Loading...
HomeMy WebLinkAboutSite & Septic Plan\ �380� Q MA1NS -� - (REMOVE) i >'0(0 /> > �, 9 � CLA PERFORATED --- PROPERTY LINE �-= FQpT1 N G DRAI SETBACK LINE ELEV.=-t365.0 (LEVEL) 0-19" TOPSOIL DARK BROWN FINE SANDY LOAM EDGE OF ROAD 19"-45" SUBSOIL YELLOWISH BROWN STRONG SANDY LOAM 25"-7'8" GRAY SANDY TILL EDGE OF DRIVEWAY NO WATER m PRIMARY SEPTIC SYSTEM . -------I RESERVE SEPTIC SYSTEM NO LEDGE PROPOSED CONTOUR UNE 370 365.4 INVERT ELEVATION X 372,E PROPOSED SPOT ELEVATIO FILTER FABRIC t 0' MAkIMUIry! POST rni["ow COMPACTED PLACEMENT OF SILT FENCE SILT FENCE DETAL NOT O SCALE 10'-6" 8" TYP. 2 PLACES WIRE MESH FENCING 6" OUTLET 4" L.P. P.V.C. PIPE SEAL _r L.1 . I- . Y . V . 1-11- r TYP. 3 PLACES PLAN VIE PROVIDE M. H. TO 24"DIA. 24"DIA. GRADE COVER COVER 18" 6" 20" OUTLET FILTER INLET DEVICE BAFFLE 6" WALLS4'-1 " I LIQUID r LEVEL CROSS SECTION VIEW 1,250 GALLON SEPTIC TANK NOT TO SCALE FILTER FABRIC 6" MIN. COVER •- +- sem- s• r- PRECAST CONCRETE 4'x8'x12" LEACHING GALLERY HS -20 LOADING 12" ®m4z 44 INVERT 1 4r 1. 1" DIAMETER 6' CRUSHED STONE TYPICAL 12" LEACHING GALLERY TRENCH NOT TO SCALE 4" TOPSOIL --\ 7.- -. .0 7. -. - . - _ _. -- �..' - 1. _ -v.r •. • - ti -.1 ' o C O� 760(c "°o so%,c o o00nnO�A 4" CLEAN FILL -J LOAM SEED CROSS-SECTION DETAIL NOT TO SCALE 2x2 5/8 16 GA. WIRE MESH 1 _ 1 /2" j 4' PVC ELBOW 1-- 3/4" I 1 r 1-1 /4r, 4" f 16" 10-3/4' 8-3/4» 2" 2" - BOX W/ELBOW cc IRS k ': `---A1 TO MY KNOWLEDGE I �n ,�• .� AND BELIEF THIS PLAN IS SUBSTANTIALLY ECT AS NOTE -OR DEPICTED HEREON. D E z o� 1 f :*4 •+..•••0 0 JAM F. MCNALLY, L.L.S. #17387 DATE 43 , 1. DIG A 6" TRENCH ON THE UPHILL SIDE OF THE BARRIER LOCATION. 2. POSITION THE POSTS ON THE DOWNHILL SIDE OF THE BARRIER AND DRIVE THE POST 1.5 FEET INTO THE GROUND. 3. LAY THE BOTTOM 6" OF THE FABRIC IN THE TRENCH TO PREVENT UNDERMINING AND BACKFILL. 4. INSPECT AND REPAIR BARRIER AFTER HEAVY RAINFALL. 5. SEDIMENT DEPOSITS ARE TO BE REMOVED WHEN THEY REACH A HEIGHT OF ONE FOOT BEHIND THE BARRIER AND ARE TO BE DEPOSITED IN AN AREA WHICH IS NOT REGULATED BY THE INLAND WETLANDS COMMISSION. 6. INSPECTIONS AND NECESSARY REPAIRS WILL BE MADE TWICE WEEKLY. TEMPORARY VEGETATIVE COVER A TEMPORARY SEEDING OF RYE GRASS WILL BE COMPLETED WITHIN 15 DAYS OF THE FORMATION OF STOCKPILES. IF THE SOIL IN THE STOCKPILES HAS BEEN COMPACTED BY CONSTRUCTION OPERATIONS IT SHALL BE LOOSENED TO A DEPTH OF 2 INCHES BEFORE THE FERTILIZER, LIME AND SEED IS APPLIED. 10-10-10 FERTILIZER AT A RATE OF 7.5 POUNDS PER 1000 S.F. LIMESTONE AT A RATE OF 90 LBS. PER 1000 S.F. SHALL BE USED. RYE GRASS APPLIED AT A RATE OF 1 LB. PER 1000 S.F. SHALL PROVIDE THE TEMPORARY VEGETATIVE COVER. STRAW FREE FROM WEEDS AND COARSE MATTER SHALL BE USED AT A RATE OF 70-90 LBS. PER 1000 S.F. AS A TEMPORARY MULCH. APPLY MULCH AND DRIVE TRACKED EQUIPMENT UP AND DOWN SLOPE OVER ENTIRE SURFACE SO CLEAT MARKS ARE PARALLEL TO THE CONTOURS. PERMANENT VEGETATIVE COVER TOPSOIL WILL BE REPLACED ONCE THE EXCAVATION HAS BEEN COMPLETED AND THE SLOPES ARE GRADED TO A SLOPE NO GREATER THAN 2.5 TO 1. PROVIDE SLOPE PROTECTION ON ALL CUT SLOPES. TOPSOIL WILL BE SPREAD AT A MINIMUM COMPACTED DEPTH OF 4 INCHES. ONCE THE TOPSOIL HAS BEEN SPREAD, ALL STONES TWO INCHES OR LARGER IN ANY DIMENSION WILL BE REMOVED AS WELL AS DEBRIS, APPLY AGRICULTURAL GROUND LIMESTONE AT THE RATE OF TWO TONS PER ACRE OR 100 LBS. PER 1000 S.F. APPLY 10-10-10 FERTILIZER OR EQUIVALENT AT A RATE OF 300 LBS. PER ACRE OR 7.5 LBS. PER S.F. WORK LIMESTONE INTO THE SOIL TO A DEPTH OF 4 INCHES. INSPECT SEEDBED BEFORE SEEDING. IF TRAFFIC HAS COMPACTED THE SOIL, RETILL COMPACTED AREAS. APPLY THE FOLLOWING GRASS SEED MIX: ,EEQ MIXTURE I RS.&ARE LBS. 1000 S.F. KENTUCKY BLUEGRASS 20 0.45 CREEPING RED FESCUE 20 0.45 PERENNIAL RYEGRASS 5 0.10 45 1.00 THE RECOMMENDED SEEDING DATES ARE: APRIL 1 - JUNE 15 AND AUGUST 1 - SEPTEMBER 15 FOLLOWING SEEDING, FIRM SEED BED WITH A ROLLER. MULCH WITH WEED FREE STRAW IMMEDIATELY FOLLOWING SEEDING, IF A PERMANENT VEGETATIVE STAND CANNOT BE ESTABLISHED SELECT FILL SPECIFICATION SELECT FILL PLACED WITHIN AND ADJACENT TO LEACHING SYSTEM AREAS SHALL BE COMPRISED OF CLEAN SAND, OR SAND AND GRAVEL, FREE FROM ORGANIC MATTER AND FOREIGN SUBSTANCES. THE SELECT FILL SHALL MEET THE FOLLOWING REQUIREMENTS PER THE CONNECTICUT PUBLIC HEALTH CODE FOR USE WITHIN THE LEACHING AREA: 1. THE SELECT FILL SHALL NOT CONTAIN ANY MATERIAL LARGER THAN THE THREE (3) INCH SLEEVE. 2. UP TO 45% OF THE DRY WEIGHT OF THE REPRESENTATIVE SAMPLE MAY BE RETAINED ON THE #4 SLEEVE (THIS IS THE GRAVEL PORTION OF THE SAMPLE). 3. THE MATERIAL THAT PASSES THE #4 SIEVE IS THEN REWEIGHEII At--, THE SITWUYSIS STARTEO, 4. THE REMAINING ZIAMPLE SHALL MEET THE FOL? 01WIG Ori i End PERCENT PASSING SIEVE SIZE WET SIEVE DRY SIEVE #4 100 100 #10 70-100 70-100 #40 10-50* 10-75 #100 0-20 0-5 #200 0-5 0-2.5 * PERCENT PASSING THE #40 SIEVE CAN BE INCREASED TO NO GRE TER THkNI 75% IF THE PERCENT PASSING THE 1100 SIEVE DOES NOT EXCEED 10% AND THE #200 SIEVE DOES NOT EXCEED 5%, SYSTEM INSTALLATION 1. REMOVE AND STOCKPILE TOPSOIL_ 2. PLACE SELECT FILL IN ACCORDANCE WITH THE CT HEALTH COiE 3. EXCAVATE 6' WIDE TRENCHES AND PREPARE SURFACE. 4. INSTALL GALLERY SECTIONS AND FILL SIDES OF TRENCHES WITH 1" 'SASHED STONE (SEE DETAIL) 5. PLACE A 6' WIDE STRIP OF NON -WOVEN FILTER FABRIC ON 70P OF THE ENTIRE LENGTH OF THE SYSTEM AND BACKFILL WITH NATIVE MATERIAL 6. REPLACE TOPSOIL, SEED & MULCH. PERCOLATION TEST DATA PE C. TEST #2 RECORDED BY CLA ENGINEERS ON 6/17/05 HOLE DEPTH 24" EK REBS 8:55 9.5" 8:55 - 8:59 11" 8:59 - 9:03 12" 9:03 - 9:07 13" 9:07 - 9:11 13.5" 9:11 - 9:15 14" 9:15 - 9:19 14.5" 9:19 - 9:23 15" 9:23 - 9:27 15.5" 9:27 - 9:31 15.75" 9:31 - 9:35 16" 9:35 - 9:39 16.25" 9:39 - 9:43 16.75" 9:43 - 9:47 17" 9:47 - 9:51 17.25" 9.51 - 9.55 17.5" PERC. RATE = 16.0 MINUTES/INCH 0"m --- - - - - --- PROPERTY LINE ----------------------- SETBACK LINE - - -- - - J70 - --- - - - EXIST. CONTOURS 0-19" TOPSOIL DARK BROWN FINE SANDY LOAM EDGE OF ROAD 19"-45" SUBSOIL YELLOWISH BROWN STRONG SANDY LOAM 25"-7'8" GRAY SANDY TILL EDGE OF DRIVEWAY NO WATER 3 PRIMARY SEPTIC SYSTEM . -------I RESERVE SEPTIC SYSTEM NO LEDGE PROPOSED CONTOUR UNE 370 365.4 INVERT ELEVATION X 372,E PROPOSED SPOT ELEVATIO GENERAL NOTES 1. TOPOGRAPHIC INFORMATION ON THIS PLAN COMPLIES WITH T-3 MAPPING STANDARDS. 2. AFTER THE SELECT FILL HAS BEEN PLACED AND COMPACTED, A PERCOLATION TEST MUST BE PERFORMED PRIOR TO THE INSTALLATION OF THE SEPTIC SYSTEM. 3. PROPOSED HOUSE AND SEPTIC SYSTEM TO BE STAKED IN THE FIELD BY A LAND SURVEYOR LICENSED IN THE STATE OF CONNECTICUT. 4. LOT AREA = 1.8± ACRES 5. ALL WORK AND MATERIAL (SEPTIC TANK, DISTRIBUTION BOX, PIPE) SHALL CONFORM TO THE CONNECTICUT PUBLIC HEALTH CODE REGULATIONS AND STANDARDS FOR SUBSURFACE SEWAGE DISPOSAL SYSTEM. 6. SEWER UNE FROM FOUNDATION WALL TO SEPTIC SHALL BE 4" SCHEDULE 40 PVC - ASTM D 1785 AND JOINTS PER HEALTH DEPT. CODE. 7. TRENCHES SHALL BE SET LEVEL FOR ENTIRE LENGTH AND HAVE A CENTER TO CENTER SPACING OF 15 FEET. 8. PIPE FROM SEPTIC TANK TO DISTRIBUTION LINES SHALL BE 4" SOLID PVC CONFORMING TO ASTMD-3034 AND SDR -35. 9. FOUNDATION DRAIN PIPE FROM HOUSE TO OUTLET SHALL CONFORM TO TABLE 2-C OF THE CONNECTICUT PUBLIC HEALTH CODE REGULATIONS AND STANDARDS FOR INSTALLATION WITHIN 25 FEET OF A SEWAGE DISPOSAL SYSTEM. 10. THERE ARE PRESENTLY NO KNOWN WATER WELLS WITHIN 75' OF THE PROPOSED SEPTIC SYSTEM. 11. A VERTICAL BENCHMARK WILL BE PROVIDED WITHIN 100 FEET OF THE PROPOSED HOUSE LOCATION PRIOR TO THE START OF CONSTRUCTION. 12. CLEAR AND GRUB THE AREA WHERE THE SEPTIC SYSTEM AND HOUSE ARE TO BE CONSTRUCTED, ALL TOPSOIL IS TO BE STRIPPED AND STOCKPILED FOR FUTURE USE. 13. ALL FILL MATERIAL SHALL BE CLEAN EARTH FREE OF STUMPS, ORGANICS, CONSTRUCTION DEBRIS AND TOPSOIL. 14. TOPSOIL SHALL BE RE-APPLIED OVER ALL FILL AREAS AND ALL DISTURBED AREAS TO PROVIDE A MINIMUN DEPTH OF FOUR INCHES. 15. ALL EXISTING UTILITIES TO BE ACCURATELY LOCATED PRIOR TO CONSTRUCTION. 16. IF BLASTING IS REQUIRED A PRE -BLAST SURVEY WILL BE REQUIRED. CALL BEFORE YOU DIG: 1-800-922-4455. 17. THERE ARE NO INLAND WETLANDS LOCATED ON THE LOT. MAP REFERENCE RESUBDIVISION PLAN - FAWN'S VIEW, PREPARED FOR STONEHENGE PILLERS LLC, OFF LYNCH HILL ROAD, MONTVILLE, CONNECTICUT, CIA ENGINEERS, INC., DESIGN DATA PERCOLATION RATE: 16 MIN -/INCH 4 BEDROOM RESIDENCE REQUIRES 900 SF OF LEACHING AREA PROVIDE 20 UNITS - 12" LEACHING AREA EFFECTIVE LEACHING AREA = 160 LF X 5.9 SF/LF = 944 PROVIDE 1,250 GAL 2 -COMPARTMENT TANK MLSS26X2X 1.5-78' MLSS PROVIDED=84 LF TEST HOLE DATA RECORDED BY ROBERT RUSSO OF CLA ENGINEERS, INC. ON 11/30/2004 TEST HOLE 200 TEST HOLE 104 0-9" TOPSOIL 0-19" TOPSOIL DARK BROWN FINE SANDY LOAM 9"-25" BROWN SANDY LOAM 19"-45" SUBSOIL YELLOWISH BROWN STRONG SANDY LOAM 25"-7'8" GRAY SANDY TILL 45"-89" GRAY TILL LOAMY SANDY WITH STONES NO WATER NO WATER NO MOTTLING NO MOTTLING NO LEDGE NO LEDGE TEST HOLE 201 0-9" TOPSOIL TEST HOLE 105 9"-29" BROWN SANDY LOAM 0-18" TOPSOIL DARK BROWN FINE SANDY LOAM 29"-93" GRAY SANDY TILL 18"-48" SUBSOIL YELLOWISH BROWN STRONG SANDY LOAM 48"-84" GRAY TILL, GRAVELLY LOAMY SAND WITH STONES No WATER MOTTLING O 29" NO WATER NO LEDGE NO MOTTLING LEDGE O 84" TEST HOLE 202 0-7" TOPSOIL TEST HOLE 106 7"-20" BROWN SANDY LOAM 0-10" TOPSOIL DARK BROWN FINE SANDY LOAM 20"-8�1" GRAY SANDY TILL 10"-38" SUBSOIL YELLOW BROWN SANDY LOAM 38"-51 " GRAY SANDY TILL NO WATER 51"-96" GRAY SANDY TILL DENSE NO MOTTLING NO LEDGE NO WATER NO MOTTLING TEST HOLE 203 No LEDGE 0-6" TOPSOIL 6"-23" BROWN SANDY LOAM TEST HOLE 107 23"-86" GRAY SANDY TILL 0-10" TOPSOIL DARK BROWN FINE SANDY LOAM 10"-41" SUBSOIL YELLOW BROWN SANDY LOAM NO WATER 41 "-91" GRAY SANDY TILL NO MOTTLING NO LEDGE NO WATER NO MOTTLING NO LEDGE 20' 0 20' 4p' SCALE: 1 "=20' CLA Engineers, Inc l CT SURVEYING 1 5/22/06 Uncas Health District Comments 317 Main Street Norwich, Connecticut (860) 886-1966 Fax (860) 886-9165 No. Date Revision`,0�� itt�jttl � � Stonehendge PProject No. Pillars, LLC CIA -3541 "'"'4 in •.ti���.� Proi. Engineer sS, SEPTIC DESIGN & SITE PLAN J.F.M. PIZ t = * = 1 FAWN'S MEADOW ROAD AD � nate: e s�p� �No. 242219 1 r w 4/17/06 N MONTVLLE, CT Sheet No. NA i LOT 14 - Fawn's View