Loading...
HomeMy WebLinkAboutIRTown of Montville Inspection Report Date: 10/13/2017 Inspection Type: Zoning Permit Inspection/CO Yes No MS4/ Erosion and Sediment Control Inspection Location: 252 Butlertown Road Map/Lot: M1 L14-5 Parties Present Other: Yes No CO Approved Comments/Observations Resolution Date: 10/13/2017 Final site inspection per 10/12/17 request of Jeff Daniels. States site work is 100% complete, including aprons and exposed soil has been seeded. 10/13/2017 Inspection. Confirmed site work complete, inc. aprons. Exposed soils are seeded, but no growth. Owner responsible for repair of erosion of exposed slopes due to lack of stabilization due to the possibility of no growth due to time of year. $2000 E & S Bond shall remain in place until exposed soils permanently stabilized with vegetated cover. DPW shall issue final approval of aprons. Bourdeau states he will inspect today. One-way entrance only to the site needs to be clearly marked with signage. As-Built site plan required after completion of future building on the site. OK to issue CZC with conditions. CZC issued with conditions. Town of Montville Inspection Report 252 Butlertown Road – One way site entrance. Two-way site entrance/exit. Town of Montville Inspection Report 252 Butlertown Road – Level Spreader Drainage Structure (Seeded). Street View.