPILL OCCURS THE FOLLOWING STEPS SHOULD BE PERFORMED AS SOON AS POSSIBLE: A. STOP THE SOURCE OF THE SPILL B. CONTAIN THE SPILL C. COVER SPILL WITH ABSORBENT MATERIAL SUCH AS KITTY LITER, SAWDUST OR OIL ABSORBENT PADS. DO NOT USE STRAW. D. DISPOSE OF ABSORBER IN ACCORDANCE WITH LOCAL AND STATE REGULATIONS. 1"X 1"X4' GRADE STAKE HAY BALE, 2 STAKES REQUIRED EACH BALE UNDISTURBED SOIL GRADE STAKES — TWO EACH BALE (TYP.) CONSTRUCTION NOTES: 1. SILT FENCE FILTER CLOTH TO BE SECURELY FASTENED TO GRADE STAKE WITH STAPLES, 6" ON CENTER. 2. WHEN TWO SECTIONS OF FILTER CLOTH ADJOIN ONE ANOTHER THEY SHALL OVERLAP BY 6* AND BE FOLDED. 3. BALES SHALL BE PLACED IN A ROW WITH ENDS TIGHTLY ABUTTING THE ADJACENT BALES. HAY-BALE/SILT FENCE EROSION PROTECTION NOT TO SCALE EROSION & SEDIMENTATION NARRATIVE AND SEQUENCE OF OPERATIONS 1. THE PROPOSED ACTIVITY CONSISTS OF THE THE CONSTRUCTION OF A CRUSHED STONE DRIVEWAY ACROSS 408 S.F. OF WETLANDS DISTURBANCE. 2. PRIOR TO ANY DISTURBANCE ON SITE, THE DEVELOPER AND CONTRACTOR WILL ATTEND A PRE -CONSTRUCTION CONFERENCE WITH TOWN STAFF TO REVIEW PLAN REQUIREMENTS AND SEQUENCE OF CONSTRUCTION. AT THIS TIME, THE INDIVIDUAL WHO WILL BE RESPONSIBILE FOR EROSION AND SEDIMENTATION CONTROL PLAN COMPLIANCE WILL BE DETERMINED. 3. LIMITS OF DISTURBANCE SHALL BE FIELD -DELINEATED AND INSPECTED BY TOWN STAFF PRIOR TO ANY CLEARING OCCURRING. THE CONTRACTOR SHALL CONTACT THE WETLANDS OFFICER FOR INSPECTION OF THE SEDIMENT AND EROSION CONTROL MEASURES, PRIOR TO SITE DISTURBANCE. CONSTRUCTION SHALL NOT BEGIN UNTIL SUCH TIME AS THE WETLANDS OFFICER HAS REVIEWED AND APPROVED THE INSTALLATION OF THE SEDIMENTATION AND EROSION CONTROL MEASURES. 4. SITE CLEARING AND GRUBBING CONSISTING OF CLEARING THE GROUND OF TREES, STUMPS, AND BRUSH SHALL BEGIN FIRST TO ALLOW ACCESS NECESSARY FOR THE CONSTRUCTION AND INSTALLATION OF EROSION AND SEDIMENTATION CONTROL DEVICES. ADDITIONAL EROSION & SEDIMENT CONTROL MEASURES SHALL BE INSTALLED IF DETERMINED TO BE NECESSARY BY THE WETLANDS OFFICER. 5. ORANGE CONSTRUCTION FENCING WILL BE INSTALLED ALONG THE 50' WETLANDS REGULATED LINE PRIOR TO DISTURBANCE. 6. THE CONTRACTOR SHALL INSPECT BARRIERS AT LEAST WEEKLY, DAILY DURING PROLONGED RAINFALL AND AFTER EACH STORM. ANY REQUIRED REPAIRS SHALL BE MADE IMMEDIATELY. SEDIMENT SHALL BE REMOVED WHEN IT HAS REACHED HALF THE ORIGINAL HEIGHT OF THE BARRIER. 7. EROSION AND SEDIMENT CONTROL DEVICES SHALL BE INSTALLED AND INSPECTED BY TOWN STAFF PRIOR TO COMMENCEMENT OF ANY SITE GRADING OR CONSTRUCTION. CONTROL DEVICES SHALL BE SILT FENCES AND/OR HAY BALES LOCATED AS SHOWN ON THE PLANS TO TRAP SEDIMENT DURING CONSTRUCTION OPERATIONS AND TO PREVENT ADDITIONAL EROSION DUE TO CONCENTRATED FLOWS AT THE TOE OF A SLOPE. 8. THE TOPSOIL SHALL BE STRIPPED AND STOCKPILED ON-SITE FOR FUTURE USE. HAYBALE SILT BARRIERS OR SILT FENCE SHALL BE INSTALLED AROUND TEMPORARY STOCKPILE AREAS AS SHOWN ON SHEET 1. 9. ALL WORK SHOULD BE CONDUCTED DURING DURING A PERIOD OF LOW GROUNDWATER TO REDUCE THE AMOUNT OF DE -WATERING REQUIRED. 10. DRAINAGE CULVERT INSTALLATION. 11. WHEN FINISH GRADING IS COMPLETED, TOPSOIL SHALL BE RE—APPLIED TO ALL REMAINING DISTURBED AREAS TO PROVIDE A MINIMUM DEPTH OF FOUR INCHES. 12. LOAM, SEEDING AND MULCHING OF ALL REMAINING DISTURBED AREAS OUTSIDE OF RESTORATION AREA. ALL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL REMAIN IN PLACE UNTIL VEGETATION IS RE-ESTABLISHED. 13. SEEDING SHOULD TAKE PLACE BETWEEN APRIL 1 THROUGH JUNE 1 AND AUGUST 15 THROUGH OCTOBER 1. — OUTSIDE OF SEEDING WINDOW EXPOSED SOIL WILL BE MULCHED FOR PROTECTION. 14. THE FOLLOWING SEEDING MIXTURES SHALL BE PROVIDED ON ALL DISTURBED AREAS: WETLANDS RESTORATION AREA: NEW ENGLAND WETLAND PLANTS EROSION CONTROL RESTORATION MIX UPLAND AREAS: KENTUCKY BLUE GRASS 20 LB's/AC CREEPING RED FESCUE 20 LBs/AC PERENNIAL RYEGRASS 5 LB's/AC 15. UNFORESEEN PROBLEMS WHICH ARE CREATED IN THE FIELD SHALL BE SOLVED ACCORDING TO CONNECTICUT 2002 GUIDELINES FOR SOIL EROSION AND SEDIMENT CONTROL, AND MAY BE AMENDED AND ADDITIONAL MEASURES REQUIRED AT THE DIRECTION OF TOWN PLANNING STAFF. 16. JAMES WRAY WILL BE RESPONSIBLE FOR EROSION & SEDIMENT CONTROL MEASURES AND ANY EMERGENCIES THAT MAY ARISE ON THE PROPERTY. DEWATERING PLAN IF DEWATERING IS NECESSARY DURING CONSTRUCTION A CLEAR WATER DISCHARGE SHALL BE PROVIDED AS FOLLOWS: A. THE PUMP INLET WILL BE WRAPPED IN FILTER FABRIC AND PLACED IN CRUSHED STONE WITHIN THE TRENCH. 4 B. THE PUMP OUTLET WILL DISCHARGE TO THE VEGATATED UPLAND ABOVE THE EXISTING RIPRAP PLUNGE POOL. C. THE DISCHARGE FROM THE DEWATERING OUTLET WILL BE MONITORED AND ADDITIONAL MEASURES EMPLOYED IF NECESSARY. GREEN SITE DESIGN - LLC - 317 Main Street Norwich, Connecticut (860) 892-1380 Pax (860) 886-9185 2 10/8/09 FUEL TANK 1 7/1/09 STAFF COMMENTS No. Date Revision Lot 10 Lombard Business Park Project No. GSD -02 Proj. Engineer E.M.B. B & W PAVING & LANDSCAPE LOMBARDI BUSINESS PARK LLC Date: APRIL 2009 Sheet No. 4 E & S Details FILTER FABRIC PRECAST CONCRETE 4'x8'x2' 6" MIN LEACHING GALLERY COVER HS -20 LOADING 1, 4' 1' I 1" DIAMETER 6CRUSHED STONE 12" CONCRETE LEACHING GALLERY TENCH NOT TO SCALE PAVED SURFACE - IN PARKING AREA 3" BIT. CONC. GRAVEL BASE BITUMINOUS CONCRETE PAVEMENT NOT TO SCALE 8" TYP. 2 PLACES 4" INLET TYP. 3 PLACES — — I -T — — — — — — — — — LO IL—� II II II II I I I I 21" --J II f F— II II I Ir 4" L.P. P.V.C. PIPE SEAL TYP. 3 PLACES PLAN VIEW } OUTLET 4" L.P. P.V.C. PIPE i 18"DIA. 4 3/4" COVER •t INLET OUTLET s, INLET = 3 ° OUTLET FILTER BAFFLE iv DEVICE 0 I � �r 4' -5 3/4" LIQUID 4 " 3" WALLS LEVEL CROSS SECTION VIEW 1.250 GALLON SEPTIC TANK H-20 LOADING NOT TO SCALE co to co 1' 6 /$" 1 6 �/8 0 1-3/16 1-3/16 3-5/8" - Y . 2'-8 3/4" 12" oZ }a N . tea- . a_ -• ' 8" 4'-0 0 8" 5'-4" 3-5/8" PRECAST CONC. UNIT (D.O.T. STANDARD) PRECAST CONC. MASONRY UNITS OR PRECAST RISERS POURED CONC. OR PRECAST SUMP t—, 0 0 0 0 1-3/16- •- 1-3/16" TOP OF FRAME APPLIES 3-13/16"-H 3-13/16" U) U-1 W 7-13/16" FRONT ELEVATION SIDE ELEVATION TYPE "C—L" CATCH BASIN RESERVED PAINTED THIS SIGN TYPICAL AT 7- ALL ACCESSIBLE PARKING • R7-8 8" 3,-0" Proj. Engineer E>M>B> 8" 4'-4" Sheet No. FRONT ELEVATION SIDE ELEVATION TYPE "C—L" CATCH BASIN SURFACE a ra 1 a `_Al 4 - 4 3500 P.S.I. \ a ° P.C. CONCRETE 1'-s" ACCESSIBLE PARKING SIGN N.T.S. VAN ACCESSIBLE PARKING SIGN NOT TO SCALE NOT TO SCALE 25' 2'-6" IN PAVED AREAS LUMINAIRE 175 WATT MV 4" SQUARE ALUMINUM POLE BY MWC LIGHTING SANTA ANA, CALIFORNIA OR APPROVED EQUAL FINISHED GRADE CONCRETE FOOTING AND BASE _. - . -- _ � _ - ..NDARD NOT TO SCALE INSTALL HANDICAPPED PARKING SIGN (TYP.) INSTALL HANDICAPPED PARKING SIGN (TYP,) PAINTED RESERVED PAINTED THIS SIGN TYPICAL AT PARKING ALL ACCESSIBLE PARKING �� R7-8 SPACES WIDE (TYP.) Proj. Engineer E>M>B> THIS SIGN TYPICAL AT Date; APxiL 2009 Sheet No. ALL VAN ACCESSIBLE PAINTED UNIVERSAL PARKING SPACES -� HANDICAP SYMBOL VAN 4' HEIGHT & CENTERED ACCESSIBLE 12"x8" PENALTY SIGN WITH WORDING AS REQUIRED 12"x9" BY STATE OR LOCAL LAW "U" -CHANNEL POST (2-lbs./ft.) z 4" PIPE BOLLARD PAINTED TRAFFIC YELLOW, FILLED o I W/CONCRETE 0 1 SLOPE TOP I� OF CONCRETE IL GROUND/PAVING SURFACE a ra 1 a `_Al 4 - 4 3500 P.S.I. \ a ° P.C. CONCRETE 1'-s" ACCESSIBLE PARKING SIGN N.T.S. VAN ACCESSIBLE PARKING SIGN NOT TO SCALE NOT TO SCALE 25' 2'-6" IN PAVED AREAS LUMINAIRE 175 WATT MV 4" SQUARE ALUMINUM POLE BY MWC LIGHTING SANTA ANA, CALIFORNIA OR APPROVED EQUAL FINISHED GRADE CONCRETE FOOTING AND BASE _. - . -- _ � _ - ..NDARD NOT TO SCALE INSTALL HANDICAPPED PARKING SIGN (TYP.) INSTALL HANDICAPPED PARKING SIGN (TYP,) PAINTED GREEN SITE DESIGN � L�� 31'7 Main Street �tc�rwich, Connecticut (860} 892-13$fl F�� {8fifl} 886-91Fi5 PAINTED LINES, 3" LINES, 3" Ngo. Date Revision WIDE (TYP.) Lot 10 Lambard'i Business Perk WIDE (TYP.) Proj. Engineer E>M>B> B & W PAVING &. LANDSCAPE � LC?MBARDI BUSINESS PARK LLC Date; APxiL 2009 Sheet No. Site Details PAINTED UNIVERSAL PAINTED UNIVERSAL HANDICAP SYMBOL HANDICAP SYMBOL 4' HEIGHT & CENTERED 4' HEIGHT & CENTERED TYPICAL HANDICAP TYPICAL HANDICAP VAN PARKING SPACE NOT TO SCALE STATE APPROVED HANDICAPPED PARKING SIGN TO INCLUDE FINE AMOUNT PAINTED GALVINIZED STEEL PIPE BOLLARD 4" DIA. MINIMUM FINISH GRADE BACKFILL CONCRETE BASE (18" SQ) 7 i PARKM El SATE PERMfi REQUMtED NOT TO SCALE HANDICAPPED PARKING SIGN DETAIL NOT TO SCALE DOUBLE SWING GATE TIE WIRES AT 12" CENTERS 1-5/8- 3/8- TRUSS RODS (TYP.)� A 00 00 CA 1/4"x3/4" STRETCHER •..• , - ;, OT - i s' ol DUMPSTER ENCLOSURE CHAIN LINK FABRIC WITH = ' VERTICAL SLATS ,: - - 12" 1 'x1 5 0 CONCRETE SLAB (PITCH 1 /4"/ft. TO REAR) CHAIN LINK FENCE/DUMPSTER ENCLOSURE NOT TO SCALE GREEN SITE DESIGN � L�� 31'7 Main Street �tc�rwich, Connecticut (860} 892-13$fl F�� {8fifl} 886-91Fi5 10/8/09 FUEL TANK Ngo. Date Revision Lot 10 Lambard'i Business Perk Project No. Gsn—o2 Proj. Engineer E>M>B> B & W PAVING &. LANDSCAPE � LC?MBARDI BUSINESS PARK LLC Date; APxiL 2009 Sheet No. Site Details A, A" A EXIST 'D , , "1 11 11 XIST�, CB, --q -- I - k k TF` i-2 29.5 INV.224.6 INV.=225.1 n LOT 10 TEST HOLE DATA TEST HOLES RECORDED BY ROBERT RUSSO BuTLERTOWN ROAD ON APRIL 2004 TH 110B 4� 93 TOTAL DEPTH ED BY CLA ENGINEERS -- X ON AUGUST 10, 2004 229 -22 9 0-18" Topsoil Dark brown fine sandy loom 42 9 1116� V 18-22" Subsoil strong brown sandy loam J TH #101 with and stones 24 D! and stones 087-13 " TL DEPTH 22 y loom with " OTA -93" brown and grasandy Topsoil Dark brown sandy loom 2 Subsoil dark brown sandy loam NO BEDROCK 13-21 WATER 86" with and stones INSTALL 30 MOTTLING 0 22 21-87" brown and gray sandy loam w/ stones SILT FENCE NO BEDROCK k-1 -26 30' WELL TH #10D NO WATER LOCATION 53" TOTAL DEPTH MOTTLING 0 21" TOPSOIL STOCKPILE 0 12" RCP 0-12 Topsoil black fine sandy loam TH #10J 12-20's Subsoil strong brown sandy loam with V) and stone 88" TOTAL DEPTH MINNOW 30 2 '- -53" Brown and gray loamy sand with silt and 0-12" Topsoil dark brown sandy loam -27 LO stones.stopped a 53 inches too wet 12-24" Subsoil brown sandy loom with stones NO BEDROCK 24-88 Brown and gray loamy sand NO WATER NO BEDROCK MOTTLING @ 20 NO WATER is WATER MOTTLING 0 24" SERVICE IH #10E TH #10K New location for tps need to gps/sketch 86" TOTAL DEPTH CB -TYPE C -L INSTALL CONSTRUCTION 87" TOTAL DEPTH ENTRANCE 0-11" Topsoil brown fine sandy loam 0-10" Topsoil brown fine sandy loam 11-24" WFkl -28f TF -228.0 75" RADIUS Subsoil strong brown sandy loam with stones 10-20" Subsoil brown/yellow brown 21 INV.=225.2 MIN. 24-87" gray brown and loamy sand with silt and stones. sandy loam with larger stones NO BEDROCK 20-86" gray brown and loamy sand w/ stones. 1. WATER 78" NO BEDROCK M OTTLI N G 0 24" NO WATER MOTTLING 0 20" ti TH #10F TH #10 S-A 83" TOTAL DEPTH 0-11" Topsoil brown fine sandy loam 85 " TOTAL DEPTH 11-22" Subsoil yellow brown sandy 0-11" Topsoil brown sandy loom 1 -29 loam with and stones. 11-21 "Subsoil brown/yellow brown sandy loom w/ stones PROPOSED BUILDINQ",", 22-84" gray and brown and loamy sand 21-85" gray brown and loamy sand w/ stones. 109000 SF to sand with stones. NO BEDROCK f \ FF=233.5 NO WATER NO BEDROCK MOTTLING 0 21 WATER 75" MOTTLING ® 22I$ TH 1 o TH SEPTIC SYSTEM NOTES: 80" #10G TOTAL DEPTH new location 10" WIDE CRUSH 0-9 Topsoil dark brown fine sandy loam 1. THE BUILDING, SYSTEM AND WELL ARE TO BE STAKED STONE STRIP 9-24" Subsoil strong brown sandy loam with BY A LICENSED SURVEYOR PRIOR TO THE START silt and stones. Hardpan at 23" OF CONSTRUCTION. WF# 1-3p 24-80" Gray and brown and loamy sand to sand with stones mottles 2. MANUFACTURER TO CERTIFY THE SEPTIC TANK WATERTIGHT. BEDROCK 72 V 3. A BENCHMARK IS TO BE SET, NOTED ON THE PLAN, AND PROVIDED WATER TO UNCAS HEALTH DISTRICT, PRIOR TO THE START OF CONSTRUCTION. MOTTLING ® 24" 4. AFTER THE FILL IS PLACED AND OM MUST BE TH #10H PERC TESTED PRIOR TO INSTALLATION OF THE SYSTEM, 50' 74" TOTAL DEPTH IH -iuu 233.9 72 LF 12" CONC. GALLERIES H-20 LOADING 0-11" Topsoil dark brown fine sandy loam 5. THE WATER USAGE FOR THE FACILITY MUST BE MONITORED. THE WATER TH 10E ELEV.=230.0 BOTTOM OF TRENCH 11-24" Subsoil strong brown sandy loam with METER READINGS MUST BE PROVIDED TO THE UNCAS HEALTH DISTRICT T -WF#1-31 25 C4 silt and stones. ON A QUARTERLY BASIS. THE WELL WITHDRAWAL RATE MUST BE LIMITED INSTALL STONE 56 LF - 12" CONIC. GALLERIES - H-20 LOADING 24-74" Gray and brown and loamy sand to sand TO LESS THAN 10 GPM. DRAINAGE TRENCH X ELEV.=230.0 BOTTOM OF TRENCH with stones and mottles 1,250 GAL SEPTIC NO BEDROCK 6. FINAL BUILDING PLANS MUST BE SUBMITTED TO THE UNCAS HEALTH (SEE DETAIL) 23" H-20 LOADING WATER 66" DISTRICT FOR REVIEW AND APPROVAL OF THE INTERNAL PLUMBING 0 COMPONENTS. TH 10L ......... ... "I[L_ MOTTLING 0 24" 41 -W MANHOLE COVER TO GRAPE PT INV.IN=231.25 H-20 LOADING TH 10D 7. NO FOOTING DRAIN ARE PROPOSED. 8. SELECT FILL SHALL BE INSTALLED FOR RESERVE SYSTEM. INV.OUT=230.3 D -BOX INV.OUT=231.0 1' / INV.IN=230.35 -6� 4' PVC (TYP) INSTALL CONTAINMENT BASIN 9. PRIOR TO OBTAINING PERMIT FOR INSTALLATION OF SEPTIC SYSTEM, ADDITIONAL 1 0 TEST HOLES MUST BE DUG IN THE WEST END OF THE PRIMARY SYSTEM & THE WF#1-32 (SEE DETAIL SHEET4) 0 PERC TEST DATA MIDDLE OF THE RESERVE SYSTEM. do 3 PERC 10: PERC 10A: TH 1 OK o o TOTAL DEPTH - 24" TOTAL DEPTH - 21 PRESOAK AT 11:00 PRESOAK AT 9:45 10 X20 CONIC. SLAB 12:49 12 3/4" 1:45 - 2 PT 1 OA -OTH 10i FOR 4000 GAL 12:54 - 15" 1:50 - 3 1/2 DIESEL FUEL TANK 46) 12:59 - 16" 1:55 - 4 1/2 WF#1-3S�l 1:04 - 17 1/4" 2:00 - 5 1/2 DESIGN DATA 1:09 - 18" LOT 10 2:05 - 6 1/4 'F T-13 101 1:14 - 18 3/4' 2:10 - 7 PRIMARY SYSTEM: WF#1-35 RESERVE PERCOLATION RATE: 10 TO 20 MIN/IN (20/MIN/IN) SYSTEM - - 19 1/2" 2:15 - 7 1/2 1.19 2:20 - 8 1 EMPLOYEES 200 SF OFFICE/200 SF/EMPLOYEE -20 LOADING 6F# 1-34 > 72 LF 12" CONC. GALLERIES H 30" 1:24 - 20 1/4" 1 EMPLOYEE X 20 GPD/EMPLOYEE 20 GPD 2:25 - 8 1/4 ELEV.-230.0 BOTTOM OF TRENCH SETBACK 1:29 - 21 - 8 3 EMPLOYEE = 24.5 EMPLOYEES 2:30 9,800 WAREHOUSE/400 SF/ /4 4.,' 1:34 21 1/4" - 9 25 EMPLOYEES X 25 GPD/EMPLOYEE 625 GPD 2:35 1:39 21 1/2" 2:40 - 9 1/4 APPLICATION RATE: 1.2 GPD / SF •1:44 - 21 3/4" WF#1-36 2:45 - 9 1/2 REQ. EFFECTIVE LEACHING AREA=(645 GPD)/(1.2 GPD/SF)=538 SF 25'• 1:49 - 22" 10B 2:50 9 3/4 USE A 12" CONIC. GALLERY 4 LL MIN H-20 LOADI 2:55 - 10 EFFECTIVE LEACHING AREA OF TRENCH = 5.9 SF/LF USE LAST 30 MINUTES D -BOX EQUALIZED RATE: 20 MIN/IN 3:00 - 10 1/4 LENGTH OF TRENCH REQUIRED -(538 SF)/(5.9 SF/LF)=92 LF - 10 3/4 INV.IN=230.05 3:05 DEPTH TO RESTRICTIVE LAYER: 20" INSTALL 120 LF Q BIT. CONIC. C0JRBl 50" INV.OUT=230.0 PERC RATE 10 TO 20 MIN/IN 3:10 - 11 SLOPE: 1.2% 3:15 - 111/4 HF=62 FF=2.15 PF=1.5 WF#1-37 MLSS=(62)(2.15)(1.5)=200 LF USE LAST 30 MINUTES USE ONE ROW OF 200 LF 30 MIN / 1.75" = 17.1 MIN/IN LEACHING AREA PROVIDED = 1,180 SF 230 EQUALIZED RATE: 20 MIN/IN WF# 1-40 WF# 41 USE EQUALIZED RATE RESERVE SYSTEM: WF#1 -39 28 50' PERC RATE = 10 TO 20 MIN/IN USE SAME DESIGN AS PRIMARY SYSTEM TOPSOIL STOCKPILE 4V 14V AREA SCALE: 1 "=20' WF# 1 -43 15WIDE AREA WF#1-55 CRUSHED STONE STRIP PWF# 1 -44 GREEN SITE r INSTALL CONTAINMENT BASIN WF#1 -54 4 10/23/0c. ROTATED BUILDING (SEE DETAIL SHEET4) DESIGN 10/8/091 FUEL TANK WF 1-45 2 5/20/09 UNCAS COMMENTS -LLC WF 1 -47 WF#1 -48 5/20/09 STAFF COMMENTS 317 Main Street Norwich, Connecticut No. Date Revision (860) 892-1380 Fax (860) 886-9165 Project No. A Lot 10 Lombardi Business Park GSD -02 #1 46 Proj. Engineer WF#1 -49 B & W PAVING E.M.B. Date. & LANDSCAPE APRIL 2009 WF#1-50 WF# 1 -51 305 BUTLERTOWN ROAD Sheet No. i j Grading & Septic