Loading...
HomeMy WebLinkAboutSite Plan1. 2. 3. 5. SOIL AND EROSION CONTROL "RES HAY BALES /SILT FENCE ARE TO BE INSTALLED PRIOR TO CONSTRUCTION. ONLY REMOVE TREES AND VEGETATION NECESSARY FOR CONSTRUCTION. PERMANENT SEEDING SHOULD BE DONE AS SOON AS POSSIBLE AFTER CONSTRUCTION FINISHES. LIME AND FERTILIZE. RECOMMENDED SEEDING DATES ARE APRIL 1 TO JUNE 15 & AUG. 15 TO OCT. 15. RECOMMENDED SEED (PER CT GUIDELINES FOR SOIL EROSION AND SEDIMENT CONTROL) SEED MIX #21 CREEPING RED FESCUE ® 60 LBS/ACRE OR #29 TURF TYPE TALL FESCUE 0 175--250 LBS/ACRE HAY BALES AND SILT FENCE TO REMAIN WHERE PLACED UNTIL ALL DISTURBED AREAS ARE PERMANENTLY STABILIZED. NO ERODED SEDIMENT SHALL BE PERMITTED TO LEAVE THE SITE OR WASH INTO THE DRAINAGE SYSTEM. IF SEEDING CANNOT MEET RECOMMENDED DATES, TEMPORARY MULCH IS TO BE APPLIED IN ACCORDANCE WITH THE TABLE BELOW. PER 1000 FT STRAW OR HAY 1/2 2 TONS 70--90lbs. FREE FROM WEEDS & COURSE PER ACRE MATTER. MUST BE ANCHORED SPREAD WITH MULCH BLOWER OR BY HAND ANY HAY BALES OR SILT FENCE REMOVED DURING CONSTRUCTION SHOULD BE REPLACED EACH NIGHT. SILT FENCE POST 10' APART NATIVE SOIL TYPICAL SILT FENCE INSTALLATION -�G1-� qP' ear S0 WIA,/V FR 1. MAP EFERENCE: "RES DIVISION LOT 32-6 UNDO AND IACONIELLO SUBDIVISION BUTLERTOWN RD. AND RTE. 161 MON LLE, CONNECTICUT" DATED 1/26/99 REV 7/20/99 BY ROB HELLSTROM LAND SURVEYING CERTI ED A-2 SURVEY. 2. WETL DS SHOWN WERE DELINIATED BY IAN T. COLE SOIL SCIENTEST / P.W.S. #2006 3. AMON OF COMA fllW&VWlASEWNT AMD MAINTENANCE AGREEMENT RECORDED I F U 336 PAGE 782 4. WARR TY DEED FROM DC REALTY LLC TO ANTONIO J. IACONIELLO RECORDED IN VOLUME 458 PAGE