Loading...
HomeMy WebLinkAboutTE CommentsCLA Engineers, Inc. Civil • Structural • Survey 317 MAIN STREET • NORWICH, CT 06360 • (860) 886-1966 • (860J 886-9165 FAX September 6, 2018 Ms. Marcia VlaW1 Town Planner 310 Norwich-New London Tpk. Uncasville, CT 06382 RE: Stony Brook WTP Addition CLA-5513D Dear Marcia: We have reviewed the plans and supporting material submitted for the proposed addition onto the Stony Brook Water Treatment Plant and we have the following comments: 1. The details for the block wall shall contain the following notes: A. Block manufacturer to submit shop drawings and design calculations by Connecticut licensed professional engineer for retaining walls to the Town prior to construction. B. An engineer shall monitor and inspect the construction of the retaining walls and, upon completion, certify to their acceptability and conformance with the required design. 2. A discussion of the effect on the drainage due to the increased impervious area must be provided. 3. The roof drainage, new and existing, must be defined. 4. Silt fencing must be extended along the south side disturbed area. 5. The effect of the proposed work on the existing perimeter swale must be defined. 6. An Erosion and Sedimentation Control Bond estimate must be provided. u~ours, ThomJ~mmingS'P.E.' Principal TLC:bab