Loading...
HomeMy WebLinkAboutSite Plan1. Set posts and Posts — excavate a 6"xe" trench, set post, downslope. Angle 10 upslope for tobil Ity and elf cleaning. 100 12" min. *C01ep t h 3. Attach filter fabric Filter to the wire fencing Fabric and extend It to the trench, 6 Bottom of Drolnocewav Plan View SILT FENCE DETAIL 2. Staple the w I re mash fencing to Vire- end post. fencing 4 Backfi I the trench and compact the excavated soil. Compacted Staked Haybale bockflll:--\ As Required Al a. a kftft0*#8_ ELEVATION Point "A" should behigher than point "B". NOT TO SCALE LExisting Grade LEGEND SAN SMH SANT -A 00 6 Inv. 330 . 6:,.' f=34.4� Inv. = 330.E 1.r 6" lateral 1.0% S I r lateral 8.4% I D 14 Notes: 1. Sewer Laterals And Force Maines Must Be Approved Pipe From Tables Z—A, Z—B and Z—D Of The Ct. Public Health Codes Technical Standards. placed under stone 2. Concrete Galleries For Roof Leaders To Be k Minimun Of 25' Downgradient Of Building Foundation And 75' From Proposed Well Location. CONSTRUCTION ENTRANCE DETAIL Not To Scale Construction Schedule/Erosion & Sedimentation Control Notes 1. Box out driveway and immediately Install anti -tracking pad (see detail). 2. Place staked hay bales/silt fence adjacent to disturbed areas to protect against possible sedimentation (see plan). 3. Strip and stockpile topsoil from area of proposed house, keep disturbance at a minimum ( see temporary stockpile detail). 4. Excavate for and install footings and foundation. 5. Backfill foundation, loam and seed disturbed area as soon as possible. Protect area, as necssary, with hay bales, mulch, etc., until area is stabilized. 6. Install sewer line, underground utilities, and water service. 7. Loam and seed all remaining disturbed areas as soon as possible. Protect area, as necessary, with hay bales, mulch, etc., until area is stablized. 8. All erosion and sedimentation control devices are to be maintained until disturbed areas are stabilized. Responsible party is John George 1-860-823-1818. 9. At time of construction stake -out, BM to be set. 1 /2* Force Mc (See No - P0 Below) ?I N MAP REFEFENCE: 1) "GAY HILL ROAD SUBDIVISION PREPARED FOR SIR BURLAKE LLC #I ZO GAY HILL ROAD MONTVILLE, CONNECTICUT TARBELL, HEINTZ ig ASSOC., INC. 1227 BURNSIDE AVENUE - SUITE 31, EAST HARTFORD, CONNECTICUT 06108 DATE 2-03-09 REV. THRU 12-03-09 SCALE AS SHOWN DRAWN BY M.L.T. SHEETS 1 -39." NOTE: I HEREBY DECLARE THAT THIS SURVEY AND MAP HAS BEEN PREPARED IN ACCORDANCE WITH SECTIONS 20-300b— I THRU 20-300b-20 OF THE REGULATIONS OF CONNECTICUT STATE AGENIES — "MINIMUM STANDARDS FOR SURVEYS AND MAPS IN THE STATE OF CONNECTICUT" AS ENDORSED BY THE CONNECTICUT ASSOCIATION OF LAND SURVEYORS INC. IT 15 A LIMITED PROPERTY/BOUNDARY SURVEY BASED ON A, DEPENDENT RESURVEY, CONFORMING TO HORIZONTAL ACCURACY — CLASS AND IS INTENDED TO BE USED FOR SITE PLAN APPROVAL Existing Contour Proposed Contour If76 98.7 Existing Elevation No. 15 466 98+7 W Proposed Elevation Proposed Water Service 60 0 .... ..... ... Test Hole Location Proposed Limits Of Clearing Silt Fence Notes: 1. Sewer Laterals And Force Maines Must Be Approved Pipe From Tables Z—A, Z—B and Z—D Of The Ct. Public Health Codes Technical Standards. placed under stone 2. Concrete Galleries For Roof Leaders To Be k Minimun Of 25' Downgradient Of Building Foundation And 75' From Proposed Well Location. CONSTRUCTION ENTRANCE DETAIL Not To Scale Construction Schedule/Erosion & Sedimentation Control Notes 1. Box out driveway and immediately Install anti -tracking pad (see detail). 2. Place staked hay bales/silt fence adjacent to disturbed areas to protect against possible sedimentation (see plan). 3. Strip and stockpile topsoil from area of proposed house, keep disturbance at a minimum ( see temporary stockpile detail). 4. Excavate for and install footings and foundation. 5. Backfill foundation, loam and seed disturbed area as soon as possible. Protect area, as necssary, with hay bales, mulch, etc., until area is stabilized. 6. Install sewer line, underground utilities, and water service. 7. Loam and seed all remaining disturbed areas as soon as possible. Protect area, as necessary, with hay bales, mulch, etc., until area is stablized. 8. All erosion and sedimentation control devices are to be maintained until disturbed areas are stabilized. Responsible party is John George 1-860-823-1818. 9. At time of construction stake -out, BM to be set. 1 /2* Force Mc (See No - P0 Below) ?I N MAP REFEFENCE: 1) "GAY HILL ROAD SUBDIVISION PREPARED FOR SIR BURLAKE LLC #I ZO GAY HILL ROAD MONTVILLE, CONNECTICUT TARBELL, HEINTZ ig ASSOC., INC. 1227 BURNSIDE AVENUE - SUITE 31, EAST HARTFORD, CONNECTICUT 06108 DATE 2-03-09 REV. THRU 12-03-09 SCALE AS SHOWN DRAWN BY M.L.T. SHEETS 1 -39." NOTE: I HEREBY DECLARE THAT THIS SURVEY AND MAP HAS BEEN PREPARED IN ACCORDANCE WITH SECTIONS 20-300b— I THRU 20-300b-20 OF THE REGULATIONS OF CONNECTICUT STATE AGENIES — "MINIMUM STANDARDS FOR SURVEYS AND MAPS IN THE STATE OF CONNECTICUT" AS ENDORSED BY THE CONNECTICUT ASSOCIATION OF LAND SURVEYORS INC. IT 15 A LIMITED PROPERTY/BOUNDARY SURVEY BASED ON A, DEPENDENT RESURVEY, CONFORMING TO HORIZONTAL ACCURACY — CLASS AND IS INTENDED TO BE USED FOR SITE PLAN APPROVAL EDGE AND BELIEF, THIS MAP IS SUBSTANTIALLY CORRECT 05-31-11 DATE , =ak MIC MLk. TAKU No. 15 466 Z: EDGE AND BELIEF, THIS MAP IS SUBSTANTIALLY CORRECT 05-31-11 DATE ,