"RES
HAY BALES /SILT
FENCE
ARE TO BE INSTALLED
PRIOR TO CONSTRUCTION.
ONLY REMOVE TREES AND VEGETATION NECESSARY FOR CONSTRUCTION.
PERMANENT SEEDING SHOULD BE DONE AS SOON AS POSSIBLE AFTER
CONSTRUCTION FINISHES. LIME AND FERTILIZE. RECOMMENDED SEEDING
DATES ARE APRIL 1 TO JUNE 15 & AUG. 15 TO OCT. 15.
RECOMMENDED SEED (PER CT GUIDELINES FOR SOIL EROSION AND SEDIMENT CONTROL)
SEED MIX #21 CREEPING RED FESCUE ® 60 LBS/ACRE OR #29 TURF TYPE
TALL FESCUE 0 175--250 LBS/ACRE
HAY BALES AND SILT FENCE TO REMAIN WHERE PLACED UNTIL ALL
DISTURBED AREAS ARE PERMANENTLY STABILIZED.
NO ERODED SEDIMENT SHALL BE PERMITTED TO LEAVE THE SITE OR WASH
INTO THE DRAINAGE SYSTEM.
IF SEEDING CANNOT MEET RECOMMENDED DATES, TEMPORARY MULCH IS
TO BE APPLIED IN ACCORDANCE WITH THE TABLE BELOW.
PER 1000 FT
STRAW OR HAY 1/2 2 TONS 70--90lbs. FREE FROM WEEDS & COURSE
PER ACRE MATTER. MUST BE ANCHORED
SPREAD WITH MULCH BLOWER
OR BY HAND
ANY HAY BALES OR SILT FENCE REMOVED DURING CONSTRUCTION SHOULD
BE REPLACED EACH NIGHT.
SILT FENCE
POST
10' APART
NATIVE SOIL
TYPICAL SILT FENCE
INSTALLATION
-�G1-� qP'
ear
S0 WIA,/V
FR
1.
MAP
EFERENCE:
"RES
DIVISION LOT 32-6
UNDO AND IACONIELLO SUBDIVISION BUTLERTOWN RD. AND RTE. 161
MON
LLE, CONNECTICUT"
DATED 1/26/99 REV 7/20/99 BY ROB HELLSTROM LAND SURVEYING
CERTI
ED A-2 SURVEY.
2.
WETL
DS SHOWN WERE DELINIATED BY IAN T. COLE SOIL SCIENTEST / P.W.S. #2006
3.
AMON OF COMA
fllW&VWlASEWNT AMD MAINTENANCE AGREEMENT RECORDED I
F U
336 PAGE 782
4.
WARR
TY DEED FROM DC
REALTY LLC TO ANTONIO J. IACONIELLO RECORDED IN VOLUME 458 PAGE