Loading...
HomeMy WebLinkAboutSite Plan4'-0' WOOD POSTS AT 10' O.C. FILTER FABRIC SILT FENCING BACKFILL EXCAVATE NATIVE SOIL 12" BANK RUN GRAVEL TOP SIZE STONE = 5" 47 PROCESSED GRAVEL t` S --SLOPE --14 MIN INV 10' TYPICAL DRIVEWAY CONSTRUCTION EXCAVATE TOPSOIL AND ORGANIC MATERIAL, GRADE AND COMPACT SUBGRADE, BACKFILL UP TO BASE WITH BANK RUN GRAVEL COMPACT GRAVEL WITH 5 TON VIBRATORY ROLLER TO 95% OF DRY DENSITY, APPLY PROCESSED GRAVEL AND REPEAT CCMPACTION C R �--1 IN N F,N IS H RAGS A TCS A I- - 0 PE )F 2 PER F00T 03 rt CL THIS SURVEY AND PLAN HAVE BEEN PREPARED IN ACCORDANCE WITH 00 THE CONNECTICUT GENERAL STATUES SECTION 20-300b v THE TYPE OF SURVEY PERFORMED IS A GENERAL LOCATION SURVEY BOUNDARY DETERMINATION IS BASED ON EXISTING MONUMENTATION, DEEDS & MAPS ON FILE THIS SURVEY CONFORMS TO CLASS D STANDARDS FOR HORIZONTAL ACCURACY THIS SURVEY CONFORMS TO CLASS T-2 STANDARDS FOR 'VERTICAL ACCURACY TO THE BEST OF MY KNOWLEDGE AND BELIEF THIS MAP IS SUBSTAN-FIAILLY CORRECT AS NOTED HEREON g, C Az 1,b, ow 1 co UTIU-ry POLE HILL- FO rC E*om *Nwmmwmw MAIN 150.00t MONUMENT RECOVERED BM #1 LLJ 0 TOP MON 01 0- EL= 126.00' PROPOSEDI'lHOUSE GA4AGP- 1134.51 FI N FL 1136.0 FF= 1,34.5 ro � lu Do PROPOSE. WELL 9 47.30' IRON ROD RECOVERED MAP REFERENCE: 1. "SCHAFER RESUBDIVISION PROPERTY OF LAWRENCE & EUZAB:-.TH SCHAFER, 37 DERRY HILL ROAD UNCASVILLE, CT, JANUARY 15, 2002, REVISED JUNE 6, 02" 1 J=DA mwassum