Loading...
HomeMy WebLinkAboutSite PlanSEPTIC NOTES 1. ALL DISTURBED AREAS TO BE STABILIZED (SEE EROSION & SEDIMENT CONTROL NOTES). 2. IT IS THE RESPONSIBILITY OF THE INSTALLER (LIC. SEPTIC CONTRACTOR) TO CONSTRUCT THE SANITARY SYSTEM AS SHOWN ON THE FINAL APPROVED PLAN WITHOUT REVISIONS UNLESS PRIOR APPROVAL IS OBTAINED FROM BOTH THE DESIGNING ENGINEER AND THE TOWN SANITARIAN. 3. IF THE INSTALLER FINDS CONDITIONS WORSE THAN THOSE SHOWN ON THE PLAN, ALL WORK SHALL BE STOPPED IMMEDIATELY AND THE ENGINEER AND THE TOWN SANITARIAN. 4. THE CONSTRUCTION OF THE SANITARY DISPOSAL SYSTEM AND ITS COMPONENTS SHALL COMPLY IN ALL RESPECTS WITH THE LATEST REVISION OF SECTION 19-13-13103a THROUGH 19-13-B 103p OF THE PUBLIC HEALTH CODE OF THE STATE OF CONNECTICUT AND OTHER TECHNICAL STANDARDS FOR THE DESIGN AND CONSTRUCTION OF SUBSURFACE SEWAGE DISPOSAL SYSTEMS. 5. PIPE FROM THE HOUSE TO THE SEPTIC TANK AND PIPE WITHIN 25 FEET OF ANY UNDERDRAIN OR FOOTING DRAIN SHALL BE EXTRA HEAVY CAST IRON OR EQUAL. DISTRIBUTION PIPES TO BE SDR -35 3033, 3034 OR EQUAL. 6. THE AREA OF THE LEACHING SYSTEM SHALL BE STRIPPED OF ALL TOPSOIL AND REPLACED WITH CLEAN BANK RUN SAND OR GRAVEL COMPACTED IN 6" LIFTS. REMOVAL OF TOPSOIL AND PLACEMENT OF FILL SHALL EXTEND A MINIMUM OF 10 FEET BEYOND THE LEACHING FIELD LIMITS, A MINIMUM OF 6" OF TOPSOIL SHALL BE PLACED OVER THE SYSTEM. 7. FILL MATERIAL TO BE CLEAN BANK RUN SAND OR GRAVEL CONTAINING NO MORE THAN 5% FINE MATERIALS. (MATERIALS WHICH WILL PASS THE #200 SEIVE). 8. SEPTIC TANK IS REQUIRED TO HAVE AN OUTLET FILTER INSTALLED ON THE OUTLET BAFFLE. 9. HOUSE, WELL AND SEPTIC SYSTEM TO BE FIELD STAKED BY A CONNECTICUT LICENSED LAND SURVEYOR PRIOR TO CONSTRUCTION. SOIL TESTING SOIL TESTING CONDUCTED ON 5-20-2003 I3Y THE UNCAS HEALTH DISTRICT. TEST HOLE TH-1 TEST HOLE TH-2 TEST HOLE TH-3 0-5" TOPSOIL 0-8" TOPSOIL 0-8" TOPSOIL 5-32" BROWN SANDY LOAM 5-25" BROWN SANDY LOAM 5-33" BROWN SANDY LOAM 32-79" ROCKY SAND AND GRAVEL 25-87" SAND AND GRAVEL 33-89" SAND AND GRAVEL / NO LEDGE. NO MOTTLING. NO GROTJNDWATER NO LEDGE. NO MOTTLING. NO GROUNDWATER NO LEDGE, NO MOTTLING, NO GROUNDWATER SOIL EROSION & SEDIMENT CONTROL NARRATIVE PROJECT DESCRIPTION: �► \. \ SITE WORK TO INCLUDE CONSTRUCTION OF I PROPOSED HOUSE, SEPTIC SYSTEM, DRIVEWAY \ \ a \ SITE GRADING AND LANDSCAPING. 4 L GENERAL SEQUENCE: �� IPIN REC 1. INSTALLATION OF EROSION & SEDIMENT CONTROL MEASURES AS SHOWN ON PLAN FOR INDIVIDUAL HOUSE CONSTRUCTION. TOPSOIL 2. CLEARING AND GRUBBING .AS REQUIRED, SUITABLE FILL 3. STRIP AND STOCKPILE TOPSOIL NVfTHIN LIMITS OF DISTURBED AREA AND RING WITH STAKED HAYBALES OR SILT FENCE. FILTER FABRIC; 2- 4. CONSTRUCTION OF HOUSE, DRIVEWAY AND SEPTIC SYSTEM. 4" PERFORATED - A 5. FINAL GRADING AND LANDSCAPING. PIPE - z GENERAL NOTES: o 1. ALL PROPOSED WORK SHALL CONFORM TO STANDARDS SET FORTH IN THE "CONNECTICUT GUIDELINES FOR SOIL EROSION AND O1t1j .SO.° �, d .3° SEDIMENT CONTROL", 1 STONE _ FOOTING & GUTTER DRAIN 2. PRIOR TO CONSTRUCTION OR EXCAVATION, EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED IN LOCATIONS WITH CRITTER CAP �� 4 ` CLEARING LIMITS WITH /� 4 AS SHOWN ON PLAN AS REQUIRED AND MAINTAINED THROUGHOUT CONSTRUCTION. OUTLET TO DAYLIGHT RIP -RAP AT ENID SNOW FENCE INSTALLED \\\\ 3. SEDIMENT SHALL BE PERIODICALLY REMOVED FROM UPHILL SIDE OF HAYBALE BARRIERS AND RESPREAD OVER SLOPE. DAILY / TRENCH INSPECTIONS SHALL BE MADE OF EROSION AND SEDIMENT CONTROLS. INSPECTIONS TO INSURE EFFECTIVENESS AND IMMEDIATE CROSS SECTION CORRECTIVE ACTION SHALL BE TAKEN IF FAILURE, OCCURS. NOT TO SCALE 4. EROSION AND SEDIMENT CONTROL MEASURES SHALL REMAIN IN PLACE UNTIL DISTURBED AREAS HAVE BEEN STABILIZED AND VEGETATION COVER HAS BEEN ESTABLISHED. 5. DISTURBED AREAS SHALL BE FINAL GRADED AS SOON AS POSSIBLE AFTER EXCAVATION. FINAL GRADING SHALL INCLUDE REMOVAL OF LARGE ROCKS, STUMPS AND OTHER DEBRIS FROM THE FINISHED SURFACE. UPON FINAL GRADING, DISTURBED AREAS SHALL BE 4" PVC ELBOW / LOAMED WITH PREVIOUSLY STOCKPILED MATERIAL AND SEED. 2X2 5/8 16 GA. WIRE MESH d- 6. PRIOR TO SEEDING, APPLY LIMESTONE AT THE RATE OF 90 LBS. PER 1000 SF AND FERTILIZE WITH 10-10-10 AT THE RATE OF 7.5 LBS 1 1/2 \ PER 1000 SF AND WORD. INTO SOIL TO A DEPTH OF 4". 7n7. APPLY GRASS SEED MIXTURE BY HAND, CYCLONE SEEDER OR HYDRO SEED. SEEDING SHOULD BE SOWN BETWEEN APRIL 1 AND JUNE 1 a� ° r OR AUGUST 15 AND SEPTEMBER 15. IF SEEDING CANNOT TAKE PLACE BETWEEN THESE DATES, IMPLEMENT MULCHING PROCEDURES - SEEDING CAN TAKE PLACE. , \ UNTIL SUCH TIME AS SEED '') ll 8. IMMEDIATELY AFTER SEEDING, MULCH THE SEEDED AREA WITH HAY OR STRAW AT THE RATE OF 1.5 TO 2 TONS PER ACRE. MULCH \ �� / SHALL BE ANCHORED BY TRACK MACHINE OR MULCH ANCHORING MACHINE. = a - 9. IT SHALL BE THE RESPONSIBILITY OF THE OWNER OF THE PROPERTY TO IMPLEMENT THIS EROSION AND SEDIMENT CONTROL PLAN. ,�� : ;:': �/ � �� �O° THIS RESPONSIBILITY INCLUDES THE INSTALLATION AND MAINTENANCE OF CONTROL MEASURES, INFORMING ALL PARTIES ENGAGED ON THE CONSTRUCTION SITE OF THE REQUIREMENTS AND OBJECTIVE OF THIS PLAN, NOTIFYING THE PLANNING AND ZONING 00 COMMISSION OF ANY TRANSFER OF THIS RESPONSIBILITY AND FOR CONVEYING A COPY OF THIS EROSION AND SEDIMENT CONTROL PLAN IF TITLE TO THE LAND IS TRANSFERRED. 2» LEGEND �--' - - PROPERTY LINE ' BUILDING & WETLAND SETBACK LINE DATE: STONEWALL IHSrAtt AS SHO140 PRIOR To x EXISTING CONTOUR LINE - - - - - - - - -- PROPOSED CONTOUR LINE O ANGLE POINT ❑ CONCRETE MONUMENT TH-1 SOIL TEST HOLE LOCATION PT -A SOIL PERCOLATION TEST LOCATION {} UTILITY POLE x 102.2 PROPOSED SPOT ELEVATION SILT FENCE OR HAYBALES w w WATER LINE CLEARING LIMITS E E UNDERGROUND UTILITIES V Y v HOTS: SAKE HAMALE EROSION uz v BARRIER 4HERE SNO*N OV PLAN. DATE: KEY HA MALES IHSrAtt AS SHO140 PRIOR To x DRAWN BY: /Afro CROLft Awtlrury THRoucHour coNsmucncw MHS HA YSALE EROSION BARRIER DETAIL (wo r ro Sc ls) UPHILL SIDE DoWHILL Svc AHCLE STAKES !D' UPA OPE / X 1- Rt�CO G14 FOR ST,�BIUTY NErAL STAKCS SPAcm Ar lo• RL MR FABRIC (tel MACHED WERVALS M KIRE )aESH SUPPORT (AJAX) fZ�NCE) { (J' 1JlN., OIR£C77AV C011PACmv OF FLow BACKFILL 111111L 8' OF RL TER AA8R/C 1H TD EXCAVATED 6`X 6" TRENCK BURY 82" FABRIC ON UP -HILL S71DE SIH) WTH FABRIC CURLED MWARD H14 4. S/L T FENCE DETAIL (Not ro scALr-) . \I1� CONSTRUCTION ENTRANCE NOT TO SCALE O TO MY KNOWLEDGE AND BELIEF, THIS MAP IS SUBSTANTIALLY CORRECT AS NOTED HEREON MARK H. SULLIVAN, L. S. #70064 DATE THIS MAP IS NOT VALID WITHOUT A LIVE SIGNATURE AND EMBOSSED SEAL w z w w a� LOCATION MAP SCALE: V = 1000' 1. THIS SUR)i'EY AND MAP HAS BEEN PREPARED PURSUANT TO THE REGULATIONS OF CONNECTICUT STATE AGENCIES SECTION 20-300b-1 THROUGH 2O -300b-20 AND THE "STANDARDS FOR SURVEYS AND MAPS IN THE STATE OF CONNECTICUT" AS ADOPTED BY THE CONNECTICUT ASSOCIATION OF LAND SURVEYORS, INC. ON SEPTEMBER 26, 1996. 2, THIS SITE PLAN IS A ZONING LOCATION SURVEY AND IS A DEPENDENT RESURVEY AND CONFORMS TO THE STANDARDS OF A "C" CLASS SURVEY. NORTH, WETLANDS LOCATION AND PROPERTY LINE INFORMATION DERIVED FROM CLASS A-2 CERTIFIED MAP REFERENCED. 3. CONTOUR LINES SHOWN HEREON ARE AT TWO FOOT INTERVALS AND ARE BASED ON AN ASSUMED VERTICAL DATUM OF 100 FEET. TOPOGRAPHIC INFORMATION DERIVED FROM ACTUAL GROUND SURVEY. 4. PROPERTY LOCATED IN A RESIDENTIAL (R-120) ZONING DISTRICT. 5. TOTAL AREA OF PARCEL EQUALS 3.41 ACRES. 6. THIS SURVEY AND MAP DOES NOT INCLUDE THE LOCATION OF UNDERGROUND UTILITIES AND / OR STRUCTURES. 7. DRIVEWAY TO BE CONSTRUCTED IN ACCORDANCE WITH THE TOWN MONTVILLE DRIVEWAY STANDARDS, REGUL-ATIONS AND / OR REQUIREMENTS. - // 8. PROPERTY IDENTIFIED ON THE TOWN OF MONTVILLE TAX ASSESSORS MAP 57, BLQ :-.=1:I- - 31-004 9. OWNERS AND APPLICANTS ARE SEAN M. AND JENNIFER M. VELAZQUEZ REFERENCE DEED: TOWN OF MONTVILLE LAND RECORDS VOLUME 347 ON PAGE 174. 1. MAP ENTITLED to RECORD SUBDIVISION MAP PREPARED FOR: RICHARD WHITEHEAD, "THE VILLAGE AT WILLOUGHBY" SUBDIVISION, COTTAGE ROAD AND FOYLE ROAD, MONTVILLE, CONNECTICUT", SCALE: 1 "= 100' ", DA'7ED: 2/96, REVISED THROUGH 3/13/97, SHEET 2 OF 8, PREPARED BY: MESSIER & ASSOCIATES, INC., MANCHESTER, CT. "marm"MYY 4 BEDROOM HOUSE, FERC RATE 5-10 MINAN. = 660 SQ. FT. OF EFFECTIVE LEACHING AREA. RESTRICTIVE LAYER - GREATER THAN 60", 1250 GALLON SEPTIC TANK, CONSTRUCT 225 L.F. OF 4' WIDE STONE TRENCH AS SHOWN. EFFECTIVE LEACHING AREA PROVIDED = 675 SQ. FT. MLSS CALCULATIONS MLSS CALCULATION NOT REQUIRED. RESTRICTIVE LAYER GREATER THAN 60". BAR SCX` E 0' 30' 6 0' go, SCALE: 1" = 30' SITE PLAN PREPARED FOR SEAN M. & JENNIFER VELAZQUEZ DATE: 133 DOYLE ROAD 6/18/2003 DRAWN BY: OAKDALE, CONNECTICUT MHS SCALE: 1 "= 30' MARK. H. SULLIVAN, L.S., C.P.S.S. PROJECT NO, 03-144 LAND SURVEYING AND ENVIRONMENTAL CONSULTING, LLC 20-20 PHILLIPS ROAD PHONE (860) 316-8525 DRAWING NO, CANTERBURY, CT 06331 FAX (860) 376-3855 03-144