Loading...
HomeMy WebLinkAboutExisiting Rock Crusher LayoutWETLAND LIMIT IP OWN LIMIT OF UPLAND REVIEW AREA REMOVE ALL STOCK PILES J NORTH EAST SEDIMENT Al EXISTING SEDIMENT TO REMOVED DOWN %EXISTING TOPSOIL EXISTING P SOIL TOREMAIN Ll SEE EROSION & SEDIMENT CONTROL NARRATIVE. I HAVE REVIEWED THE WETLANDS ON THE PROPERTY IN THE FIELD AND HAVE REVIEWED THE WETLANDS AS SHOWN ON THE PLAN AND FIND THAT THEY SUBSTANTIALLY REPRESENT THE WETLANDS AS DELINEATED IN THE FIELD. ROBERT C. RUSSO DATE CERTIFIED SOIL SCIENTIST t i EXISTING PROPERTY LIN E (TYP.) REMOVE EXISTING EARTH BERM PREVIOUSLY APPROVEDDOWNTOEXISTINGTOPSOIL / — I — -- EXISTING CLEARING LIMIT LIMITS OF CLEARING & 249 - EXISTING TOPSOIL TO REMAIN -55'-`56 E_ISTING LIWT- e3AINPLACE.. CLEARING (TYP.) rly 23a 4 TING EARTH r -' _ -- 1 - 1` X __ ' i : X i\i `v `_i i"= `a_i \i\ "-i;\. _/ % i _; moi' `moi i _ i » -- 236- 236 REMOVE Exis TO EXISTING TO EXISTING TOPSOIL TO REMAININSTALLSILTFENCEEXISTING EARTH BERM 238 TO REMAIN. IN PLACE. F 234 TH 12E 5 3 15 TH 12H TOPSOIL 3BOULDBOULDERSERS STOCKPILE TH 121 3 5 sq.ft. EARTH PRODUCT KLM%jVr. rJLA_ LF*JTWM TOP OF ORIGINAL WETLAND SOIL TH 12C STOCKPILE STUMP 4l Alt REMOVE ENTIRE STUMP STOCK PILE cu 21 ------- ROCK v0_ STOCKPILE CU EARTH PRODUCT STOCKPILE I -.i 7_ GRAVEL ACCESS DRIVE— TH 128 PREVIOUSLY APPROVED & PERMITTED REMOVE ROCK STOCK PILE, CONCRETE BARRIER SWALE ROCK 4111 STOCKPILE E) STING lam - X STi G TRAM \ / 419a 386 S .JJ NORTH WEST SEDIMENT AREA: EXISTING SEDIMENT TO REMAIN IN HEAVILY VEGETATED AREA C REMOVE FILL DOW TOP OF ORIGINAL Iola [on:] 0 it REMOVE SECTION OF STOCK PILE WITHIN THE 50"REGULATED AREA, EXISTING CLEARING UMrT INSTALL SILT FENCEIfi REMOVE EXISTING EARTH BERM DOWN TO EXISTING TOPSOIL EXISTING TOPSOIL TO REMAIN IN PLACE moo- --__ \> All 1 >\ LOT 10 WF#1 135 ko-T n REMOVE SECTION OF STOCK PILE D AREA.4 R &40VE FI LL DOWN TO Z+ TOP OF ORIAf NAL WETLAND SOIL 39 S.Fi. REMOVE BOULDERS FROM *THIN THE 50" REGULATED AREA 20' 0 20' 40' M SCALE: 1"=20' GREEN SITE DESIGN LLC 317 Main Street Norwich, Connecticut INSTALL SILT FENCEIfi REMOVE EXISTING EARTH BERM DOWN TO EXISTING TOPSOIL EXISTING TOPSOIL TO REMAIN IN PLACE moo- --__ \> All 1 >\ LOT 10 WF#1 135 ko-T n REMOVE SECTION OF STOCK PILE D AREA.4 R &40VE FI LL DOWN TO Z+ TOP OF ORIAf NAL WETLAND SOIL 39 S.Fi. REMOVE BOULDERS FROM *THIN THE 50" REGULATED AREA 20' 0 20' 40' SCALE: 1"=20' GREEN SITE DESIGN LLC 317 Main Street Norwich, Connecticut 2 10/23/18 Address Review Comments 1 10/11/18 Stockpile Areas Added 4o. Date Revision 860) 892-1380 Fax (860) 886-9165 18 Sachatello Industrial Drive Project No. Town of Montville, Connecticut GSD -51 Prod. EngineerN 0 Holly Lombardi Land Holdings, LLC Lot 3 Combination & Reconfi ura ion Date: 09/29/18 Sheet No. Lombardi Business Park L IS EXISTING CONDITIONS DEMOLISION PLAN a Chesterfield SACHATELLOINDUSTRIAL DRIVE Devi8 4 Pond 46 01cr Lake LLJ KanomosP4 z LL_ y IL ell LOMBARDI LOT 16 25 SACHATELLO INDUSTRIAL DRIVE LOT 17 375 BUTLERTOWN ROAD LOT 18 393 BUTLERTOWN ROAD BUSNE33 1-11 PARK 4107 LOT 6 ROCK CRUSHER I Y, 42 SACHATELLO LOCATION INDUSTRIAL D IVE. ASSESSOR -005/027-007 1 LOCATION MAP 4 EXISTING CONCRETE SCALE: 1 1000' BLOCK WALL GENERATOR E 0000 LOT 7 335 BUTLERTOWN ROAD0000" 000, TRAILERS 325 BUTLERTOWN ASSESSOR -005/027-012 ROCK LOT 5 Ode OTTOWN ROAD X 78CRUSHER ---\\ ZA 4ZA ATPA I C) INDUSTRIAL DRIVE ASSESSOR -005/027-008 1Z HaT . 000 m. EXISTING SEDIMENTATION BASIN & EARTH BERM w. V LOT 4XLOT9 315 BUTLERTOWN ROAD 26 SACHATELLO FROMWF#11 CLEAN OUT SEDIMENT 2 0 INDUSTRIAL DRIVE cF W EXISTING SEDIMENT TRAPSOR-005/027-009 59, W F # INSTALL STONE/WOODCHIP I... ---- CHECK DAMLOT1000. lftftft -.- _... LOT 11 WF4 i, 7 305 BUTLERTOWN ROAD 0 279 BUTLERTOWN ROAD "ft-%. - ftft. '+ " ft. WF#1--ft— lftftftAmkop!) r> IF# 1 -7, V F 7) 7. N, J W'F#1 -6W7#1 -67 WF# 1 WF# I F# ftl - , I - IV EXISTING8WF#1 -,8 WF#1-6-? 1v F # 1 1 J -- F, 1-61 \kr WELL 0000ri 1 4WF#11-9 '7# VY, rF#1 I- r 57 01 rVY WF#1-7 14 F l _31 b- INSTALL NEWP WETMIXVTrrw 1 4*07* EXISTING F-_ ->34,%, wr -48VF,,, r 4' WF#1 WFO - rl, It, I EXISTING SEDIMENT TO REMAIN SCALE 0 7000 CONCRETE BLOCK\ STORAGE BINS LOT 14 9 SACHATELLO INDUSTRIAL DRIVE CA 6/ Y i __ 11 19 ,Ifl _#1 -51 #1-5 IN HEAVILY VEGETATED AREA 11 F T F INSTALL 20' WIDE INTERMEDIATE LEVEL A/F# LOT 3 LOT 19 1492 ROUTE 85 7SPREADEROUTLET18SACHATELLO . INDUSTRIAL DRIVE estACCCn -7/ r) r) r, / p) VIVIF 10000- 6000, INSTALL STONE/WOODCHIP 1, CHECK DAM 40000 doolillillilillisiolloo" llo 4000, INSTALL 20' WIDE INTERMEDIATE LEVEL h. v SPREADER OUTLET i: CLEAN OUT SEDIMENT FROM REMOVE DEPOSITED MATERIAL EXISTING SEDIMENT TRAP FROM ADJACENT STOCKPILE N. WTHATHASENTEREDTHEI.I.R.A. F S A91 WF, WETLAND AREA L07 10 SACH ELLLOE jt DUSTRIAL DRIV W,_# i ASSESSOR — 005/o27/011 WE# MONO OWN REMOVE ALL CONSTRUCTION F` MATERIALS FROM WITHIN THE ` 50' REGULATED AREAS. F# )z INSTALL LOAM, SEED & MULCH 810 RETENSIONf> RAIN GARDEN F> 4' WFy, vv YVF# 1F> F> t F> F, t" NrWW WF4 I swoop doom - FI> LOT 1 2 SACHATELLO W7 1-14' 2 INDUSTRIAL DRIVEVIF WF 1 F,' WF; 5 F#r-, P J k, jyW WF#5-foW UR xl i"VF#5 -0 bi WF#7 -'FA'F # 8 z` 71- S I r )NF#5 WF#5 14UPND 1 F> FVF#5' #5SEESHEET1,2&,38 - AW -A WI W,5 WETLAND AREA FOR RESTORATION PILMS WF#5 - 1, WF#-/ F#5-11i0 WF# WF#8 W r VVF#5 4 WF#5-2 SHED VVIF 6_1WF#6--4 I# V F #6-`, YAY IJ F # 6 - STORMWATER BASIN 3\ 10- 001 r 4- 8 iF#4 7 STORMWATER BASIN F#_ 0J,#4- 4 W F WETLAND W AREA f 4.4- 7. F> WF#3-- R 100* 96T W2 q 4e 2w a 0 0 loo, SCALE: 1 "=100` 200' 0, Eez_ GREEN SITE DESIGN310/31/118 Address Review Comments LLC 317 Main Street Norwich, Connecticut 2 101231 18 I Address Review Comments 1 10/11/18 Stockpile Areas Added No. Dat,E! Revision 860) 892-1380 Fax (860) 886-91,65 18 Sachatello Industrial Drive Project No. WATER TOWER BUSNE33 1-11 PARK 4107 LOT 6 ROCK CRUSHER I Y, 42 SACHATELLO LOCATION INDUSTRIAL D IVE. ASSESSOR -005/027-007 1 LOCATION MAP 4 EXISTING CONCRETE SCALE: 1 1000' BLOCK WALL GENERATOR E 0000 LOT 7 335 BUTLERTOWN ROAD0000" 000, TRAILERS 325 BUTLERTOWN ASSESSOR -005/027-012 ROCK LOT 5 Ode OTTOWN ROAD X 78CRUSHER ---\\ ZA 4ZA ATPA I C) INDUSTRIAL DRIVE ASSESSOR -005/027-008 1Z HaT . 000 m. EXISTING SEDIMENTATION BASIN & EARTH BERM w. V LOT 4XLOT9 315 BUTLERTOWN ROAD 26 SACHATELLO FROMWF#11 CLEAN OUT SEDIMENT 2 0 INDUSTRIAL DRIVE cF W EXISTING SEDIMENT TRAPSOR-005/027-009 59, W F # INSTALL STONE/WOODCHIP I... ---- CHECK DAMLOT1000. lftftft -.- _... LOT 11 WF4 i, 7 305 BUTLERTOWN ROAD 0 279 BUTLERTOWN ROAD "ft-%. - ftft. '+ " ft. WF#1--ft— lftftftAmkop!) r> IF# 1 -7, V F 7) 7. N, J W'F#1 -6W7#1 -67 WF# 1 WF# I F# ftl - , I - IV EXISTING8WF#1 -,8 WF#1-6-? 1v F # 1 1 J -- F, 1-61 \kr WELL 0000ri 1 4WF#11-9 '7# VY, rF#1 I- r 57 01 rVY WF#1-7 14 F l _31 b- INSTALL NEWP WETMIXVTrrw 1 4*07* EXISTING F-_ ->34,%, wr -48VF,,, r 4' WF#1 WFO - rl, It, I EXISTING SEDIMENT TO REMAIN SCALE 0 7000 CONCRETE BLOCK\ STORAGE BINS LOT 14 9 SACHATELLO INDUSTRIAL DRIVE CA 6/ Y i __ 11 19 ,Ifl _#1 -51 #1-5 IN HEAVILY VEGETATED AREA 11 F T F INSTALL 20' WIDE INTERMEDIATE LEVEL A/F# LOT 3 LOT 19 1492 ROUTE 85 7SPREADEROUTLET18SACHATELLO . INDUSTRIAL DRIVE estACCCn -7/ r) r) r, / p) VIVIF 10000- 6000, INSTALL STONE/WOODCHIP 1, CHECK DAM 40000 doolillillilillisiolloo" llo 4000, INSTALL 20' WIDE INTERMEDIATE LEVEL h. v SPREADER OUTLET i: CLEAN OUT SEDIMENT FROM REMOVE DEPOSITED MATERIAL EXISTING SEDIMENT TRAP FROM ADJACENT STOCKPILE N. WTHATHASENTEREDTHEI.I.R.A. F S A91 WF, WETLAND AREA L07 10 SACH EL LLOE jt DUSTRIAL DRIV W,_# i ASSESSOR — 005/o27/011 WE# MONO OWN REMOVE ALL CONSTRUCTION F` MATERIALS FROM WITHIN THE ` 50' REGULATED AREAS. F# )z INSTALL LOAM, SEED & MULCH 810 RETENSIONf> RAIN GARDEN F> 4' WFy, vv YVF# 1F> F> t F> F, t" NrWW WF4 I swoop doom - FI> LOT 1 2 SACHATELLO W7 1-14' 2 INDUSTRIAL DRIVEVIF WF 1 F,' WF; 5 F#r-, P J k, jyW WF#5-foW UR xl i"VF#5 -0 bi WF#7 -'FA'F # 8 z` 71- S I r )NF#5 WF#5 14UPND 1 F> FVF#5' #5SEESHEET1,2&,38 - AW -A WI W,5 WETLAND AREA FOR RESTORATION PILMS WF#5 - 1, WF#-/ F#5-11i0 WF# WF#8 W r VVF#5 4 WF#5-2 SHED VVIF 6_1WF#6--4 I# V F #6-`, YAY IJ F # 6 - STORMWATER BASIN 3\ 10- 001 r 4- 8 iF#4 7 STORMWATER BASIN F#_ 0J,#4- 4 W F WETLAND W AREA f 4.4- 7. F> WF#3-- R 100* 96T W2 q 4e 2w a 0 0 loo, SCALE: 1 "=100` 200' 0, Eez_ GREEN SITE DESIGN310/31/118 Address Review Comments LLC 317 Main Street Norwich, Connecticut 2 101231 18 I Address Review Comments 1 10/11/18 Stockpile Areas Added No. Dat,E! Revision 860) 892-1380 Fax (860) 886-91,65 18 Sachatello Industrial Drive Project No. Town of Montville, Connecticut GSD -51 Proj. Engineer Holly Lombardi Land Holdings, LLC N A E.M.B. Lot 3 Combination & Reconfiguration Date: 09/29/18 W t Lombardi Business Park Sheet Na. Existing Rock Crusher Layout LEGEhID WETLAND LIMIT LIMIT OF UPLAND REVIEW AREA 23S EXISTING PROPERTY LI N E (Ti PREVIOUSLY APPROVED EXISTING CLEARING LIMIT LIMITS OF CLEARING & 248 aVt ------ XISTING J e3l'r CLEARING (TYP.) A J / 236 —236 EXISTING EARTH BERM TO REMAIN 238 j 234 T Y T14 1 `7 P 7 7 TH 12H TH 121 M INSTALL NORTH AMERICAN GREEN INSTALL SILT FENCE I0 ICUCq, GREEN SITE DESIGNAddress3 A IM74 S-150 EROSION MATS ON SLOPES BOTTOM OF WATER QUALITY BASIN PT 12 41 12C TH 12F U 01 TH 12A TH 12G 236—- ------- i. NORTHEAST PERMANENT TH 12J SEDIMENT BASIN INSTALL BOULDERS — 10O.C. ALONG THE ENTIRE LIMIT OF TH 12KTHE50* UPLAND REGULATED AREA OUTSIDE 50' REGULATED AREA INSTALL BOULDERS 10' O.C. ON A 5` WIDE STRIP OF CRUSHEDALONG NORTHERN SIDE OF SWALE STONE & OUTSIDE 50' REGULATED AREA ON A W %Lqnc* IcTpip OF r-o"lizurn31SLOPE 20' WIDE INTERMEDIATE RIPRAP LIE'Vn SPREADER C11 BOTTOM OF RIPRAP ELEV=230.5 INSTALL STONE/VOOD CHIP CHECK DAM rl U INSTALL 2" DEEP X 10' LONG 47- fSED11W*T CLEAN OUT L i IN4ALL MODIFIED RIPRAP CHECK DAM Q ` 2:1 SLOPE INSTALL BOULDERS 10' O.C. 236 ALONG EASTERLY SIDE OF SWALE TH 12B 10 do OUTSIDE 509 REGULATED AR 0 HEDONA50WIDESTRIPOFCRUSH INSTALL BOULDERS — 10* O.C. ALONG EASTERLY SIDE OF lc:) 40; 011) WOO ./ / z" 63 — 7 A# o -- INSTALL NORTH AMERICAN GREEN SEDIMENT BASIN & SWALE INSTALL VEGETATED SWALE 0 1 .4ir20' WIDE INTERMEDIATE RIPRAP 00S-150 EROSION MATS ON SLOPES & OUTSIDE 50" REGULATED AREA (SEE DETAIL SHEET 5) A'lLEVELSPREADER & BOTTOM OF WATER QLAMW BASIN ON A 5* WIDE STRIP OF CRUSHED lill VVF 7 - 8 BOTTOM OF RIPRAP ELEV=230.0 INSTALL 2" DEEP X 10" LONG C3 Cn STONE SEDIMENT CLEAN OUT POOL CZ) C- C. -J C:3 A -INORTHWESTPAC3INSTALLMODIFIEDSEDIMENTBASINvol 1 SopcD RIPRAP CHECK DAM A'l AwlC3Ca23zINSTALLMODIFIED53 C r7l c::) C:) A"i RIPRAP CHECK DAM . 00001 4 C:3 L.J L -J L_J t -J L_J L_J LJ L_J L_J THE AREA TO BE VEGETATED MUST BE EVENLY GRADED TOINSTALL2* DEEP X 10" LONG #/ AZ A INHIBIT CONCENTRATION OFGX227.02z SEDIMENT CLEAN OUT POOLC_J 0STORMWATER FLOWS . (Tiolop X 227.0 236 M C:) C) C:3 C:3 4T21 SLOPE 36 227.0 X EXISTING CLEARING LIMIT 0 4Nt 000 21 SLOPE 232 INSTALL SILT FENCE l> LOT 10 WF#1 -135 JL "'T 41, 20' 0 20 4QI SCALE: 1"=20' GREEN SITE DESIGNAddress310/31/18 Review Comments LLC 317 Main Street Norwich, Connecticut 2 10/23/18 Address Review Comments 10/ No. Date Revision 860) 892-1380 Fax (860) 886-9165 18 Sachatello Industrial Drive Project No® Town of Montville, Connecticut GSD -51 Proj. Engineer C Holly Lombardi Land Holdings, LLC L of ;'03 Combination & Reconfiguration Date: 09/29/18 Lombardi Business Park Sheet No. C, Grading & E&S Plan WETLAND LIMIT N&M M fii'.,, LIMIT OF UPLAND REVIEW AREA INSTALL 10—RED MAPLE ell INSTALLZTAII I n U SEED k MULCH 20—HIGHBUSH BLUEBERRYr 15—ARROWOOD VIBURNUM 20—WINTERBERRY HOLLY 130—PLUGS TUSSOCK SEDGE n ^C' ^AUAnA 0"CU NORTH EAST SEDIMENT AREk' 130—PLUGS FOWL MANNA GRASS EXISTING PROPERTY EXISTING SEDIMENT TOR LINE (1YP.) DOWN TO EXISTING TOPSOIL NEWP WETMIX PREVIOUSLY APPROVEDTOPSOILEXIVINGTOPSOILTOREMAIN12EXISTINGCLEARINGLIMITLIMITSOFCLEARING & # — . - - - , _ NE. SSA 248APPLYCLEANSTRAWMULCHQISTINGLIW-T- P-M CLEARtNG (TYP.) X77'7, 236 7—, 10 238 234 TH 12E V" ru 12H OTH 121 Z' 3585 sq. PT 12 jill INSTALL SILT FENCE TH 1 TH 12F - 2C i # \1 Qj TH 12A TH 120 Ile 236- 00 INSTALL e TOPSOIL., RESTORATION TH 12,E ISO, CU SEED MIX & STRAW MULCH G I NZ TH 12K INSTALL 3—WINTERBERRY HOLLY w NEWP WE 12n TOPSO11 100, 4i lot 1.0 ei4 "— ` Q WU 83 SQ.FT. TH 12D 236 VV GRAVEL TH 128 ,' a _' -" ACCESS DRIVE AN INSTALL Ar3—HIGHBUSH BLUEBERRY NEWP WERAIdid 12" TOPSOIL 1&0 dA SON* 00-0CDCDCDCDCDCDQj INSTALL 4* TOPSOIL, -RESTORATION A' SEED MIX ON SIDES AND BOTTOM OF BASIN INSTALL INSTALL 4* TOPSOIL., RESTORATION j''."'000 3—RED MAPLE SEED MIX & STRAW MULCH C' 3—HIGHBUSH BLUEBERRYCC O 3—WINTERBERRY HOLLYC:) 0Q) C:) C:D C:) NEWP WETMIX 901" 39 SQ.FT. — C 12* TOPSOIL goO C:) co C:) C:) 232 C:) C:) 4 C' C:3 C3 M M____ M M M M M M A V362swap X,227.0 C:)d* so@0 L..j AX7.0 323 C::l 228 227.0 X EXISTING CLEARING LIMIT A t 6 386 sq.ft, I NSTACL SILT FENCE F# EXISTING SEDIMENT TO REMAIN NORTH WEST SEDIMENT AREA: IN HEAVILY VEGRATED AREA - ------ — > 3 INSTALL NEWP WETMIX dl LOT 10 WF#1 35 L-Cff n M 20' 0 20' 409 SCALE: 1 "=20' GREEN. SITE DESIGN310/31//18 Address Review Comments 2 10/23/18 Address Review Comments LLC110/11/18 Stockpile Areas Added 317 Main Street Norwich, Connecticut No. Date I Revision (860) 892-1380 Fax (860) 886-9165 1A Rnnhntadln Industrial Drive Project No. Town of Montville, Connecticut GSD -51 Proj. Engineer Holly Lombardi Land Hoicings, LLC E.M.B. De: Lot 3 Combination & Reconfigurationat 09/29/18 Lombardi Business Park Sheet No. Landscape Plan LIELM[3, REVIEW ZOE NAMES N I REST'Qf2agN AM 1!L&fflWj SCHEDULE WETLAND INDICATOR STATUS QUANTITY/DESCRIPTION TREES Annual _- OBL RED MAPLE (AGER RUBRUM) FACULTATIVE WETLAND 13 RED MAPLES - 2" CALIBER SHRUBS inspection Repair undercut or eroded areas. WINTERBERRY HOLLY (ILEX VERTICILLATA) FACULTATIVE WETLAND SHRUBS AND TREES TO TOTAL 600 PER ACRE ARROWOOD VIBUNUM (VIBURNUM RECOGNITUM) FACULTATIVE WETLAND SHRUBS AND TREES TO TOTAL 600 PER ACRE HIGHBUSH BLUEBERRY (VACCINUM CORYMBOSUM) FACULTATIVE WETLAND SHRUBS AND TREES TO TOTAL 600 PER ACRE PLANTS Holler Lombardi Land Holdings, LLC Mow side slopes once per year. High vegetation along basin edge FOWL MANNA GRASS (GLYCERIA CANADENSIS) OBLIGATE 3 FT ON CENTER TUSSOCK SEDGE (CARER STRCTA) OBLIGATE 3 FT ON CENTER CANADA RUSH (JUNCUS CANADENSIS) OBLIGATE 3 FT ON CENTER SEEDMIX i Asclepias incarnata NEW ENGLAND EROSION CONTROL VARIABLE 1 LB./ 2500 S.F. SEED MIX TO BE Carex crinita I Fringed Sedge BROADCAST OVER RESTORATION AREA FOR PLAN NOTES- Verzonia noveboracensis SOIL STABILIZATION, ESTABLISH HERBACEOUS WETLAND PLANTS 1. ALL SEDIMENTATION AND EROSION CONTROLS WILL BE ESTABLISHED BEFORE GRADING BEGINS. 2.TEMPORARY DEVICES AND STRUCTURES TO CONTROL EROSION AND SEDIMENTATION IN AND AROUND RESTORATION SITES SHALL BE PROPERLY MAINTAINED AT ALL TIMES. THE DEVICES AND STRUCTURES SHALL BE DISASSEMBLED AND DISPOSED OF NO LATER THAN NOVEMBER 1, THREE FULL GROWING SEASONS AFTER PLANTING. SEDIMENTS COLLECTED BY THESE DEVICES WILL BE REMOVED AND PLACED UPLAND IN A MANNER THAT PREVENTS ITS TRANSPORT INTO A WETLAND OR WATERWAY. 3.TOPSOIL STRIPPED FROM THE IMPACT AREA WILL BE RE -USED IF AVAILABLE. 4.THE RESTORATION AREA WILL BE OVER EXCAVATED 4 INCHES BELOW THE FINAL ELEVATIONS IF DEEMED NECESSARY BY THE ON-SITE WETLAND SCIENTIST AS SHOWN ON THE PLAN AND REFILLED TO THE SPECIFIED GRADES WITH NATIVE TOPSOIL. THE ON-SITE WETLAND SCIENTIST WILL ESTABLISH MICROTOPOGRAPHIC GRADING. 5. ALL WETLAND RESTORATION AREAS WILL BE SEEDED WITH NEW ENGLAND WETMIX (NEW ENGLAND PLANTS, INC, AMHERST. MA, PH 413-256-1752) OR EQUIVALENT AT 1 LB PER 2500 S.F. B.PLANTING AND SEEDING WILL TAKE PLACE IN THE SPRING OR FALL PLANTING PERIODS TO MAXIMIZE PLANT SURVIVAL AND SEED GERMINATION. 7.A SUPPLY OF DEAD AND DYING WOODY DEBRIS SHALL COVER AT LEAST 2% OF THE GROUND THROUGHOUT THE RESTORATION SITE AFTER COMPLETION OF CONSTRUCTION OF THE MITIGATION SITE. THESE MATERIALS SHOULD NOT INCLUDE SPECIES SHOWN ON THE A.C.O.E. LIST OF INVASIVE SPECIES. NO EQUIPMENT WILL BE STAGED IN THE EXISTING WETLANDS. EQUIPMENT WILL BE USED IN THE RESTORATION AREA ONLY AS NECESSARY FOR REMOVAL OF FILL AND GRADING. IF NECESSARY CONSTRUCTION MATS WILL BE USED TO STAGE EQUIPMENT. 9.TO REDUCE THE IMMEDIATE THREAT AND MINIMIZE THE LONG-TERM POTENTIAL OF DEGRADATION, THE SPECIES INCLUDED ON THE INVASIVE PLANT SPECIES LIST IN THE CORPS MITIGATION " INTRODUCTION: PERFORMANCE STANDARDS AND SUPPLEMENTAL INFORMATION' DATED 2/21/0-11 ARE NOT INCLUDED AS PLANTING STOCK IN THE OVERALL PROJECT. ONLY PLANT MATERIALS NATIVE AND INDIGENOUS TO THE REGION SHALL BE USED. SPECIES NOT SPECIFIED IN THE MITIGATION PLAN SHALL NOT BE USED WITHOUT WRITTEN APPROVAL FROM THE CORPS 10. A CERTIFIED SOIL SCIENTIST OR QUALIFIED WETLAND SCIENTIST WILL OVER -SEE THE RESTORATION WORK. 11.A CERTIFIED SOIL SCIENTIST OR QUALIFIED WETLAND SCIENTIST WILL LOCATE THE SITES FOR PLANTING THE SHRUBS AND TREES. 12. THE SITE WILL BE MONITORED FOR 2 YEARS FOLLOWING THE COMPLETION OF WORK AND CONTROLLED FOR INVASIVE SPECIES. ANNUAL REPORTS WILL BE FILED WITH THE LOCAL INLAND WETLANDS COMMISSION. THE LOCAL WETLANDS COMMISSION WILL BE NOTIFIED BEFORE WORK BEGINS AND ALSO BE NOTIFIED UPON COMPLETION OF THE MITIGATION SITE AND PLANTINGS SO THAT THEY MAY INSPECT. THE NEW ENGLAND EROSION CONTROURESTORATION MIX FOR MOIST SITES CONTAINS A SELECTION OF NATIVE GRASSES AND WILDFLOWERS DESIGNED TO COLONIZE RECENTLY DISTURBED SITES 'WHERE QUICK GROWTH OF VEGETATION IS DESIRED TO STABILIZE THE SOIL SURFACE. IT IS AN EXCELLENT SEED MIX FOR ECOLOGICALLY APPROPRIATE RESTORATIONS ON MOIST SITES THAT REQUIRE QUICK STABILIZATION AS WELL AS LONG-TERM ESTABLISHMENT OF NATIVE VEGETATION. THIS MIX IS PARTICULARLY APPROPRIATE FOR DETENTION BA&S THAT DO NOT NORMALLY HOLD STANDING WATER. SOME PLANTS IN THIS MIX CAN TOLERATE INFREQUENT INUNDATfONI, BUT NOT CONSTANT FLOODING. SEEDING: THE MIX MAY BE APPLIED BY HYDROSEEDING, BY MECHANICAL SPREADER, BY HYDRO -SEEDING OR ON SMALL SITES IT CAN BE SPREAD BY HAND. WHEN APPLYING ON BARE SOIL, RAKE THE SOIL TO CREATE GROOVES, APPLY SEED, THEN LIGHTLY RAKE OVER. IN NEW ENGLAND, THE BEST RESULTS ARE OBTAINED WITH A SPRING OR EARLY FALL SEEDING. SUMMER AND LATE FALL SEEDING WALL 'BENEFIT WITH A LIGHT MULCHING OF WEED -FREE STRAW TO CONSERVE MOISTURE. LATE FALL AND WINTER DORMANT SEEDING REQUIRE A SLIGHT INCREASE IN THE SEEDING RATE. FERTILIZATION IS NOT REQUIRED UNLESS -a E SOILS ARE PARTICULARLY INFERTILE. APPLICATION RATE: 35 LBS/ACRE (1250 SQ. FT./LB.) SPECIES *: SWITCHGRASS (PANICUM VIRGATUM), VIRGINIA WILD RYE (ELYMUS VIRGINICUS), CREEPING RED FESCUE (FESTUCA RUBRA), FOX SEDGE (CARER VULPINOIDEA), CREEPING BENTGRASS (AGROSTIS STOLONIFERA), SOFT RUSH (JUNCUS EFFUSUS), NEW ENGLAND ASTER (ASTER NOVAE-ANGLIAE), GRASS -LEAVED GOLDENROD EUTHAMIA GRAMINIFOLiA), GREEN BULRUSH (SCIRPUS ATROVIRENS), BONESET (EUPATORIUM PERFOLIATUM), BLUE VERVAIN (VERBENA HASTATA) UPLAND BENTGRASS AGROSTIS PERENNANS), BIG BLUESTEM, NIAGRA ANDROPOGON GERARDII), SENSITIVE FERN (ONOCLEA SENSIBILIS), LITTLE BLUESTEM (SCHIZACHYRIUM SCOPARIUM), WOOLGRASS (SCIRPUS CYPERINUS). I CIF I ATIONS 1. ALL PLANTS SHALL BE NURSERY GROWN AND CONFORM TO THE LATEST EDITION OF' ANSI 260.1, AMERICAN STANDARD FOR NURSERY STOCK. 2. NO SUBSTITUTION OF PLANT MATERIALS WILL BE ALLOWED WITHOUT THE PRIOR WRITTEN CONSENT OF THE PROJECT OWNER. 3. PLANTING MIXTURE FOR TREES AND SHRUBS: 1 PART DEHYDRATED COW MANURE OR COMPOSTED ORGANIC MATERIAL 2 PARTS PEAT MOSS AND 5 PARTS TOPSOIL 5 PARTS TOPSOIL 4. FERTILIZER: TO BE COMPLETE PLANT FOOD WITH A GUARANTEED ANALYSIS OF 10-10--10 UNLESS OTHERWISE APPROVED BY THE LANDSCAPE ARCHITECT. FERTILIZER SHALL CONTAIN 50% SLOW RELEASE NITROGEN AND 50% QUICK RELEASE NITROGEN. 5. ALL PLANT PITS MUST BE FREE DRAINING. BREAK UP THE BOTTOM OF THE HOLE BY FORK IF NECESSARY TO ENSURE PLANT HAS PROPER DRAINAGE. 6. SET ALL PLANTS IN CENTER OF PLANT PITS, PLUMB AND STRAIGHT AND AS DETAILED ON THE DRAWING. ALL PLANT MATERIAL SHALL BEAR THE SAME RELATIONSHIP TO FINISHED GRADE AS TO ORIGINAL PLANTING GRADE PRIOR TO DIGGING. TREES SHALL BE PLANTED WITH THE JUNCTION OF ROOTS AND STEM LEVEL WITH FINISHED GRADE. 7. HANDLE BALLED AND BURLAPPED PLANTS FROM THE BALL ONLY. ONCE POSITIONED IN THE HOLE, REMOVE THE TOP 1/3 OF THE BURLAP FROM THE ROOT BALL WITHOUT DISTURBING THE ROOTS. 8. FACE EACH PLANT TO GIVE THE BEST APPEARANCE. 9. DO NOT STAKE THE TREES UNLESS DIRECTED BY THE OWNER. 10. FILL PLANT PITS 2/3 THEIR DEPTH WITH PREPARED PLANTING MIXTURE, WATER THOROUGHLY AND ALLOW TO SETTLE. COMPLETE BACK -FILLING, WATER THOROUGHLY TO ELIMINATE ANY VOIDS AND AIR POCKETS. PROVIDE ADDITIONAL BACK -FILL AS NECESSARY TO CONFORM TO REQUIRED ELEVATION AND AS DETAILED. 11. FORM SAUCER AND INSTALL MULCH OVER ENTIRE PLANT PIT AND SAUCER AREA AS DETAILED. 12. 3 INCHES SHREDDED HEMLOCK BARK MULCH OR EQUAL 'SHALL BE USED AROUND ALL TREES AND SHRUB PLANTINGS. 13. ALL PLANTS AND TREES SHALL BE GUARANTEED FOR A PERIOD OF ONE FULL YEAR`. AFTER INSPECTION AND ACCEPTANCE BY THE OWNER'S REPRESENTATIVE, AND SHALL HAVE AT LEAST 80% HEALTHY GROWTH AT THE END OF THE GUARANTEE PERIOD. I J 1'-0" (MIN.) RIP RAP CHECK DAM & SEDIMENT CLEANOUT POOL NOT TO SCALE SILT F' FILTER EMBED FILTER 3" MIN. INTO TTOM OF SWAI H EROSION PROTECTION NOT TO SCALE 1. PRIOR TO THE INSTALLATION OF ANY EROSION AND SEDIMENT CONTROL MEASURES, THE OWNER AND CONTRACTOR SHALL MEET WITH THE TOWN OF MONTVILLE ZONING/WETLANDS OFFICER. 2. THE EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED PRIOR TO SITE DISTURBANCE AS SHOWN ON SHEET 1, ADDITIONAL EROSION & SEDIMENT CONTROL MEASURES SHALL BE INSTALLED IF DETERMINED NECESSARY BY THE ZONING/WETLANDS OFFICER. 3. THE CONTRACTOR SHALL CONTACT THE WETLANDS OFFICER FOR INSPECTION OF THE SEDIMENT AND EROSION CONTROL MEASURES, PRIOR TO SITE DISTURBANCE. CONSTRUCTION SHALL NOT BEGIN UNTIL SUCH TIME AS THE ZONING/WETLANDS OFFICER HAS REVIEWED AND AP'P'ROVED THE INSTALLATION OF THE SEDIMENTATION AND EROSION CONTROL MEASURES. 4. CONTRACTOR TO INSPECT ALL EROSION AND SEDIMENT CONTROL MEASURES AT LEAST WEEKLY AND AFTER EVERY STORM EVENT AND REPAIR AND MAINTAIN AS NECESSARY. 5. THE LIMIT OF THE 50 FOOT UPLAND REGULATED AREA SHALL BE STAKED OUT BY A LICENSED SURVEYOR. 6. PEFORM MAINTENANCE ON THE TWO EXISTING SEDIMENT BASINS SHOWN ON SHEET 4 AND CONSTRUCT NEW OUTLETS FOR THOSE BASINS. 7. ALL STOCKPILES LOCATED WITHIN THE UPLAND REGULATED AREA SHALL BE REMOVED. 8. ALL MANMADE EARTH BERMS AND SWALES SHALL BE REMOVED FROM WITHIN THE UPLAND REGULATED AREA. 9. REMOVE FILL SOILS FROM THE WETLANDS UNDER DIRECTION OF THE SOIL SCIENTIST. RETAIN IN PLACE EXISTING WETLAND TOPSOIL. 10. MATCH NATURAL EXISTING GRADES ALONG THE PERIMETER OF THE DISTURBANCE, ADJACENT TO THE WETLANDS, AND THEN GRADE THE AREA WITHIN THE UPLAND REGULATED AREA FAIRLY LEVEL MAINTAINING A 1% SLOPE. 11. GRADE WATER QUALITY SWALES AND BASINS, WITH OUTLETS AND CHECK DAMS AS SHOWN ON THESE PLANS. 12. INSTALL 12" OF TOPSOIL WITHIN ANY AREA OF WETLAND DISTURBANCE IF SOIL SCIENTIST DEEMS NECESSARY 13. INSTALL 4" OF TOPSOIL WITHIN THE DISTURBED UPLAND REGULATED AREA. 14. PLANT ALL TREES, SHRUBS, AND PLUGS AS SHOWN ON THESE PLANS. THE SOIL SCIENTIST WILL OVERSEEPLANTINGS AND CHOOSE LOCATIONS. 15. INSTALL RESTORATION SEED MIX TO ALL DISTURBED AREAS. 16. INSTALL STRAW MULCH ON ALL DISTURBED AREAS. 17. PLACE BOULDERS 10' ON CENTER ALONG THE BORDER OF THE UPLAND REVIEW AREA, OR ALONG EDGE OF VEGETATED SWALE, AS MAY APPLY AND AS SHOWN ON THESE PLANS. 18. UPON COMPLETION OF WORK, CALL TOWN WETLANDS OFFICER FOR INSPECTION,. 19. UNFORESEEN PROBLEMS WHICH ARE ENCOUNTERED IN THE FIELD SHALL BE SOLVED ACCORDING TO CONNECTICUT GUIDELINES FOR SOIL EROSION AND SEDIMENT CONTROL. DO NOT HEAVILY PRUNE THE TREE AT PLANTING. PRUNE ONLY CROSSOVER LIMBS CO -DOMINANTLEADERSANDBROKENOR59bBRANCHES. SOME INrTERIOR TWIGS AND LATERAL BRANCHES MAY BE PRUNED- HOWEVER DO NOT REMOVETHETERMINALBADSOFi&QHES THAT EXTEND TO THE EDGE OF THE CROWN. STAKE TREES ONLY UPON THE APPROVAL OF THE LANDSCAPE ARCHITECT WRAP TREE TRUNKS ONLY UPON THE APPROVAL OF THE LANDSCAPE ARCHITECT. 91 LEVEL SPREADER TO BE 6" LOWER THAN TOP OF BASIN BERM 18 Sacha.tello Industrial Drive STOR 1WATER SYSTEM MAINTENANCE Maintenance Schedule for Stormwater Basins* Activity Schedule For the Basins and side slopes, inspect for invasive vegetation. Annual _- OBL inspection Inspect for damage, undercut, or eroded area Annual Monitor for sediment accumulation inspection Repair undercut or eroded areas. As needed 18 Sachatello Industrial Drive maintenance Clean and remove debris from basins, and their inlets and outlets Lurid Sedge Inspect and clean debris and sediments I Clean and remove debris from the riprap level spreaders & Semi -animal stone.'NN-oodchip berms Holler Lombardi Land Holdings, LLC Mow side slopes once per year. High vegetation along basin edge 1 Fowl Bluegrass will discourage waterfowl from taking up residence and serve to filter Lot S Combination & ReconfigurationDate. pollutants. Beggar Ticks Provide report to the Town of Montville after each of the first two years after completion. Plant survival shall be 70% or greater after the first year and 80° o or greater after the second year. Maintenance Schedule for Vegetated Swale Activity Schedule Inspection for sediment buildup and erosion Semi -annual Repair undercut or eroded areas As needed maintenance E• Clean and remove debris from check darns./pools Frequent (3-4 times year) maintenance 10' s" MIN. LEVEL SPREADER NOT TO SCALE INTERMEDIATE RIPRAP f..... \ 1Alf%r%r% f%LIIRC` Air%r%ir"i= 0100Ad MARK THE NORTH SIDE OF THE TREE_, IN THE NURSERY, AND ROTATE TREE EACH TREE MUST BE PLANTED SUCH THATTOFACENORTHATTHESITEWHENEVERTHETRUNKFLAREISVISIBLEATTHETOPPOSSIBLE. OI THE ROOT BALL. TREES WHERE: THE TRUNK MULCH RING is NOT VISIBLE SHALL BE IdEJECTED. SET TOP OF ROOT FLUSH TO 1800 M I FT.} DU` 1. MIN, NOT COVER THE TOP OF THE ROOT GRADE OR 25-50 MM 1-2 IN.) LS 400 MM 8 DIAbA PREFERRED SOIL HIGHER IN SLOWLY ING SO] lS. 200 MM (8 IN.) r r r r r r r r r? rsrr r t r r ? ? rrr ± r ? ? ? r r sr rrrr? rrrr 10MM (4 IN. HIGH EARTH SAUCER 50 MM 2 IN. MULCH. DO NOT PLACE ? rrrr; r ? rrr rr? rsrr??? B'YOND tDGE F ROOT FALL. MULCH i CONTACT WITH TREE TRUNK. r r r r r r r r r ? r r MAINTAIN THE MULCH WEED -FREE FOR rrrrr}rrr?' r?? r ? ?rrr r ? r ? r r r r rrr i r ?REMOVE ALL TWINE, ROPE AND WIRE, AND A MINIMUM OF THREE YEARS AFTER r? r r rrr r r r r r r r r r r r r r r r r r? BURLAP FROM TOP HALF OF ROOT BALL PLANTING. ? r r ? ? r ?rrrr r rrr ? s IF PLANT IS SHIPPED WITH A WIRE BASKET AROUNDTHEROOTBALLCUTTHEWIREETINFOURPLACESANDFOLD200MM (8 IN.) PLANTING HOLE. PLACE ROOT BALL ON UNEXCAVATEDORTAMPEDSOIL TAMP SOIL AROUND ROOT BALLBASEFIRMLYWITHFOOTPRESSURE SO THAT ROOT BALL DOES NOT SHIFT. TREE PLANTING DETAIL NOT TO SCALE I" V I" V A' FAKES BALE OIL STAKES - TWO BALE (TYP.) oNSTRUCTION NOTES: SILT FENCE FILTER CLOTH TO BE SECURELY FASTENED TO GRADE STAKE WITH STAPLES, 6" ON CENTER. WHEN TWO SECTIONS OF FILTER CLOTH ADJOIN ONE ANOTHER THEY SHALL OVERLAP BY 6" AND BE FOLDED. 3. BALES SHALL BE PLACED IN A ROW WITH ENDS TIGHTLY ABUTTING THE ADJACENT BALES. STONE / WOODCHIP CHECK A NOT TO SCALE I 18f1' 4" LOAM & SEED MIX LINE WITH NORTH AMERICAN GREEN 51 S-150 EROSION MATS PERMANENT VEGETATED SWALE NOT TO SCALE 4 STAPLES AT START END OF ROLL AND S AT W INITFRVAI S AS EROSION CONTROL MATTING NOT TO SCALE Chesterf I e [d C1 Davis 0S Pond 1 a' R-80 Z Ll X SCALE: 1 "=1000' 820 WEST STREET, AMHERST, MA 01002 PHONE: 413-548-8000 FAX 413-549-4000 EMAIL: INFO@NEWP.COM WEB ADDRESS: WWW..NEWP.COM New Eggland Wetm ix(Wetland Seed Mix) Botanical Name Common Name Indicator - Carex vulpinoidea Fox Sedge OBL 3 10/31118 Address Review Comments Carex scoparia Blunt Broom Sedge FACW Revision. 860) 892-1880 Fax (860) 886--91.85 18 Sachatello Industrial Drive Project No. Carex lurida Lurid Sedge OBL I Carex lupulina Hop Sedge OBL Holler Lombardi Land Holdings, LLC Poa palustris 1 Fowl Bluegrass FACW Lot S Combination & ReconfigurationDate. Bidensfrondosa Beggar Ticks FACW Uj Scirpus atrovirens Green Bulrush OBL i Asclepias incarnata I Swamp Milkweed OBL Details Carex crinita I Fringed Sedge OBL Verzonia noveboracensis New York Ironweed 1 FACW+ Juncus ofesus Soft Rush FACW+ Aster lateriflorus (Symphyotrichum lateriflorum) Starved/Calico AsterI FACW Iris versicolor Blue Flag OBL Glviceria Tndis American Mannagrass I OBL 14irnarlus ringens Square Stemmed Monkey Flower i OBL Eupatorium maculatum (Eutrochium maculatum) Spotted Joe Pye Weed OBL Lake onomoa PRICE PER LB. 5135.00 MIN. QUANITY 1 LBS. TOTAL: $135.00 APPLY: 18 LBS/ACRE :2500 sq ft/Ib The New England Wetmix (Wetland Seed Mix) contains a wide variety of native seeds that are suitable for most wetland restoration sites that are not permanently flooded. All species are best suited to moist ground as found in most wet meadows, scrub shrub, or forested wetland restoration areas. The mix is well suited for detention basin borders and the bottom of detention basins not generally under standing water. The seeds will not germinate under inundated conditions. If planted during the fall months the seed mix will germinate the following spring. During the first season of growth several species will produce seeds while other species will produce seeds after the second growing season. Not all species will grow in all wetland situations. This mix is comprised of the wetland species most likely to grow in created/restored wetlands and should produce more than 75% ground cover in two full growing seasons. The wetland seeds in this mix can be sown by hand, with a hand-held spreader, or hydro -seeded on large or hard to reach sites. Lightly rake to insure good seed -to -soil contact. Seeding can take place on frozen soil, as the freezing and thawing weather of late fall and late winter will work the seed into the soil. If spring conditions are drier than usual watering may be required. If sowing during the summer months supplemental watering will likely be required until germination. A light mulch of clean, weed free straw is recommended. New England Wetland Plants, Inc. may modify seed mixes at any time depending upon seed availability. The design criteria and ecological function of the mix will remain unchanged. Price is $/bulk pound, FOB warehouse, Plus SH and applicable taxes. EROSION CONTROL MATTING SHALL BE NORTH AMERICAN GREEN S-150 EROSION MAT GREEN SITE DESIGN LLC 317 Main Street Norwich, Connecticut 3 10/31118 Address Review Comments 2 10/23/'18 Address Review Comments No. hate Revision. 860) 892-1880 Fax (860) 886--91.85 18 Sachatello Industrial Drive Project No. Town of Montville Connecticut GSD -51 Ati11tl,ct,ttt.f Prof. Engineer E Holler Lombardi Land Holdings, LLC E.M.B. 09/29/18LotSCombination & ReconfigurationDate. Uj Lombardi Business Park sheet No. GfS?P 5FSJONDetails4