Loading...
HomeMy WebLinkAboutPlanSOIL EROSION & SEDIMENT CONTROL NARRATIVE PROJECT DESCRIPTION: CONSTRUCTION OF 1 PROPOSED HOUSE, SEPTIC SYSTEM, DRIVEWAY, SITE GRADING AND LANDSCAPING}. GENERAL SEQUENCE: 1. INSTALLATION OF EROSION & SEDIMENT CONTROL MEASURES AS SHOWN ON PLAN FOR INDIVIDUAL HOUSE CONSTRUCTION. 2. CLEARING AND GRUBBING AS REQUIRED. 3. STRIP AND STOCKPILE TOPSOIL WITHIN LIMITS OF DISTURBED AREA AND RING WITH STAKED HAYBALES OR SILT FENCE. 4. CONSTRUCTION OF HOUSE, DRIVEWAY AND SEPTIC SYSTEM. 5. FINAL GRADING AND LANDSCAPING. GENERAL NOTES: 1. ALL PROPOSED WORK SHALL CONFORM TO STANDARDS SET FORTH IN THE "CONNECTICUT GUIDELINES FOR SOIL EROSION AND SEDIMENT CONTROL". 2, PRIOR TO CONSTRUCTION OR EXCAVATION, EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED IN LOCATIONS AS SHOWN ON PLAN AS REQUIRED AND MAINTAINED THROUGHOUT CONSTRUCTION. 3. SEDIMENT SHALL BE PERIODICALLY REMOVED FROM UPHILL SIDE OF HAYBALE BARRIERS AND RESPREAD OVER SLOPE. DAILY INSPECTIONS SHALL BE MADE OF EROSION AND SEDIMENT CONTROLS. INSPECTIONS TO INSURE EFFECTIVENESS AND IMMEDIATE CORRECTIVE ACTION SHALL BE TAKEN IF FAILURE OCCURS. 4. EROSION AND SEDIMENT CONTROL MEASURES SHALL REMAIN IN PLACE UNTIL DISTURBED AREAS HAVE BEEN STABILIZED AND VEGETATION COVER HAS BEEN ESTABLISHED, 5. DISTURBED AREAS SHALL BE FINAL GRADED AS SOON AS POSSIBLE AFTER EXCAVATION. FINAL GRADING SHALL INCLUDE REMOVAL OF LARGE ROCKS, STUMPS AND OTHER DEBRIS FROM THE FINISHED SURFACE. UPON FINAL GRADING, DISTURBED AREAS SHALL BE LOAMED WITH PREVIOUSLY STOCKPILED MATERIAL AND SEED. 6. PRIOR TO SEEDING, APPLY LIMESTONE AT THE RATE OF 90 LBS. PER 1000 SF AND FERTILIZE WITH 10-w0-10 AT THE RATE OF 7.5 LBS PER 1000 SF AND WORK INTO SOIL TO A DEPTH OF 4 7. APPLY GRASS SEED MIXTURE BY HAND, CYCLONE SEEDER OR HYDRO SEED. SEEDING SHOULD BE SOWN BETWEEN APRIL 1 AND JUNE 1 OR AUGUST 15 AND SEPTEMBER 15. IF SEEDING CANNOT TAKE PLACE BETWEEN THESE DATES, IMPLEMENT MULCHING PROCEDURES UNTIL SUCH TIME AS SEEDING CAN TAKE PLACE. 8. IMMEDIATELY AFTER SEEDING, MULCH THE SEEDED AREA WITH HAY OR STRAW AT THE RATE OF 1.5 TO 2 TONS PER ACRE. MULCH SHALL BE ANCHORED BY TRACK MACHINE OR MULCH ANCHORING MACHINE. 9. IT SHALT., BE THE RESPONSIBILITY OF THE OWNER OF THE PROPERTY TO IMPLEMENT THIS EROSION AND SEDIMENT CONTROL PLAN. THIS RESPONSIBILITY INCLUDES THE INSTALLATION AND MAINTENANCE OF CONTROL MEASURES, INFORMING ALL PARTIES ENGAGED ON THE CONSTRUCTION SITE OF THE REQUIREMENTS AND OBJECTIVE OF THIS PLAN, NOTIFYING THE PLANNING AND ZONING COMMISSION OF ANY TRANSFER OF THIS RESPONSIBILITY AND FOR CONVEYING A COPY OF THIS EROSION AND SEDIMENT CONTROL PLAN IF TITLE TO THE LAND IS TRANSFERRED. SEPTIC NOTA l,,cc* 1. ALL DISTURBED AREAS TO BE STABILIZED (SEE EROSION & SEVIMENT CONTROL NOTES). 2. IT IS THE RESPONSIBILITY OF THE INSTALLER (LIC. SEPTIC CONTRACTOR) TO CONSTRUCT THE SANITARY SYSTEM AS SHOWN ON THE FINAL APPROVED PLAN WITHOUT REVISIONS UNLESS PRIOR APPROVAL IS OBTAINED FROM BOTH THE DESIGNING ENGINEER AND THE UNCAS HEALTH DISTRICT. 3. IF TTIT INSTALLER FINDS CONDITIONS WORSE THAN THOSE SHOWN ON THE PLAN, ALL WORK SHALL BE STOPPED IMMEDIATELY AND THE ENGINEER AND THE HEALTH DISTRICT CONTACTED FOR REVISIONS. 4. THE CONSTRUCTION OF THE SANITARY DISPOSAL SYSTEM AND ITS COMPONENTS SHA:,L COMPLY IN ALL RESPECTS WITH l-liE LATEST REVISION OF SECTION 19-13-B 103a THROL'JA 19-13-B 103p OF THE PUBLIC HEALTH CODE OF' THE STATE OF CONNECTICUT AND OTHEF: TECHNICAL STANDARDS FOR THE DESIGN AND CONSTRUCTION OF SUBSURFACE SEWAGE DISPOSAL SYSTEMS. 5. PIPE FROM THE HOUSE TO THE SEPTIC TANK AND PIPE WITHIN 25 FEET OF ANY UNDERDRAIN OR FOOTING DRAIN SHALL BE EXTRA HEAVY CAST IRON OR EQUAL. DISTRIBUTION PIPES TO BE SDR -35 3033, 3034 OR EQUAL. 6. THE AREA OF THE LEACHING SYSTEM SHALL BE STRIPPED OF ALL TOPSOIL AND REPLACED WITH CLEAN BANK RUN SAND OR GRAVEL COMPACTED IN 6" LIFTS. REMOVAL OF TOP;;OIL AND PLACEMENT OF FILL SHALL EXTEND A MINIMUM OF 10 FEET BEYOND THE LEACHING FIELD LIMITS. THE BOTTOM OF THE LEACHING FIELD SHALL BE NO DEEPER THAN 14" E ELOW ORIGINAL GRADE. A MINIMUM OF 6" OF TOPSOIL SHALL BE PLACED OVER THE SYSTEM r 7. FILL MATERIAL TO BE CLEAN BANK RUN SAND OR GRAVEL CONTAINING NO MORE THAN 5% FINE MATERIALS. (MATERIALS WHICH WILL PASS THE #200 SEIVE). 8. IF THE OIL TANK IS TO BE BURIED OUTSIDE THE FOUNDATION IT MUST BE LOCATED A qINTMUM OF 75 FEET FROM ALL WELLS. 9. SEPTIC TANK IS REQUIRED TO HAVE AN OUTLET FILTER INSTALLED ON THE CUTLET B 4FFLE. 10. HOUSE, WELL AND SEPTIC SYSTEM TO BE FIELD STAKED BY A CONNECTICUT LICENSED LAND SURVEYOR PRIOR TO CONSTRUCTION. 11 ADDITIONAL SOIL TESTING MAY BE REQUIRED AT TIME OF CONSTRUCTION. LEGEND w PROPERTY LINE BUILDING SETBACK LINE STONEWALL EXISTING CONTOUR LINE PROPOSED CONTOUR LINE ANGLE POINT CONCRETE MONUMENT SOIL TEST HOLE LOCATION SOIL PERCOLATION TEST LOCATION UTILITY POLE EXISTING SPOT ELEVATION SILT FENCE OR HAYBALES SOIL TESTING SOII, TESTING CONDUCTED ON 2-25-2004 BY THE UNCAS HEALTH DISTRICT TEST HOLE TH-1 TEST HOLE TH-2 0-14" FILL 0-12" FILL 14% 19" TOP SOIL 12"- 18" TOP SOIL 19" -45" BROWN SANDY LOAM 18" -37" BROWN SANDY LOAM 45" -96" GRAY MEDIUM COMPACT SANDY TILL 3 T' -61 " GRAY MEDIUM COMPACT SANDY TILL NO LEDGE, MOTTLING @ 4511(3 1 0% NO GROUNDWATER LEDGE @ 61", NO MOTTLING, NO GROUNDWATER TEST HOLE TH-3 TEST HOLE TH-4 0"- 9" TOP SOIL 0"- 7" TOP SOIL 9" -32" BROWN SANDY LOAM 7" -30" BROWN SANDY LOAM 32" -82" GRAY MEDIUM COMPACT SANDY TILL 30" -75" GRAY MEDIUM COMPACT SANDY TILL NO LEDGE, NO MOTTLING, NO GROUNDWATER NO LEDGE, NO MOTTLING, NO GROUNDWATER MLSS CALCULATIONS FLOW FACTOR (FF) - 4 BEDROOM HOUSE = 2.0 PERCOLATION TEST # 1 TIME READING (INCHES) 11:52 4.0 12:01 9.0 12:08 12.0 12:21 15.25 PERC RATE = 4 MIN, /IN. PERCOLATION FACTOR (PF) - 4 MIN./1N. = 1.0 N/F KARL E. & HYDRAULIC FACTOR (HF) - RESTRICTIVE LAYER @ 32tv, 15+% SLOPE = 18 JACQUELINE L. BECKER MLSS = 2.0 (FF) x 1.0 (PF) x 18 (HF) 36.0' VOL. 91 / PG. 584 MLSS PROVIDED 75' (MUNICIPAL SEWER & WATER) = N 11046'42" -- now .00'mom o /g - f lir ""'►n" , � / '� ; r X11.6 N/F MICHAEL S.l A & l I I I VICTORIA B. SPOONER 1 VOL. 185 / PG. 244 / MUNICIPAL SEWER & WATER` (MUNI ) a' i Q' x 70. / a N I x' 6.5 VI T TIMOTHY J. RIORDAN 1' . x 72.2, VOL. 408 / PG. 189 f / / / : ; j ` J ; y x 83 MUNICIPAL SEWER & WATER / (Mf CLEARING} / f / '� ; ' /' • ,- / - LIN&S MF ' Yc , .✓ 26' PVC 4" ` r / �AS'TM 131785/ II � ft 1 40.0' s i v. is ' tl. ',, � 7 I � t� � � �• � I frilj r!f ! f r r, 1 I 1 ,r`t wf ff p j 1ter r� �1/ ��frl r i r" f , N i i ,!' / � , , , ,` ' 1 i� JJII} �rl , , N/F RICHARD D. JOHNSON ...I ! . ' J ` g _ FOOTLING DRAIN VOL. 382 /PG. 113 vvlT>=f RD-RAPi 1 r g x`TENTION BASIN (MU'NICIPAL SEWER & WATER) NOT srWT xAvALt rosxw PlSrAU .AS .R+ 404 P" rV t /NTO CROL D u.uN r W reeft CiMt7A! r cows r*UCro w HA YSALE I ROSION BARRIER DETAIL (Nor M SCALF) upvu ADF DOWMLL SVC N DATE: ANCL£ sr,Axrs , 4-14-2004 # 40 CEDAR LANE /0•U+.Aapt MONTVILLE, CONNECTICUT � fZ7YR ST.4FKJlY 1, /%C 1' IFl�G1d Q4 PROJECT NO. 04-100 - AAMAL srAX[s RL 7M FAMYC (A T7.OY0 t'�v.Ax) VACCO Ar 10' Ar uCsH 5wptwr INTERVALS (VAX.) sro ovc D/Rt'c77av Axl "f, I £a or Row SAClrFLL CXrEHo e' or /7L r" ,CA8*1C /Nrte CXr A VA 7E„1 L r t 6,.r S' TRENCJ, PLAY FABRK cw Lp-,,ALL srte N"11 kMf FABRIC CURLED TOWA" X24 T FENCE OCrAIL (Nor rn =4Lz) ANTIALLY CORRECT G. GRUSSY, P.E. #11654 , `<a®\wktllrt!ffir OF COI 1A e� L ATE CROSS SECTION A -A NOTES BROWN �,`f tY� Vr CEDAR LOCUS 2A BMW LANE 433 VER LOCATION MAP SCALE: NTS 1. THIS SURVEY AND MAP HAS BEEN PREPARED PURSUANT TO THE REGULATIONS OF CONNECTICUT STATE AGENCIES SECTION 20-300b-1 THROUGH 2O -300b-20 AND THE "STANDARDS FOR SURVEYS AND MAPS IN THE STATE OF CONNECTICUT" AS ADOPTED BY THE CONNECTICUT ASSOCIATION OF LAND SURVEYORS, INC. ON SEPTEMBER 26, 1996. 2, THIS IMPROVEMENT LOCATION SURVEY IS A DEPENDENT RESURVEY AND CONFORMS TO THE STANDARDS OF A "C" CLASS SURVEY. PROPERTY LINE INFORMATION BASED ON REFERENCED DEED AND MAP 3. CONTOUR LINES SHOWN HEREON ARE AT TWO FOOT INTERVALS AND ARE BASED ON AN ASSUMED VERTICAL DATUM OF 100 FEET. TOPOGRAPHIC INFORMATION DERIVED FROM ACTUAL GROUND SURVEY. 4. TOTAL AREA OF PARCEL EQUALS 0.85 +/- ACRES. 5. THIS SURVEY AND MAP DOES NOT INCLUDE THE LOCATION OF UNDERGROUND UTILITIES AND / OR STRUCTURES. 6. PROPERTY LOCATED IN A RESIDENTIAL (R-20) ZONING DISTRICT. 7. DRIVEWAY TO BE INSTALLED IN ACCORDANCE WITH THE TOWN OF MONVILLE DRIVEWAY ORDINANCE, REGULATIONS, STANDARDS AND / OR REQUIREMENTS. 8. THERE ARE NO INLAND WETLANDS OR WATERCOURSES ON THIS PROPERTY. 9. PROPERTY IDENTIFIED ON THE TOWN OF MONTVILLE TAX ASSESSORS MAP 106 AS LOT 48. 10. REFERENCE DEED: TOWN OF MONTVILLE LAND RECORDS VOLUME 305 ON PAGE 92. MAP REFERENCES 1 . MAP ENTITLED " MAP SHOWING SUBDIVISION OF ALFRED RAAB, TOWN OF MONTVILLE 'CALE: 1 "=40', JUNE 1961 ". PREPARED BY: FRANCIS J. LEONARD, L. S. 1 1j INVERT ELEVATIONS TOP OF FOUNDATION (MIN.) = 91.00 j 1 SEWER LINE MIN. IlN7vrERT AT FOUNDATION = 83.25 j INVERT TANK IN = 82,50 I INVERT TANK OUT = 82.75 D -BOX 1 IN s 81.00 D -BOX 1 OUT = 81.17 TO MY KNOWLEDGE AND BELIEF, THIS MAP IS SUBSTANTIALLY CORRECT CA. �'f� AS NOTED HEREON #70064 -he Y_ 7 4-�l f/,1,\ H. SULLIVAN, L.S. #70064 DATE 'THIS M # AP IS NOT VALID WITHOUT A LIVE SIGNATURE AND EMBOSSED SEAL �'f�1lltrrrr,�ti111��` BOTTOM OF TRENCH 1 = 81.00 D -BOX 2 IN = 80.00 D -BOX 2 OUT = 80.17 BOTTOM OF TRENCT 2 = 80.00 D -BOX 3 IN / OUT = 79.00 BOTTOM OF TRENCF' 3 = 79.00 DEPTH OF RESTRICT; VE LAYER = 32" IN ORIGINAL GRADE THE BOTTOM OF THF, LEACHING TRENCH NOT TO BE INSTALLED MORE THAN 14" INTO EXISTING GRADE BAR SCALE 0' 20' 40` 60' SCALE: V = 20' DATE I REVISION 4' TOPSOIL FILTER FABRIC SUITABLE FILL ao 2' 4' PERFORATED PIPE o "a o N 4' TRENCH CRESS SECTION NOT TO SCALE 2X2 5/8 16 GA. WIRE MESH M •' A'7 O 4' PVC ELBOW (CUT FOR 4' OVERFLOW) STANDARD D -BOX W/ELBOW NOT TO SCALE w SEPTIC DESIGN PLAN PREPARED FOR N DATE: .r 4-14-2004 # 40 CEDAR LANE •4 MONTVILLE, CONNECTICUT � .` 1, MARK H. SULLIVAN, L.S., C.P.S.S. PROJECT NO. 04-100 LAND SURVEYING AND ENVIRONMENTAL CONSULTING, LLC 20-20 PHILLIPS ROAD PHONE (860) 376-8525 CD LISBON, CT 06351 FAX (860) 376-3855 04-100 STANDARD D -BOX W/ELBOW NOT TO SCALE w SEPTIC DESIGN PLAN PREPARED FOR CENTER ROAD ASSOCIATES, LLC DATE: 4-14-2004 # 40 CEDAR LANE DRAWN BY: MONTVILLE, CONNECTICUT MHS SCALE: 1 "= 20' MARK H. SULLIVAN, L.S., C.P.S.S. PROJECT NO. 04-100 LAND SURVEYING AND ENVIRONMENTAL CONSULTING, LLC 20-20 PHILLIPS ROAD PHONE (860) 376-8525 DRAWING NO, LISBON, CT 06351 FAX (860) 376-3855 04-100