Loading...
HomeMy WebLinkAboutBond Estimate 110917_ROUNDED TO WHOLE DOLLARBond Estimate Soil Erosion and Sediment Control/Site Restoration SiteDevelopment Plan Montville,CT DATE:11/13/2017 Page 1 of 1 Item No.Description Quantity Unit Cost Amount EROSION AND SEDIMENTCONTROL 1a Sediment fence/wood chip berm,per linear foot 480 $1.60 $768 1b Staked hay bales,per linear foot 110 $4.51 $496 SUBTOTAL $1,264 SITE RESTORATION 2a Spreadtopsoil from stockpile (4 inches topsoil),per cubic yard 269 $2.76 $742 2b Mechanical seeding (215 lb./acre),per acre 0.5 $1,200.00 $600 2c Hay (1"deep,with large power mulcher),per thousand square feet 28.0 $64.00 $1,792 SUBTOTAL $3,134 TOTAL $4,398 Note: Costs developed using RSMeans Site Work &Landscape Cost Data35th edition.