HomeMy WebLinkAboutSeptic Plan/ nT /� T
AREA = 2.78 ACRES
LOT 15 S
369,2 -PROPOSED INVERT
,VOTES: 370 -,-- EXISTING CONTOUR
PROPOSED CONTOUR
jVjAp �_"7'EOMETR/,'-eS FROArl "SUED11.11.5,10N PLAN MADE
FOR EDWARD HAYDEN, CRANBERRY MEADOW -SECTIOAl
IT, OLD COLCHESTER ROAD 8 CRANBERRY DRIVE
MONTVILLE,CONNECTICUT, SCALE I"=40 CH4 NDLER,
PALMER & KING, FEB. 21,1986.
W 407 27
L 0 7-.,/,,5 G
PROPOSED
WELL
376
374 f
372
CURTAIN
370 DRAIN
3 BEDROOI4
RESERVE HOME
366 FLOOR ELE*.
AREA 380.0
2 6_0 GAL
SEPTIC TAN X66 2.94"C.1 1378
369.2
364
PROPOSED
362\ \ DRIVE
TCH 8. 368.5
366 83 376
3
I
S
IV
LOf - 1
N H LE 374
362
P. T_CH I
364
372
370
A =1060-23,-32
BENCH MARK 47
/I R 6'0.01 ,
NAIL //v /8 OAK 368,
EL EV. 371.65' 366 L L
A BERRY DR 6-
XY)
TEST HOLE DATA
14 0- 6 It TOPSOIL
6-30 SUBSOIL
30 - 84 SANDY TILL
NO MOTTLING
NO WATER
LEDGE AT 84"
PERC. RATE
I" IN 6MIN.
DESIGN DATA
PROPOSED 3 BEDROOM HOME, REQUIRES
USE 2 - 83TRENCHES IN SERIES. PROVID
USE /000 GAL. SEPTIC TANK.
Sys"I t
I. REMOVE AND STOCKPILE TOPSOIL.
2. BANK RUN GRAVEL (LESS THAN 5%
/.A/ 6" LIFTS AND COMPACT TO 95% L
3. REPLACE TOPSOIL AFTER INSTALLA7
BUILDING
PAPE
4°' PERF. PIPE
/ If STONE
WX
I'-,
't-tot't,
A5. Ao
1,
MADE FOR
A P_ lHW'arowNsTill9mormill I
MONTVILLE -CONS
A
SGALE lj=20- -it)
CHANDLER, PALMER & KING
IVORWICtl`CONjNLCTICUT