Loading...
HomeMy WebLinkAboutE&S Bond Estimate November 10,2017 Town of Montville Planning &Zoning Commission Attn:Liz Burdick,ZEO 310 Norwich New London Tpke. Uncasville,CT 06382 RE:Soil Erosion and Sediment Control Bond Estimate Site Development Plan Property Location:14 Enterprise Lane Owner/Applicant:Patterson Brothers Properties,LLC Boundaries LLC Job I.D.:17 2566 Dear Ms.Burdick, This Bond Estimate has been prepared using “RS Means Site Work and Landscape Cost Data,35th edition.” The quantities and items are based on the plans entitled “Improvement Location &Topographic Survey, Prepared for Patterson Brothers Properties,LLC,14 Enterprise Lane,Montville (Oakdale),Connecticut,Scale: Varies,Date:October 2017,Job I.D.No.17 2566,Sheets 1/3 thru 3/3,Last revised 11/10/17”as prepared by Boundaries LLC.The following estimate includes materials,equipment,and labor costs for the sole purpose of providing a basis for soil erosion and sediment control bonding for this site development. The estimated cost of the soil erosion and sediment control measures for the project and the complete restoration of the development area is $4,398.The breakdown of costs is summarized on the following page. If you have any questions please feel free to contact me at your convenience. Respectfully, David C.McKay,P.E. Boundaries LLC Bond Estimate Soil Erosion and Sediment Control/Site Restoration SiteDevelopment Plan Montville,CT DATE:11/10/2017 Page 1 of 1 Item No.Description Quantity Unit Cost Amount EROSION AND SEDIMENTCONTROL 1a Sediment fence/wood chip berm,per linear foot 480 $1.60 $768.00 1b Staked hay bales,per linear foot 110 $4.51 $496.10 SUBTOTAL $1,264.10 SITE RESTORATION 2a Spreadtopsoil from stockpile (4 inches topsoil),per cubic yard 269 $2.76 $742.16 2b Mechanical seeding (215 lb./acre),per acre 0.5 $1,200.00 $600.00 2c Hay (1"deep,with large power mulcher),per thousand square feet 28.0 $64.00 $1,792.00 SUBTOTAL $3,134.16 TOTAL $4,398.26 Note: Costs developed using RSMeans Site Work &Landscape Cost Data35th edition.