Loading...
HomeMy WebLinkAboutAs-BuiltPROVIDE ANTI TRACKING PAD THROUGHOUT CONSTRUCTION PROVIDE CONTINUOUS LINE OF SILT FENCE OR HAY BALES THROUGHOUT CONSTRUCTION i i X I o 0 M BENCHMARK NAIL SET IN CL&P POLE 10861 ELEV.= 558.90 v O d M M JEFFREY MANOR 80'36'33" E 150.00' BOTTOM SY ELEV.=558. Ln F_ �. Li PER REFERENCE PLAN ,. BACKFILL 12" NO STONE (SEE NOTE 9) -� INV.=556.0 S BCI<. - BOTTOM S`rSTEM I ELEV.=559.5 X15 on - SETBACK 27 L. F. 4 SDR 35 TEMPO t OCKPILE 2,000 GAL. SEPTIC TANK P 0'C H +ca 34 L.F. 4" PVC-,�----- - -- -- - O t` SCHEDULE 40 � A GAR.PROPOSES 5 BEDROOM t' SLAB= II RE<_UENCE - N/F c� 565.5 F.F.=567.5 �\ ALBERT L. & EVELYN B. N jO f f I MILLANEro b)C-4 126 FORSYTH ROAD O 043/009-009 � 1 � 1 1 � BUILDING SETBACK LINE 150 FORSYTH ROAD 043/009-014 20' 0 20' 40' SCALE: 1 "=203 ).00' N 8U",56'33"" W J�1 N N 0 FILTER FABRIC SELECT---,-��,, -T I FILL 1 1 „ 16" Ion I 1-- 3" 3" - 2'- 10" HIGH CAPACITY INFILTRATOR NOT TO SCALE 4" CLEAN FILL--" LOAM &SEED CROSS-SECTION DETAIL FILTER FABRIC PROPERTY LINE NOT TO SCALE 1 1 n' ....... POST WIRE MESH FENCING 6" COMPACTED BACKFILL AFTER PLACEMENT OF SILT FENCE SILT FENCE DETAIL LOT 7 118 FORSYTH ROAD 043/009-007 NOT TO SCALE him TH 8A 0-10" TOPSOIL 10"-44" SUBSOIL 44"-112" GRAVEL WITH LARGE ROCKS NO LEDGE NO WATER NO MOTTLING TH 8B 0-9" TOPSOIL 9"-42" SUBSOIL 42"-106" GRAVEL WITH LARGE ROCKS NO LEDGE NO WATER MOTTLING AT 44" vis IffunAku i 0-8" TOPSOIL 8"-48" SUBSOIL 48"-96' GRAVEL WITH LARGE ROCKS NO LEDGE NO WATER NO MOTTLING TH 8D 0-6" TOPSOIL 6"-58" SUBSOIL 58"-105" GRAVEL WITH LARGE ROCKS NO LEDGE NO WATER MOTTLING AT 58" 1. DIG A 6" TRENCH ON THE UPHILL SIDE OF THE BARRIER LOCATION. 2. POSITION THE POSTS ON THE DOWNHILL SIDE OF THE BARRIER AND DRIVE THE POST 1.5 FEET INTO THE GROUND. 3. LAY THE BOTTOM 6" OF THE FABRIC IN THE TRENCH TO PREVENT UNDERMINING AND BACKFILL. 4. INSPECT AND REPAIR BARRIER AFTER HEAVY RAINFALL. 5. SEDIMENT DEPOSITS ARE TO BE REMOVED WHEN THEY REACH A HEIGHT OF ONE FOOT BEHIND THE BARRIER AND ARE TO BE DEPOSITED IN AN AREA WHICH IS NOT REGULATED BY THE INLAND WETLANDS COMMISSION. 6. INSPECTIONS AND NECESSARY REPAIRS WILL BE MADE TWICE WEEKLY. TEMPORARY VEGETATIVF 0 P A TEMPORARY SEEDING OF RYE GRASS WILL BE COMPLETED WITHIN 15 DAYS OF THE FORMATION OF STOCKPILES. IF THE SOIL IN THE STOCKPILES HAS BEEN COMPACTED BY CONSTRUCTION OPERATIONS IT SHALL BE LOOSENED TO A DEPTH OF 2 INCHES BEFORE THE FERTILIZER, LIME AND SEED IS APPLIED. 10-10-10 FERTILIZER AT A RATE OF 7.5 POUNDS PER 1000 S.F. LIMESTONE AT A RATE OF 90 LBS. PER 1000 S.F. SHALL BE USED. RYE GRASS APPLIED AT A RATE OF 1 LB. PER 1000 S.F. SHALL PROVIDE THE TEMPORARY VEGETATIVE COVER. STRAW FREE FROM WEEDS AND COARSE MATTER SHALL BE USED AT A RATE OF 70-90 LBS. PER 1000 S.F. AS A TEMPORARY MULCH. APPLY MULCH AND DRIVE TRACKED EQUIPMENT UP AND DOWN SLOPE OVER ENTIRE SURFACE SO CLEAT MARKS ARE PARALLEL TO THE CONTOURS. PERMANENT VEGETATIVE COVER TOPSOIL WILL BE REPLACED ONCE THE EXCAVATION HAS BEEN COMPLETED AND THE SLOPES ARE 11'-0" GRADED TO A SLOPE NO GREATER THAN 2.5 TO 1. PROVIDE SLOPE PROTECTION ON ALL CUT SLOPES. TOPSOIL WILL BE SPREAD AT A MINIMUM COMPACTED DEPTH OF 4 INCHES. ONCE THE TOPSOIL HAS I -I8" TYP. 2 PLACES BEEN SPREAD, ALL STONES TWO INCHES OR LARGER IN ANY DIMENSION WILL BE REMOVED AS WELL AS 4" INLET TYP. 3 PLACES DEBRIS, APPLY AGRICULTURAL GROUND LIMESTONE AT THE RATE OF TWO TONS PER ACRE 3R 100 LBS. it PER 1000 S.F. APPLY 10-10-10 FERTILIZER OR EQUIVALENT AT A RATE OF 300 LBS. PER ACRE OR _ 7.5 LBS. PER S.F. WORK LIMESTONE INTO THE SOIL TO A DEPTH OF 4 INCHES, INSPECT SEEDBED ^o IL_ -1 1 BEFORE SEEDING. IF TRAFFIC HAS COMPACTED THE SOIL, RETILL COMPACTED AREAS. APPLY THE 1 o FOLLOWING GRASS SEED MIX: N I I SEED MIMRE LBS. ACRE LBS./1000 S.F. 1 1 1 OUTLET KENTUCKY BLUEGRASS 20 0.45 F -1 11 1 4" L.P. P.V.C. CREEPING RED FESCUE 20 0.45 _ _ _ - s u - - .- PIPE SEAL PERENNIAL RYEGRASS 5 0.10 ITT45 1.00 4" L.P. P.V.C. PIPE SEAL TYP. 3 PLACES THE RECOMMENDED SEEDING DATES ARE: PLAN VIEW APRIL 1 - JUNE 15 AND AUGUST 1 - SEPTEMBER 15 24"DIA. 24"DIA. _ FOLLOWING SEEDING, FIRM SEED BED WITH A ROLLER. MULCH WITH WEED FREE STRAW 6" COVER COVER IMMEDIATELY FOLLOWING SEEDING. IF A PERMANENT VEGETATIVE STAND CANNOT BE ESTABL'SHED L 71 18" LEGEND 4�s.. INLET PROPERTY LINE BAFFLE 6" WALLS 5:_4" OUTLET SETBACK LINE LIQUID It FILTER LEVEL DEVICE _ 558 _. -- EXIST. CONTOURS 2,000 GALLON SEPTIC TANK NOT TO SCALE 4 -- PROPOSED CONTOUR LINE EDGE OF DRIVEWAY 560.8 PROPOSED INVERT ELEV. 1. TOPOGRAPHIC INFORMATION ON THIS PLAN COMPLIES WITH T-2 MAPPING STANDARDS. 2. BASE FOR LEVELS: FIELD SURVEY 3. PROPOSED HOUSE AND SEPTIC SYSTEM TO BE STAKED IN THE FIELD BY A LAND SURVEYOR LICENSED IN THE STATE OF CONNECTICUT. 4. LOT AREA = 40,500± SF 5. ALL WORK AND MATERIAL (SEPTIC TANK, DISTRIBUTION BOX, PIPE) SHALL CONFORM TO THE CONNECTICUT PUBLIC HEALTH CODE REGULATIONS AND STANDARDS FOR SUBSURFACE SEWAGE DISPOSAL SYSTEM. 6. SEWER LINE FROM FOUNDATION WALL TO SEPTIC SHALL BE 4" SCHEDULE 40 PVC - ASTM D 1785 AND JOINTS PER HEALTH DEPT. CODE. 7. TRENCHES SHALL BE SET LEVEL FOR ENTIRE LENGTH AND HAVE A CENTER TO CENTER SPACING OF 9 FEET. 8. PIPE FROM SEPTIC TANK TO DISTRIBUTION LINES SHALL BE 4" SOLID PVC CONFORMING TO ASTMD-3034 AND SDR -35. 9. FOUNDATION DRAIN PIPE FROM HOUSE TO OUTLET SHALL CONFORM TO TABLE 2-C OF THE CONNECTICUT PUBLIC HEALTH CODE REGULATIONS AND STANDARDS FOR INSTALLATION WITHIN 25 FEET OF A SEWAGE DISPOSAL SYSTEM. 10. THERE ARE PRESENTLY NO KNOWN WATER WELLS WITHIN 75' OF THE PROPOSED SEPTIC SYSTEM. 11. A VERTICAL BENCHMARK WILL BE PROVIDED WITHIN 100 FEET OF THE PROPOSED HOUSE LOCATION PRIOR TO THE START OF CONSTRUCTION. 12. CLEAR AND GRUB THE AREA WHERE THE SEPTIC SYSTEM AND HOUSE ARE TO BE CONSTRUCTED. ALL TOPSOIL IS TO BE STRIPPED AND STOCKPILED FOR FUTURE USE. 13. ALL FILL MATERIAL SHALL BE CLEAN EARTH FREE OF STUMPS, ORGANICS, CONSTRUCTION DEBRIS AND TOPSOIL. 14. TOPSOIL SHALL BE RE-APPLIED OVER ALL FILL AREAS AND ALL DISTURBED AREAS TO PROVIDE A MINIMUM DEPTH OF FOUR INCHES. 15. ALL EXISTING UTILITIES TO BE ACCURATELY LOCATED PRIOR TO CONSTRUCTION. 16. IF BLASTING IS REQUIRED A PRE -BLAST SURVEY WILL BE REQUIRED. CALL BEFORE YOU DIG: 1-800--922-4455, 17. A TEST HOLE MUST BE DUG IN THE RESERVE AREA PRIOR TO THE START OF CONSTRUCTION. PERCOLATION RATE = 1.0-10 MIN./INCH 5 BEDROOM RESIDENCE REQUIRES 760 SF OF LEACHING AREA PROVIDE 32 - 1'4"H x 2^'10"W x 6'3"L HIGH CAPACITY INFILTRATOR SECTIONS 2 ROWS OF 16 SECTIONS AT 9' O.C. EFFECTIVE LEACHING AREA = (32x6.25 LF) x 3.9 SF/LF = 780 SF PROVIDE 2,000 GAL. 2 -COMPARTMENT TANK M.L.S.S. REQUIRED = 24x2.5x1.2 = 72' M.L.S.S. PROVIDED = 100' PREPARE AREA OF PROPOSED SYSTEM AS FOLLOWS 1. REMOVE AND STOCKPILE TOPSOIL. 2. PLACE BANK RUN GRAVEL (LESS THAN 5% FINES) PLACED IN 6" LIFTS AND COMPACTED TO 95% DENSITY. 3. EXCAVATE 4' WIDE TRENCHES AND PREPARE SURFACE. 4. FILL TRENCHES WITH 1" WASHED STONE TO HEIGHT OF PIPE INVERTS PLACE PIPE IN TRENCH, AND FILL TO 2" OVER TOP OF PIPE. 5. CAP ENDS OF PIPES. 6. PLACE A 4' WIDE STRIP OF NON -WOVEN FILTER FABRIC ON TOP OF THE ENTIRE LENGTH OF THE SYSTEM AND BACKFILL WITH NATIVE MATERIAL. 7. REPLACE TOPSOIL, SEED & MULCH. MAP REFERENCE SUBDIVISION PLAN, ZONING DISTRICT R40, PREPARED FOR RTT DEVELOPMENT, INC. FORSYTH ROAD & CHAPEL HILL ROAD, MONTVILLE, CT., PREPARED BY CHANDLER PALMER & KING, 110 BROADWAY, NORWICH, CT., DATED: 11/8/98. REVISED TO: 10/99, TOWN FILE# 1656 2 9;`15/04 REVISED LOCATION HOUSE/SEPTIC 1 9/10/04 BENCH MART{: SET '4. DATE REVISION c�; a F0 `9 u g j .yo y66 o°000oo®°`j(�^y, Gpi � 0 F 0,21411 CLA Engineers, inc. 1 CIVIL STRUCTURAL -SURVEYING 317 Main Street Norwich, CT 063+60 (860) 886-1966 Fax (860) 886-9165 Project No. RTT Development, Inc. Cllr -3186 Proj. Engineer J.F.M. ?2 FORSYTH ROAD Date: MONTVILLE, CT 7/13/4 Sheet No. ....`,:`¢�&�`��u Septic Design -Lot X122/9 -D08 CLI► _ - -