Loading...
HomeMy WebLinkAboutSite Planlie, 0 RTT --LOT5_ FORSYTH rION 566,53 297 LOT 6 RADIUS=390.04' DELTA=05'29'26" 62"10 ".57 "IN 2 x 2 5! 8 16 c', A WIRE MESIH 7-V Nt 7 rT j. co Y' 2" 5j&MD D-,EQX 401T TO SCALE MENT N TQQNIR0 R REFEFENCE PLAN CLEARING, GRUBBING, AND GRADING OF THE PROPQSEQ LOT TESItiQLE #5ATOBELIMITEDTOAREASADJACENTTOTHEPROPOSEDHOUSE, DRIVEWAY, AND SEPTIC SYSTEM 0"— 12" TOPSOIL L DISTURBED AREAS TO BE LOAMED, SEEDED, AND MULCHED. 12 60" SUBSOIL 3. ALL TOPSOIL TO BE STOCKPILED ON SITE AND,PROT'CTED 60"— 112 " GRAVEL WITH LARGE ROCKS WITH HAYBALES OR SILT FENCE. NO LEDGE, NO WATER, NO MOTTLING 4, ALL CUT AND FILL '-SLOPES ARE NOT TO EXCEED 3; I' SLOPES. 5, PRIOR TO SITE DISTURBANCE, THE REPRESENTATIVE OF THE TESTHQLE #58 TOWN OF MONT'VILLE SHALL BE NOTIFIED WHEN SEDIMENT 0-10" TOPSOIL CONTROL MEASURES ARE IN PLACE SO THAT THE INI-,,PECTION 10"-34" SUBSOILCANOCCUR. 6. THE DEVELOPER WILL BE RESPONSIBLE FOR THE INSULLATION 34"— 107" GRAVEL WITH LARGE ROCKS AND MAINTENANCE OF ALL REQUIRED SEDIMENT CONT OL NO LEDGE, NO WATER, MOTTLING 4 48" MEASURES THROUGH(_DUT CONSTRUCTION. 7. DUST CONTROL WILL BE ACCOMPLISHED BY SPRAYING WITH TESTHQLL_j_5L WATER, AND IF NECESSARY THE APPLICATION OF CALCIUM CHLORIDE. C#,~-1 " TOPSOIL 10"-48" SUBSOIL 48"— 108" GRAVEL WITH LARGE ROCKS NO LEDGE, NO WATER, NO MOTTLING JEMPORARY YEQUATIVE COVER TESTHOLE #5 MULCHES APPLICATION RATE NOTES C-12" TOPSOIL PER 1000 S.F. 12"-39" SUBSOIL STRAW/HAY 7Ci--9(D lbs. FREE FROM WEEDS 39"-100" GRAVEL WITH LARGE ROCKS AND COARSE M,4TTER:l NO LEDGE, NO WATER, NO MOTTLING WOOD CHIPS 1855-2>75 lbs. FREE OF COARSE PATTER AIR DRIED, TREAT WITH 12lbs NITPOC,FN TON EIRCOLATIOUL INFORMATION PROVIDED PER REFERENCE PLAN PLANT PERCOLATION RATE: 7.2 MINUTES INCH SEEDING DATES APRIL I — — — — — — — JUNE 1 AUGUST 1 — — — — — — SEPTEMBER 15 M8E R FEELBLE SEED MIXTURE: SUBDIVISION PLAN, ZONING DISTRICT R4®, PREPARED FOR RTT DEVELOPMENT, 4_5% RED FESCUE 45% KENTUCKY BLUE GRASS INC., FORSYTH ROAD & CHAPEL HILL ROAD, MONTVILLE, CONNECTICUT, 10% PERENNIAL RYE PREPARED BY CHANDLER, PALMER & KING 11/8/98 QESIreN DAA PERCOLATION RATE 7.2 MINUTES/INCH 3 BEDROOM RESIDENCE REQUIRES 495 SF OF LEACHING AREA FILTER PROVIDE 2-83' (48" WIDE) TRENCHES WITH ENDS CONNECTEDFABRICEFFECTIVELEACHINGAREA = 528 SF POST ANGLE 10* UP SLOPE PROVIDE A 1000 GALLON 2—COMPARTMENT TANK, FOR STABILITY AND M.L,S.S. REQUIRED = 24 x 1.5 x 1,2 = 43.2' SELF CLEANING M,L.S.S. PROVIDED = 83, COMPACTED BACKFILL 7 7, iLd FLUU 1 < REMOVE AND STOCKPILE TOPSOIL. NOT TO SCALE 2, EXCAVATE 4' WJDE TRENCHES, AND PREPARE SURFACE. 3. FILL TRENCHES WITH I" WASHED STONE TO HEIGHT OF PIPE INVERTS PLACE PIPE IN TRENCH, AND FILL TO 2" OVER TOP OF PIPE. 4, CAP ENDS OF PIPES, 5, PLACE A 4' WIDE STRIP OF NON—WOVEN FILTER FABRIC ON TOP OF THE FWTIRV I FNGTI I OF TIIE ICZYSTEMS AND BACKFILLI WITU NATIVE MATER'IAL, PLACF_ TOPSOIL, SEEP & MULCH OUTLET OPENINGS RIBS INSIDE- T 1. TOPOGRAPHIC INFORMATION ON THIS PLAN COMPLIES WITH T-2 MAPPING STANDARDS, 4 2. BASE FOR LEVELS, SUBDIVISION MAP, I PROPOSED HOUSE AND SEPTIC SYSTEM TO BE STAKED IN THE FIELD BY A LAND SURVEYOR. LICENSED IN THE STATE OF CONNECTICUT. CAST CONCRETE COVERS- J 4. LOT AREA = 1.13E ACRES 4x4 12,6/12,6 Gk WIRE MESH 24' c=l PROVIDE RISERS T;- 1KTHIN 12" OF FINISH GR"PE AT INLET AND OSTI. E1 4 PROVIDE 0j,!,'fLET FILTER POLYL0 K FU- 122 OUTLET j 11 IU CONTINUOUS HOT ASPHALT SEAL '_ 4` SCHEDULE #40 INLET 13AFFLE ui j4 3 4" OUTLET BAFFLE LINED W/ 1/8" PVCj' I/ gn, illhS rirrll rrTl_D 01 4f2*5 --c5L TON p p N ANOTTOSCALE TOPSOIL SUITABLE FILL FILTER FABRIC 2 4" PERFORATED PIPE - z ol STONE 4' NOT lu ,_ALL FF ELEV F, 50 566 FIRST FLOOR ELEVATION SQUARE FEET EXISTING CONTOURS PROPOSED CONTOURS BUILDING SETBACK LINE TEST HOLE INVERT ELEVATION SEPTIC SYSTEM PLAN PREPARED FOR R" -f- INC"