HomeMy WebLinkAboutExisiting Rock Crusher LayoutWETLAND LIMIT
IP OWN LIMIT OF UPLAND REVIEW AREA
REMOVE ALL STOCK PILES
J
NORTH EAST SEDIMENT Al
EXISTING SEDIMENT TO REMOVED
DOWN %EXISTING TOPSOIL
EXISTING P SOIL TOREMAIN
Ll SEE EROSION &
SEDIMENT CONTROL NARRATIVE.
I HAVE REVIEWED THE WETLANDS ON THE PROPERTY IN THE FIELD AND HAVE
REVIEWED THE WETLANDS AS SHOWN ON THE PLAN AND FIND THAT THEY
SUBSTANTIALLY REPRESENT THE WETLANDS AS DELINEATED IN THE FIELD.
ROBERT C. RUSSO DATE
CERTIFIED SOIL SCIENTIST t i
EXISTING PROPERTY
LIN E (TYP.)
REMOVE EXISTING EARTH BERM PREVIOUSLY APPROVEDDOWNTOEXISTINGTOPSOIL / — I — --
EXISTING CLEARING LIMIT LIMITS OF CLEARING & 249 - EXISTING TOPSOIL TO REMAIN -55'-`56 E_ISTING LIWT- e3AINPLACE.. CLEARING (TYP.) rly
23a
4 TING EARTH
r -' _ -- 1 - 1` X __ ' i : X i\i `v `_i i"= `a_i \i\ "-i;\. _/ % i _; moi' `moi i _ i » --
236- 236 REMOVE Exis
TO EXISTING TO
EXISTING TOPSOIL TO REMAININSTALLSILTFENCEEXISTING EARTH BERM
238 TO REMAIN. IN PLACE. F
234 TH 12E
5 3 15 TH 12H
TOPSOIL 3BOULDBOULDERSERS
STOCKPILE TH 121
3 5 sq.ft. EARTH PRODUCT
KLM%jVr. rJLA_ LF*JTWM
TOP OF ORIGINAL
WETLAND SOIL
TH 12C
STOCKPILE
STUMP
4l
Alt
REMOVE ENTIRE STUMP STOCK PILE
cu
21 -------
ROCK
v0_ STOCKPILE
CU
EARTH PRODUCT
STOCKPILE
I -.i 7_
GRAVEL ACCESS
DRIVE— TH 128
PREVIOUSLY
APPROVED &
PERMITTED
REMOVE ROCK STOCK PILE,
CONCRETE BARRIER SWALE
ROCK
4111 STOCKPILE
E) STING
lam -
X STi G TRAM \ / 419a
386 S .JJ
NORTH WEST SEDIMENT AREA:
EXISTING SEDIMENT TO REMAIN
IN HEAVILY VEGETATED AREA
C
REMOVE FILL DOW
TOP OF ORIGINAL
Iola [on:] 0 it
REMOVE SECTION OF STOCK PILE
WITHIN THE 50"REGULATED AREA,
EXISTING CLEARING UMrT
INSTALL SILT FENCEIfi
REMOVE EXISTING EARTH BERM
DOWN TO EXISTING TOPSOIL
EXISTING TOPSOIL TO REMAIN
IN PLACE
moo- --__ \>
All
1 >\
LOT 10 WF#1 135 ko-T n
REMOVE SECTION OF STOCK PILE
D AREA.4
R &40VE FI LL DOWN TO Z+ TOP OF ORIAf NAL WETLAND SOIL
39 S.Fi.
REMOVE BOULDERS FROM *THIN
THE 50" REGULATED AREA
20' 0 20' 40'
M
SCALE: 1"=20'
GREEN SITE
DESIGN
LLC
317 Main Street Norwich, Connecticut
INSTALL SILT FENCEIfi
REMOVE EXISTING EARTH BERM
DOWN TO EXISTING TOPSOIL
EXISTING TOPSOIL TO REMAIN
IN PLACE
moo- --__ \>
All
1 >\
LOT 10 WF#1 135 ko-T n
REMOVE SECTION OF STOCK PILE
D AREA.4
R &40VE FI LL DOWN TO Z+ TOP OF ORIAf NAL WETLAND SOIL
39 S.Fi.
REMOVE BOULDERS FROM *THIN
THE 50" REGULATED AREA
20' 0 20' 40'
SCALE: 1"=20'
GREEN SITE
DESIGN
LLC
317 Main Street Norwich, Connecticut
2 10/23/18 Address Review Comments
1 10/11/18 Stockpile Areas Added
4o. Date Revision 860) 892-1380 Fax (860) 886-9165
18 Sachatello Industrial Drive Project No.
Town of Montville, Connecticut GSD -51
Prod. EngineerN
0 Holly Lombardi Land Holdings, LLC
Lot 3 Combination & Reconfi ura ion
Date:
09/29/18
Sheet No. Lombardi Business Park
L
IS
EXISTING CONDITIONS DEMOLISION PLAN
a
Chesterfield SACHATELLOINDUSTRIAL
DRIVE
Devi8
4 Pond
46
01cr Lake
LLJ KanomosP4
z
LL_
y
IL
ell
LOMBARDI
LOT 16
25 SACHATELLO
INDUSTRIAL DRIVE
LOT 17
375 BUTLERTOWN ROAD
LOT 18
393 BUTLERTOWN ROAD
BUSNE33 1-11
PARK
4107 LOT 6
ROCK CRUSHER I Y,
42 SACHATELLO
LOCATION INDUSTRIAL D IVE.
ASSESSOR -005/027-007 1
LOCATION MAP 4 EXISTING CONCRETE
SCALE: 1 1000'
BLOCK WALL
GENERATOR
E
0000
LOT 7
335 BUTLERTOWN ROAD0000"
000,
TRAILERS
325 BUTLERTOWN
ASSESSOR -005/027-012 ROCK
LOT 5
Ode
OTTOWN ROAD X 78CRUSHER ---\\ ZA 4ZA ATPA I C)
INDUSTRIAL DRIVE
ASSESSOR -005/027-008
1Z
HaT .
000
m. EXISTING SEDIMENTATION
BASIN & EARTH BERM
w. V LOT 4XLOT9
315 BUTLERTOWN ROAD 26 SACHATELLO
FROMWF#11 CLEAN OUT SEDIMENT
2 0
INDUSTRIAL DRIVE
cF
W EXISTING SEDIMENT TRAPSOR-005/027-009
59, W F #
INSTALL STONE/WOODCHIP
I... ---- CHECK DAMLOT1000. lftftft -.- _...
LOT 11 WF4 i, 7 305 BUTLERTOWN ROAD 0
279 BUTLERTOWN ROAD "ft-%. -
ftft. '+ "
ft. WF#1--ft— lftftftAmkop!)
r> IF# 1 -7,
V F 7) 7.
N, J W'F#1 -6W7#1 -67
WF# 1 WF# I F# ftl - , I -
IV
EXISTING8WF#1 -,8 WF#1-6-?
1v F # 1
1 J --
F, 1-61 \kr
WELL 0000ri
1 4WF#11-9 '7# VY, rF#1 I- r 57
01
rVY
WF#1-7 14 F l _31 b- INSTALL NEWP WETMIXVTrrw
1 4*07*
EXISTING
F-_ ->34,%,
wr -48VF,,, r 4' WF#1 WFO - rl, It, I EXISTING SEDIMENT TO REMAIN SCALE
0
7000 CONCRETE BLOCK\
STORAGE BINS
LOT 14
9 SACHATELLO
INDUSTRIAL DRIVE
CA
6/
Y i __ 11 19 ,Ifl _#1 -51 #1-5 IN HEAVILY VEGETATED AREA
11
F T F
INSTALL 20' WIDE
INTERMEDIATE LEVEL
A/F#
LOT 3
LOT 19
1492 ROUTE 85
7SPREADEROUTLET18SACHATELLO .
INDUSTRIAL DRIVE
estACCCn -7/ r) r) r, / p)
VIVIF
10000-
6000,
INSTALL STONE/WOODCHIP 1,
CHECK DAM
40000
doolillillilillisiolloo"
llo
4000, INSTALL 20' WIDE
INTERMEDIATE LEVEL h. v
SPREADER OUTLET
i: CLEAN OUT SEDIMENT FROM
REMOVE DEPOSITED MATERIAL EXISTING SEDIMENT TRAP
FROM ADJACENT STOCKPILE N.
WTHATHASENTEREDTHEI.I.R.A. F S A91
WF,
WETLAND AREA
L07
10 SACH ELLLOE
jt DUSTRIAL
DRIV
W,_# i
ASSESSOR —
005/o27/011
WE#
MONO OWN
REMOVE ALL CONSTRUCTION F`
MATERIALS FROM WITHIN THE `
50' REGULATED AREAS. F# )z
INSTALL LOAM, SEED & MULCH
810 RETENSIONf> RAIN GARDEN
F>
4' WFy,
vv YVF# 1F> F> t F> F,
t" NrWW
WF4 I
swoop
doom - FI> LOT 1
2 SACHATELLO
W7 1-14' 2 INDUSTRIAL DRIVEVIF
WF 1
F,' WF;
5 F#r-, P
J k,
jyW
WF#5-foW
UR
xl
i"VF#5 -0 bi
WF#7 -'FA'F # 8
z`
71-
S I
r )NF#5
WF#5 14UPND
1 F> FVF#5' #5SEESHEET1,2&,38 - AW -A WI W,5 WETLAND AREA
FOR RESTORATION PILMS
WF#5 - 1, WF#-/
F#5-11i0
WF#
WF#8
W r
VVF#5 4
WF#5-2
SHED
VVIF 6_1WF#6--4 I#
V
F #6-`,
YAY
IJ F # 6 -
STORMWATER BASIN
3\
10-
001
r
4-
8
iF#4 7
STORMWATER BASIN F#_
0J,#4-
4
W F
WETLAND
W
AREA
f
4.4-
7.
F>
WF#3--
R
100*
96T
W2 q
4e
2w
a
0
0 loo,
SCALE: 1 "=100`
200'
0, Eez_
GREEN SITE
DESIGN310/31/118 Address Review Comments
LLC
317 Main Street Norwich, Connecticut
2 101231 18 I Address Review Comments
1 10/11/18 Stockpile Areas Added
No. Dat,E! Revision 860) 892-1380 Fax (860) 886-91,65
18 Sachatello Industrial Drive Project No.
WATER
TOWER
BUSNE33 1-11
PARK
4107 LOT 6
ROCK CRUSHER I Y,
42 SACHATELLO
LOCATION INDUSTRIAL D IVE.
ASSESSOR -005/027-007 1
LOCATION MAP 4 EXISTING CONCRETE
SCALE: 1 1000'
BLOCK WALL
GENERATOR
E
0000
LOT 7
335 BUTLERTOWN ROAD0000"
000,
TRAILERS
325 BUTLERTOWN
ASSESSOR -005/027-012 ROCK
LOT 5
Ode
OTTOWN ROAD X 78CRUSHER ---\\ ZA 4ZA ATPA I C)
INDUSTRIAL DRIVE
ASSESSOR -005/027-008
1Z
HaT .
000
m. EXISTING SEDIMENTATION
BASIN & EARTH BERM
w. V LOT 4XLOT9
315 BUTLERTOWN ROAD 26 SACHATELLO
FROMWF#11 CLEAN OUT SEDIMENT
2 0
INDUSTRIAL DRIVE
cF
W EXISTING SEDIMENT TRAPSOR-005/027-009
59, W F #
INSTALL STONE/WOODCHIP
I... ---- CHECK DAMLOT1000. lftftft -.- _...
LOT 11 WF4 i, 7 305 BUTLERTOWN ROAD 0
279 BUTLERTOWN ROAD "ft-%. -
ftft. '+ "
ft. WF#1--ft— lftftftAmkop!)
r> IF# 1 -7,
V F 7) 7.
N, J W'F#1 -6W7#1 -67
WF# 1 WF# I F# ftl - , I -
IV
EXISTING8WF#1 -,8 WF#1-6-?
1v F # 1
1 J --
F, 1-61 \kr
WELL 0000ri
1 4WF#11-9 '7# VY, rF#1 I- r 57
01
rVY
WF#1-7 14 F l _31 b- INSTALL NEWP WETMIXVTrrw
1 4*07*
EXISTING
F-_ ->34,%,
wr -48VF,,, r 4' WF#1 WFO - rl, It, I EXISTING SEDIMENT TO REMAIN SCALE
0
7000 CONCRETE BLOCK\
STORAGE BINS
LOT 14
9 SACHATELLO
INDUSTRIAL DRIVE
CA
6/
Y i __ 11 19 ,Ifl _#1 -51 #1-5 IN HEAVILY VEGETATED AREA
11
F T F
INSTALL 20' WIDE
INTERMEDIATE LEVEL
A/F#
LOT 3
LOT 19
1492 ROUTE 85
7SPREADEROUTLET18SACHATELLO .
INDUSTRIAL DRIVE
estACCCn -7/ r) r) r, / p)
VIVIF
10000-
6000,
INSTALL STONE/WOODCHIP 1,
CHECK DAM
40000
doolillillilillisiolloo"
llo
4000, INSTALL 20' WIDE
INTERMEDIATE LEVEL h. v
SPREADER OUTLET
i: CLEAN OUT SEDIMENT FROM
REMOVE DEPOSITED MATERIAL EXISTING SEDIMENT TRAP
FROM ADJACENT STOCKPILE N.
WTHATHASENTEREDTHEI.I.R.A. F S A91
WF,
WETLAND AREA
L07
10 SACH EL LLOE
jt DUSTRIAL
DRIV
W,_# i
ASSESSOR —
005/o27/011
WE#
MONO OWN
REMOVE ALL CONSTRUCTION F`
MATERIALS FROM WITHIN THE `
50' REGULATED AREAS. F# )z
INSTALL LOAM, SEED & MULCH
810 RETENSIONf> RAIN GARDEN
F>
4' WFy,
vv YVF# 1F> F> t F> F,
t" NrWW
WF4 I
swoop
doom - FI> LOT 1
2 SACHATELLO
W7 1-14' 2 INDUSTRIAL DRIVEVIF
WF 1
F,' WF;
5 F#r-, P
J k,
jyW
WF#5-foW
UR
xl
i"VF#5 -0 bi
WF#7 -'FA'F # 8
z`
71-
S I
r )NF#5
WF#5 14UPND
1 F> FVF#5' #5SEESHEET1,2&,38 - AW -A WI W,5 WETLAND AREA
FOR RESTORATION PILMS
WF#5 - 1, WF#-/
F#5-11i0
WF#
WF#8
W r
VVF#5 4
WF#5-2
SHED
VVIF 6_1WF#6--4 I#
V
F #6-`,
YAY
IJ F # 6 -
STORMWATER BASIN
3\
10-
001
r
4-
8
iF#4 7
STORMWATER BASIN F#_
0J,#4-
4
W F
WETLAND
W
AREA
f
4.4-
7.
F>
WF#3--
R
100*
96T
W2 q
4e
2w
a
0
0 loo,
SCALE: 1 "=100`
200'
0, Eez_
GREEN SITE
DESIGN310/31/118 Address Review Comments
LLC
317 Main Street Norwich, Connecticut
2 101231 18 I Address Review Comments
1 10/11/18 Stockpile Areas Added
No. Dat,E! Revision 860) 892-1380 Fax (860) 886-91,65
18 Sachatello Industrial Drive Project No.
Town of Montville, Connecticut GSD -51
Proj. Engineer
Holly Lombardi Land Holdings, LLC
N
A E.M.B.
Lot 3 Combination & Reconfiguration
Date:
09/29/18
W
t Lombardi Business Park Sheet Na.
Existing Rock Crusher Layout
LEGEhID
WETLAND LIMIT
LIMIT OF UPLAND REVIEW AREA
23S EXISTING PROPERTY
LI N E (Ti
PREVIOUSLY APPROVED
EXISTING CLEARING LIMIT LIMITS OF CLEARING & 248
aVt ------ XISTING
J e3l'r CLEARING (TYP.)
A
J /
236 —236
EXISTING EARTH BERM TO REMAIN
238
j 234 T Y T14 1 `7 P
7 7
TH 12H
TH 121
M
INSTALL NORTH AMERICAN GREEN
INSTALL SILT FENCE
I0
ICUCq,
GREEN SITE
DESIGNAddress3
A
IM74
S-150 EROSION MATS ON SLOPES
BOTTOM OF WATER QUALITY BASIN
PT 12 41
12C TH 12F U
01 TH 12A
TH 12G
236—- -------
i. NORTHEAST PERMANENT
TH 12J
SEDIMENT BASIN
INSTALL BOULDERS — 10O.C.
ALONG THE ENTIRE LIMIT OF TH 12KTHE50* UPLAND REGULATED AREA
OUTSIDE 50' REGULATED AREA INSTALL BOULDERS 10' O.C.
ON A 5` WIDE STRIP OF CRUSHEDALONG NORTHERN SIDE OF SWALE
STONE & OUTSIDE 50' REGULATED AREA
ON A W %Lqnc* IcTpip OF r-o"lizurn31SLOPE
20' WIDE INTERMEDIATE RIPRAP
LIE'Vn SPREADER C11
BOTTOM OF RIPRAP ELEV=230.5
INSTALL STONE/VOOD CHIP CHECK DAM
rl
U
INSTALL 2" DEEP X 10' LONG
47- fSED11W*T CLEAN OUT L i
IN4ALL MODIFIED
RIPRAP CHECK DAM Q `
2:1 SLOPE
INSTALL BOULDERS 10' O.C.
236 ALONG EASTERLY SIDE OF SWALE
TH 12B 10 do OUTSIDE 509 REGULATED AR 0
HEDONA50WIDESTRIPOFCRUSH
INSTALL BOULDERS — 10* O.C.
ALONG EASTERLY SIDE OF
lc:)
40;
011)
WOO ./ /
z" 63 —
7
A#
o --
INSTALL NORTH AMERICAN GREEN SEDIMENT BASIN & SWALE INSTALL VEGETATED SWALE 0 1 .4ir20' WIDE INTERMEDIATE RIPRAP 00S-150 EROSION MATS ON SLOPES & OUTSIDE 50" REGULATED AREA (SEE DETAIL SHEET 5) A'lLEVELSPREADER & BOTTOM OF WATER QLAMW BASIN ON A 5* WIDE STRIP OF CRUSHED
lill VVF 7 - 8
BOTTOM OF RIPRAP ELEV=230.0 INSTALL 2" DEEP X 10" LONG
C3 Cn STONE SEDIMENT CLEAN OUT POOL
CZ) C- C. -J C:3 A -INORTHWESTPAC3INSTALLMODIFIEDSEDIMENTBASINvol
1 SopcD RIPRAP CHECK DAM A'l
AwlC3Ca23zINSTALLMODIFIED53
C r7l c::) C:) A"i
RIPRAP CHECK DAM .
00001
4 C:3 L.J L -J L_J t -J L_J L_J LJ L_J L_J
THE AREA TO BE VEGETATED
MUST BE EVENLY GRADED TOINSTALL2* DEEP X 10" LONG #/ AZ A INHIBIT CONCENTRATION OFGX227.02z SEDIMENT CLEAN OUT POOLC_J 0STORMWATER FLOWS . (Tiolop
X 227.0 236 M C:) C) C:3 C:3
4T21 SLOPE 36
227.0 X
EXISTING CLEARING LIMIT
0
4Nt
000
21 SLOPE 232
INSTALL SILT FENCE
l>
LOT 10 WF#1 -135 JL "'T 41,
20' 0 20
4QI
SCALE: 1"=20'
GREEN SITE
DESIGNAddress310/31/18 Review Comments
LLC
317 Main Street Norwich, Connecticut
2 10/23/18 Address Review Comments
10/
No. Date Revision 860) 892-1380 Fax (860) 886-9165
18 Sachatello Industrial Drive Project No®
Town of Montville, Connecticut GSD -51
Proj. Engineer
C Holly Lombardi Land Holdings, LLC
L of ;'03 Combination & Reconfiguration Date:
09/29/18
Lombardi Business Park Sheet No.
C, Grading & E&S Plan
WETLAND LIMIT
N&M M fii'.,, LIMIT OF UPLAND REVIEW AREA INSTALL
10—RED MAPLE
ell INSTALLZTAII I n U SEED k MULCH 20—HIGHBUSH BLUEBERRYr
15—ARROWOOD VIBURNUM
20—WINTERBERRY HOLLY
130—PLUGS TUSSOCK SEDGE
n ^C' ^AUAnA 0"CU
NORTH EAST SEDIMENT AREk' 130—PLUGS FOWL MANNA GRASS EXISTING PROPERTY
EXISTING SEDIMENT TOR LINE (1YP.)
DOWN TO EXISTING TOPSOIL NEWP WETMIX PREVIOUSLY APPROVEDTOPSOILEXIVINGTOPSOILTOREMAIN12EXISTINGCLEARINGLIMITLIMITSOFCLEARING & # — . - - - , _
NE. SSA
248APPLYCLEANSTRAWMULCHQISTINGLIW-T- P-M
CLEARtNG (TYP.)
X77'7,
236
7—, 10
238
234 TH 12E
V"
ru 12H
OTH 121
Z' 3585 sq.
PT 12
jill
INSTALL SILT FENCE TH 1 TH 12F - 2C
i # \1
Qj
TH 12A
TH 120
Ile
236-
00
INSTALL e TOPSOIL., RESTORATION TH 12,E
ISO, CU SEED MIX & STRAW MULCH
G
I
NZ
TH 12K INSTALL
3—WINTERBERRY HOLLY w
NEWP WE
12n TOPSO11
100,
4i
lot
1.0
ei4 "— ` Q
WU
83 SQ.FT.
TH 12D
236
VV
GRAVEL TH 128 ,' a _' -"
ACCESS
DRIVE
AN
INSTALL
Ar3—HIGHBUSH BLUEBERRY
NEWP WERAIdid
12" TOPSOIL 1&0 dA
SON*
00-0CDCDCDCDCDCDQj
INSTALL 4* TOPSOIL, -RESTORATION A'
SEED MIX ON SIDES AND BOTTOM
OF BASIN INSTALL INSTALL 4* TOPSOIL., RESTORATION j''."'000
3—RED MAPLE SEED MIX & STRAW MULCH
C' 3—HIGHBUSH BLUEBERRYCC O 3—WINTERBERRY HOLLYC:)
0Q) C:) C:D C:) NEWP WETMIX
901" 39 SQ.FT. — C 12* TOPSOIL goO C:) co C:)
C:) 232 C:) C:) 4 C' C:3 C3 M M____ M M M M M M A
V362swap
X,227.0
C:)d* so@0
L..j AX7.0 323 C::l
228 227.0 X
EXISTING CLEARING LIMIT
A
t 6
386 sq.ft,
I NSTACL SILT FENCE
F#
EXISTING SEDIMENT TO REMAIN
NORTH WEST SEDIMENT AREA:
IN HEAVILY VEGRATED AREA - ------ — >
3
INSTALL NEWP WETMIX
dl
LOT 10 WF#1 35 L-Cff n
M
20' 0 20' 409
SCALE: 1 "=20'
GREEN. SITE
DESIGN310/31//18 Address Review Comments
2 10/23/18 Address Review Comments LLC110/11/18 Stockpile Areas Added 317 Main Street Norwich, Connecticut
No. Date I Revision (860) 892-1380 Fax (860) 886-9165
1A Rnnhntadln Industrial Drive Project No.
Town of Montville, Connecticut GSD -51
Proj. Engineer
Holly Lombardi Land Hoicings, LLC E.M.B.
De: Lot 3 Combination & Reconfigurationat
09/29/18
Lombardi Business Park Sheet No.
Landscape Plan
LIELM[3, REVIEW ZOE
NAMES N I
REST'Qf2agN AM 1!L&fflWj SCHEDULE
WETLAND INDICATOR STATUS QUANTITY/DESCRIPTION
TREES Annual _-
OBL
RED MAPLE (AGER RUBRUM) FACULTATIVE WETLAND 13 RED MAPLES - 2" CALIBER
SHRUBS
inspection
Repair undercut or eroded areas.
WINTERBERRY HOLLY (ILEX VERTICILLATA) FACULTATIVE WETLAND SHRUBS AND TREES TO TOTAL 600 PER ACRE
ARROWOOD VIBUNUM (VIBURNUM RECOGNITUM) FACULTATIVE WETLAND SHRUBS AND TREES TO TOTAL 600 PER ACRE
HIGHBUSH BLUEBERRY (VACCINUM CORYMBOSUM) FACULTATIVE WETLAND SHRUBS AND TREES TO TOTAL 600 PER ACRE
PLANTS
Holler Lombardi Land Holdings, LLC
Mow side slopes once per year. High vegetation along basin edge
FOWL MANNA GRASS (GLYCERIA CANADENSIS) OBLIGATE 3 FT ON CENTER
TUSSOCK SEDGE (CARER STRCTA) OBLIGATE 3 FT ON CENTER
CANADA RUSH (JUNCUS CANADENSIS) OBLIGATE 3 FT ON CENTER
SEEDMIX
i
Asclepias incarnata
NEW ENGLAND EROSION CONTROL VARIABLE 1 LB./ 2500 S.F. SEED MIX TO BE
Carex crinita I Fringed Sedge
BROADCAST OVER RESTORATION AREA FOR
PLAN NOTES-
Verzonia noveboracensis
SOIL STABILIZATION, ESTABLISH HERBACEOUS WETLAND PLANTS
1. ALL SEDIMENTATION AND EROSION CONTROLS WILL BE ESTABLISHED BEFORE GRADING BEGINS.
2.TEMPORARY DEVICES AND STRUCTURES TO CONTROL EROSION AND SEDIMENTATION IN AND AROUND RESTORATION SITES SHALL BE PROPERLY MAINTAINED AT ALL
TIMES. THE DEVICES AND STRUCTURES SHALL BE DISASSEMBLED AND DISPOSED OF NO LATER THAN NOVEMBER 1, THREE FULL GROWING SEASONS AFTER
PLANTING. SEDIMENTS COLLECTED BY THESE DEVICES WILL BE REMOVED AND PLACED UPLAND IN A MANNER THAT PREVENTS ITS TRANSPORT INTO A WETLAND OR
WATERWAY.
3.TOPSOIL STRIPPED FROM THE IMPACT AREA WILL BE RE -USED IF AVAILABLE.
4.THE RESTORATION AREA WILL BE OVER EXCAVATED 4 INCHES BELOW THE FINAL ELEVATIONS IF DEEMED NECESSARY BY THE ON-SITE WETLAND SCIENTIST AS SHOWN
ON THE PLAN AND REFILLED TO THE SPECIFIED GRADES WITH NATIVE TOPSOIL. THE ON-SITE WETLAND SCIENTIST WILL ESTABLISH MICROTOPOGRAPHIC GRADING.
5. ALL WETLAND RESTORATION AREAS WILL BE SEEDED WITH NEW ENGLAND WETMIX (NEW ENGLAND PLANTS, INC, AMHERST. MA, PH 413-256-1752) OR EQUIVALENT
AT 1 LB PER 2500 S.F.
B.PLANTING AND SEEDING WILL TAKE PLACE IN THE SPRING OR FALL PLANTING PERIODS TO MAXIMIZE PLANT SURVIVAL AND SEED GERMINATION.
7.A SUPPLY OF DEAD AND DYING WOODY DEBRIS SHALL COVER AT LEAST 2% OF THE GROUND THROUGHOUT THE RESTORATION SITE AFTER COMPLETION OF
CONSTRUCTION OF THE MITIGATION SITE. THESE MATERIALS SHOULD NOT INCLUDE SPECIES SHOWN ON THE A.C.O.E. LIST OF INVASIVE SPECIES.
NO EQUIPMENT WILL BE STAGED IN THE EXISTING WETLANDS. EQUIPMENT WILL BE USED IN THE RESTORATION AREA ONLY AS NECESSARY FOR REMOVAL OF FILL
AND GRADING. IF NECESSARY CONSTRUCTION MATS WILL BE USED TO STAGE EQUIPMENT.
9.TO REDUCE THE IMMEDIATE THREAT AND MINIMIZE THE LONG-TERM POTENTIAL OF DEGRADATION, THE SPECIES INCLUDED ON THE INVASIVE PLANT SPECIES LIST IN
THE CORPS MITIGATION " INTRODUCTION: PERFORMANCE STANDARDS AND SUPPLEMENTAL INFORMATION' DATED 2/21/0-11 ARE NOT INCLUDED AS PLANTING STOCK IN
THE OVERALL PROJECT. ONLY PLANT MATERIALS NATIVE AND INDIGENOUS TO THE REGION SHALL BE USED. SPECIES NOT SPECIFIED IN THE MITIGATION PLAN
SHALL NOT BE USED WITHOUT WRITTEN APPROVAL FROM THE CORPS
10. A CERTIFIED SOIL SCIENTIST OR QUALIFIED WETLAND SCIENTIST WILL OVER -SEE THE RESTORATION WORK.
11.A CERTIFIED SOIL SCIENTIST OR QUALIFIED WETLAND SCIENTIST WILL LOCATE THE SITES FOR PLANTING THE SHRUBS AND TREES.
12. THE SITE WILL BE MONITORED FOR 2 YEARS FOLLOWING THE COMPLETION OF WORK AND CONTROLLED FOR INVASIVE SPECIES. ANNUAL REPORTS WILL BE FILED
WITH THE LOCAL INLAND WETLANDS COMMISSION. THE LOCAL WETLANDS COMMISSION WILL BE NOTIFIED BEFORE WORK BEGINS AND ALSO BE NOTIFIED UPON
COMPLETION OF THE MITIGATION SITE AND PLANTINGS SO THAT THEY MAY INSPECT.
THE NEW ENGLAND EROSION CONTROURESTORATION MIX FOR MOIST SITES
CONTAINS A SELECTION OF NATIVE GRASSES AND WILDFLOWERS DESIGNED TO COLONIZE RECENTLY DISTURBED SITES 'WHERE QUICK GROWTH OF VEGETATION IS DESIRED
TO STABILIZE THE SOIL SURFACE. IT IS AN EXCELLENT SEED MIX FOR ECOLOGICALLY APPROPRIATE RESTORATIONS ON MOIST SITES THAT REQUIRE QUICK STABILIZATION
AS WELL AS LONG-TERM ESTABLISHMENT OF NATIVE VEGETATION. THIS MIX IS PARTICULARLY APPROPRIATE FOR DETENTION BA&S THAT DO NOT NORMALLY HOLD
STANDING WATER. SOME PLANTS IN THIS MIX CAN TOLERATE INFREQUENT INUNDATfONI, BUT NOT CONSTANT FLOODING.
SEEDING: THE MIX MAY BE APPLIED BY HYDROSEEDING, BY MECHANICAL SPREADER, BY HYDRO -SEEDING OR ON SMALL SITES IT CAN BE SPREAD BY HAND. WHEN
APPLYING ON BARE SOIL, RAKE THE SOIL TO CREATE GROOVES, APPLY SEED, THEN LIGHTLY RAKE OVER. IN NEW ENGLAND, THE BEST RESULTS ARE OBTAINED WITH A
SPRING OR EARLY FALL SEEDING. SUMMER AND LATE FALL SEEDING WALL 'BENEFIT WITH A LIGHT MULCHING OF WEED -FREE STRAW TO CONSERVE MOISTURE. LATE FALL
AND WINTER DORMANT SEEDING REQUIRE A SLIGHT INCREASE IN THE SEEDING RATE. FERTILIZATION IS NOT REQUIRED UNLESS -a E SOILS ARE PARTICULARLY INFERTILE.
APPLICATION RATE: 35 LBS/ACRE (1250 SQ. FT./LB.)
SPECIES *: SWITCHGRASS (PANICUM VIRGATUM), VIRGINIA WILD RYE (ELYMUS VIRGINICUS), CREEPING RED FESCUE (FESTUCA RUBRA), FOX SEDGE (CARER VULPINOIDEA),
CREEPING BENTGRASS (AGROSTIS STOLONIFERA), SOFT RUSH (JUNCUS EFFUSUS), NEW ENGLAND ASTER (ASTER NOVAE-ANGLIAE), GRASS -LEAVED GOLDENROD
EUTHAMIA GRAMINIFOLiA), GREEN BULRUSH (SCIRPUS ATROVIRENS), BONESET (EUPATORIUM PERFOLIATUM), BLUE VERVAIN (VERBENA HASTATA) UPLAND BENTGRASS
AGROSTIS PERENNANS), BIG BLUESTEM, NIAGRA
ANDROPOGON GERARDII), SENSITIVE FERN (ONOCLEA SENSIBILIS), LITTLE BLUESTEM (SCHIZACHYRIUM SCOPARIUM), WOOLGRASS (SCIRPUS CYPERINUS).
I CIF I ATIONS
1. ALL PLANTS SHALL BE NURSERY GROWN AND CONFORM TO THE LATEST EDITION OF' ANSI 260.1, AMERICAN STANDARD FOR NURSERY STOCK.
2. NO SUBSTITUTION OF PLANT MATERIALS WILL BE ALLOWED WITHOUT THE PRIOR WRITTEN CONSENT OF THE PROJECT OWNER.
3. PLANTING MIXTURE FOR TREES AND SHRUBS:
1 PART DEHYDRATED COW MANURE OR COMPOSTED ORGANIC MATERIAL
2 PARTS PEAT MOSS AND 5 PARTS TOPSOIL
5 PARTS TOPSOIL
4. FERTILIZER: TO BE COMPLETE PLANT FOOD WITH A GUARANTEED ANALYSIS OF 10-10--10 UNLESS OTHERWISE APPROVED BY THE LANDSCAPE ARCHITECT. FERTILIZER
SHALL CONTAIN 50% SLOW RELEASE NITROGEN AND 50% QUICK RELEASE NITROGEN.
5. ALL PLANT PITS MUST BE FREE DRAINING. BREAK UP THE BOTTOM OF THE HOLE BY FORK IF NECESSARY TO ENSURE PLANT HAS PROPER DRAINAGE.
6. SET ALL PLANTS IN CENTER OF PLANT PITS, PLUMB AND STRAIGHT AND AS DETAILED ON THE DRAWING. ALL PLANT MATERIAL SHALL BEAR THE SAME RELATIONSHIP
TO FINISHED GRADE AS TO ORIGINAL PLANTING GRADE PRIOR TO DIGGING. TREES SHALL BE PLANTED WITH THE JUNCTION OF ROOTS AND STEM LEVEL WITH FINISHED
GRADE.
7. HANDLE BALLED AND BURLAPPED PLANTS FROM THE BALL ONLY. ONCE POSITIONED IN THE HOLE, REMOVE THE TOP 1/3 OF THE BURLAP FROM THE ROOT BALL
WITHOUT DISTURBING THE ROOTS.
8. FACE EACH PLANT TO GIVE THE BEST APPEARANCE.
9. DO NOT STAKE THE TREES UNLESS DIRECTED BY THE OWNER.
10. FILL PLANT PITS 2/3 THEIR DEPTH WITH PREPARED PLANTING MIXTURE, WATER THOROUGHLY AND ALLOW TO SETTLE. COMPLETE BACK -FILLING, WATER THOROUGHLY
TO ELIMINATE ANY VOIDS AND AIR POCKETS. PROVIDE ADDITIONAL BACK -FILL AS NECESSARY TO CONFORM TO REQUIRED ELEVATION AND AS DETAILED.
11. FORM SAUCER AND INSTALL MULCH OVER ENTIRE PLANT PIT AND SAUCER AREA AS DETAILED.
12. 3 INCHES SHREDDED HEMLOCK BARK MULCH OR EQUAL 'SHALL BE USED AROUND ALL TREES AND SHRUB PLANTINGS.
13. ALL PLANTS AND TREES SHALL BE GUARANTEED FOR A PERIOD OF ONE FULL YEAR`. AFTER INSPECTION AND ACCEPTANCE BY THE OWNER'S REPRESENTATIVE, AND
SHALL HAVE AT LEAST 80% HEALTHY GROWTH AT THE END OF THE GUARANTEE PERIOD.
I
J
1'-0" (MIN.)
RIP RAP CHECK DAM & SEDIMENT CLEANOUT POOL
NOT TO SCALE
SILT F'
FILTER
EMBED FILTER
3" MIN. INTO
TTOM OF SWAI
H
EROSION PROTECTION
NOT TO SCALE
1. PRIOR TO THE INSTALLATION OF ANY EROSION AND SEDIMENT CONTROL MEASURES,
THE OWNER AND CONTRACTOR SHALL MEET WITH THE TOWN OF MONTVILLE
ZONING/WETLANDS OFFICER.
2. THE EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED PRIOR TO
SITE DISTURBANCE AS SHOWN ON SHEET 1, ADDITIONAL EROSION & SEDIMENT CONTROL
MEASURES SHALL BE INSTALLED IF DETERMINED NECESSARY BY THE ZONING/WETLANDS OFFICER.
3. THE CONTRACTOR SHALL CONTACT THE WETLANDS OFFICER FOR INSPECTION OF
THE SEDIMENT AND EROSION CONTROL MEASURES, PRIOR TO SITE DISTURBANCE.
CONSTRUCTION SHALL NOT BEGIN UNTIL SUCH TIME AS THE ZONING/WETLANDS OFFICER
HAS REVIEWED AND AP'P'ROVED THE INSTALLATION OF THE SEDIMENTATION AND
EROSION CONTROL MEASURES.
4. CONTRACTOR TO INSPECT ALL EROSION AND SEDIMENT CONTROL MEASURES AT
LEAST WEEKLY AND AFTER EVERY STORM EVENT AND REPAIR AND MAINTAIN AS
NECESSARY.
5. THE LIMIT OF THE 50 FOOT UPLAND REGULATED AREA
SHALL BE STAKED OUT BY A LICENSED SURVEYOR.
6. PEFORM MAINTENANCE ON THE TWO EXISTING SEDIMENT BASINS SHOWN ON SHEET 4
AND CONSTRUCT NEW OUTLETS FOR THOSE BASINS.
7. ALL STOCKPILES LOCATED WITHIN THE UPLAND
REGULATED AREA SHALL BE REMOVED.
8. ALL MANMADE EARTH BERMS AND SWALES SHALL BE REMOVED
FROM WITHIN THE UPLAND REGULATED AREA.
9. REMOVE FILL SOILS FROM THE WETLANDS UNDER DIRECTION OF THE SOIL SCIENTIST.
RETAIN IN PLACE EXISTING WETLAND TOPSOIL.
10. MATCH NATURAL EXISTING GRADES ALONG THE PERIMETER OF THE DISTURBANCE, ADJACENT TO
THE WETLANDS, AND THEN GRADE THE AREA WITHIN THE UPLAND REGULATED AREA FAIRLY
LEVEL MAINTAINING A 1% SLOPE.
11. GRADE WATER QUALITY SWALES AND BASINS, WITH OUTLETS AND CHECK DAMS AS SHOWN ON
THESE PLANS.
12. INSTALL 12" OF TOPSOIL WITHIN ANY AREA OF WETLAND DISTURBANCE IF SOIL SCIENTIST DEEMS
NECESSARY
13. INSTALL 4" OF TOPSOIL WITHIN THE DISTURBED UPLAND REGULATED AREA.
14. PLANT ALL TREES, SHRUBS, AND PLUGS AS SHOWN ON THESE PLANS. THE SOIL SCIENTIST WILL
OVERSEEPLANTINGS AND CHOOSE LOCATIONS.
15. INSTALL RESTORATION SEED MIX TO ALL DISTURBED AREAS.
16. INSTALL STRAW MULCH ON ALL DISTURBED AREAS.
17. PLACE BOULDERS 10' ON CENTER ALONG THE BORDER OF THE UPLAND REVIEW AREA, OR ALONG
EDGE OF VEGETATED SWALE, AS MAY APPLY AND AS SHOWN ON THESE PLANS.
18. UPON COMPLETION OF WORK, CALL TOWN WETLANDS OFFICER FOR INSPECTION,.
19. UNFORESEEN PROBLEMS WHICH ARE ENCOUNTERED IN THE FIELD SHALL BE SOLVED
ACCORDING TO CONNECTICUT GUIDELINES FOR SOIL EROSION AND SEDIMENT
CONTROL.
DO NOT HEAVILY PRUNE THE TREE AT PLANTING.
PRUNE ONLY CROSSOVER LIMBS CO -DOMINANTLEADERSANDBROKENOR59bBRANCHES. SOME INrTERIOR TWIGS AND LATERAL BRANCHES
MAY BE PRUNED- HOWEVER DO NOT REMOVETHETERMINALBADSOFi&QHES THAT
EXTEND TO THE EDGE OF THE CROWN.
STAKE TREES ONLY UPON THE APPROVAL
OF THE LANDSCAPE ARCHITECT
WRAP TREE TRUNKS ONLY UPON THE
APPROVAL OF THE LANDSCAPE ARCHITECT.
91
LEVEL SPREADER TO BE
6" LOWER THAN TOP
OF BASIN BERM
18 Sacha.tello Industrial Drive
STOR 1WATER SYSTEM MAINTENANCE
Maintenance Schedule for Stormwater Basins*
Activity Schedule
For the Basins and side slopes, inspect for invasive vegetation. Annual _-
OBL
inspection
Inspect for damage, undercut, or eroded area Annual
Monitor for sediment accumulation inspection
Repair undercut or eroded areas. As needed
18 Sachatello Industrial Drive
maintenance
Clean and remove debris from basins, and their inlets and outlets
Lurid Sedge
Inspect and clean debris and sediments
I
Clean and remove debris from the riprap level spreaders & Semi -animal
stone.'NN-oodchip berms
Holler Lombardi Land Holdings, LLC
Mow side slopes once per year. High vegetation along basin edge
1 Fowl Bluegrass
will discourage waterfowl from taking up residence and serve to filter
Lot S Combination & ReconfigurationDate.
pollutants.
Beggar Ticks
Provide report to the Town of Montville after each of the first two years after completion. Plant
survival shall be 70% or greater after the first year and 80° o or greater after the second year.
Maintenance Schedule for Vegetated Swale
Activity Schedule
Inspection for sediment buildup and erosion Semi -annual
Repair undercut or eroded areas As needed maintenance
E• Clean and remove debris from check darns./pools Frequent (3-4 times year)
maintenance
10'
s" MIN.
LEVEL SPREADER
NOT TO SCALE
INTERMEDIATE RIPRAP
f..... \ 1Alf%r%r% f%LIIRC` Air%r%ir"i= 0100Ad
MARK THE NORTH SIDE OF THE TREE_, IN THE NURSERY, AND ROTATE TREE EACH TREE MUST BE PLANTED SUCH THATTOFACENORTHATTHESITEWHENEVERTHETRUNKFLAREISVISIBLEATTHETOPPOSSIBLE. OI THE ROOT BALL. TREES WHERE: THE TRUNK
MULCH RING is NOT VISIBLE SHALL BE IdEJECTED.
SET TOP OF ROOT FLUSH TO 1800 M I FT.} DU` 1. MIN, NOT COVER THE TOP OF THE ROOT
GRADE OR 25-50 MM 1-2 IN.)
LS
400 MM 8 DIAbA PREFERRED SOIL
HIGHER IN SLOWLY ING SO] lS.
200 MM (8 IN.)
r r r r r r r r r? rsrr r t r r ? ?
rrr ± r ? ? ? r r
sr rrrr?
rrrr 10MM (4 IN. HIGH EARTH SAUCER
50 MM 2 IN. MULCH. DO NOT PLACE ?
rrrr;
r ?
rrr rr?
rsrr???
B'YOND tDGE F ROOT FALL.
MULCH i CONTACT WITH TREE TRUNK. r r r r r r r r r ? r r
MAINTAIN THE MULCH WEED -FREE FOR rrrrr}rrr?'
r?? r ? ?rrr r ? r ? r r r r rrr i r ?REMOVE ALL TWINE, ROPE AND WIRE, AND
A MINIMUM OF THREE YEARS AFTER r? r r rrr r r r r r r r r r r r r r r r r r? BURLAP FROM TOP HALF OF ROOT BALL
PLANTING. ? r r ? ? r ?rrrr r rrr ? s
IF PLANT IS SHIPPED WITH A WIRE BASKET AROUNDTHEROOTBALLCUTTHEWIREETINFOURPLACESANDFOLD200MM (8 IN.) PLANTING HOLE.
PLACE ROOT BALL ON UNEXCAVATEDORTAMPEDSOIL
TAMP SOIL AROUND ROOT BALLBASEFIRMLYWITHFOOTPRESSURE
SO THAT ROOT BALL DOES NOT SHIFT.
TREE PLANTING DETAIL
NOT TO SCALE
I" V I" V A'
FAKES
BALE
OIL
STAKES - TWO
BALE (TYP.)
oNSTRUCTION NOTES:
SILT FENCE FILTER CLOTH TO BE SECURELY FASTENED TO GRADE STAKE
WITH STAPLES, 6" ON CENTER.
WHEN TWO SECTIONS OF FILTER CLOTH ADJOIN ONE ANOTHER THEY SHALL
OVERLAP BY 6" AND BE FOLDED.
3. BALES SHALL BE PLACED IN A ROW WITH ENDS TIGHTLY ABUTTING THE
ADJACENT BALES.
STONE / WOODCHIP CHECK A
NOT TO SCALE I
18f1'
4" LOAM & SEED MIX LINE
WITH NORTH AMERICAN GREEN 51
S-150 EROSION MATS
PERMANENT VEGETATED SWALE
NOT TO SCALE
4 STAPLES AT START
END OF ROLL AND S
AT W INITFRVAI S AS
EROSION CONTROL MATTING
NOT TO SCALE
Chesterf I e [d
C1
Davis
0S Pond
1
a'
R-80 Z Ll
X
SCALE: 1 "=1000'
820 WEST STREET, AMHERST, MA 01002
PHONE: 413-548-8000 FAX 413-549-4000
EMAIL: INFO@NEWP.COM WEB ADDRESS: WWW..NEWP.COM
New Eggland Wetm ix(Wetland Seed Mix)
Botanical Name Common Name Indicator -
Carex vulpinoidea Fox Sedge OBL
3 10/31118 Address Review Comments
Carex scoparia Blunt Broom Sedge FACW
Revision. 860) 892-1880 Fax (860) 886--91.85
18 Sachatello Industrial Drive Project No.
Carex lurida Lurid Sedge OBL I
Carex lupulina Hop Sedge OBL
Holler Lombardi Land Holdings, LLC
Poa palustris 1 Fowl Bluegrass FACW
Lot S Combination & ReconfigurationDate.
Bidensfrondosa Beggar Ticks FACW
Uj
Scirpus atrovirens Green Bulrush OBL
i
Asclepias incarnata I Swamp Milkweed OBL
Details
Carex crinita I Fringed Sedge OBL
Verzonia noveboracensis New York Ironweed 1 FACW+
Juncus ofesus Soft Rush FACW+
Aster lateriflorus (Symphyotrichum lateriflorum) Starved/Calico AsterI FACW
Iris versicolor Blue Flag OBL
Glviceria Tndis American Mannagrass I OBL
14irnarlus ringens Square Stemmed Monkey Flower i OBL
Eupatorium maculatum (Eutrochium maculatum) Spotted Joe Pye Weed OBL
Lake
onomoa
PRICE PER LB. 5135.00 MIN. QUANITY 1 LBS. TOTAL: $135.00 APPLY: 18 LBS/ACRE :2500 sq ft/Ib
The New England Wetmix (Wetland Seed Mix) contains a wide variety of native seeds that are suitable for most wetland restoration sites
that are not permanently flooded. All species are best suited to moist ground as found in most wet meadows, scrub shrub, or forested
wetland restoration areas. The mix is well suited for detention basin borders and the bottom of detention basins not generally under
standing water. The seeds will not germinate under inundated conditions. If planted during the fall months the seed mix will germinate the
following spring. During the first season of growth several species will produce seeds while other species will produce seeds after the
second growing season. Not all species will grow in all wetland situations. This mix is comprised of the wetland species most likely to grow
in created/restored wetlands and should produce more than 75% ground cover in two full growing seasons.
The wetland seeds in this mix can be sown by hand, with a hand-held spreader, or hydro -seeded on large or hard to reach sites. Lightly
rake to insure good seed -to -soil contact. Seeding can take place on frozen soil, as the freezing and thawing weather of late fall and late
winter will work the seed into the soil. If spring conditions are drier than usual watering may be required. If sowing during the summer
months supplemental watering will likely be required until germination. A light mulch of clean, weed free straw is recommended.
New England Wetland Plants, Inc. may modify seed mixes at any time depending upon seed availability. The design criteria and ecological function of the
mix will remain unchanged. Price is $/bulk pound, FOB warehouse, Plus SH and applicable taxes.
EROSION CONTROL
MATTING SHALL BE
NORTH AMERICAN GREEN
S-150 EROSION MAT
GREEN SITE
DESIGN
LLC
317 Main Street Norwich, Connecticut
3 10/31118 Address Review Comments
2 10/23/'18 Address Review Comments
No. hate Revision. 860) 892-1880 Fax (860) 886--91.85
18 Sachatello Industrial Drive Project No.
Town of Montville Connecticut GSD -51
Ati11tl,ct,ttt.f Prof. Engineer
E Holler Lombardi Land Holdings, LLC E.M.B.
09/29/18LotSCombination & ReconfigurationDate.
Uj Lombardi Business Park sheet No.
GfS?P 5FSJONDetails4