PROJECT DESCRIPTION:
CONSTRUCTION OF 1 PROPOSED HOUSE, SEPTIC SYSTEM, DRIVEWAY, SITE GRADING AND LANDSCAPING}.
GENERAL SEQUENCE:
1. INSTALLATION OF EROSION & SEDIMENT CONTROL MEASURES AS SHOWN ON PLAN FOR INDIVIDUAL HOUSE CONSTRUCTION.
2. CLEARING AND GRUBBING AS REQUIRED.
3. STRIP AND STOCKPILE TOPSOIL WITHIN LIMITS OF DISTURBED AREA AND RING WITH STAKED HAYBALES OR SILT FENCE.
4. CONSTRUCTION OF HOUSE, DRIVEWAY AND SEPTIC SYSTEM.
5. FINAL GRADING AND LANDSCAPING.
GENERAL NOTES:
1. ALL PROPOSED WORK SHALL CONFORM TO STANDARDS SET FORTH IN THE "CONNECTICUT GUIDELINES FOR SOIL EROSION AND
SEDIMENT CONTROL".
2, PRIOR TO CONSTRUCTION OR EXCAVATION, EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED IN LOCATIONS
AS SHOWN ON PLAN AS REQUIRED AND MAINTAINED THROUGHOUT CONSTRUCTION.
3. SEDIMENT SHALL BE PERIODICALLY REMOVED FROM UPHILL SIDE OF HAYBALE BARRIERS AND RESPREAD OVER SLOPE. DAILY
INSPECTIONS SHALL BE MADE OF EROSION AND SEDIMENT CONTROLS. INSPECTIONS TO INSURE EFFECTIVENESS AND IMMEDIATE
CORRECTIVE ACTION SHALL BE TAKEN IF FAILURE OCCURS.
4. EROSION AND SEDIMENT CONTROL MEASURES SHALL REMAIN IN PLACE UNTIL DISTURBED AREAS HAVE BEEN STABILIZED AND
VEGETATION COVER HAS BEEN ESTABLISHED,
5. DISTURBED AREAS SHALL BE FINAL GRADED AS SOON AS POSSIBLE AFTER EXCAVATION. FINAL GRADING SHALL INCLUDE REMOVAL
OF LARGE ROCKS, STUMPS AND OTHER DEBRIS FROM THE FINISHED SURFACE. UPON FINAL GRADING, DISTURBED AREAS SHALL BE
LOAMED WITH PREVIOUSLY STOCKPILED MATERIAL AND SEED.
6. PRIOR TO SEEDING, APPLY LIMESTONE AT THE RATE OF 90 LBS. PER 1000 SF AND FERTILIZE WITH 10-w0-10 AT THE RATE OF 7.5 LBS
PER 1000 SF AND WORK INTO SOIL TO A DEPTH OF 4
7. APPLY GRASS SEED MIXTURE BY HAND, CYCLONE SEEDER OR HYDRO SEED. SEEDING SHOULD BE SOWN BETWEEN APRIL 1 AND JUNE 1
OR AUGUST 15 AND SEPTEMBER 15. IF SEEDING CANNOT TAKE PLACE BETWEEN THESE DATES, IMPLEMENT MULCHING PROCEDURES
UNTIL SUCH TIME AS SEEDING CAN TAKE PLACE.
8. IMMEDIATELY AFTER SEEDING, MULCH THE SEEDED AREA WITH HAY OR STRAW AT THE RATE OF 1.5 TO 2 TONS PER ACRE. MULCH
SHALL BE ANCHORED BY TRACK MACHINE OR MULCH ANCHORING MACHINE.
9. IT SHALT., BE THE RESPONSIBILITY OF THE OWNER OF THE PROPERTY TO IMPLEMENT THIS EROSION AND SEDIMENT CONTROL PLAN.
THIS RESPONSIBILITY INCLUDES THE INSTALLATION AND MAINTENANCE OF CONTROL MEASURES, INFORMING ALL PARTIES ENGAGED
ON THE CONSTRUCTION SITE OF THE REQUIREMENTS AND OBJECTIVE OF THIS PLAN, NOTIFYING THE PLANNING AND ZONING
COMMISSION OF ANY TRANSFER OF THIS RESPONSIBILITY AND FOR CONVEYING A COPY OF THIS EROSION AND SEDIMENT CONTROL
PLAN IF TITLE TO THE LAND IS TRANSFERRED.
SEPTIC NOTA
l,,cc*
1. ALL DISTURBED AREAS TO BE STABILIZED (SEE EROSION & SEVIMENT CONTROL NOTES).
2. IT IS THE RESPONSIBILITY OF THE INSTALLER (LIC. SEPTIC CONTRACTOR) TO CONSTRUCT
THE SANITARY SYSTEM AS SHOWN ON THE FINAL APPROVED PLAN WITHOUT REVISIONS
UNLESS PRIOR APPROVAL IS OBTAINED FROM BOTH THE DESIGNING ENGINEER AND THE
UNCAS HEALTH DISTRICT.
3. IF TTIT INSTALLER FINDS CONDITIONS WORSE THAN THOSE SHOWN ON THE PLAN, ALL
WORK SHALL BE STOPPED IMMEDIATELY AND THE ENGINEER AND THE HEALTH
DISTRICT CONTACTED FOR REVISIONS.
4. THE CONSTRUCTION OF THE SANITARY DISPOSAL SYSTEM AND ITS COMPONENTS SHA:,L
COMPLY IN ALL RESPECTS WITH l-liE LATEST REVISION OF SECTION 19-13-B 103a THROL'JA
19-13-B 103p OF THE PUBLIC HEALTH CODE OF' THE STATE OF CONNECTICUT AND OTHEF:
TECHNICAL STANDARDS FOR THE DESIGN AND CONSTRUCTION OF SUBSURFACE SEWAGE
DISPOSAL SYSTEMS.
5. PIPE FROM THE HOUSE TO THE SEPTIC TANK AND PIPE WITHIN 25 FEET OF ANY UNDERDRAIN
OR FOOTING DRAIN SHALL BE EXTRA HEAVY CAST IRON OR EQUAL. DISTRIBUTION PIPES TO
BE SDR -35 3033, 3034 OR EQUAL.
6. THE AREA OF THE LEACHING SYSTEM SHALL BE STRIPPED OF ALL TOPSOIL AND REPLACED
WITH CLEAN BANK RUN SAND OR GRAVEL COMPACTED IN 6" LIFTS. REMOVAL OF TOP;;OIL
AND PLACEMENT OF FILL SHALL EXTEND A MINIMUM OF 10 FEET BEYOND THE LEACHING
FIELD LIMITS. THE BOTTOM OF THE LEACHING FIELD SHALL BE NO DEEPER THAN 14" E ELOW
ORIGINAL GRADE. A MINIMUM OF 6" OF TOPSOIL SHALL BE PLACED OVER THE SYSTEM r
7. FILL MATERIAL TO BE CLEAN BANK RUN SAND OR GRAVEL CONTAINING NO MORE THAN 5%
FINE MATERIALS. (MATERIALS WHICH WILL PASS THE #200 SEIVE).
8. IF THE OIL TANK IS TO BE BURIED OUTSIDE THE FOUNDATION IT MUST BE LOCATED A qINTMUM
OF 75 FEET FROM ALL WELLS.
9. SEPTIC TANK IS REQUIRED TO HAVE AN OUTLET FILTER INSTALLED ON THE CUTLET B 4FFLE.
10. HOUSE, WELL AND SEPTIC SYSTEM TO BE FIELD STAKED BY A CONNECTICUT LICENSED LAND
SURVEYOR PRIOR TO CONSTRUCTION.
11 ADDITIONAL SOIL TESTING MAY BE REQUIRED AT TIME OF CONSTRUCTION.
LEGEND
w
PROPERTY LINE
BUILDING SETBACK LINE
STONEWALL
EXISTING CONTOUR LINE
PROPOSED CONTOUR LINE
ANGLE POINT
CONCRETE MONUMENT
SOIL TEST HOLE LOCATION
SOIL PERCOLATION TEST LOCATION
UTILITY POLE
EXISTING SPOT ELEVATION
SILT FENCE OR HAYBALES
SOIL TESTING
SOII, TESTING CONDUCTED ON 2-25-2004 BY THE UNCAS HEALTH DISTRICT
TEST HOLE TH-1 TEST HOLE TH-2
0-14" FILL 0-12" FILL
14% 19" TOP SOIL 12"- 18" TOP SOIL
19" -45" BROWN SANDY LOAM 18" -37" BROWN SANDY LOAM
45" -96" GRAY MEDIUM COMPACT SANDY TILL 3 T' -61 " GRAY MEDIUM COMPACT SANDY TILL
NO LEDGE, MOTTLING @ 4511(3 1 0% NO GROUNDWATER LEDGE @ 61", NO MOTTLING, NO GROUNDWATER
TEST HOLE TH-3 TEST HOLE TH-4
0"- 9" TOP SOIL 0"- 7" TOP SOIL
9" -32" BROWN SANDY LOAM 7" -30" BROWN SANDY LOAM
32" -82" GRAY MEDIUM COMPACT SANDY TILL 30" -75" GRAY MEDIUM COMPACT SANDY TILL
NO LEDGE, NO MOTTLING, NO GROUNDWATER NO LEDGE, NO MOTTLING, NO GROUNDWATER
MLSS CALCULATIONS
FLOW FACTOR (FF) - 4 BEDROOM HOUSE = 2.0
PERCOLATION TEST # 1
TIME READING (INCHES)
11:52 4.0
12:01 9.0
12:08 12.0
12:21 15.25
PERC RATE = 4 MIN, /IN.
PERCOLATION FACTOR (PF) - 4 MIN./1N. = 1.0 N/F KARL E. &
HYDRAULIC FACTOR (HF) - RESTRICTIVE LAYER @ 32tv, 15+% SLOPE = 18 JACQUELINE L. BECKER
MLSS = 2.0 (FF) x 1.0 (PF) x 18 (HF) 36.0' VOL. 91 / PG. 584
MLSS PROVIDED 75'
(MUNICIPAL SEWER & WATER)
=
N 11046'42"
-- now .00'mom
o /g
- f
lir ""'►n" , � / '� ;
r X11.6
N/F MICHAEL S.l A
& l I I I
VICTORIA B. SPOONER 1
VOL. 185 / PG. 244 /
MUNICIPAL SEWER & WATER`
(MUNI )
a' i
Q' x 70. / a
N I
x'
6.5
VI T TIMOTHY J. RIORDAN 1' .
x 72.2,
VOL. 408 / PG. 189 f / / / : ; j ` J ; y x 83
MUNICIPAL SEWER & WATER /
(Mf
CLEARING} / f / '� ; ' /' • ,-
/ -
LIN&S MF '
Yc , .✓
26' PVC
4"
` r
/ �AS'TM 131785/
II � ft
1
40.0'
s i
v.
is
' tl. ',, � 7 I � t� � � �• � I frilj r!f ! f r r, 1
I 1
,r`t wf ff p
j 1ter r� �1/ ��frl r i r" f ,
N i i ,!' / � , , , ,` '
1
i�
JJII}
�rl
, ,
N/F RICHARD D. JOHNSON ...I ! . ' J `
g _ FOOTLING DRAIN
VOL. 382 /PG. 113 vvlT>=f RD-RAPi 1 r
g x`TENTION BASIN
(MU'NICIPAL SEWER & WATER)
NOT srWT xAvALt rosxw
PlSrAU .AS .R+ 404 P" rV t /NTO CROL D
u.uN r W reeft CiMt7A! r cows r*UCro w
HA YSALE I ROSION BARRIER DETAIL
(Nor M SCALF)
upvu ADF
DOWMLL SVC
N
DATE:
ANCL£ sr,Axrs ,
4-14-2004
# 40 CEDAR LANE
/0•U+.Aapt
MONTVILLE, CONNECTICUT
�
fZ7YR ST.4FKJlY
1,
/%C 1' IFl�G1d Q4
PROJECT NO.
04-100
-
AAMAL srAX[s
RL 7M FAMYC (A T7.OY0
t'�v.Ax)
VACCO Ar 10'
Ar uCsH 5wptwr
INTERVALS
(VAX.)
sro ovc
D/Rt'c77av Axl "f, I £a
or Row SAClrFLL
CXrEHo e' or /7L r"
,CA8*1C /Nrte CXr A VA 7E„1 L r t
6,.r S' TRENCJ, PLAY
FABRK cw Lp-,,ALL srte N"11
kMf FABRIC CURLED TOWA"
X24
T FENCE OCrAIL
(Nor rn =4Lz)
ANTIALLY CORRECT
G. GRUSSY, P.E. #11654
, `<a®\wktllrt!ffir
OF COI 1A
e� L
ATE
CROSS SECTION A -A
NOTES
BROWN �,`f
tY�
Vr
CEDAR
LOCUS
2A BMW
LANE 433
VER
LOCATION MAP
SCALE: NTS
1. THIS SURVEY AND MAP HAS BEEN PREPARED PURSUANT TO THE REGULATIONS OF CONNECTICUT
STATE AGENCIES SECTION 20-300b-1 THROUGH 2O -300b-20 AND THE "STANDARDS FOR SURVEYS AND
MAPS IN THE STATE OF CONNECTICUT" AS ADOPTED BY THE CONNECTICUT ASSOCIATION OF LAND
SURVEYORS, INC. ON SEPTEMBER 26, 1996.
2, THIS IMPROVEMENT LOCATION SURVEY IS A DEPENDENT RESURVEY AND CONFORMS TO THE STANDARDS
OF A "C" CLASS SURVEY. PROPERTY LINE INFORMATION BASED ON REFERENCED DEED AND MAP
3. CONTOUR LINES SHOWN HEREON ARE AT TWO FOOT INTERVALS AND ARE BASED ON AN ASSUMED
VERTICAL DATUM OF 100 FEET. TOPOGRAPHIC INFORMATION DERIVED FROM ACTUAL GROUND SURVEY.
4. TOTAL AREA OF PARCEL EQUALS 0.85 +/- ACRES.
5. THIS SURVEY AND MAP DOES NOT INCLUDE THE LOCATION OF UNDERGROUND UTILITIES AND / OR
STRUCTURES.
6. PROPERTY LOCATED IN A RESIDENTIAL (R-20) ZONING DISTRICT.
7. DRIVEWAY TO BE INSTALLED IN ACCORDANCE WITH THE TOWN OF MONVILLE DRIVEWAY
ORDINANCE, REGULATIONS, STANDARDS AND / OR REQUIREMENTS.
8. THERE ARE NO INLAND WETLANDS OR WATERCOURSES ON THIS PROPERTY.
9. PROPERTY IDENTIFIED ON THE TOWN OF MONTVILLE TAX ASSESSORS MAP 106 AS LOT 48.
10. REFERENCE DEED: TOWN OF MONTVILLE LAND RECORDS VOLUME 305 ON PAGE 92.
MAP REFERENCES
1 . MAP ENTITLED " MAP SHOWING SUBDIVISION OF ALFRED RAAB, TOWN OF MONTVILLE
'CALE: 1 "=40', JUNE 1961 ". PREPARED BY: FRANCIS J. LEONARD, L. S.
1 1j INVERT ELEVATIONS
TOP OF FOUNDATION (MIN.) = 91.00
j 1 SEWER LINE MIN. IlN7vrERT AT FOUNDATION = 83.25
j INVERT TANK IN = 82,50
I INVERT TANK OUT = 82.75
D -BOX 1 IN s 81.00
D -BOX 1 OUT = 81.17
TO MY KNOWLEDGE AND BELIEF, THIS MAP IS SUBSTANTIALLY CORRECT
CA. �'f� AS NOTED HEREON
#70064 -he Y_ 7 4-�l
f/,1,\ H. SULLIVAN, L.S. #70064 DATE
'THIS M #
AP IS NOT VALID WITHOUT A LIVE SIGNATURE AND EMBOSSED SEAL
�'f�1lltrrrr,�ti111��`
BOTTOM OF TRENCH 1 = 81.00
D -BOX 2 IN = 80.00
D -BOX 2 OUT = 80.17
BOTTOM OF TRENCT 2 = 80.00
D -BOX 3 IN / OUT = 79.00
BOTTOM OF TRENCF' 3 = 79.00
DEPTH OF RESTRICT; VE LAYER = 32" IN ORIGINAL GRADE
THE BOTTOM OF THF, LEACHING TRENCH NOT TO BE
INSTALLED MORE THAN 14" INTO EXISTING GRADE
BAR SCALE
0' 20' 40` 60'
SCALE: V = 20'
DATE I REVISION
4'
TOPSOIL
FILTER FABRIC SUITABLE FILL ao 2'
4' PERFORATED
PIPE o
"a o N
4'
TRENCH
CRESS SECTION
NOT TO SCALE
2X2 5/8 16 GA. WIRE MESH
M •'
A'7
O
4' PVC ELBOW
(CUT FOR 4' OVERFLOW)
STANDARD D -BOX W/ELBOW
NOT TO SCALE
w
SEPTIC DESIGN PLAN
PREPARED FOR
N
DATE:
.r
4-14-2004
# 40 CEDAR LANE
•4
MONTVILLE, CONNECTICUT
�
.`
1,
MARK H. SULLIVAN, L.S., C.P.S.S.
PROJECT NO.
04-100
LAND SURVEYING AND ENVIRONMENTAL CONSULTING, LLC
20-20 PHILLIPS ROAD PHONE (860) 376-8525
CD
LISBON, CT 06351 FAX (860) 376-3855
04-100
STANDARD D -BOX W/ELBOW
NOT TO SCALE
w
SEPTIC DESIGN PLAN
PREPARED FOR
CENTER ROAD ASSOCIATES, LLC
DATE:
4-14-2004
# 40 CEDAR LANE
DRAWN BY:
MONTVILLE, CONNECTICUT
MHS
SCALE:
1 "= 20'
MARK H. SULLIVAN, L.S., C.P.S.S.
PROJECT NO.
04-100
LAND SURVEYING AND ENVIRONMENTAL CONSULTING, LLC
20-20 PHILLIPS ROAD PHONE (860) 376-8525
DRAWING NO,
LISBON, CT 06351 FAX (860) 376-3855
04-100