HomeMy WebLinkAboutE & S PlanIA 1c� C0 C A K EROSION CONTROL NOTES 3 1. THE CONTRACTOR SHALL CONSTRUCT ALL SEDIMENT AND EROSION CONTROLS IN ACCORDANCE WITH THE 2002 CONNECTICUT GUIDELINES FOR SOIL EROSION FENCING SHALL BE MAINTAINED AND REPAIRED DURING CONSTRUCTION. AND SEDIMENT CONTROL, LATEST EDITION, IN ACCORDANCE WITH THE CONTRACT DOCUMENTS, AND AS DIRECTED BY TOWN OF MONTVILLE. THE CONTRACTOR SHALL KEEP A COPY OF THE CURRENT GUIDELINES ON-SITE FOR REFERENCE DURING CONSTRUCTION.ALL SEDIMENTATION AND EROSION CONTROL MEASURES, 10. ANTI -TRACKING PADS SHALL BE INSTALLED PRIOR TO ANY SITE EXCAVATION OR CONSTRUCTION ACTIVITY AND SHALL BE MAINTAINED THROUGHOUT THE INCLUDING THE CONSTRUCTION OF TEMPORARY SEDIMENTATION TRAPS/BASINS, TEMPORARY DIVERSION SWALES AND ANTI -TRACKING PADS, SHALL BE INSTALLED DURATION OF ALL CONSTRUCTION. THE LOCATION OF THE TRACKING PADS MAY CHANGE AS VARIOUS PHASES OF CONSTRUCTION ARE COMPLETED. PRIOR TO THE START OF CLEARING AND GRUBBING AND DEMOLITION OPERATIONS. 11. ALL CONSTRUCTION SHALL 8E CONTAINED WITHIN THE LIMIT OF DISTURBANCE, WHICH SHALL BE MARKED WITH SILT FENCE, SAFETY FENCE, RIBBONS, OR 2. THESE DRAWINGS ARE ONLY INTENDED TO DESCRIBE THE SEDIMENT AND EROSION CONTROL MEASURES FOR THIS SITE. ALL TEMPORARY EROSION AND SEDIMENT OTHER MEANS PRIOR TO CLEARING. CONSTRUCTION ACTIVITY SHALL REMAIN ON THE UPHILL SIDE OF THE SEDIMENT BARRIER UNLESS WORK IS SPECIFICALLY CONTROL MEASURES SHOWN ON THE EROSION Et SEDIMENT CONTROL PLAN ARE SHOWN IN A GENERAL SIZE AND LOCATION ONLY. THE CONTRACTOR SHALL BE CALLED FOR ON THE DOWNHILL SIDE OF THE BARRIER. STAKED HAY BALES OR SILT FENCES SHALL ALSO BE INSTALLED AT THE DOWNHILL SIDES OF BUILDING RESPONSIBLE FOR ENSURING THAT ALL EROSION CONTROL MEASURES ARE CONFIGURED AND CONSTRUCTED IN A MANNER THAT WILL MINIMIZE EROSION OF SOILS EXCAVATIONS, DEWATERING PUMP DISCHARGES, AND MATERIAL STOCKPILES. AND PREVENT THE TRANSPORT OF SEDIMENTS AND OTHER POLLUTANTS TO STORM DRAINAGE SYSTEMS AND/OR WATERCOURSES. ACTUAL SITE CONDITIONS OR SEASONAL AND CLIMATIC CONDITIONS MAY WARRANT ADDITIONAL CONTROLS OR CONFIGURATIONS WHEN DIRECTED BY THE ENGINEER. SEE SEDIMENT AND 12. INSTALL TEMPORARY DIVERSION DITCHES, PLUNGE POOLS, TEMPORARY SEDIMENT TRAPS/BASINS, AND DEWATERING PITS AS SHOWN AND AS NECESSARY EROSION CONTROL DETAILS SUGGESTED CONSTRUCTION SEQUENCE FOR MORE INFORMATION. REFER TO SITE PLAN FOR GENERAL INFORMATION AND OTHER DURING VARIOUS PHASES OF CONSTRUCTION TO CONTROL RUNOFF UNTIL UPHILL AREAS ARE STABILIZED. LOCATION OF TEMPORARY SEDIMENT TRAPS/BASINS .AND CONTRACT PLANS FOR APPROPRIATE INFORMATION. WILL REQUIRE REVIEW AND APPROVAL BY THE ENGINEER AND GOVERNING OFFICIAL. DEWATERING SETTLING TRAPS SHALL BE USED IF GROUND WATER IS ENCOUNTERED. NO RUNOFF SHALL BE ALLOWED TO EXIT THE SITE PRIOR TO TREATMENT FOR SEDIMENT REMOVAL. 3. THE CONTRACTOR IS RESPONSIBLE FOR IMPLEMENTING THE SEDIMENT AND EROSION CONTROL PLAN. THIS RESPONSIBILITY INCLUDES THE PROPER INSTALLATION AND MAINTENANCE OF CONTROL MEASURES, INFORMING ALL PARTIES ENGAGED WITH CONSTRUCTION ON THE SITE OF THE REQUIREMENTS AND SU , 13. AS GENERAL GRADING OPERATIONS PROGRESS, THE TEMPORARY DIVERSION DITCHES SHALL BE RAISED OR LOWERED AND RELOCATED, AS CUT AND FILL OBJECTIVES OF THIS PLAN, INFORMING THE GOVERNING AUTHORITY OR INLAND WETLANDS AGENCY OF ANY TRANSFER OF THIS RESPONSIBILITY, AND FOR SLOPES DICTATE, TO DIVERT SURFACE RUNOFF TO THE SEDIMENT TRAPS/BASINS. CONVEYING A COPY OF THE SEDIMENT Et EROSION CONTROL PLAN IF THE TITLE TO THE LAND IS TRANSFERRED. COMPLY WITH REQUIREMENTS OF CGS SECTION 22A, 430B FOR STORMWATEiR DISCHARGE FROM CONSTRUCTION ACTIVITIES AND WITH DEP RECORD KEEPING AND INSPECTION REQUIREMENTS. 14. TEMPORARY SEDIMENT TRAPS SHALL PROVIDE 134 CUBIC YARDS OF SEDIMENT STORAGE PER DISTURBED ACRE CONTRIBUTING TO THE TRAP/BASIN. PROVIDE TRAP/BASIN VOLUMES FOR ALL DISTURBANCE ON SITE. 4. A BOND MAY BE REQUIRED TO BE POSTED WITH THE GOVERNING AUTHORITY FOR THE EROSION CONTROL INSTALLATION AND MAINTENANCE. 15. PERIODICALLY CHECK ACCUMULATED SEDIMENT LEVELS IN SEDIMENT TRAPS/BASINS DURING CONSTRUCTION AND CLEAN ACCUMULATED SILT WHEN NECESSARY 5. THE CONTRACTOR SHALL APPLY THE MINIMUM EROSION Et SEDIMENT CONTROL MEASURES SHOWN ON THE PLAN IN CONJUNCTION WITH CONSTRUCTION OR WHEN ONE FOOT OF SEDIMENT HAS ACCUMULATED. CLEAN ACCUMULATED SEDIMENT FROM CATCH BASIN SUMPS AS NECESSARY. REMOVE ACCUMULATED SEQUENCING, SUCH THAT ALL ACTIVE WORK ZONES ARE PROTECTED. ADDITIONAL AND/OR ALTERNATIVE SEDIMENT AND EROSION CONTROL MEASURES MAY BE SEDIMENT FROM BEHIND HAY BALES AND SILT FENCE. EXCAVATED MATERIAL FROM TEMPORARY SEDIMENT TRAPS/BASINS MUST BE STOCKPILED ON UPHILL SIDE OF INSTALLED DURING THE CONSTRUCTION PERIOD IF FOUND NECESSARY BY THE CONTRACTOR, OWNER, SITE ENGINEER, MUNICIPAL OFFICIALS, OR ANY GOVERNING SILT FENCE. AGENCY. THE CONTRACTOR SHALL CONTACT THE OWNER AND APPROPRIATE GOVERNING AGENCIES FOR APPROVAL IF ALTERNATIVE CONTROLS OTHER THAN 16. TOPSOIL SHALL BE STRIPPED AND STOCKPILED FOR USE IN FINAL LANDSCAPING. ALL EARTH STOCKPILES SHALL HAVE HAY BALES OR SILT FENCE AROUND THE THOSE SHOWN ON THE PLANS ARE PROPOSED BY THE CONTRACTOR. LIMIT OF PILE. PILES SHALL BE TEMPORARILY SEEDED IF PILE IS TO REMAIN IN PLACE AND UNDISTURBED FOR MORE THAN 30 DAYS. El '61 THE SITE. PROPER SANITARY DEVICES SHALL BE MAINTAINED ON-SITE AT ALL TIMES. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO AVOID THE SPILLAGE OF FUEL OR OTHER POLLUTANTS ON THE CONSTRUCTION SITE AND SHALL ADHERE TO ALL APPLICABLE POLICIES AND REGULATIONS RELATED TO SPILL PREVENTION AND RESPONSE/CONTAINMENT. 21. COVERED METAL WASTE CONTAINERS SHALL BE PROVIDED AT THE SITE TO FACILITATE THE COLLECTION OF REFUSE MATERIAL GENERATED FROM CONSTRUCTION ACTIVITIES. SUCH MATERIAL SHALL NOT BE BURIED OR BURNED AT THE SITE. 22. MINIMIZE LAND DISTURBANCES. SEED AND MULCH DISTURBED AREAS WITH TEMPORARY MIX AS SOON AS PRACTICABLE (2 WEEK MAXIMUM UNSTABILIZED PERIOD) USING PERENNIAL RYEGRASS AT 40 LBS PER ACRE. MULCH ALL CUT AND FILL SLOPES AND SWALES WITH LOOSE HAY AT A RATE OF 2 TONS PER ACRE. IF NECESSARY, REPLACE LOOSE HAY ON SLOPES WITH EROSION CONTROL BLANKETS OR JUTE CLOTH. MODERATELY GRADED AREAS, ISLANDS, AND TEMPORARY CONSTRUCTION STAGING AREAS MAY BE HYDROSEEDED WITH TACKIFIER. 23. MAINTAIN EXISTING PAVED AREAS FOR CONSTRUCTION STAGING FOR AS LONG AS POSSIBLE. UPON REMOVAL OF ALL PAVEMENT, THE CONTRACTOR SHALL PLACE STONE OVER DISTURBED AREAS TO SERVE AS STAGING AREAS TO THE SATISFACTION OF THE ENGINEER. 24. SWEEP AFFECTED PORTIONS OF OFF SITE ROADS ONE OR MORE TIMES A DAY (OR LESS FREQUENTLY IF TRACKING IS NOT A PROBLEM) DURING CONSTRUCTION. FOR DUST CONTROL, PERIODICALLY MOISTEN EXPOSED SOIL SURFACES WITH WATER ON UNPAVED TRAVEL WAYS TO KEEP THE TRAVEL WAYS DAMP. CALCIUM CHLORIDE MAY ALSO BE APPLIED TO ACCESS ROADS. DUMP TRUCK LOADS EXITING THE SITE SHALL BE COVERED. 25. TURF ESTABLISHMENT SHALL BE PERFORMED OVER ALL DISTURBED SOIL, UNLESS THE AREA IS UNDER ACTIVE CONSTRUCTION, IT IS COVERED IN STONE OR SCHEDULED FOR PAVING WITHIN 30 DAYS. TEMPORARY SEEDING OR NON -LIVING SOIL PROTECTION OF ALL EXPOSED SOILS AND SLOPES SHALL BE INITIATED WITHIN THE FIRST 7 DAYS OF SUSPENDING WORK IN AREAS TO BE LEFT LONGER THAN 30 DAYS. 27. MAINTAIN ALL PERMANENT AND TEMPORARY SEDIMENT CONTROL DEVICES IN EFFECTIVE CONDITION THROUGHOUT THE CONSTRUCTION PERIOD. UPON COMPLETION OF WORK SWEEP PARKING LOTS, CLEAN THE STORM DRAINAGE SYSTEMS AND REMOVE ALL TEMPORARY SEDIMENT CONTROLS ONCE THE SITE IS FULLY STABILIZED AND APPROVAL HAS BEEN RECEIVED FROM TOWN OF MONTVILLE AND/OR ENGINEER. 6. THE CONTRACTOR SHALT, TAKE EXTREME CARE DURING CONSTRUCTION SO AS NOT TO DISTURB UNPROTECTED WETLAND AREAS OR SEDIMENTATION AND EROSION CONTROL MEASURIES. THE CONTRACTOR SHALL INSPECT ALL SEDIMENT AND EROSION CONTROLS WEEKLY AND WITHIN 24 HOURS OF A STORM WITH A 17. NO CUT OR FILL SLOPES SHALL EXCEED 2:1 EXCEPT WHERE STABILIZED BY ROCK FACED EMBANKMENTS OR EROSION CONTROL BLANKETS, JUTE MESH AND RAINFALL AMOUNT OF 0.2 INCHES OR GREATER TO VERIFY THAT THE CONTROLS ARE OPERATING PROPERLY AND MAKE REPAIRS WHERE NECESSARY. VEGETATION. ALL SLOPES SHALL BE SEEDED, AND THE ROAD SHOULDER AND BANKS WILL BE STABILIZED IMMEDIATELY UPON COMPLETION OF FINAL GRADING - UNTIL TURF IS ESTABLISHED. 7. THE CONTRACTOR SHALL KEEP A SUPPLY OF EROSION CONTROL MATERIAL HAY BALES, SILT FENCE, JUTE MESH, ETC.) ON-SITE FOR PERIODIC MAINTENANCE AND EMERGENCY REPAIRS. 18. DIRECT ALL DEWATERING PUMP DISCHARGE TO A SEDIMENT CONTROL DEVICE SUCH AS TEMPORARY SEDIMENT TRAPS OR GRASS FILTERS WITHIN THE APPROVED LIMIT OF DISTURBANCE. DISCHARGE TO STORM DRAINS OR SURFACE WATERS FROM SEDIMENT CONTROLS SHALL BE CLEAR AND APPROVED BY THE 8. ALL FILL MATERIAL PLACED ADJACENT TO ANY WETLAND AREA SHALL BE GOOD QUALITY, WITH LESS THAN 5% FINES PASSING THROUGH A #200 SIEVE (BANK ENGINEER. RUN), SHALL BE PLACED IN MAXIMUM ONE FOOT LIFTS, AND SHALL BE COMPACTED TO 95% MAX. DRY DENSITY MODIFIED PROCTOR OR AS SPECIFIED IN THE CONTRACT SPECIFICATIONS. 19. BLOCK THE OPEN UPSTREAM ENDS OF DETENTION BASIN/SEDIMENT TRAP OUTLET CONTROL ORIFICES UNTIL SITE IS STABILIZED AND BLOCK END OF STORM DRAINS IN EXPOSED TRENCHES WITH BOARDS AND SANDBAGS AT THE END OF EACH WORKING DAY WHEN RAIN IS EXPECTED. _ 9. PROTECT EXISTING TREES THAT ARE TO BE SAVED BY FENCING AT THE DRIP LINE, OR AS DETAILED, WITH SNOW FENCE, ORANGE SAFETY FENCE, OR - SHALL MAINTAIN A CLEAN CONSTRUCTION SITE AND SHALL NOT ALLOW THE ACCUMULATION OF RUBBISH OR CONSTRUCTION DEBRIS ON _. EQUIVALENT FENCING. ANY LIMB TRIMMING SHOULD BE DONE AFTER CONSULTATION WITH AN ARBORIST AND BEFORE CONSTRUCTION BEGINS IN THAT AREA, 20. THE CONTRACTOR 101 EROSION CONTROL LEGEND CONTROL MEASURE ILLUSTRATION SILT FENCE , SF ANTI TRACKING PAD CONTRACT LIMIT UNE EQUALS CONSTRUCTION LIMIT LINE SOD EROSION CONTROL BLANKET STOCKPILE AREA EE D AM A/Z Design Services LLC 800.400.2420 i a-zcorp.com 46 Norwich Westerly Road O P.O. Box 370 U North Stonington, CT 06359 This document is an instrument of professional service, and shall not be used, in whole or in part, for any project other than for which it was created without the express, written consent of AZ Corp. Any unauthorized use, reuse, modification or alteration, including automated conversion of this document shall be at the user's sole risk without liability or legal exposure to AZ Corp. Consultants Civil FREEMAN COMPANIES 36 John Street Hartford, Connecticut Structural GIRARD & COMPANY, LLP 10 Waterchase Drive Rocky Hill, Connecticut Mech./Elec./Plumbing/Fire-Protection: N K ENGINEERS INC 755 main Street, Building 4 Monroe, Connecticut SAREN ENGINEERING INC 270 Farmington Avenue Farmington, Connecticut NEW BOILER INSTALLATION 125 DEPOT ROAD UNCASVILLE CONNECTICUT Key Plan Rev I Description FOR PERMITTING &t PRICING PURPOSES ONLY NOT RELEASED FOR CONSTRUCTION 1 2 3 0 5 GRAPHIC SCALE 20 '10 0 20 SCALE IN FEET 101 NTTTTyrrm Date 02/27/2015 EROSION AND SEDIMENT r1.1...ONTROL PLAN Date: 02/27/15 Drawn By: CEB Checked By: PAR Scale: 1 "=20' Project #: 2012-0708 C-401 0 1 2 GRADING AND DRAINAGE NOTES 1. SEE SITE PLAN FOR ADDITIONAL GENERAL NOTES. 2. THIS DRAWING IS INTENDED TO DESCRIBE GRADING AND DRAINAGE ONLY. REFER TO SITE PLAN FOR GENERAL INFORMATION AND DETAIL SHEETS FOR DETAILS. 3. THE CONTRACTOR SHALL PRESERVE EXISTING VEGETATION WHERE POSSIBLE AND/OR AS NOTED ON THE DRAWINGS. REFER TO EROSION CONTROL PLAN FOR LIMIT OF DISTURBANCE AND EROSION CONTROL NOTES. 4. TOPSOIL SHALL BE STRIPPED AND STOCKPILED ON SITE FOR USE IN FINAL LANDSCAPING. 5. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL NECESSARY CONSTRUCTION PERMITS REQUIRED BY FEDERAL, STATE AND LOCAL AGENCIES PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY CONSTRUCTION PERMITS FROM THE TOWN OF MONTVILLE AND/OR STATE OF CONNECTICUT REQUIRED TO PERFORM ALL REQUIRED WORK, INCLUDING STREET CUTS AND CONNECTIONS TO EXISTING UTILITIES. THE CONTRACTOR SHALL POST ALL BONDS, PAY ALL FEES, PROVIDE PROOF OF INSURANCE AND PROVIDE TRAFFIC CONTROL NECESSARY FOR THIS WORK. 6. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN TRAFFIC CONTROL DEVICES FOR PROTECTION OF VEHICLES AND PEDESTRIANS CONSISTING OF DRUMS, BARRIERS, SIGNS, LIGHTS, FENCES AND UNIFORMED TRAFFICMEN/OFFICERS AS REQUIRED, ORDERED BY THE ENGINEER OR REQUIRED BY THE STATE AND LOCAL GOVERNING AUTHORITIES. 7. VERTICAL DATUM IS THE 1929 NATIONAL GEODETIC VERTICAL DATUM (NGVD29). 8. CLEARING LIMITS SHALL BE PHYSICALLY MARKED IN THE FIELD AND APPROVED BY THE CONSTRUCTION MANAGER PRIOR TO THE START OF WORK ON THE SITE. 9. PROPER CONSTRUCTION PROCEDURES SHALL BE FOLLOWED ON ALL IMPROVEMENTS WITHIN THIS PARCEL SO AS TO PREVENT THE SILTING OF ANY WATERCOURSE OR WETLANDS IN ACCORDANCE WITH THE REGULATIONS OF THE DEPARTMI-NT OF ENVIRONMENTAL PROTECTION GUIDELINES FOR SOIL EROSION AND SEDIMENT POLLUTION CONTROL. IN ADDITION.. THE CONTRACTOR SHALL STRICTLY ADHERE TO THE "EROSION CONTROL PLAN" CONTAINED HEREIN. THE CONTRACTOR SHALL BE RESPONSIBLE TO POST ALL BONDS AS REQUIRED BY THE LOCAL TOWN WHICH WOULD GUARANTEE THE PROPER IMPLEMENTATION OF THE PLAN. 10. ALL SITE WORK, MATERIALS OF CONSTRUCTION, AND CONSTRUCTION METHODS FOR EARTHWORK AND STORM DRAINAGE WORK, SHALL CONFORM TO THE SPECIFICATIONS AND DETAILS AND APPLICABLE SECTIONS OF THE PROJECT SPECIFICATIONS MANUAL. ALL FILL MATERIAL UNDER STRUCTURES AND PAVED AREAS SHALL BE PER THE ABOVE STATED APPLICABLE SPECIFICATIONS, AND SHALL BE PLACED IN ACCORDANCE WITH THE APPLICABLE SPECIFICATIONS UNDER THE SUPERVISION OF A QUALIFIED PROFESSIONAL ENGINEER. WJ DRAINAGE NARRATIVE THE DEVELOPMENT SITE ENCOMPASSES APPROXIMATELY 0.60 ACRE OF A 6.28 ACRE PARCEL BEING A PORTION OF THE PROPERTY OF ROCKTENN CP LLC. THE SITE IS BOUNDED ON THE NORTH BY DEPOT ROAD, OTHER PROPERTY OF ROCKTENN CP LLC AND A RAILROAD RIGHT OF WAY TO THE EAST, DOCK ROAD TO THE SOUTH AND COMSTOCK CEMETERY AND PROPERTY OF FREDERICK AND ELEANOR PERKINS TO THE WEST. THE SITE PLAN CALLS FOR A NEW 3381 S.F. FOOTPRINT BUILDING. THERE WILL BE 3500 S.F. OF BITUMINOUS CONCRETE AND CONCRETE REMOVED FROM THE SITE LEAVING A 190 S.F. DECREASE IN IMPERVIOUS SURFACE. THE PROPOSED SITE MIMICS THE EXISTING GRADING AND DRAINAGE PATTERNS WHILE REDUCING THE IMPERVIOUS COVER WITHIN THE PROJECT LIMITS. 11. ALL DISTURBANCE INCURRED TO PUBLIC, MUNICIPAL, COUNTY, OR STATE PROPERTY DUE TO CONSTRUCTION SHALL BE RESTORED TO ITS PREVIOUS CONDITION OR BETTER, TO THE SATISFACTION OF THE OWNER. Bto12. ALL CONSTRUCTION SHALL COMPLY WITH THE PROJECT SPECIFICATIONS MANUAL. ALL CONSTRUCTION WITHIN A DOT / op RIGHT OF WAY SHALL COMPLY WITH ALL DEPARTMENT OF TRANSPORTATION STANDARDS. WHERE SPECIFICATIONS OR STANDARDS ARE IN CONFLICT, THE MORE STRINGENT SPECIFICATION OR STANDARD SHALL BE SUPERIOR. / 13. IF IMPACTED OR CONTAMINATED SOIL IS ENCOUNTERED BY THE CONTRACTOR, THE CONTRACTOR SHALL SUSPEND / EXCAVATION WORK OF IMPACTED SOIL AND NOTIFY THE OWNER AND/oR OWNER'S ENVIRONMENTAL CONSULTANT PRIOR do TO PROCEEDING WITH FURTHER WORK IN THE IMPACTED SOIL LOCATION UNTIL FURTHER INSTRUCTED BY THE OWNER i AND/OR OWNER'S ENVIRONMENTAL CONSULTANT. i i }v IN 10 El 5 lei LEGEND EXISTING CONTOURS PROPOSED CONTOURS 20 PROPOSED SPOT GRADE x 20.00 UMIT OF DISTURBANCE SOD Q_ A/Z Design Services LLC r/ 800.400.2420 1 a-zcorp.com 46 Norwich Westerly Road O P.O. Box 370 U North Stonington, CT 06359 This document is an instrument of professional service, and shall not be used, in whole or in part, for any project other than for which it was created without the express, written consent of AZ Corp. Any unauthorized use, reuse, modification or alteration, including automated conversion of this document shall be at the user's sole risk without liability or legal exposure to AZ Corp. Consultants Civil FREEMAN COMPANIES 36 John Street Hartford, Connecticut Structural GIRARD & COMPANY, LLP 10 Waterchase Drive Rocky Hill, Connecticut Mech./Elec./Plumbing/Fire-Protection: N K ENGINEERS INC 755 main Street, Building 4 Monroe, Connecticut SAREN ENGINEERING INC 270 Farmington Avenue Farmington, Connecticut 9 ockTenn NEW BOILER INSTALLATION 125 DEPOT ROAD UNCASVILLE CONNECTICUT Description Date 02/27/2015 r PERMITTING Et PRICING PURPOSES ONLY NOT RELEASED FOR CONSTRUCTION 1 2 3 11 GfRAPHIIC SCALE 20, 10 0 20 SCALE 1N FEET 5 6 GRADING AND DRAINAGE PLAN Date: 02/27/15 Drawn By: CEB Checked By: PAR Scale: 1 "=20 Project #: 2012-0708 C-301 0 I•J 10 iI DEPOT PROPOSED SITE ry > Q O FST Q O Of EDWARD RD. F— W DOCK CL 3 8 2 ZONING INFORMATION 3 LOCATION: 125 DEPOT ROAD UNCASVILLE CONNECTICUT ZONE: INDUSTRIAL DISTRICT USE: INDUSTRIAL ITEM # ITEM REQUIRED PROPOSED 1 MINIMUM LOT AREA 40,000 SF N/A 3 MINIMUM LOT FRONTAGE 150 FEET N/A 3 MINIMUM FRONT YARD 30 FEET N/A 4 MINIMUM SIDE YARD 15 FEET 15+ FEET 5 MINIMUM REAR YARD 30 FEET 30+ FEET 6 MAXIMUM BUILDING HEIGHT 50 FEET x El 5 no LEGEND E= PROPOSED BUILDING - - PROPERTY LINE/RIGHT OF WAY LINE Loa LIMIT OF DISTURBANCE PROPOSED RETAINING WALL — — — — — — — — — — — — — CUT BIT. CONC. PAVEMENT W w w WATER LINE PROPOSED GRAVEL SURFACE n A/Z Design Services LLC 800.400.2420 1 a-zcorp.com 46 Norwich Westerly Road O P.O. Box 370 U North Stonington, CT 06359 This document is an instrument of professional service, and shall not be used, in whole or in part, for any project other than for which it was created without the express, written consent of AZ Corp. Any unauthorized use, reuse, modification or alteration, including automated conversion of this document shall be at the user's sole risk without liability or legal exposure to AZ Corp. Consultants Civil FREEMAN COMPANIES 36 John Strppt TRANSPORTATION STANDARDS AND SPECIFICATIONS IN THE ABOVE REFERENCED INCREASING HILRAKCHY. IF bPL(.JFICAI IUNS AKL IN LUNruc.1, 1 ht MORE STRINGENT SPECIFICATION SHALL APPLY. ALL CONSTRUCTION SHALL BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE OSHA, FEDERAL, i STATE AND LOCAL REGULATIONS. 2. THE OWNER IS RESPONSIBLE FOR OBTAINING ALL NECESSARY ZONING PERMITS REQUIRED BY GOVERNMENT AGENCIES PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL OBTAIN ALL STATE AND TOWN CONSTRUCTION PERMITS, INCLUDING CONNECTICUT DOT PERMITS. THE CONTRACTOR SHALL POST ALL BONDS, PAY ALL FEES, PROVIDE PROOF OF INSURANCE AND PROVIDE TRAFFIC CONTROL NECESSARY FOR THIS WORK. MODULAR RETAINING WALL 3. REFER TO PLANS, DETAILS AND PROJECT MANUAL FOR ADDITIONAL INFORMATION. THE CONTRACTOR SHALL VERIFY ALL SITE CONDITIONS IN THE Project FIELD AND CONTACT THE ENGINEER IF THERE ARE ANY QUESTIONS OR CONFLICTS REGARDING THE CONSTRUCTION DOCUMENTS AND/OR FIELD CONDITIONS SO THAT APPROPRIATE REVISIONS CAN BE MADE PRIOR TO BIDDING/CONSTRUCTION. ANY CONFLICT BETWEEN THE DRAWINGS AND CONCRETE DOOR PAD AT RAVEL SURFACE (TYP) SPECIFICATIONS SHALL BE CONFIRMED WITH THE OWNER'S CONSTRUCTION MANAGER PRIOR TO CONSTRUCTION. SINGLE DOOIR LIMIT OF DISTURBANCE (TYP. 4. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS OF ALL PRODUCTS AND MATERIALS PER PLANS AND SPECIFICATIONS TO THE OWNER AND ENGINEER ONCRETE DOOR PAD AT FOR REVIEW AND APPROVAL PRIOR TO FABRICATION OR DELIVERY TO THE SITE. ALLOW A MINIMUM OF 14 WORKING DAYS FOR REVIEW. SINGLE DOOReni BOILER GAS METERING STATIO Roc kT 5 THE CONTRACTOR SHALL FOLLOW THE RECOMMENDED SEQUENCE OF CONSTRUCTION NOTES PROVIDED ON THE EROSION CONTROL PLAN OR SUBMIT REFER TO MEP PLANS AN ALTERNATE PLAN FOR APPROVAL BY THE ENGINEER PRIOR TO CONSTRUCTION. LOD LOD LOD LOU' LOD LOD 6. THE CONTRACTOR SHALL REFERENCE THE ARCHITECTURAL PLANS FOR EXACT DIMENSIONS AND CONSTRUCTION DETAILS OF BUILDING. LOD 7. SHOULD ANY UNKNOWN OR INCORRECTLY LOCATED EXISTING PIPING OR OTHER UTILITY BE UNCOVERED DURING EXCAVATION, CONSULT THE CIVIL LOD ENGINEER IMMEDIATELY FOR DIRECTIONS BEFORE PROCEEDING FURTHER WITH WORK IN THIS AREA. LOD 8„ 8. DO NOT INTERRUPT EXISTING UTILITIES SERVICING FACILITIES OCCUPIED AND USED BY THE OWNER OR OTHERS DURING OCCUPIED HOURS, EXCEPT -�- LOD WHEN SUCH INTERRUPTIONS HAVE BEEN AUTHORIZED IN WRITING BY THE OWNER AND THE LOCAL MUNICIPALITY. INTERRUPTIONS SHALL ONLY LOD -- � r OCCUR AFTER ACCEPTABLE TEMPORARY SERVICE HAS BEEN PROVIDED. 0 0 0 0 o d o 0 0 o QU o O O o O o o O 9. ALL SITE DIMENSIONS ARE REFERENCED TO THE FACE OF CURB OR EDGE OF PAVING AS APPLICABLE, UNLESS OTHERWISE NOTED. ALL BUILDING O I DIMENSIONS ARE REFERENCED TO THE OUTSIDE FACE OF THE STRUCTURE. "+ I UT EXISTING BIT.': CONNECT TO EXISTING- o CONC PAVEMENT NEW BOILER INSTALLATION 125 DEPOT ROAD UNCASVILLE CONNECTICUT 10. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN TRAFFIC CONTROL DEVICES FOR PROTECTION OF VEHICLES AND PEDESTRIANS CONSISi!aG OF WATER SERVICE. \ Key Plan 1 FOR PERMITTING Et PRICING PURPOSES ONLY NOT RELEASED FOR CONSTRUCTION El 5 GRAPHIC SCALE r 20 10 0 20 SCALE IN FEET L It 1 Description 1tttttNllililittry��} SITE PLAN Date: 02/27/15 Drawn Byw CEB Checked By: PAR Scale- 1"=20 Project #: 2012-0708 Date 02/27/2015 C�►�i�l