Loading...
HomeMy WebLinkAboutSite PlanN//, OXIBY FARM, L` LOT #44/3-C) TH{ F 1 B Bio 7 c L n Lt! PROVIDE AND MAINTAIN A CO;7*V ;OUS LINE OF SILT FENCE OR HXTtL.ES cc#` ?dPOSED uMli THROUGHOUT CONSTRUCTION (SEE Df:T'AJL) ` OF CLEARING 1 1 1 1 I N/F JXIfT FARM LLC LOT #4413-002 i l i 1 II 3I 4 r 11 1 l FORSYTH ROAD i in 163 GA. WIRE MFSW _.. :. T- 00 Le 4 " 2 „ Q C) s`' FII iFP 4ND GRADING OF THE PRCrDOSED LOT TO BE LIVI"E" AREAS A: _ TO FA[iI I 2) DIS7_ = -_ PEAS N.- LOAMED, SEEDED, NNS MULCHED. LCKPILED ON SITE AND PROTECTED WITH HAYBALLS CP Z`. n CE f yyi I i y I 1p ! ip # C} 1` A16 t I i i l{ I 5. L R OR'= D"wNCE, C Kl_I0 CI_C_ANIN(_ SEDIMENT CONTROL MEASURES ARE IN PLACEINSPECTI'"• OCCl-"- PACI ED BE RESPONSIBLE FOR THE INSTALLATION AND %Y AINTENANCE Lu CONTROL MEASURES THROUGHOUT CONSTRUCT, 7 ) DUS L W -- Q NECESS .-- 4PPL " N OF CALCIUM CHLORIDE. TEMP Q,APY C ALnff C;"•'R J SI LT FENCE j0T TO SCALE PLANTING SCHEDUI c KNOCKO'.IT OUTLET OrE,I.,,..; RIBS iN'= Rr CAST CONCQ T, 1.) CLEAN=", _•-' ' -- UBBI 4ND GRADING OF THE PRCrDOSED LOT TO BE LIVI"E" AREAS A: _ TO PROPOSED HOUSE, DRIVES"r'AY, AND SEPTIC SYSTFY2) DIS7_ = -_ PEAS N.- LOAMED, SEEDED, NNS MULCHED. 3.) TO SILT LCKPILED ON SITE AND PROTECTED WITH HAYBALLS CP Z`. n CE 4.) ALL FILL rv)C ES ARE NOT TO EXCEED 3:1 SLOPES, 5. L R OR'= D"wNCE, THE REPRESENTATIVE OF THE TOWN OFSHALLRE =. D ', SEDIMENT CONTROL MEASURES ARE IN PLACEINSPECTI'"• OCCl-"- 6.) THE C''%ACTOR 'A _, BE RESPONSIBLE FOR THE INSTALLATION AND %Y AINTENANCEOFALL =._ , _D SED1'•"-1T CONTROL MEASURES THROUGHOUT CONSTRUCT, 7 ) DUS L W -- E ACCOMPLISHED BY SPRAYING WITH WATER, p^4D r NECESS .-- 4PPL " N OF CALCIUM CHLORIDE. TEMP Q,APY C ALnff C;"•'R J a_ CL PLANTING SCHEDUI c MULC" --' "RTIC NOTES SEEDING DATE: I QC APRIL 1 - JU";;; STRAW/.,:-9D AUGUST 1 - S_ GREE FROM WEEDS 0oc AND COARSE MATTER WOOD CHIPS 1 F5-27` ' - FREE OF COARSE MATTER -4545% MIXTURE` RED FESCUE o AIR DRIED, TREAT WITH 45% KENTUCKY BLUE GRASS 0 0 121bs NITROGEN / TON 10% PERENNIAL Rvr TESTHOLE DATA 00 PER MAP REFERENC` F 1 A - 05/04/. a 0"-16" TOPSOIL 16"-39" SUBSOIL 39„--84" FINE TO V SAND NO LEDGE, 'ATER (a 77LING THF1 B - 05/04/, 0"-8" TOPSOIL 8"-32" SUBSOIL z 32 -73" CC,,Q SE SAN' NO LEDGE, 'r'A` ER @ LING 05/04/2-- 5/04/2" 0"-- O w G 0"-1 1 " TOP501L 1 1 "_ 3__z cl L 0ZU TO D W/ SILT NO LEDGER 0 NG @ 35" TH #F" "" 04/ w ME R C YI OTTLI NG PROVIDE PISERS 4x4 12.6/12.6 TO WITHIN 12" OF GA. WIRE MESH FINISH Gr -",DE AT INLET AND OUTLET 24 PROVIDE4" OUTLET 24 FILTER INLET \ POLYLOK PL -122 In Cc CONTINUOUS un? I ASPHALT 5Ea1 f . n -t -, in j 4' SCHEDULE 0+4 1 INLET BAFFLE I LJj' T__---r''f_ 5' - s" - /' 4" OUTLET BAFFLE LINED w/ 1/8" PVC J 60' GAS DEFLECTOR CROS; SECDON INT SEPTIC TALK NOT TO SCALE EER_G,0 I.ATi 1D ti 2,La PER Map 0c ^PNCE If ,, _H FLAN, Z ` " "7 PICTS WRP-1 60, R-80 AND P-120 PREPARED LL_ 11 POAD, OLD COLCHESTER ROADEQD & OXOrBOXO DAvi ' `' i __4(lt_IT/ILI - -- _ .:-. _/ IUri \.-H N'L'R, H.'L V EF t KINV DATED 05/01/2000 WITH F" ' , 09/06/00. N DATA PERCOLATION RATE - ' NCH 3 BEDROOM RESIDEh S 495 SF OF LEACHING AREA PROVIDE (2) 83' (4F`"NCHES, CONNECT ENDS. EFFECTIVE- LEACHING- SI= _ PROVIDE A 1000 GA- "':' RTMENT TANK M.L.S.S, REQUIRED - _ 1.0 = 45' M.L.S.S, PROVIDED PREPARE AREA OF ;. e 7 r_ ' TQM AS FOS A3 1.) REMOVE AND S" L. 2. PLACE BANK RL', . „ 5 THAN 5% FINES; PLACED IN 6 LIFTS AND U p W 00 7-ILEVATION Ck' z Z`. n CE i- U r-- a- O o Ln o o V o LJ 0 BUILDING SETBACK LINE oI? Itr) 20 10 o '----- , W f = elf_.! LLj Q o J a_ CL a- It Ln E cn O 0oc Lc a 0 o LLJ o w 0 0 00 a Y s 1 I ia `' "' V1a z a U O w G P at 0ZU U w w PREPARE AREA OF ;. e 7 r_ ' TQM AS FOS A3 1.) REMOVE AND S" L. 2. PLACE BANK RL', . „ 5 THAN 5% FINES; PLACED IN 6 LIFTS AND U p W ELEV 7-ILEVATION Ck' z Z`. n CE i- U r-- a- O o Ln o o w o LJ 0 BUILDING SETBACK LINE oI? Itr) 20 10 o '----- , W f = elf_.! LLj Q o J a_ CL a- It Ln cn 5.) CAP ENDS OF PIcE "s O w o Lc a 0 o LLJ o w PREPARE AREA OF ;. e 7 r_ ' TQM AS FOS A3 1.) REMOVE AND S" L. 2. PLACE BANK RL', . „ 5 THAN 5% FINES; PLACED IN 6 LIFTS AND U p W ELEV 7-ILEVATION I z COMPACTED TO 95" o r z o w 3.) EXCAVATE 4' W'__' =aND PREPARE SUR, ACE. U 4- BUILDING SETBACK LINE 4 TEST HOLE 20 10 o '----- , 520.7 INVERT ELEVATION GRAPHIC SCALE IN FEET LL. J a- 5.) CAP ENDS OF PIcE "s o w o Lc a ry o LLJ o w PREPARE AREA OF ;. e 7 r_ ' TQM AS FOS A3 1.) REMOVE AND S" L. 2. PLACE BANK RL', . „ 5 THAN 5% FINES; PLACED IN 6 LIFTS AND U p W ELEV 7-ILEVATION S. F. c- COMPACTED TO 95" o r z a 3.) EXCAVATE 4' W'__' =aND PREPARE SUR, ACE. U 4- BUILDING SETBACK LINE O 4,) FILL TRENCHES of, _ e ' -°.D STONE TO HEIGHT OF PIPE INVERTS PLACE TEST HOLE 20 10 o '----- , 520.7 INVERT ELEVATION GRAPHIC SCALE IN FEET PIPE IN TRENCH, ANS = -_",/ER TOP OF PIPE. J a- 5.) CAP ENDS OF PIcE "s o w o Lc a 6.) PLACE A 4' WIDE r -;, 3. `' "JrN-WOVEN FILTER FABRIC ON TOP OF THE o w ENTIRE I F%rr '' ^F T- ; "" '•ND BACKFILL 111117« NATIVE MATERIAL a 7.) REPLt-'-• ` _.SOIL. u NOTES THIS PLAN COMz)L'ES WITH T-2 MAPPING STANDARDS. 2.) BASE FOR LEVEL SL,IB'DIv SIGN MAP. 3.) PROPOSED HODS= =ND SEPTIC SYSTEM TO BE STAKED IN THE FIELD BY A LAND SURVE`'CR LIC-'ED IN -HE STATE OF CONNECTICUT, 4.) LOT AREA = 2.56 _4 ACRES 5.) BENCHMARK TO BE SET IN AREA OF SEPTIC SYSTEM AT TIME OF CONSTRUCTION. LE_QEND FF FIRST FLOC,R ELEV 7-ILEVATION S. F. SQUARE FEET 52.0 -- Ex117ITING CONTOURS r z a I BUILDING SETBACK LINE O ci 1 TEST HOLE 20 10 o '----- , 520.7 INVERT ELEVATION GRAPHIC SCALE IN FEET Q I i Q U-1 L r cn ,,,, m C; 0ozz L.J LL W Y Z V O O O to Q LLJ R' n n_. m ca DATE: 2/2-8/2002 SCALE: " = 20' SHEET: OF 1 z z a I O ci1 LLJ o V) w LLJ a 0 z Q I i Q U-1 L r cn ,,,, m C; 0ozzL.J LL W Y Z V O O O to Q LLJ R' n n_. m ca DATE: 2/2-8/2002 SCALE: " = 20' SHEET: OF 1