HomeMy WebLinkAboutSite PlanN//,
OXIBY FARM, L`
LOT #44/3-C)
TH{
F 1 B
Bio 7
c
L
n Lt!
PROVIDE AND MAINTAIN A CO;7*V ;OUS
LINE OF SILT FENCE OR HXTtL.ES cc#` ?dPOSED uMli THROUGHOUT CONSTRUCTION (SEE Df:T'AJL) ` OF CLEARING
1
1 1
1 I
N/F
JXIfT FARM LLC
LOT #4413-002
i
l
i
1
II
3I
4
r
11
1
l
FORSYTH ROAD i
in
163 GA. WIRE MFSW _.. :.
T-
00
Le
4 "
2 „
Q
C)
s`'
FII iFP
4ND GRADING OF THE PRCrDOSED LOT TO BE LIVI"E" AREAS A: _ TO
FA[iI I
2) DIS7_ = -_ PEAS N.- LOAMED, SEEDED, NNS MULCHED.
LCKPILED ON SITE AND PROTECTED WITH HAYBALLS CP
Z`.
n CE
f yyi I i y I 1p ! ip # C} 1` A16 t I i i l{ I
5. L R OR'= D"wNCE,
C Kl_I0 CI_C_ANIN(_
SEDIMENT CONTROL MEASURES ARE IN PLACEINSPECTI'"• OCCl-"-
PACI ED
BE RESPONSIBLE FOR THE INSTALLATION AND %Y AINTENANCE
Lu
CONTROL MEASURES THROUGHOUT CONSTRUCT, 7 ) DUS L W --
Q
NECESS .-- 4PPL " N OF CALCIUM CHLORIDE.
TEMP Q,APY C ALnff C;"•'R
J
SI LT FENCE
j0T TO SCALE
PLANTING SCHEDUI c
KNOCKO'.IT
OUTLET OrE,I.,,..;
RIBS iN'= Rr
CAST CONCQ T,
1.) CLEAN=", _•-' ' -- UBBI 4ND GRADING OF THE PRCrDOSED LOT TO BE LIVI"E" AREAS A: _ TO PROPOSED HOUSE, DRIVES"r'AY, AND SEPTIC SYSTFY2) DIS7_ = -_ PEAS N.- LOAMED, SEEDED, NNS MULCHED. 3.) TO
SILT
LCKPILED ON SITE AND PROTECTED WITH HAYBALLS CP
Z`.
n CE
4.) ALL FILL rv)C ES ARE NOT TO EXCEED 3:1 SLOPES, 5. L R OR'= D"wNCE, THE REPRESENTATIVE OF THE TOWN OFSHALLRE =. D ', SEDIMENT CONTROL MEASURES ARE IN PLACEINSPECTI'"• OCCl-"-
6.) THE C''%ACTOR 'A _, BE RESPONSIBLE FOR THE INSTALLATION AND %Y AINTENANCEOFALL =._ , _D SED1'•"-1T CONTROL MEASURES THROUGHOUT CONSTRUCT, 7 ) DUS L W -- E ACCOMPLISHED BY SPRAYING WITH WATER, p^4D r
NECESS .-- 4PPL " N OF CALCIUM CHLORIDE.
TEMP Q,APY C ALnff C;"•'R
J
a_ CL
PLANTING SCHEDUI c
MULC" --' "RTIC NOTES SEEDING DATE: I QC APRIL 1 - JU";;;
STRAW/.,:-9D AUGUST 1 - S_ GREE FROM WEEDS
0oc
AND COARSE MATTER
WOOD CHIPS 1 F5-27` ' - FREE OF COARSE MATTER -4545%
MIXTURE`
RED FESCUE
o
AIR DRIED, TREAT WITH 45% KENTUCKY BLUE GRASS
0 0
121bs NITROGEN / TON 10% PERENNIAL Rvr
TESTHOLE DATA
00
PER MAP REFERENC`
F 1 A - 05/04/.
a
0"-16" TOPSOIL
16"-39" SUBSOIL
39„--84" FINE TO V SAND
NO LEDGE, 'ATER (a 77LING
THF1 B - 05/04/,
0"-8" TOPSOIL
8"-32" SUBSOIL
z
32 -73" CC,,Q SE SAN'
NO LEDGE, 'r'A` ER @ LING
05/04/2-- 5/04/2"
0"--
O
w
G
0"-1 1 " TOP501L
1 1 "_ 3__z cl L
0ZU
TO D W/ SILT
NO LEDGER 0 NG @ 35"
TH #F" "" 04/
w
ME
R C YI OTTLI NG
PROVIDE PISERS
4x4 12.6/12.6 TO WITHIN 12" OF
GA. WIRE MESH FINISH Gr -",DE AT
INLET AND OUTLET
24
PROVIDE4" OUTLET
24
FILTER
INLET \ POLYLOK
PL -122
In Cc CONTINUOUS un? I ASPHALT 5Ea1 f .
n -t -, in
j 4' SCHEDULE 0+4
1 INLET BAFFLE I
LJj'
T__---r''f_
5' - s" - /'
4" OUTLET BAFFLE LINED w/ 1/8" PVC J
60' GAS DEFLECTOR
CROS; SECDON
INT
SEPTIC TALK
NOT TO SCALE
EER_G,0 I.ATi 1D ti 2,La
PER Map 0c ^PNCE
If ,, _H
FLAN, Z ` " "7 PICTS WRP-1 60, R-80 AND P-120 PREPARED
LL_ 11 POAD, OLD COLCHESTER ROADEQD & OXOrBOXO
DAvi ' `' i __4(lt_IT/ILI - -- _ .:-. _/ IUri \.-H N'L'R, H.'L V EF t KINV DATED
05/01/2000 WITH F" ' , 09/06/00.
N DATA
PERCOLATION RATE - ' NCH
3 BEDROOM RESIDEh S 495 SF OF LEACHING AREA
PROVIDE (2) 83' (4F`"NCHES, CONNECT ENDS.
EFFECTIVE- LEACHING- SI= _
PROVIDE A 1000 GA- "':' RTMENT TANK
M.L.S.S, REQUIRED - _ 1.0 = 45'
M.L.S.S, PROVIDED
PREPARE AREA OF ;. e
7 r_ ' TQM AS FOS A3
1.) REMOVE AND S" L.
2. PLACE BANK RL', . „ 5 THAN 5% FINES; PLACED IN 6 LIFTS AND
U
p
W
00
7-ILEVATION
Ck'
z
Z`.
n CE i-
U
r--
a-
O
o
Ln
o o
V
o
LJ 0
BUILDING SETBACK LINE
oI?
Itr)
20 10 o '----- ,
W
f = elf_.!
LLj
Q
o J
a_ CL
a-
It Ln
E
cn O
0oc
Lc
a
0
o
LLJ
o
w
0 0
00
a
Y s
1 I ia `' "' V1a
z
a U
O
w
G
P at
0ZU
U w
w
PREPARE AREA OF ;. e
7 r_ ' TQM AS FOS A3
1.) REMOVE AND S" L.
2. PLACE BANK RL', . „ 5 THAN 5% FINES; PLACED IN 6 LIFTS AND
U
p
W
ELEV 7-ILEVATION
Ck'
z
Z`.
n CE i-
U
r--
a-
O
o
Ln
o o w
o
LJ 0
BUILDING SETBACK LINE
oI?
Itr)
20 10 o '----- ,
W
f = elf_.!
LLj
Q
o J
a_ CL
a-
It Ln
cn
5.) CAP ENDS OF PIcE "s
O
w
o
Lc
a
0
o
LLJ
o
w
PREPARE AREA OF ;. e
7 r_ ' TQM AS FOS A3
1.) REMOVE AND S" L.
2. PLACE BANK RL', . „ 5 THAN 5% FINES; PLACED IN 6 LIFTS AND
U
p
W
ELEV 7-ILEVATION
I
z
COMPACTED TO 95" o
r
z
o w
3.) EXCAVATE 4' W'__' =aND PREPARE SUR, ACE. U 4-
BUILDING SETBACK LINE
4
TEST HOLE 20 10 o '----- ,
520.7 INVERT ELEVATION GRAPHIC SCALE IN FEET
LL.
J a-
5.) CAP ENDS OF PIcE "s o w
o
Lc
a
ry
o
LLJ
o
w
PREPARE AREA OF ;. e
7 r_ ' TQM AS FOS A3
1.) REMOVE AND S" L.
2. PLACE BANK RL', . „ 5 THAN 5% FINES; PLACED IN 6 LIFTS AND
U
p
W
ELEV 7-ILEVATION
S. F.
c-
COMPACTED TO 95" o
r
z a
3.) EXCAVATE 4' W'__' =aND PREPARE SUR, ACE. U 4-
BUILDING SETBACK LINE
O
4,) FILL TRENCHES of, _ e ' -°.D STONE TO HEIGHT OF PIPE INVERTS PLACE
TEST HOLE 20 10 o '----- ,
520.7 INVERT ELEVATION GRAPHIC SCALE IN FEET
PIPE IN TRENCH, ANS = -_",/ER TOP OF PIPE. J a-
5.) CAP ENDS OF PIcE "s o w
o
Lc
a
6.) PLACE A 4' WIDE r -;, 3. `' "JrN-WOVEN FILTER FABRIC ON TOP OF THE o
w
ENTIRE I F%rr '' ^F T- ; "" '•ND BACKFILL 111117« NATIVE MATERIAL
a
7.) REPLt-'-• ` _.SOIL. u
NOTES
THIS PLAN COMz)L'ES WITH T-2 MAPPING
STANDARDS.
2.) BASE FOR LEVEL SL,IB'DIv SIGN MAP.
3.) PROPOSED HODS= =ND SEPTIC SYSTEM TO BE STAKED IN THE FIELD BY A
LAND SURVE`'CR LIC-'ED IN -HE STATE OF CONNECTICUT,
4.) LOT AREA = 2.56 _4 ACRES
5.) BENCHMARK TO BE SET IN AREA OF SEPTIC SYSTEM AT TIME OF
CONSTRUCTION.
LE_QEND
FF FIRST FLOC,R
ELEV 7-ILEVATION
S. F. SQUARE FEET
52.0 -- Ex117ITING CONTOURS
r
z a I
BUILDING SETBACK LINE
O ci 1
TEST HOLE 20 10 o '----- ,
520.7 INVERT ELEVATION GRAPHIC SCALE IN FEET
Q
I i
Q U-1
L
r
cn ,,,,
m
C; 0ozz L.J LL
W
Y Z V O
O O to Q LLJ
R' n
n_. m ca
DATE: 2/2-8/2002
SCALE: " = 20'
SHEET: OF 1
z
z a I
O ci1
LLJ
o
V)
w
LLJ
a
0
z
Q
I i
Q U-1
L
r
cn ,,,,
m
C; 0ozzL.J LL
W
Y Z V O
O O to Q LLJ
R' n
n_. m ca
DATE: 2/2-8/2002
SCALE: " = 20'
SHEET: OF 1