Loading...
HomeMy WebLinkAboutModified Site PlanTHIS PROPOSAL i ORIGINALLY APPROVED ON ► •4 AND PARTIALLY COMPLETED AS SHOWN ON THE ATTACHED PLANS. MINOR MODIFACTIONS ., APPROVED •r i.. ON, 2iiCHANGE THE SIZE OF THE UNDER ROAD DRAINAGE PIPES AND a ROUTETHE OF OVERFLOW DRAINAGE NARRATIVE THIS PROPOSAL INVOLVESTHE CHANGE OF i- If BOTTOM ELEVATION TO 275.0 AND COMPLETION OF ORIGINAL AND MODIFIED APPROVED D PLAN.y i OF CUBIC YARDS OF GRAVEL r . ACRE POND TO , ACRES, y REGARDINGAND i' 'r AN ACCESS ROAD ALONG THE TOP OF SLOPEOF THE POND. THE GRAVEL BE REMOVED • i' THIS SITE EXCEPT I'THAT WHICH WILL . USED FOR ACCESS ROAD CONSTRUCTION AND THE ACCE55 ROAD 15 TO BE 1/ DURING EXCAVATION/REGRADING r" ry • AND WILL EVENTUALLY BE THE DRIVEWAY TO ACCESS A FUTURE HOUSEON it SIDE OF iTHE SITE CON515TS OF OWNED BY APPLICANT i i APPROXIMATELY ACRES. TOTAL D15TURBANCE 15 25+ ACRES. THE EXCAVATION OPERATIONSARE EXPECTED i, BEGIN r* RECEIPT OF ALL NECESSARY APPROVALS AND ARE EXPECTED TO BE COMPLETED WIT14IN 3 YEARS OR APPROXIMATELY JANUARY 2005. ROGER VIENS *fir BE RESPONSIBLE w► .R ALL INSTALLATION AND MAINTENANCE ALL EROSION r r SEDIMENTt AND MAINTAINED AT THE PROPOSED OF DISTURBANCE IN THE AREA ,i . i ACCESS DRIVE e NEAR THE EDGEOF POND PROPOSED REGRADING ►S. SEDIMENT FENCE WILL it INSTALLED AND k # D AROUND D A' !r i STOCKPILES ALSO. DISTURBANCE OF SOIL SURFACES 15 REGULATED BY STATE LAW. ALL WORK SHALL COMPLY WITH THE APPROVED SITE PLAN TO PREVENT OR MINIMIZE SOIL EROSION THE INSTALLATION AND MAINTENANCE OF EROSION CONTROL DEVICES IS THE RESPONSIBILITY OF THE LAND OWNER, APPLICANT AND THE EXCAVATION CONTRACTOR. TOWN OFFICIALS ARE TO CONTACT MR. ROGER '''LENS AT (203) 848-7871 TO REPORT ANY UNSATISFACTORY CONDITIONS OR OPERATIONS OF THE SESC MEASURES ON THE SITE. A PRECONSTRUCTION CONFERENCE WITH TOWN OF MONTVILLE STAFF 15 REQUIRED. PRIOR COMMENCEMENT OF ANY SITE WORK OR DISTURBANCE THE APPLICANT SHALL USE THE CONNECTICUT GUIDELINES FOR SOIL EROSION AND SEDIMENT CONTROL, REVISED TO 1988 OR LATER REVISION, AS A GUIDE IN CONSTRUCTING THE ERO— SION AND SEDIMENT CONTROLS INDICATED ON THESE PLANS. THESE GUIDELINES MAY BE OBTAINED FROM THE STATE OF CONN- ECTICUT SOIL CONSERVATION SERVICE, HARTFORD, CONN. THE APPLICANT SHALL INFORM ALL CONSTRUCTION SITE WORKERS ABOUT THE MAJOR PROVISIONS OF THE EROSION CONTROL PLAN AND SEEK THEIR COOPERATION IN AVOIDING THE DISTURBANCE OF THESE MEASURES. THE APPLICANT SHALL BE RESPONSIBLE FOR THE TIMELY INSTALLATION, INSPECTION AND REPAIR OR REPLACEMENT OF EROSION CONTROL DEVICES TO ENSURE PROPER OPERATION. THE APPLICANT SHALL INSPECT AND REPAIR EROSION AND SEDIMENT CONTROL DEVICES AT THE END OF EACH WORKING DAY AND AFTER EACH STORM. THE APPLICANT SHALL RESTORE DISTURBED AREAS AS CLOSELY AS POSSIBLE TO THEIR ORIGINAL CONDITION. THE CONTRACTOR SHALL NOTIFY THE WINTHROP GROUP, HEREINAFTER REFERRED TO A3 THE "ENGINEER", OF UN— SATISFACTORY EROSION CONDITIONS NOT CONTROLLED BY T1415 PLAN AND SHALL INSTALL ADDITIONAL MEASURES AS DIRECTED BY THE ENGINEER. THE ENGINEER MAY BE CONTACTED AT (860) 464-1143 IN CASE OF EMERGENCY, FIELD CHANGES TO THIS PLAN SHALL BE MADE ONLY WITH THE WRITTEN CONSENT OF THE ENGINEER. ACCUMULATED SEDIMENT 'REMOVED FROM EROSION CONTROL DEV— ICES SHALL BE SPREAD AND STABILIZED IN LEVEL, EROSION RE— SISTANT LOCATIONS AS GEINEI?AL FILL WITHIN LANDSCAPE AREAS. ALL DISTURBED AREAS NOT COVERED WITH IMPERVIOUS SURFACE ,BUILDING OR MULCH SHALL BE PLANTED WITH GRASS ON 4" MIN. THICK— NESS TOPSOIL LAYER AND PROTECTED WITH MULCH ANCHORING. SEEDING SHALL TAKE PLACE BETWEEN APRIL -15 - TO JUNE 15 AND AUGUST 15 TO SEPTEMBER 30. SEEDING S?­IALL BE PERFORMED IN ACCORDANCE WITH THE FOLLONING SEEDING f STABILIZATION DIRECTIVES: A.) FINE GRADE AND SCARIFY (AS NECESSARY) SEED BED TOGETHER WITH LIMESTONE TO PH OF 6.0 PER 1000 SF. B.) APPLY THE FOLL~OWI�IG SEFD MIXTURE BARON BLUEGRASS AT 50%, PENNLAWN FESCUE AT 35% 4 MANHATTAN II PERENNIAL RYE AT 15%. C,) 1F SEEDING CANNOT BE PL,;FORMED WITHIN THE SPEC- IFIED SEEDING DATES, SEED WITH A.iNUAI" RYE GRASS AT A RATE OF ILB PER 1000 SF AS A T EMPOF._tiRY MEASURE. (LATER RE -SEEDING REQUIRED) OR SEED AS SPECIt'IED AND PROVIDE MULCHING. MULCHING: IMMEDIATELY FOLLOWING SEEDING, MULCH THE SEEDED SURFACE WITH STRAW OR NAY AT A RATE OF 2 BALES PER 1000 5F. SPREAD MULCH BY NAND OR MULCH BLOWER. PUNCH MULCH INTO SOIL SURFACE WITH TRACK MACHINE APPROXIMATELY 2" TO 3" TO ANCHOR SECURELY INTO SOIL. ANY EXISTING OR PROPOSED STORM WATER DRAINAGE STRUCTURES W141CH MAY BE SUBJECT TO SEDIMENTATION, INCLUDING CATCH BASINS/GRATES, INLET/OUTLET STRUCTURES AND OUTFALL AREAS SHALL BE PROTECTED THROUGHOUT THE ENTIRE CONSTRUCTION PERIOD. THE CONTRACTOR SHALL ENSURE THAT ANY DAMAGE, SEDIMENTATION OR OTHER CONSTRUCTION RELATED DEBRIS SHALL BE REMOVED, CLEANED AND/OR REPAIRED FOR ALL COMPONENTS OF ANY STORM DRAIN OR OTHER PROPERTIES AFFECTED BY THIS PROJECT. ALL HAYBALES SHALL BE TOED INTO EXISTING SUBSTRATE SOILS AND STABILIZED WITH STURDY STAKES (TWO PER BALE). ALL TEMPORARY SOIL STOCKPILE AREAS SHALL BE PROTECTED WITH A ROW OF HAY BALES OR SEDIMENT FENCE AROUND THE TOE AND A SPREAD HAY MULCH AND WOVEN NETTING (OR EXCELSIOR EROSION CONTROL MATTING) WHEN LEFT EXPOSED FOR LONG PERIODS OF TIME. UPON PROJECT COMPLETION, ALL DISTURBED AREAS OTHER THAN THOSE SPECIFIED ON THE SITE PLANS, SHALL BE TREATED WITH AN APPROPRIATE SEED MIX TO ENSURE PERMANENT STABILIZATION. ALL TEMPORARY SESC CONTROLS SHALL BE MAINTAINED UNTIL EX— POSED SOILS ARE SATISFACTORILY STABILIZED. �k 400 06, 40 0010, ' �'° I C�P 'i'.e, ` 1 '�.'+.4�b. "u.+.a-.1fu`'•£C�C° +. y� R'rYi"� µ vn� ' iXx ♦ .F } z_ -SED DGS ppm ED SES; . WT FF E oy :-Y:ti r '\! 44Y y 'r a►l-s ' �v+i+ .,moi V 6, 0 X. r ��,'`''�Y g.,a ry�rtr4-•}•.,.. �- F ,yam. 1 Q OF i� � 'FQ�' ' JL- 23,95. 0. V Z, - C> AREA 011- PROPOSMF� IREGRAD] NG '-�+ rig - .. _ w PROPOSED RELOCATION OF DRA N'A � C' ,,"� F-LQN AND OUTFALL FOR DEN ATE I NG . FR FVIO11J55L,y APPROVED BY NETLANDS COMM !SDN ....JLC! Y (DRANING NOT To SCALE) IL EROSION t &DIN __NT NARRATIVE THE FOLLOWING IS THE ANTICIPATED CONSTRUCTION SEQUENCE: A,) 1/03 : SECURE ALL NECESSARY PERMITS FOR DEMOLITION AND CONSTRUCTION. NOTIFY "CALL BEFORE YOU DIG" AT 1-800—q22-4455, B.) 1/03-2/03: INSTALL SEDIMENT FENCES ALONG LIMITS OF DISTURBANCE, NOTIFY UTILITY COMPANIES TO SHUTOFF EXISTING UTILITY SERVICES TO THE SITE; COMMENCE SITE CLEARING; STRIP TOPSOIL AND STOCKPILE. ROUGH GRADE SITE. C.) 2/03-3/03 : PERFORM EXCAVATION, FILL AND GRADE TO PREPARE BUILDING PAD. INSTALL ALL UTILITIES, SEPTIC SYSTEM 4 WELL. BRING UTILITY SERVICES TO BUILDING PAD LOCATION. EXCAVATE t INSTALL FOUNDATION. D.) 3/03-4/03: CONSTRUCT BUILDING. CONNECT ALL. UTILITY SERVICES, E.) 4/03-5/04: INSTALL TOPSOIL, SEED AND PLANTINGS® INSTALL B11'. PAVED SURFACES. CLEAN t REPAIR ALL SESC MEASURES UNTIL FINAL STABILIZATION. OF DEMOLITION AND OTHER SITE OPERATIONS. F.) 1/05: PUNCHLIST ITEMS. APPLY FOR C.O. T141-- CONTRACTOR SHALL PROVIDE ADEQUATE FACILITIES AND EQUIPMENT FDR DUST CONTROL DURING DEMOLITION PHASES THROUGH CONSTRUCTION PHASES. DUST CONTROL SHALL BE A PRIMARY CONCERN AND SHALL BE ABATED WITH ADEQUATE WATER TRUCKS AND CONTINUOUS WATER SPRAYING OF DEMOLITION AND OTHER SITE OPERATIONS NOTES: BOUNDARY INFORMATION TAKEN FROM PLAN TITLED "PROPERTY MAP LAND NOW OR FORMERLY KNOWN OF ROGER J. VIENS AND BIRGIT M. VIENS FELLOWS ROAD MONTVILLE CONNECTICUT NOV. 301 198q SCALE 0=100' SHEET PM—I REVISED UP TO 10-25—q0" PREPARED BY DeCARLO t DOLL INC. ELEVATIONS BASED ON NATIONAL GEODETIC VERTICAL DATUM (NGVD) LIMIT OF INLAND WETLANDS WERE FLAGGED BY MICHEAL SCHAEFER OF ENVIRO—TECH CONSULTANTS AND FIELD LOCATED BY FIELD SURVEY. OTHER TYPES WERE TAKEN FROM THE SCS SOIL SURVEY OF NEW LONDON COUNTY THE SITE IS LOCATED IN A R-120 ZONE SITE 15 NOT LOCATED IN A COASTAL AREA MANAGEMENT ZONE SITE IS LOCATED IN ZONES A AND C AS SHOWN ON THE FLOOD INSURANCE RATE MAP FOR THE TOWN OF MONTVILLE PANEL 5 OF 16 COMMUNITY PANEL #OgOOq 005 B EFFECTIVE DATE JULY 21 Ig THIS PROPOSAL INVOLVES THE COMPLETION AND EXPANSION OF A PREVIOUSLY APPROVED EXCAVATION INVOLVING THE REMOVAL OF g71600± CUBIC YARDS OF GRAVEL WHICH WILL ENLARGE THE EXISTING POND, A550CIATED REGRADING AND CONSTRUCTION OF A ACCESS ROAD ALONG THE TOP OF SLOPE OF THE POND THE PROPOSED AREA TO BE EXCAVATED 15 BASICALLY THE SAME AREA THAT WAS PREVIOUSLY APPROVED BY THE ZONING AND PLANNING COMMISSION. THAT PERMIT EXPIRED. PROPOSED POND ENLARGEMENT AREA IS 1.0± ACRES. PROPOSED WETLANDS DISTURBANCE 15 20.270± SF. THE AREA ADJACENT TO THE EXISTING POND EAST OF THE EXISTING GRAVEL SHALL BE REGRADED TO A 2:1 MAXIMUM SLOPE. LOANED AND SEEDED WITH GRASS. NO FINISH BANK OF THIS EXCAVATION SHALL EXCEED A SLOPE OF ONE FOOT (11) OF VERTICAL RISE IN TW0 FEET (21) OF HORIZONTAL DISTANCE, NO EQUIPMENT USED FOR THE PROCESSING OF EXCAVATED MATERIAL SUCH AS GRADER SHALL BE LOCATED CLOSER THAN 1000 FEET TO ANY STRUCTURE USED FOR RESIDENTIAL PURPOSES THE CRUSHING OF EARTH PRODUCTS 15 PROHIBITED SCREENING MAY BE ACCOMPLISHED WHEN THE FOLLOWING CONDITIONS ARE MET: A. THE PROCESSING (SCREENING EQUIPMENT) SHALL HAVE NO CONVEYOR BELTS. ENSURING THAT THE MATERIAL SHALL BE PROCESSED BY THROUGH THE MACHINERY BY GRAVITY. B. NOT -MORE THAN 5 CUBIC YARDS MAY BE SCREENED AT ONE TIME C. THE ENGINE SHALL NOT BE LARGER THAN 35 HP D. THE PROCESSING (SCREENING) EQUIPMENT SHALL BE PORTABLE AND SELF—CONTAINED E. THE PROCESSING (SCREENING) ACTIVITY SHALL NOT GENERATE, CAUSE OR ALLOW CONTINUOUS NOISE MEASUREMENTS AS PER SECTION 17.8.3.A,5 OF THE TOWN OF MONTVILLE ZONING REGULATIONS F. THE PROCESSING (SCREENING) ACTIVITY SHALL TAKE PLACE ONLY BETWEEN 7 A.M. AND 6 P.M. NO PROCESSING SHALL BF PERMITTED ON SUNDAYS OR HOLIDAYS G. ONLY MATERIAL EXCAVATED AND UNEARTHED AT A SITE IN ACCORDANCE WITH A VALID EXCAVATION PERMIT SHALL BE PERMITTED TO BE PROCESSED (SCREENED)ON SAID 51TE EXCAVATION SHALL NOT BE CONDUCTED BETWEEN THE HOURS OF P.M. AND 7 A.M. EXCEPT FOR MUNICIPAL PURPOSES EXCLUSIVE OF SUNDAYS AND HOLIDAY5 (HOLIDAYS BEING NEW YEARS DAY MEMORIAL DAY INDEPENDENCE DAY LABOR DAY THANKSGIVING AND CHRISTMAS DAY. BEFORE A SPECIAL PERMIT FOR AN EXCAVATION 15 ISSUED. THE APPLICANT SHALL POST A BOND IN ACCORDANCE WITH SECTION 18.5,10 OF THE TOWN OF MONTVILLE ZONING REGULATIONS IN AN AMOUNT APPROVED BY THE COMMISSION OF AS SUFFICIENT TO GUARANTEE CONFORMITY WITH THE APPLICABLE PROVISIONS OF THESE REGULATIONS. ANY ACCESS ROAD WITHIN THE AREA OF OPERATIONS SHALL HAVE A DUSTLESS SURFACE WHICH 15 MAINTAINED AT ALL TIMES. PROVISIONS SHALL ALSO BE MADE TO PREVENT DUST FROM BLOWING INTO NEIGHBORING PROPERTIES FROM EXCAVATION OPERATIONS OWNER OF RECORD AND APPLICANT ROGER VIENS, 255 LEFFINGWEL. ROAD UNCASVILLE CT 06382 AREA OF EASTERN LOT IS 5,251 ACRES (228,733±SF), AREA OF WESTERN LOT 15 12.7± ACRIES (5531212±SF) MAJOR LAND USE OF ABUTTING PROPERTIES TO THE WEST, SOUTH AND EAST ARE SINGLE FAMILY, TWO FAMILY AND MULTI FAMILY RESIDENTIAL. SCHOFIELD POND ABUTS THIS SITE TO THE NORTHEAST. VACANT LAND OWNED BY THE TOWN OF MONTVILLE ABUTS THIS PROPERTY TO THE NORTHWEST REFERANCE SITE PLAN DATED JUNE Iggl BY TOTAL TECHNOLOGY INC. ( ATTACHED) WAIVER OF SECTION 18.2.4 OF THE TOWN OF I-IONT`ALLE ZONING REGULATIONS (A-2 SURVEY) GRANTED BY THE TOWN OF MONTVILLE PLANNING AND ZONING COMMISSION CHAIRrAN/SECRETARY DATE SOIL EROSION AND SEDIMENT CONTROL PLAN CERTIFIED BY THE MONTVILLE PLANNING AND ZONING COMMISSION CH>y iRI 'AIWSECRETARY DATE SPECIAL PERMIT GRANTED BY THE MONTVILLE PL,1oNNING AND ZONING COMMISSION CHAIRMAN/SECRETARY DATE The Winthrop Grou] ARCHITECTS 'I ENGINEERS INTERIOR DESIGNEF 2 Chapman Lane, Ste C 4 Court St, Ste 16 Gales Ferry, CT 06335 Taunton, MA 0272 Voice (860) 464-1143 Voice(508)82464, Fox (860) 464-1202 Fax (508-- 824-612 Contractor shall verify all dimensions and relations to other work before fabrication and/`or installation. All notes on this drawing are typical and apply equally to all comparable condition: Drawings are not to be scaled. Written dimensions shall tape preced,­-?ce. l hese drawings are the property of The Winthrop Group and have been specificall^ prepared for the owner of this project a� this site, and are not to be duplicated c used in part or whole for any other purpose, project location or owner withou the express written consent of The Winth Group. Markl Date Description ISSUE MODIFIED OF SITE PLAN PROPOSED GRAVEL EXCAVATION Date: 12-11-02 Drawn by: JRH Checked by: ELG Project no.: CAD fil e no.: NAMF_nw� SHEET OF INDUSTRIAL NETTING, SNOW FENCE 2"x 2"x 48" WOOD POLE OR WOVEN WIRE FENCE FOR SUPPORT 7 ON CENTER MAXIMUM FILTER FABRIC T_ BACKFILL 10 FLOW NATIVE SOI L' S"Effum"IMENT FENkA0*;'E CONNECTICUT D.O.T. STANDARD RIP,RAP (30- THICK MIN.) 1' MIN, le, % a- CIO V�do 0-<.P C, ogs000c, a®o C. � 45 3 IV 3 6 6m BEDDING ON FILTER FABRIC RIP RAP CH AANNEL PROPOSED IGRADE OF GRAVEL ACCESS DRIVE G R AV E Lam_ -_Al_ 12 2.5' MIN. tach Vow 4 Q I*CT 0,C 104 o %4 toor 0,00 -4p 0 cop 96 Itro 7b 4w t• 0 0 9, w. 0 V'# 0 6 040 lwv�, %, 00,0 oey-c 0 0 \D;Wor a® vo .9"0" # , 060 12" MIN. 0 0 �Pe p D 4 11000111 6 1 op /O 10 & 0 �6 CIO 0 0 0'Zolpo 00 a - 0 .101.0 01,00 fig CRUSHED ST( NE—J *NOTE: EXCAVATE EXISTING MATERIAL DOWN TO STABLE BASE, TO BE VERIFIED BY ENGINEER "ULVERT 0N DUE TO DISTORTION DURING REPRODUCTION, THIS PRINT MAY NOT 01 SCALE EXACTLY. ALL DIMENSIONS SHOWN OVERRULE SCALING. IF , I TliERE ARE ANY DISCREPANCIES, CONTACT ENGINEER. 9 A TH PROPOSt,,I- INVOLVES THE EXCAVATION OF 24,000-+ CUBIC, YARDS OF GRAVEL WH WILL CE A 6.0+ ACRE POND TO 7,0+ ACRES, ASSOCIATED REGRADINe AND CONSTRUCT OF AN ACCESS ROAD ALONG THE TOP OF SLOPE OF THE >k<. THE GRAVEL WILL B. EMOVED FROM THIS SITE EXCEPT FOR THAT WHICH WIJBE USED FOR THE ACCESS ROAD NSTRUCTION AND REGRADING. THE ACCESS R-OA13 IS TO BE USED DURING THE EXCAVA ON/REGRADING OPERATIONS AND WIL EVENTUALLY BE THE S DRIVEWAY TO ACCESS A F RE HOUSE ON THE NORTHWES IDE OF THE POND. THE TOTALING SITE CONSISTS OF 2 PROPER] OWNED BY THE APP ANT TOTALING APPROXIMATELY '5� 28 ACRES. 711E TOTAL AREA OF URBANCE IS -+ ACRES. THE EXCAVATION OPERATIONS P BEGIN UPON RECEIPT OF ALL NECESSARY APPROVALS (OCTOBER 199 AND A EXPECTED TO BE COMPLETED WITHIN 3 YEARS OR APPROXIMATELY OCTOB5E7�,­T_4, )WILL ROGER VIENS (848-7 BE RESPONSIBLE R ALL INSTALLATION AND MAINTENANCE OF ALL , OSION CONTROL MEASURES. • RESPONSIBLE R AL IN STA L T 1 0 N POS ED LIMIT T C L < SEDIMENT F E WILL BE INSTALLED AND MAINTAINED AT THE POSED LIMIT OF H DISTURB E IN THE AREA OF THE PRO -POSED ACCESS DRIVE AND N THE EDGE OF T i THE ND IN THE PROPOSED REGRADING AREAS. SEDIMEN FENCE WILL B NSTALLED I� AROUND ALL TOPSOIL STOCKPILES ALSO. MAINTAINED NIF CONSTRUCTION SEQUENCE CID CocGESHALL WARREN R. SECURE ALL NECESSARY PERMITS. 2. IN LL SEDIMENT FENCE/STAKED RAY BALES ALONG THE PROPOSED CLEARING LIMIT ,kt I SHOWN. 3. BEGIN GRAVE CAVATION IN POND AREA. THIS OPERATION WILL CONTI THROUGHOUT —PROPOSED CLEARING LIMIT THE PROJECT. lb IV lb (TI CLEAR PROPOSED RAVE CCESS DRIVE AREA AND PROPOSED P EXCAVATION AREA OF ACK LINE BUIL61NG SETB ALL VEGETATION. STRIP D GRUB AREAS- STOCKPILE T OIL IN LOCATION SHOWN TION. FOR REUSE AFTER COMPLETION INSTALL SEDIMENT F DOWNHILL OF STOCKPILE TO MINIMIZE SEDIMENTATION. WOO SHALL BE CUT , D REMOVED FROM SITE BY THE N, If 0_lt_ APPLICANT, BRUSH SHALL BE T PS WILL BE BURIED IN THE AREA OF PROPOSED REGRADING ON T OF THE POND. INSTALL DRAINAGE BENCHMARK 312-- CULVERTS, RIP RAP APRON AND RIP V HANNEL. REGRADE INLET AS NECESSARY, INSTALL GRAVEL FOR ACCESS DRIVE k iW�0� -44 (NGVD) �p�,E IN 1 9" OAK ELEV 336 f 5 INSTALL SEDIMENT FENCE AD�JA TO POND IN AREA OF PROPOSED REGRADING. CLEAN C C AREA OF VEGETATION. DE I T GRAVEL AND STUMPS AREA AND/OR REGRADE AS REQUIRED. -Oro, ALL DISTURBED AS OTHER THAN THE GRAVEL ACCESS W�A SS ROAD D POND SHALL BE LOAMED AND SEEDED WITH GRASS UPON COMPLETION HE RESPECTIVE I I J; ' f! ( / AREA ALL SLOPES HAVE BEEN PERMANENTLY STABILIZED, REMOVE EROSION OSION NTROL F"T A AFT I L EROz-310N AND SEDIMENT ClONTROL NOTES DISTUR3A.NCE OF SOIL SURFACES IS REGULATED BY STATE LAW. ALI, WORK SHA INIMIZI, SOIL EROSION. COMPLY WITH THE APPROVED "SITE PLAN" TO PREVENT OR M T kRSA P""C'�Y' RE_-'IRADTNG 2. HE INSTALLATION AND MAINTENANCE OF EROSION CONTROL DEVICES IS, THE SPONSIBILITY OF THE LAND OWNER, APPLICANT AND THE EXCAVATION CONT TOR. T iTN OFFICIALS ARE TO CONTACT MR. ROGER VIENS AT ('2,031 848 -871 TO ErORT cr) J CONDITIONS OR OPERATIONS OF' THE SESC MEASURES 0 THE SIT A PRECONSTRUCTION CONFERENCE WITH TOWN OF MONTVILLE AFF IS REQU �:D, PRIOR TO CO,"-ENCEMENT OF ANY SITE WORK OR DISTURBANCE. 3. THE AP 'ICAliT SHALL USE THE 'CONNECTICUT GUIDELINES FOR SOIL AND SEDIMENT\ CONTROL- REVISED TO 1988, AS AMENDED, AS A GUIDE INOkONSTRUCTING THE EROSI� AND SEDIMENT CONTROLS INDICATED ON THESE PLANS. POND 810.2SHE GUIDELINES 0 MAY OBTAI D FROM THE CONNECTICUT COUNCIL ON SOIL AND WATER;``CONSERVATION, PROPOSED SEDIMENT FEN(,` STATE OF'-'-TCX BUILDING, HARTFORD, CT 06106, 4, THE APPLICAN SHALL INFORM ALL 4 MAJOR CONSTRUCTION SITE WORKER � ABOUT THE OR Fr" PROVISIONS OF THE SITE AND REQUIRE THEIR COOPERATION' IN AVOIDING THE 11 DlSTURlJQ,:E OF ESE CONTROL MEASURES. 7' 5. THE AP�'LICANT SH�ALL SCHEDULE ALL OPERATIONS TO LIMIT41� DISTURBAN(l­E TO THE SMALLE,. - PRACTICAL""AREA FOR THE SHORTEST POSSIBLE TIME-� A 6• THE A. liPlICANT is XESPONSIBLE FOR THE TIMELY R� TALLATION, INSPECTION, REPAIR CR REPLACEMVNT OF EROSION CONTROL DE -VICES TO ENSURE PROPER OPERATION. 7. THE APPLICANT SHALL INS AND REPAIR EROSION &ND SEDIMENT CONTROL DEVICES \\ \\ \�` �, \ \\ 1 \ �\ \\ AT THE EN) OF EACH WORKIA DAY AND AFTER EACH S'bRm. N THE APPLICANT SHALL NOiFY THE ENGINEER OF UNSATISFACTORY EROSION ONTROLLED &Y THE SITE PLAN AND SHALL INSTALL ADDITIONAL CONDITIONS NOT C MEASURES AS DIRECTED. N 9. FIELD CHANGES TO THE SITE PLAN HALL BE MADE ONLY WITH THE WRITTEN APPROVAL N OF THE R'iGINEER AFTER REFER MftCledMlmmQF THE TOWN OF MONTVILLE INLAND WETLANDS ENFORCEMENT OFFICE ff 10. ACCUMULATED SEDIMENT REMOVED FROM 0 SION CONTROL DEVICES IS TO BE SPREAD 60' REAR f i \ \ \ �\ \ \ \�� \\ AND STABILIZED IN LEVEL, EROSION XISTANT LOCATIONS AND NOT IN REGULATED W (POND, ETC.) E T L -4-N D �,R EA S SEEDING: BETWEEN APRIL I TO JUNE 15, WD AUGUST 15 TO SEPTEMBER 15, ALL "I DISTURBED AREAS SHALL BE IMMEDIATE f 1 \ � �� ` \� ��- �'� •,� STABILIZATION OF SLOPES. ATEV GRADED AND SEEDED TO PROMOTE SEEDING SHALL BE DONE IN ACCORDANCE WITH THE FOLLOWING SEEDING AND SLOPE STABILIZATION NjRECTIVES: ................... ....................... A. FINE RADE SEED BED TOGETHER WITH LIMESTOIN AT A RATE OF 90 LBS. I PER 1000 SF AND 10-10-10 FERTILIZER AT A RATE OF 7N LBS. 'SF. LIME AND FERTILIZER ARE TO *11 PER 1000 BE APPLIED ONLY ONCE, t � It �\ \ �\�` 1`�1� �`�\ �``e �� ��` `�_—� — ^— _---_,____--_�` = � '�`` _, B. APPLY THE FOLLOWING SEED MIXTURE: KENTUCKY{� \ ��\ `'� - ` `\ \ ^ — -- — - 3'`� PERENNIAL BVE GRASS AT 45%; CREEPING RED FESCUE AT 45% AND, -RENNIAL RYEGRAS S AT lo%% SEF ING, MULCH THE AREA WITH HA OR STRAW AT A C . IMJME�TATELY UPON RATE OF 2 / :'.,LES PER 100(_�' SF_ �81,9., ------ D . IF SEKI-�TNC; -------- ,Al';NOTj'BE DONE WITHIN THE SPECIFIED U b 3,eo SEE NG DATES, SEED WITH T%. ANNUAL CVEGRASS ,AT A RATE OF I LB/1000 SF AS A TEMP Y MEASURE (LATER 3_��e RESEED -NG REQUIRED) OR SEED AS SPECIFIED AND PROVI E MULCHING AND/OR PERIOD-: _7 WATFP NG FOR SUMMER MONTHS. 3 -?4 3R6 12, MULCHING IMMEDIATELY FOLLOWING SEEDING, MULCH THE SEED SURFACE WITH Q, MULCH BENCHMARK p 3,e8— — STRAW OR q.AY,,AT A RATE OF 70 LB/1000 SF. SPREAD M BA RAND OR MULCH 380� BLOWER- ?U�CH MULCH INTO SOIL SURFACE WITH TRACK MACHINE \ APPROXIMATELY 2"- 3" TO ANMOR. TOP OF HUB 3 ELEV 334.58 (ATC VD) 13. IN THE Ev'ENT 'THAT EROSION AND SEDIMENT CONTROL MEASURES ARE NOT INSTALLED MA7 NOR I4ATNED IN ACCORDANCE WITH THE PLAN TITLED -SITE PLAN -', I PROPOSED GRAVEL �'�:,KCAVATION, PREPARED FOR ROGER VIENS, FELLOWS ROAD, MYNTVILLE, N CONNECTICUT" DATED JUNE 1991, THEN THE APPLICANT SHALL BE REQU4RED TO IMMEDVATELY CEASE AND DESIST ALL CONSTRUCTION UNTIL SUCH TIME IkS SAID '77-1, T ERos;6N AND SEDIMENT CONTROL MEASURES ARE INSTALLED AND/OR REPAIRkD AND WRITTEN '�RTIFICATION TO CONTINUE CONSTRUCTION IS GRANTED BY THE D Llm,[T OF LNrLlAAr WE 'DS CFFICER, _D wZTLA VDS 14, THE PROPERTY OW'NER, PRESENTLY ROGER VIENS, SHALL BE RESPONSIBLE FOR E J4AIN`TF_NA_N,_E OF THE PERMANENT EROSION CONTROL MEASURES WE J TED EN THIS PROJECT \ COMPLE: S AN MH SAN TF 137.51 lAq' '-)'26.28 36 WAI*.--r "i '�KCT:3,N 18 2 4 OF THE TOWN OF MONT'VILI-E ZONING REGUII�ITIONS 20' WJDE SAVITARY EASEYE1,7T N (A..- S_­Y�--�') CR -A -';TF" 5, THE 4ONT%TILLF PLANNING AND ZONING COMMISSION CHA: R_'tA_N,, S ECRETA.RY DAT F \MIT SOIL F_R_ A -S'_ SEDIMENT :ONTROL PLAN CERTIFIED BY THEOlT LE 'I N AND Z._,N:S; CD"': S S 10 N CHA: S E. --RET, ARY DATE 4C 20 GRAPHIC S, -'ALE IINT l.T7 (CHECK B-IFORV '_'-'_?.G 0 h F Z' iQ4 LIJ (_ D w0 Z 0 0) Z 0 z 0 cf � < C bi Z 0 _J 7r Lr, UJ Z C\, um 0 SPEC:.— -!,!IT ­iANTKED 61 THE MON7VILLE PLANNING kNL ZIJNIN;, CO`J41SS'ON 'A H lll-�` VI 4, P 1 !.-34 (,-;�C) A P 11. "r"l—C") F R 0 M, 0', T H R -M PS, DEEru% DIMENSIONZ) r"T TO BE CO'rN0T7N"U'ED AND OTH.P.-7 Rit S 0 i R CEEB (_)F INP 01 NU AS AN A�4(.%OUROI_A�,�_E SIURVEY AND ui_�%j.�_CT TO FINAL 'UNA �_e _�.o U, L 0 V -ANIJ DIS"'O"Lo"E. MORE Ar^, P?JCTE SUR"OEY 1A OC 1989 TOTAL TECHNOLOGY INC, These drawings are the property of the Engineer and have been specWlcatl,y prepared for -the owner of this project, at this site, and a -re not to be dupticated or used R) part or whote for any other purpose, project, location or owner without the express written consent of' the Engin"r. OF JOB NO, 9 1 3- 10 Z 0) LLJ _J z 0 cf � w bi U OF JOB NO, 9 1 3- 10 0 r.3 i7l�) z OF JOB NO, 9 1 3- 10 t ZONING DATA TABLE _ R-120 ZONE 328 PROPOSED CONTOUR REQUIRED MINIMUM LOT AREA 120,000 SF MINIMUM LOT FRONTAGE 200 FT MINIMUM FRONT YARD 60 FT MINIMUM SIDE YARD 25 FT MINIMUM REAR YARD 60 FT MAXIMUM HEIGHT 35 FT IN - -_ SAN— a �-SAN TF 332.7 SAN MH, INV 324.4? TF 330.09 - - - INV 323.44 - - - w c.a 0 SCHOLFIELD N RAYMOND R-40 4 R-120 ' -ELE PD C -20 SCAB_: - _ 00' GRAPHIC SCALE IN FEET � SES ll �iFOR-KATION TAKEN FROM PLAN TITLED ^PROPERTY MAP IAND NOW OR FORMERLY OF RD' ER VIF*7S AND BIRGIT M. VIENS FELLOWS ROAD MONTVILL.E CO! lFCTICUT NyV 3C, :4Ev SCALE i"-100' SHEET PM -1 REVISED UP TO 10-25-90" PREPARED BY DeCARLO 3�0 DOLJ-. INC. ELEVAT NS BASED ON NATIONAL GEODETIC VERTICAL DATUM (NCVD) . ��MIT 0 INLAND WETLANDS WERE FIA.GGED BY MICHAEL SCHAEFER OF ENV 0 -TECH °CONSULTANT AND FIELD 1,0CATED BY FIELD SURVEY. OTHER SOIL TYPES WERE T EN FROM THE SGS SOI SURVEY OF NEW LONDON COUNTY. -. SITE LS IOCAT IN A R-IL20 ZONE. SITE IS NOT ED INA COASTAL AREA MANAGEMENT (CAM) ZONE. c. SITE IS LOCATED ZONES A AND C AS SHOWN ON THE FLOOD INSU E RATE MAP FOR THE TOw?, OF MONTV PANEL 5 OF 16 COMMUNITY PANEL x:090099 0005 B EFFECTIVE DATE JULY 2, 1980. THIS PROPOSAL INVOL S THE COMPLETION OF A PREVIOUSLY APPROVED EXCAVATION IN,'O_VINC THE REMOVALF 24,000+ CUBIC YARDS OF GRAVEL CH WILL ENLARGE THE EXISTING POND, ASSOCIAT REGRADING AND CONSTRUCTION OF `ACCESS ROAD ALONG THE TOP iF SLOPE OF THE PON THE PROPOSED AREA TO BE £XCIVATED IS BASICALLY THE SA.wF AREA THAT VAS PR£VI SLY APPROVED BY THE ZONING ND PLANNING COMMISSION. TKAT PERMIT EXPIRED THIS Y r PROPOSED POND ENiARCFKENT AR IS 1.0+ ACRES. PROP ED WETLANDS DISTURBANCE -tS 20,270+ SF TH£" AREA ADJACENT TO TliE EXISTI G POND EAST OF E EXISTING GRAVEL DRIVE SHALL BE REGRADED TO A 2:1 MAiIMUM SLOP LOAMED AND SF DED WITH GRASS, G NO FINISHED BANK OF THIS EXCAVATI SHALL FJEED A SLOPE OF ONE FOOT (1') OF VERTICAI. RISE IN ir0 FEET {2'} 0 H ZO 5T GE. NO EQUIPMENT L'S ED FOR THE PROC OW NG ` F CAVA MATERIAL SUCH AS A GRADER, SHALL BE LOCATED CLOSER THAN 1000 FEE 0 ANY STRUCTURE USED FOR RESIDENTIAL PURPOSES, THE CRUSHING OF EARTL{ PROD TS IS PROHIBITED, SCREENING MAY BE ACCOMPLISHED WHEN THE FOLLOWING CONDITIO S E MET: THE PROCESSING (SCREENING EQtJIPM) SHA HAVE NO CONVEYOR BELTS, ENSURING THAT THE �'.;EkIA SHABE PRC)(7F$S D TiROUG THE MACHINERY BY GRAVITY. ti :: M: R.P YAti 5 CUBIC. YARDS FAY SCREENED r ONE TIME niF- ENGINE S'r:ALI- NOT BE LARGER YliAN 35 HP, C THE PROCESSING (SCREENING) F_QUJfPMFNT SHALL BE ORTABLE AND SELF-CONTAINED. THE PROCESSING (SCREENING).-CTIV.ITY SHALL N T GENERATE, CAUSE, OR ALLOW CONTIN-UOUS NOISE MEASUR£M S AS PER SECTION 17.8.3.A.5 OF THE TOWN OF 4ONTV1ItF ZONING REGULATION F. THE PROCESSING (S(;RFJFNING)`ACTZVIT7 SHALL TAKE P CE ONLY BETWEEN 7 A.M. AND b P.H. NO PROCESSING SHA BE PERMITTED ON SUNDAYS HOLIDAYS. C, ONLY MATERIAL EXCAVATED, AND UNEARTHED AT A SITE I ACCORDANCE WITH A VALID EXCAVATION PERMIT SHA BE PERMITTED TO BE PROCESSED CREENED) ON SAID SITE. 1�' EXCAVATIONS SliALL NOT B CONDUCTED BF;TWE-FN. TFE HOURS OF 6 M. AND 1 A.M. EXCEPT i FOR MUNICIPAL PURPOSES EXCLUSIVE OF SUNDAYS AND HOLIDAYS. (HOLIDAYS BEINC NEW i \ YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, iANKSGIVING DAY AND FEASIBLE CHR' ST"4AS DAY) _ i` IB BEFORE A, SPECIAL P II` FOR AN L''YCA`,%'.ICN lS ISSUED, THE APPI-' SRALI. POST. A STOCKPILE BON:; IN ACCORD CE WITI: SFCTI.": 13.5.10 OF THE TOWN OF NTVILLE ZO'N'ING LOCATION �R REGULATIONS IN AMOU:RT APPROVED' D' 1,Y THE C:)MMI SSI014 AS SUFFIC 'F 'T TO GUARANTEE .f._O j J� CONFORMITY WITH HE APPIAC.i9LE PIC')'iISIONS C'F 1HESE REGULATIONS m /j AN'i ACCESS R AD V1'11II;( THE ARLA. OF OPE(A7ION:I SHALL HAVF. A DUST SS SURF'AC Y V'HICH 1S MAI TA:NED AT. ALL TIMES. ITOVISION3 SlIALL ALSO BE MADE TO P EVEN!' ')U�T INTO NEIGH' -LUNG 1'P.'l-I't!:TIES FROti EXCAVATION OPERATIONS_ L»tiEF: C'F' E.`RD AND APPLICPNT: ROGER VIENS, 255 I.EFFINGWEL_ ROAD UNC SV'1'1— , f CT AR FA FASTER:: LOI IS 5.251 ACRES (2:'8,733+ SJ'). AREA OF WESTERN LOT IS `.7± ACKES/'553,212+ SF), KAU R LAND USES CF A.Bj1I`ING PROPERTIES TO THE WEST, SOUTH AND EAST ARE SING F ILY. TWO FAMILY AND MULTI -FAMILY RESIDENTIAL. SCHOLFIELD POND ABUTS THIS SIT TIHE NORTHEAST. VACAIIT LAND OWNED BY THE TOWN OF MONTVILLE ABUTS THIS PROPERTY BENCHMARK TOP OF IRON PIN LEGEND AND ABBREVIATIONS V/F LTL ENT F_ .I S ES _ I MI T ED P__ �7'11T `RS . ' -- - - 328- -- CONTOUR 328 PROPOSED CONTOUR + 330.0 PROPOSED SPOT GRADE — BUILDING SETBACK LINE CMP CORRUGATED METAL PIPE .0" DIAMETER EI,E :' ELEVATION HDPE HEAVY DUTY POLYETHELENE INV INVERT II' 1IRON PIPE/IRON PIN LBS POUNDS M}f MANHOLE MIN MINIMUM _®._,---- N/F NOW OR FORMERLY Sys N --+ - - PVC POLYVINYL CHLORIDE PIPE - TF 331 36 S SLOPE 20' jYfl;i_E _5 A_NVITARY EASE-MEIVT // �� I:STV _ 320 $1 SAN SANITARY SF SQUARE FEET } TF TOP OF FRAME -l'-HIS AP 'IS (N� !Pll Fl` O Off" E PaDEE D DIM"ENSIOWS" A HER H 'WE� 1 �" 1z� �$ c DUE TO DISTORTION DURING REPRODUCTION, THIS PRINT MAY NOT ¢ R U � � ANDSUBJECTI A ASE.,. SI.J g` SCALE EXACTLY. ALL DIMENSIONS S�iOWN OVERRULE SCALING. II ® GRAPHIC SCFEET jL THERE ARE ANY DISCREPANCIES, CONTACT ENGINEER. �f�E � �= ��� � � e (CHECK BEFORE USING) -I�ICFAit Off F��R!TT A (�(1 VAIVER OF SECTION 18 _ - -)F THE TOWN OF MONTVILLE Z,:. -(' R£C:ATI�),N� A-2 SURVEY) GAA.NTEC ^. THE MONTVILLE PLANNING AN--, CO"SSICN CHAIRMAN/S =RFTARY`A - r. — TYP TYPICAL SOIL EROSION AND SEDIMENT CONTROL PLAN CERTIFIED BY THE MONTVILLE PLANNING AND ZONING COM"iISSION CRA IR.MAN/SECRETARY DATE SPECIAL, PFRMIT GRANTED BY THE MONTVILLE PLANNING AND ZONING COMMISSION CHAIRMAN/SECRETARY DATE lei W J O IQL wUf t j i I I i O 1989 TDTAL TECHNOLOGY INC These drawings are the property QF the Engineer and hale been spec,'Wlc:CMy prepares! For Cher owner of this project, c -t this site, o.nd are not to be dupttcated or used to part or whole For any other purpose, project, (ocation or owner without the express written consent off' the Engineer, I 1 z I b fff111��� `Z:) ; C/ J �1 r1 9' r �I 7- �� k 4 ,� y 1 I per" �� Lli LD U 0 4 I Pzil P i 43! 1 am lei W J O IQL wUf t j i I I i O 1989 TDTAL TECHNOLOGY INC These drawings are the property QF the Engineer and hale been spec,'Wlc:CMy prepares! For Cher owner of this project, c -t this site, o.nd are not to be dupttcated or used to part or whole For any other purpose, project, (ocation or owner without the express written consent off' the Engineer, I 1 z I [IF 2 CC Z k Lli LD U 0 4 Pzil P [IF 2 k i [IF 2