HomeMy WebLinkAboutInspection Report 10032016Town of Montville Inspection Report
Date: 10/3/2016 Inspection Type: Wetlands Complaint
Follow Up
Location: 260 Cherry Hill Road Map/Lot: M53 L1-A
Parties
Present
Choose
an
item.
Choose
an
item.
Choose
an
item.
Choose
an
item.
Choose
an
item.
Other: Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Yes No
CO Approved ☐ ☒
Comments/Observations
Resolution Date: 10/3/2016
10/03/16 – 12 pm On-site inspection with NDPU Mark Decker, Water & Wastewater Integrity Manager, Mark
Gaudette, Utility Engineer, NDPU Consultant Paul Burgess, Commercial Construction Group, LLC/Generators
On Demand, Swaney (Responsible Party), Swaney Consultant, Don Fortunato, C.S.S. & Town Consultant, Bob
Russo, C.S.S.
Paul Burgess states he is recommending to NDPU it enter the Voluntary Remediation Program through DEEP in
order for it to obtain an official sign-off.
Conducted a site walk with Burgess, Fortunato, Swaney & Russo (1:00pm). Observed post-excavation
conditions. Fortunato confirmed areas excavated to remove contaminated soils are wetlands areas. Burgess
& Fortunato recommend further excavation to remove contamination – still odor of diesel fuel in soil.
Additional excavation work will be performed on Tuesday, 10/04/16.
Walked site past excavated areas that were contaminated with diesel fuel, but not able to be excavated due to
very wet soils & stream. Booms and absorbent pads were observed at intervals along the stream. Sandbag
dam had been constructed at area of stream prior to Stony Brook. Water clean – no sheen or oil detected past
this point and additional booms had been installed at the intersection of the stream with Stony Brook.
However, absorbent pads need to be place in stream as pockets of oil were detected up to the area of the
dam. Swaney will install additional absorbent pads already on site.
Reviewed next steps with Fortunato, Swaney & Russo. Additional absorbent pads to be placed in pockets of
stream from excavated areas to dam area by Swaney. Additional excavation work to further remove
contaminated soils will be performed 10/4/16 and areas to be seeded with wetlands seed mix to temporarily
stabilize soil. A plan for wetlands restoration shall be prepared and submitted to the Montville Wetlands
Commission.
Open soils remediation/wetlands restoration project.
Town of Montville Inspection Report
Boom in stream past excavated areas.
Dam at area of stream (below contaminated
areas) where water running clean – installed
Sun, 10/2/16 by Environmental Services, Inc.
Town of Montville Inspection Report
Boom at intersection of Stony Brook downstream
from dam area.
Boom at intersection of Stony Brook.