HomeMy WebLinkAboutSite PlanLot 40�',
0
tn
-4-
0
...1
W
iq9tioll
2" Stone 01b
2'x2'x6" Deep
Tie Roof Leaders At End Footing
Into Concrete Galleries
Drain
(See Note Below)
Lof 38
20,3 13 sq. ff. 2
acres
CN
25' Min
See Note
Below)
Prop,
Ln
eck
U) D 16$
Footing Drain
._0 0 (0
F PVC 0 11, 40
- �40
01 — FL Gt�ade
340 Z
54.00 S S
-,-,.-Prop. hse. Inv.=
A r, 1 335.4
Track 4_1
ad
115.001 2/9.79
01 00
it I N 87 3'*1 E
4003 1 38 E 260.0 S.S.
Inv.= Z
<
3-54.0
ATffii�_34�
C� Porch
I . 11)
BSM't=3S3Z11N
60 L.F
2,41
Gf = 340.5
= 330.6
411 lateral
2.2%
_22.01
340+4
32.01
SAN
SAN ----
SAN
L I SMH
.000
-
Anti –
SAN S.S.
98.7
P
37.5' Front
Ix
Track
&S.
Inv. 330.9
t-
Inv.
Yard
/Af,=340-46
/Inv. 9
96+7
Proposed Elevation
Prop.
Pad
Prop. U dgr.
Water
Service
W
Proposed Water Service
Util, Se rvice
3410
Prop.
10' CL&P
I
10 CL&P
UGF�\
U
Anti- Well LO
Esm t
7
Esrn't
Track 4_1
ad
115.001 2/9.79
01 00
it I N 87 3'*1 E
4003 1 38 E 260.0 S.S.
Inv.= Z
<
3-54.0
Notes:
1. Sewer Laterals And Force Maine Must Be Approved
Pipe From Tables Z—A, Z—B and Z—D Of The Cf. Public
Health Codes Technical Standards.
2® Concrete Galleries For Roof Leaders To Be A Mintmun
Of 25' Downgrodlent Of Building Foundation And 751
From Proposed Well Location.
Construction Schedule/Erosion
k Sedimentation Control Notes
1. Box out driveway and Immediately install anti -tracking pod( see detail).
2. Place staked hay bales/silt fence adjacent to disturbed areas to protect
against possible sedimentation (see plan).
3, Strip and stockpile topsoil from area of proposed house, keep disturbance at a
minimum ( see temporary stockpile detail).
4. Excavate for and install footings and foundation.
5, Backfill foundation, loom and seed disturbed area as soon as possible. Protect
area, as necssary, with hay bales, mulch, etc., until area Is stabilized.
6. Install sewer line, underground utilities, and water service.
7. Loam and seed all remaining disturbed areas as soon as possible. Protect
area, as necessary, with hay bales, mulch, etc., until area Is stablized.
8. All erosion and sedimentation control devices are to be maintained until
disturbed areas are stabilized. Responsible party Is John George
1-860-823-1818.
9. At time of construction stake -out, BM to be set.
Util. Service i'Prop.
NOTE: I HEREBY DECLARE THAT THIS SURVEY AND MAP HAS BEEN PREPARED IN
ACCORDANCE WITH SECTIONS 20-300b- I THRU 20-300b-20 OF THE REGULATIONS OF
CONNECTICUT STATE AGENIES - "MINIMUM STANDARDS FOR SURVEYS AND MAPS IN THE
STATE OF CONNECTICUT" AS ENDORSED BY THE CONNECTICUT ASSOCIATION OF LAND
SURVEYORS INC. IT IS A LIMITED PROPERTY/'BOUNDARY SURVEY BASED ON A DEPENDENT
RESURVEY, CONFORMING TO HORIZONTAL ACCURACY - CLASS "A-2", AND IS INTENDED
TO BE USED"FOR SITE PLAN APPROVAL
TO THE BEST OF MY KNO*C E AND BELIEF, THIS MAP 15 SUBSTANTIALLY CORRECT
AS NOTED HERON.
L.S. 15466
' I
:IARBE
REGISTRATION NO
3– 12– 12
DATE
76----
Existing Contour
e n
S Inv.
= 330.6
—76 —
Proposed Contour
SAN
SAN ----
SAN
L I SMH
'*�
�6
-
Anti –
SAN S.S.
98.7
Existing Elevation
Ix
Track
&S.
Inv. 330.9
t-
Inv.
330
/Af,=340-46
/Inv. 9
96+7
Proposed Elevation
%
Z_
Pad
W
Proposed Water Service
UGP
25 L.F
P
UGP
UGF�\
U
Test Hole Location
Udgr.
A�'
6r, lateral
3r3 260
Service,1.0%
",
f-
11. 1 v.
Proposed Limits Of Clearing
-_ I —
4 MW
71
44581
S i l tFence
P
�,". <' ,:<�
T
>
Wet land Location
---7- ZN 1--i
. 71-777
A 1-4-1-1
Notes:
1. Sewer Laterals And Force Maine Must Be Approved
Pipe From Tables Z—A, Z—B and Z—D Of The Cf. Public
Health Codes Technical Standards.
2® Concrete Galleries For Roof Leaders To Be A Mintmun
Of 25' Downgrodlent Of Building Foundation And 751
From Proposed Well Location.
Construction Schedule/Erosion
k Sedimentation Control Notes
1. Box out driveway and Immediately install anti -tracking pod( see detail).
2. Place staked hay bales/silt fence adjacent to disturbed areas to protect
against possible sedimentation (see plan).
3, Strip and stockpile topsoil from area of proposed house, keep disturbance at a
minimum ( see temporary stockpile detail).
4. Excavate for and install footings and foundation.
5, Backfill foundation, loom and seed disturbed area as soon as possible. Protect
area, as necssary, with hay bales, mulch, etc., until area Is stabilized.
6. Install sewer line, underground utilities, and water service.
7. Loam and seed all remaining disturbed areas as soon as possible. Protect
area, as necessary, with hay bales, mulch, etc., until area Is stablized.
8. All erosion and sedimentation control devices are to be maintained until
disturbed areas are stabilized. Responsible party Is John George
1-860-823-1818.
9. At time of construction stake -out, BM to be set.
Util. Service i'Prop.
NOTE: I HEREBY DECLARE THAT THIS SURVEY AND MAP HAS BEEN PREPARED IN
ACCORDANCE WITH SECTIONS 20-300b- I THRU 20-300b-20 OF THE REGULATIONS OF
CONNECTICUT STATE AGENIES - "MINIMUM STANDARDS FOR SURVEYS AND MAPS IN THE
STATE OF CONNECTICUT" AS ENDORSED BY THE CONNECTICUT ASSOCIATION OF LAND
SURVEYORS INC. IT IS A LIMITED PROPERTY/'BOUNDARY SURVEY BASED ON A DEPENDENT
RESURVEY, CONFORMING TO HORIZONTAL ACCURACY - CLASS "A-2", AND IS INTENDED
TO BE USED"FOR SITE PLAN APPROVAL
TO THE BEST OF MY KNO*C E AND BELIEF, THIS MAP 15 SUBSTANTIALLY CORRECT
AS NOTED HERON.
L.S. 15466
' I
:IARBE
REGISTRATION NO
3– 12– 12
DATE