Loading...
HomeMy WebLinkAboutSite PlanLot 40�', 0 tn -4- 0 ...1 W iq9tioll 2" Stone 01b 2'x2'x6" Deep Tie Roof Leaders At End Footing Into Concrete Galleries Drain (See Note Below) Lof 38 20,3 13 sq. ff. 2 acres CN 25' Min See Note Below) Prop, Ln eck U) D 16$ Footing Drain ._0 0 (0 F PVC 0 11, 40 - �40 01 — FL Gt�ade 340 Z 54.00 S S -,-,.-Prop. hse. Inv.= A r, 1 335.4 Track 4_1 ad 115.001 2/9.79 01 00 it I N 87 3'*1 E 4003 1 38 E 260.0 S.S. Inv.= Z < 3-54.0 ATffii�_34� C� Porch I . 11) BSM't=3S3­Z­11N 60 L.F 2,41 Gf = 340.5 = 330.6 411 lateral 2.2% _22.01 340+4 32.01 SAN SAN ---- SAN L I SMH .000 - Anti – SAN S.S. 98.7 P 37.5' Front Ix Track &S. Inv. 330.9 t- Inv. Yard /Af,=340-46 /Inv. 9 96+7 Proposed Elevation Prop. Pad Prop. U dgr. Water Service W Proposed Water Service Util, Se rvice 3410 Prop. 10' CL&P I 10 CL&P UGF�\ U Anti- Well LO Esm t 7 Esrn't Track 4_1 ad 115.001 2/9.79 01 00 it I N 87 3'*1 E 4003 1 38 E 260.0 S.S. Inv.= Z < 3-54.0 Notes: 1. Sewer Laterals And Force Maine Must Be Approved Pipe From Tables Z—A, Z—B and Z—D Of The Cf. Public Health Codes Technical Standards. 2® Concrete Galleries For Roof Leaders To Be A Mintmun Of 25' Downgrodlent Of Building Foundation And 751 From Proposed Well Location. Construction Schedule/Erosion k Sedimentation Control Notes 1. Box out driveway and Immediately install anti -tracking pod( see detail). 2. Place staked hay bales/silt fence adjacent to disturbed areas to protect against possible sedimentation (see plan). 3, Strip and stockpile topsoil from area of proposed house, keep disturbance at a minimum ( see temporary stockpile detail). 4. Excavate for and install footings and foundation. 5, Backfill foundation, loom and seed disturbed area as soon as possible. Protect area, as necssary, with hay bales, mulch, etc., until area Is stabilized. 6. Install sewer line, underground utilities, and water service. 7. Loam and seed all remaining disturbed areas as soon as possible. Protect area, as necessary, with hay bales, mulch, etc., until area Is stablized. 8. All erosion and sedimentation control devices are to be maintained until disturbed areas are stabilized. Responsible party Is John George 1-860-823-1818. 9. At time of construction stake -out, BM to be set. Util. Service i'Prop. NOTE: I HEREBY DECLARE THAT THIS SURVEY AND MAP HAS BEEN PREPARED IN ACCORDANCE WITH SECTIONS 20-300b- I THRU 20-300b-20 OF THE REGULATIONS OF CONNECTICUT STATE AGENIES - "MINIMUM STANDARDS FOR SURVEYS AND MAPS IN THE STATE OF CONNECTICUT" AS ENDORSED BY THE CONNECTICUT ASSOCIATION OF LAND SURVEYORS INC. IT IS A LIMITED PROPERTY/'BOUNDARY SURVEY BASED ON A DEPENDENT RESURVEY, CONFORMING TO HORIZONTAL ACCURACY - CLASS "A-2", AND IS INTENDED TO BE USED"FOR SITE PLAN APPROVAL TO THE BEST OF MY KNO*C E AND BELIEF, THIS MAP 15 SUBSTANTIALLY CORRECT AS NOTED HERON. L.S. 15466 ' I :IARBE REGISTRATION NO 3– 12– 12 DATE 76---- Existing Contour e n S Inv. = 330.6 —76 — Proposed Contour SAN SAN ---- SAN L I SMH '*� �6 - Anti – SAN S.S. 98.7 Existing Elevation Ix Track &S. Inv. 330.9 t- Inv. 330 /Af,=340-46 /Inv. 9 96+7 Proposed Elevation % Z_ Pad W Proposed Water Service UGP 25 L.F P UGP UGF�\ U Test Hole Location Udgr. A�' 6r, lateral 3r3 260 Service,1.0% ", f- 11. 1 v. Proposed Limits Of Clearing -_ I — 4 MW 71 44581 S i l tFence P �,". <' ,:<� T > Wet land Location ---7- ZN 1--i . 71-777 A 1-4-1-1 Notes: 1. Sewer Laterals And Force Maine Must Be Approved Pipe From Tables Z—A, Z—B and Z—D Of The Cf. Public Health Codes Technical Standards. 2® Concrete Galleries For Roof Leaders To Be A Mintmun Of 25' Downgrodlent Of Building Foundation And 751 From Proposed Well Location. Construction Schedule/Erosion k Sedimentation Control Notes 1. Box out driveway and Immediately install anti -tracking pod( see detail). 2. Place staked hay bales/silt fence adjacent to disturbed areas to protect against possible sedimentation (see plan). 3, Strip and stockpile topsoil from area of proposed house, keep disturbance at a minimum ( see temporary stockpile detail). 4. Excavate for and install footings and foundation. 5, Backfill foundation, loom and seed disturbed area as soon as possible. Protect area, as necssary, with hay bales, mulch, etc., until area Is stabilized. 6. Install sewer line, underground utilities, and water service. 7. Loam and seed all remaining disturbed areas as soon as possible. Protect area, as necessary, with hay bales, mulch, etc., until area Is stablized. 8. All erosion and sedimentation control devices are to be maintained until disturbed areas are stabilized. Responsible party Is John George 1-860-823-1818. 9. At time of construction stake -out, BM to be set. Util. Service i'Prop. NOTE: I HEREBY DECLARE THAT THIS SURVEY AND MAP HAS BEEN PREPARED IN ACCORDANCE WITH SECTIONS 20-300b- I THRU 20-300b-20 OF THE REGULATIONS OF CONNECTICUT STATE AGENIES - "MINIMUM STANDARDS FOR SURVEYS AND MAPS IN THE STATE OF CONNECTICUT" AS ENDORSED BY THE CONNECTICUT ASSOCIATION OF LAND SURVEYORS INC. IT IS A LIMITED PROPERTY/'BOUNDARY SURVEY BASED ON A DEPENDENT RESURVEY, CONFORMING TO HORIZONTAL ACCURACY - CLASS "A-2", AND IS INTENDED TO BE USED"FOR SITE PLAN APPROVAL TO THE BEST OF MY KNO*C E AND BELIEF, THIS MAP 15 SUBSTANTIALLY CORRECT AS NOTED HERON. L.S. 15466 ' I :IARBE REGISTRATION NO 3– 12– 12 DATE