Loading...
HomeMy WebLinkAboutSanitary SystemP O !� AS REQUIRED 4' MINIMUM- CT INIMUM CT DOT 2' FILTER FABRIC CONSTRUCTION ENTRANCE r' 1. SET POSTS & EXCAVATE A 6"716" 2, STAPLE THE VIRE MESH TRENCH, SET POST DOWNSLOPE. FENCING TO END POST. WIRE I ! ANGLE 10 1 FENCING --1 UPSLCIPE FOR 1 l it STABILITY POSTS it I Il !ti _lrt� =1 it= - I =1_ 1 =r- t 12' MIN DEPTH 3. ATTACH FILTER FABRIC To THE WIRE 4. BACKFILL THE TRENCH & COMPACT FENCING & EXTEND TO THE TRENCH. THE EXCAVATED SOIL. FILTER FABRIC I COMPACTED! 1 } BACKFILL t } r1 11 111 !r if - I III _l it . r 11 i =110 =1 TYPICAL INSTALLATION SYNTHETIC FILTER FABRIC BENCH MARK ON BACK CENTER OF TOP OF CB FRAME n ELEV=228.48. SET, BM IN LEACHING FIED, AREA UPON STAN OUT LU'1' 1No 4A--44 �! I -- _ f _' 74H ,r' f% ! f tel' f I• r,•' .',,. .•'! r' ' -r i'�`\ i•.f •'",' ,r' J, ,,fes ,'','' "',,\ 85d .56' 08" W — 150.69' _ '"~ ` J,, 73H 8 0 H 20' WIDE DRAINAGE �, 81 H \ r .r EASEMENT \=`%'' r\ . • \ r' EXISTING 72H.. STORM DRAIN \ ' 42 .... f . ••. CEJ l Z20 \ X _ 4 = 50 LIMIT MM ASTO DI TPA \ TP43` �► ` \ 232 80T N' 2A--21 / 234 236 234 3AR�' A — 440,513-. SF`\ S "V �='..93 ACRES / , R=225.00 I,S0 D=48d38 02 L= 190.98' 231 PB TP44 '� O INV233.25 1000 G SEPTIC TANK, INV232.00-OUT INV232.25-IN 40 4 CIP'.. & TP45 ` ~ CO f o. 222 220 238 236 r 1 '1 1 Z 1 1 LOT No 2A-23 LEGEND 0 FLAGGED TREES(TO BE SAVED) GENERAL NOTES TEST PITS ' �5 { T-, I T PERC TEST -------- EXISTING CONTOUR 500 PROPOSED CONTOUR — O — IRON PINS RECOVERED — O — IRON PINS TO BE SET FINE/MED SAND BUILDING SETBACK LINES 8 STONE WALL APPROX. TREELINE SEE FOOTING DRAINS TEST PIT PROPOSED WELL ------0 SILT FENCE BARRIER — a — MONUMENT RECOVERED — ■ — MONUMENT TO BE SET 01 PRIME LEACHING TRENCH GRAY SANDY HARDPAN RESERVE LEACHING TRENCH ■ HIGH LEVEL OVERFLOW DISTRIB BOX O TYP. GRADE TO DRAIN SWALE 48" -24 ) GROUND SURFAC Ij w 18 0°0 00 o° $0° o COMMON BACKFILL 2' oo°°O d� 0$ --1' DIA BROKEN STONE 0 0 0000 0p o OR SCREENED GRAVEL NON WOVEN 6' 4' PERFORATED PIPE FILTER', FABRIC (PERFORATIONS DOWN) TYPICAL LEACHING TRENCH NTS 21'8 tK` LOT No � \sp `SQ..'\>z, ,. / • . • is —20 n Q z� `� / �„��` 224 2A 80 0°O 80 80 �o-oo° a a CONSTRUCTIU ENTRANCE ARL A 240 } - .0 0 . Nvt -. r I 111 \ S` RJ ` a 228 3`0 226 PERCOLATION TEST 9:50 PRESOAK EROSION CONTROL NOTES General Requirements for Erosion Control: A schedule of operations to include starting and completion dates for major development phases, such as land clearing and grading, street, sidewalk, and storm sewage installation, etc. Seeding, sodding, or revegetation plans and specifications for all unprotected or unvegetated areas shall be implemented as soon as possible. Excavations, Fills and Grading: Cut and fill slopes shall not be steeper than 3:1 unless stabilized by a retaining wall or cribbing, except as approved by the Commission under special conditions. Adequate provisions shall be made to prevent surface water from damaging the cut face of excavation or the sloping surfaces of fills. Cut and fills shall not endanger adjoining property. Fill shall be placed and compacted so as to minimize sliding or erosion of the soil. Grading shall not be done in such a way so as to divert water onto the property of another landowner without the expressed consent of that landowner and the Commission. Fills shall not encroach on natural watercourses or constructed channels. During grading operations, necessary measures for dust control shall be exercised. Grading equipment will not be allowed to cross live streams except by means of bridges and culverts or other methods as approved by the Commission. Implementation Procedures: Wherever feasible, natural vegetation should to retained and protected. Only the smallest practical area of land should be exposed at any one time during development. When land is exposed during development, the exposure should be kept to the shortest practical period of time,. Where necessary, temporary vegetation and/or mulching should be used to protect areas exposed during developrnen-t. The permanent final vegetation and structures should be installed as soon as practical in the development. 0 E D s T E R P C T T H I E A E R HYDRAULIC FACTOR (HF) HYDRAULIC GRADIENT (% OF SUPE) A (BY DUTCH & ASSOC) GENERAL NOTES 0- 6" ' �5 { T-, I T a 6-30" 0- 9" TOPSOIL 30-84" 9-28" "' FINE SANDY LOAM f' 28-91 FINE/MED SAND 6 8 NO LEDGE, WATER OR MOTTLING <17.9 SEE .^' TEST PIT 44 6--30" 30-78" 0-11" TOPSOIL ��-y�.+.� {/ t /vy 11-20" FINE SANDY LOAM 72 20-90" GRAY SANDY HARDPAN 48 42 NO LEDGE, WATER OR MOTTLING 30 TEST PIT 45 214 0- 5" TOPSOIL 48 5-16" FINE SANDY LOAM 30 16-87" FINE/MED SAND 24 26 NO LEDGE, WATER OR MOTTLING TEST PIT 46 0- 4" TOPSOIL 216 4-24" SANDY LOAM 56 24-86" MED/COARSE SAND 34 30 NO LEDGE, WATER OR MOTTLING 21'8 tK` LOT No � \sp `SQ..'\>z, ,. / • . • is —20 n Q z� `� / �„��` 224 2A 80 0°O 80 80 �o-oo° a a CONSTRUCTIU ENTRANCE ARL A 240 } - .0 0 . Nvt -. r I 111 \ S` RJ ` a 228 3`0 226 PERCOLATION TEST 9:50 PRESOAK EROSION CONTROL NOTES General Requirements for Erosion Control: A schedule of operations to include starting and completion dates for major development phases, such as land clearing and grading, street, sidewalk, and storm sewage installation, etc. Seeding, sodding, or revegetation plans and specifications for all unprotected or unvegetated areas shall be implemented as soon as possible. Excavations, Fills and Grading: Cut and fill slopes shall not be steeper than 3:1 unless stabilized by a retaining wall or cribbing, except as approved by the Commission under special conditions. Adequate provisions shall be made to prevent surface water from damaging the cut face of excavation or the sloping surfaces of fills. Cut and fills shall not endanger adjoining property. Fill shall be placed and compacted so as to minimize sliding or erosion of the soil. Grading shall not be done in such a way so as to divert water onto the property of another landowner without the expressed consent of that landowner and the Commission. Fills shall not encroach on natural watercourses or constructed channels. During grading operations, necessary measures for dust control shall be exercised. Grading equipment will not be allowed to cross live streams except by means of bridges and culverts or other methods as approved by the Commission. Implementation Procedures: Wherever feasible, natural vegetation should to retained and protected. Only the smallest practical area of land should be exposed at any one time during development. When land is exposed during development, the exposure should be kept to the shortest practical period of time,. Where necessary, temporary vegetation and/or mulching should be used to protect areas exposed during developrnen-t. The permanent final vegetation and structures should be installed as soon as practical in the development. 0 E D s T E R P C T T H I E A E R HYDRAULIC FACTOR (HF) HYDRAULIC GRADIENT (% OF SUPE) A (BY DUTCH & ASSOC) GENERAL NOTES 0- 6" TOPSOIL 6-30" SILTY LOAM .1 30-84" TAN/WHITE HARDPAN <1 2 3 4 6 8 10 1 >15 15 <17.9 SEE NOTE #1 CODES. 6--30" 30-78" SILTY LOAM TAN/WHITE HARDPAN 4. IF FIELD CONDITIONS (LEDGE — MOTTLING OR GROUNDWATER) ARE ENCOUNTERED ��-y�.+.� {/ t /vy (MED. DENSE &LIGHTLY 18-22 72 62 54 48 42 34 30 28 26 22.1 - 66 56 48 42 34 30 28 26 24 26 26.1 - 56 49 42 34 30 28 26 24 20 30 30.1 - 48 42 34 30 28 26 24 10 18 36. t 42 42 36 30 28 26 24 20 18 16 42.1 36 32 28 26 24 20 18 16 14 48 48.1 - 30 28 24 22 20 1 18 16 14 10 60 > 60 MLSS NEED NOT BE CONSIDER=ED #1 - CANNOT BE APPROVED UNLESS HYDkA,%1C ANALYSIS DEMONSTRATES SUITAB= CONSTRUCTION NOTES No change in plan location or elevation shall be made without notifying the engineer and proper Town authority. The engineer shall be notified prior to construction to set location and grade stakes for the subsurface sewage disposal system to include; fill material, septic tank, primary leach system. Similiar staking required for all curtain and foundation drains and well. No soil stripping or excavation shall begin within the area of the subsurface sewage disposal system without a valid construction permit. A licensed sewage disposal system installer shall obtain a construction permit and arrange for a site inspection prior to construction. The system shall be installed in accordance with this plan and all applicable State and Local rules, regulations, and codes. Topsoil to be stripped and stockpiled prior to any filling. Scarify area before filling. Avoid stripped area with heavy vehicles on wheels to minimize compaction. Place fill at edge of prepared area and spread with bulldozer in 6' lifts and compact to 90% maximum density. Fill material shall be clean bankrun sand or gravel with no more than 5% fines passing a 200 mesh sieve. Sanitarian to inspect any fill over 24" deep prior to construction. Trench bottoms shall be level and set to follow contours of existing grade. Trench laterals shall be laid level with perforations downward. No construction below original grade in the leach system area shall take place within 48 hours of a rainstorm or with standing puddles. All footing drains, curtain drains and subsurface sewage disposal system components shall be inspected by the Town and located "AS -BUILT' by the engineer/land surveyor prior to covering. Inspection shall be within 2 working days following timely notification by the contractor. Contractor to protect open work from siltation and erosion. All disturbed areas shall be graded, loamed, and seeded as soon as possible after construction. If seeding cannot take place during the growing season, a temporary mulch cover shall be placed and maintained until permanent cover can be established. A licensed well driller shall obtain a permit prior to any drilling. The well shall be provided in accordance with this plan and all applicable State and Local regulations and codes. Satisfactory completion of all the above requirements shall preceed the final inspection and approval of the subsurface sewage disposal and well, BASIS OF SANITARY DESIGN 3 BEDROOM HOUSE — 3 Min/In PERC RATE 495 SQ. FT. OF LEACHING AREA REQUIRED USE 6 TRENCHES 4 WIDE ® 9 CTRS @ LENGTHS SHOWN 495 SQ. FT. OF LEACHING AREA PROVIDED USE MINIMUM 1000 GALLON SEPTIC TANK. HF 24- x FF 1.5 x :PF i .0 = MLSS 315' TEST PIT A (BY DUTCH & ASSOC) GENERAL NOTES 0- 6" TOPSOIL 6-30" SILTY LOAM THIS SURVEY MAP HAS BEEN PREPARED IN ACCORDANCE WITH THE 30-84" TAN/WHITE HARDPAN 1. ADDITIONAL SOILS TESTING MAY BE NECESSARY AT TIME OF DEVELOPMENT OF LOT. "RECOMMENDED STANDARDS FOR SURVEYS AND MAPS IN THE STATE (MED. DENSE & LIGHTLY MOTTLED) 2. DISTIUBUTION BOXES TO BE INSTALLED TO CREATE A HIGH LEVEL OVERFLOW (2"MIN.). TEST PIT B 3• SEPTfC SYSTEM SHALL CONFORM TO THE CURRENT STATE OF CONN. PUBLIC HEALTH 0— 6" TOPSOIL CODES. 6--30" 30-78" SILTY LOAM TAN/WHITE HARDPAN 4. IF FIELD CONDITIONS (LEDGE — MOTTLING OR GROUNDWATER) ARE ENCOUNTERED ��-y�.+.� {/ t /vy (MED. DENSE &LIGHTLY AT S�iALLOWER DEPTHS THAN THOSE SHOWN IN DEEP TEST HOLE RESULTS — THE 392 SOUTH MAIN STREET, COLCHESTER, CONN. JOB NO 97 --IDB MOTTLED} ENG14EER SHALL BE CONTACTED IMMEDIATELY AND CONSTRUCTION HALTED UNTIL DAIS'Y.Lel FURTHER DIRECTED. 5, BASED UPON A TOPSOIL DEPTH OF 6"' AND THE PROPOSED CONTOURS SHOWN FOR PROP)SED GRADING, THE ESTIMATED FILL IS 85'x4O'x1.25' = 160 CY, ASSUMING THAT THE TOPSOIL IS USED FOR TOP COVER. 10:53 5" DEPTH=28" 10:56 11" RATE=3 MIN/INCH 11:00 14" 11:05 15.5" 11:10 17.25" 11:15 18,75" 11>20 DRY SANITARY SYSTEM — Lot 21 DAISY HILL SUBDIVISION DAISY HILL DRIVE MONTVILLE, CONNECTICUT MAP REFERENCE: DAISY HILL SUBDIVISION PREPARED FOR ROGER & LINDA PHILIPPS FOR LAND ON ROUTE 85 IN MONTVILLE, CONNECTICUT. PLANS ARE COMPLETED BY ROLAND HARRIS & ASSOC., INC, FROM GRISWOLD, CT. HORIZOIS-TAL SURVEY TO CLASS A-2 STANDARDS. THE VERTICAL TOPOGRAPHY TO CLASS D. PLAN PREPARED FOR PROGRESSIVE BUILDING SYSTEMS INC. 2389 MAIN STREET GLASTONBURY, CONNECTICUT SCALE: 1"=20' DATE: OCT 28, 1997 SHEET: 1 OF 1 50 20 0 20 50 SCALE IN FEET CLASS A-2 MAP CERTIFIED SUBSTANTIALLY CORRECT THIS SURVEY MAP HAS BEEN PREPARED IN ACCORDANCE WITH THE F ;'; n �, 8'g`jye ; �"`"" I� �. T I A "RECOMMENDED STANDARDS FOR SURVEYS AND MAPS IN THE STATE � s OF CONNECTICUT" AS ADOPTED FOR USE BY THE CONNECTICUTk'4 l I CIVIL ENGINEERS T & LARD SURVEYORS ASSOCIATION OF LAND S VE RS =I: ONTEMBER 24, 1992. d 15 1� ��-y�.+.� {/ t /vy �� - C � r' `� +}'� 392 SOUTH MAIN STREET, COLCHESTER, CONN. JOB NO 97 --IDB � DAIS'Y.Lel