HomeMy WebLinkAboutSite Plan pg 2Proposed
We 1 1
25' _tea
E-?ne
Unit Stiid
Footing
, 10, 10, 1 ---- I r
Ora ,
Ud9r
utilities
Sewer Lateral
M (A
CL&P
Edge Of Pavement
Sewer Main
1— -- SAN
MINIMUM CLEARANCE METAIL
Not 'To Slcale
Debris Removed from
Wall Area
LExistinrjde
1. Set Post$ and
Posta exccvote a 62;x6f,
trench, set post,
downslope.
Angle 10
up3lope for
stability and
self cleaning. 100
12"min.
Depth
*rl
� 3. Attach filter 4abrIc
Filter— to the wire fencing
Fabric and extend It to
the trench,
Bottom of
Drol
Plan View
Wire—
fencing
2, Staple the
wire mesh
fencing to
endas,.
4. Backfil the
trench and
compact the
excavated
Staked Hoyl
im Required
All
ELEVATION
Point "A" should be higher
than point "B".
placed under stone
CONSTRUCTION ENTRANCZ DETAIL
Not To Scale
4" Dic.
Filter Fobric
Pavemn t (See Ot to I I
1111inar-wo
GALLEY DETAIL FOR ROOF LEADERS
Not To Scale