HomeMy WebLinkAboutPlanIron Pin Pound
vNtn Spoce 0.19 --� c �� 2 N
09
1 '3 -
Lot 5-10 � 1 12 / / ___ ---`
--1 10 —10-7
`109
Property Boundary Detail z
'10-7--
_--
-___106 -
� --_ ____ Iron f Ir -n "� / / ---- `-- --.__ -. <
105..._
104
\103
X102 \
101
100 `
i�
CO 'cam
N
Z �
Property Boundary Detail
Not 1-o
Iron Tin
Found
SOIL EROSION & SI- DIMENT CONTROL NOTES
1. Unnecessary clearing of any vegetation or ground cover will be avoided. Any disturbed
area left unvegetated for more than five days will be covered with a hay or straw mulch
to minimize erosion material.
2. Following final grading, all disturbed areas will be covered with 6" loam and seeded as
described below. If any seeded areas are disturbed or damaged, reseeding will occur as
soon as possible. Seeding Rate
Seed Mixture 9: by Wt. Lbs./Ac.
Red Fescue 75 100
Colonial Bentgross-Exeter 5
Perennial Ryegross 5
Birdsfoot Trefoil -Empire 15
If final grading occurs past October 15, disturbed areas will be seeded with winter rye-
grass and mulched with hay or straw at a rate of 1.5 - 2 tons per acre.
3. Any proposed vegetation which has not survived one growing season will be replaced.
HAY BALE I N STALLS II -10 N
1. Bales shall be placed in a single row, lengthwise,
oriented along to the contour, with ends
of adjacent bales tightly abutting one another.
2. Bales shall be entrenched and backfilled. A trench
shall be excavated the width of a bale and the
length of the proposed barrier to a minimum
depth of 4 inches.
3.. Each ' bale shall be securely anchored by at least
two (2) stakes.
4. The gaps between bales shall be wedged with straw
to prevent water from escaping between the bales.
5. The barrier shall be extended to such a length
that the bottoms of the end bales are higher in
elevation than the top of the lowest middle bale
to assure that sediment laden run --off will flow
either through or over the barrier, but not
around it.
CONSTRUCTION NARRATIVE
1. INSTALL EROSION CONTROL DEVICES AS PER THIS PLAN.
2. INSTALL ORANGE CONSTRUCTION SAFETY FENCE ALONG LIMITS OF CLEARING
3, EXISTING SOIL STOCKPILE AREAS SHALL BE USED TO REGRADE PONDING AREAS.
AND To FILL IN DITCH
4. AN EXCAVATOR OR LIKE KIND WILL BE USED TO REMOVE SOIL PILES IN
WETLAND BUFFER AREAS. GREAT CARE WILL BE TAKEN BY EXTENDING EXCAVATOR BUCKET
INTO THESE AREAS PULLING SOIL INTO NON -BUFFER AREAS, THEN SOIL WILL BE
COLLECTED AND PLACED INTO DESIRED AREAS
5. AFTER PONDING AREA ARE FILLED, STABILIZE GRADED, SOIL TO PREVENT EROSION
2 W
WETLANDS
r
E&s — _=__rTE-
1) DISTURBANCE OF SOIL SURFACES IS REGULATED 9y iTATE LAW. ALL WORK
SHALL COMPLY WITH AN APPROVED 'EROSION AND S:DIMENT CONTROL PLAN'
TO PREVENT OR MINIMIZE SOIL EROSION,,
2) THE INSTALLATION AND MAINTENANCE OF EROSON 0NTFQL DEVICES IS
THE RESPONSIBILITY OF THE LAND OWNER, DE\IEI-QKR ANO EXCAVATION
CONTRACTOR. TOWN OFFICIALS SHALL BE NOTED'N WR'TING OF THE
NAME, ADDRESS, AND TELEPHONE NUMBER OF THE INDI'NDUAL RESPONSIBLE
FOR THIS WORK (INCLUDING ANY CHANGES). A PRE -CONSTRUCTION CONFERENCE
WITH THE TOWN STAFF IS REQUIRED PRIOR TO ANYSITE WORK OR DISTURBANCE.
3) THE CONTRACTOR SHALL USE THE-CONNECTICLI- SCL EROSION AND SEDIMENT
CONTROL HANDBOOK' (2002), AS AMENDED AS A G11DE IN CONSTRUCTING THE
EROSION AND SEDIMENT CONTROLS AS INDICATE; OI~ THESE PLANS.
4) INFORM ALL CONSTRUCTION SITE WORKERS ABOUT TME kOJOR PROVISIONS
OF THE EROSION AND SEDIMENT CONTROL PLAN A* SEE< THEIR
COOPERATION IN A AVOIDING THE DISTURBANCE OF THESE CONTROL
MEASURES.
5) THE CONTRACTOR SHALL SCHEDULE ALL OPERA10HS TO -IMIT
DISTURBANCE TO THE SMALLEST PRACTICAL ARA FOR T! -E SHORTEST
POSSIBLE TIME.
6) THE CONTRACTOR IS RESPONSIBLE FOR THE -nUCLY INSTk-LATION,
INSPECTION, REPAIR OR REPLACEMENT OF EROS'ON DONTGOL DEVICES TO
INSURE PROPER OPERATION.
7) 1NSPECT AND REPAIR SEDIMENT CONTROL DEVICE AT THE
END OF EACH WORKING DAY AND AFTER EYER)RNtAS"CFM. FLOW
8) THE CONTRACTOR SHALL NOTIFY THE ENCIINEEROF UN'SAl1SFACTORY
EROSION CONDITIONS NOT CONTROLLED BY THE 10SION AND SEDIMENT
CONTROL PLAN AND SHALL INSTALL ADDIiTIONALMEA&JRES AS DIRECTED.
9) FIELD CHANGES TO THE EROSION AND SEDIMENT (INNTROL PLAN SHALL BE
MADE ONLY WITH THE WRITTEN APPROVAL Cr THIIENGI' _ER AFTER
REFERRAL AND APPROVAL OF THE TOWN 4AFF.
Compacted
10) ACCUMULATED SEDIMENT REMOVED FROWEHC�SI(gN ,ONTROL DEVICES IS Backfill
TO BE SPREAD AND STABILIZED IN LEVL. EROSIOM RESISTANT LOCATIONS
AS GENERAL FILL WITHIN LAWN AND LNDSCAPE AREAS.
VERNAL POOL PLANTING AND MAINTENANCE NARRATIVE
Concrete Monument
Found
Property Boundary Detail
Not To S::: a v
_'_-
1. TO ENSURE SAFE EGRESS THE VERNAL POOL/EXCAVATED FOUNDATION HOLE
AREA SHALL BE GRADED TO A SLOPE OF 3:1. GRADE STAKES SHALL BE INSTALLED
TO MARK LIMITS OF REGRADING AND ELEVATION.
2. SEA ROSE (ROSH RUGUSO) €SIZE -2-3'1 SHALL BE PLANTED 6' OC
ALONG THE PERIMETER OF VERNAL POOL AMERICAN HOLLY 2-3' TALL CAN BE
SUBSTITUTED FOR SEA ROSE.
3, HOME OWNER SHOULD USE "MOSQUITO DUNKS" OR EQUAL TO CONTROL MOSQUITOES AS NEEDED.
SEA ROSE SHOULD BE PRUNED ONCE ANNUALLY.
2"x2"x3'
Sta ke
Bales placed
on the contour
1�
_4 Excava ed Trench
11) ALL DISTURBED AREAS NOT COVERE133Y BUILDINGS PAVEMENT OR WOOD�AK ED HAYBALE DETAIL
CHIPS SHALL BE PLANTED WITH GRA4 ON 6" THICKNESS TOPSOIL
SCALE,- NA -.S1.
\'9 4
"To my knowledge and belief, this map is substantially correct as
noted hereon.
Nathan D. Lauder, P.L.S. #15762 Date
-�-
EX 7si.ing
Br_>_.ISh Line
DISTRICT DIMENSIONAL REGULATIONS
District R-40 Required
Property Boundary Detail
15" Plastic Pip
Provided
Use
Non -Residential and
Any Permitted Use
Min. Lot Size
40,000 Sq. Ft.
68,491 SF
Min. Lot Frontage
150 feet
125 Feet
Min. Front Yrd.
50'
198.4'
Min Side Yard
15'
51.7 / 60.3
Min Rear Yard
50'
135.0'
Max Structure Height
35'
35'
SURVEY NOTES:
1.
s This survey has been prepared pursuant to the Regulations of Connecticut
State Agencies Sections 20-300b-1 through 20-300b-20 and the
"Standards for Surveys and Maps in the State of Connecticut"
as adopted by the Connecticut Association of Land Surveyors, Inc.
on September 26, 1996.
s Type of Survey; Property Survey
s Boundary Determination Category; Dependent Resurvey
Class of Accuracy. Horrizontal- A-2
Vertical- T-2
Reference is made to the following plan:
FINAL SUBDIVISION PLAN ROBIN HILL ESTATES
BLACK ASH SWAMP ROAD, OAKDALE, CONNECTICUT
PREPARED FOR OWNER/DEVELOPER DIOLINDA & ALEJO ORTEGA
Prepared by John Kopko Jr. & Associates. Trails Corner Professional
Center, Suite 100, Groton, CT Scale: 1"=100' Dated: Revised July 1990.
Bearings are based on a magnetic observation taken January, 2002.
Vertical datum is assumed.
NOTES:
PROPOSED PLAN IS FOR CONSTRUCTION OF A SINGLE FAMILY HOME.
- WETLANDS WERE FLAGGED ON APRIL 26, 2002 BY DONALD J. FORTUNATO, CERTIFIED
SOIL SCIENTIST(#2278), SOIL & ENVIRONMENTAL SERVICES, INC.
- VERNAL POOL VERFIFIED ON MAY 7, 2002 BY SOIL & ENVIRONMENTAL SERVICES, INC.
fice
Grotort 0..
0 Bridge Street
F" _)289- 1 Groton, CT. 06,340
-< �. r) i 4r)5-1900
J
Wk"!vA,, 71(j.CCJ?l f
I er er1._.i: C}c: herenzir,i :oI--n
D4
S S
LEGEND
Water Gate or Shut -Off
Utility Pole
Existing Contours
Existing Tree To Remain
Sanitary Sewer
WF 3X WF 31^
Flagged Wetlands
PROPERTY SURVEY AND
CONSTRUCTION SITE PLAN
PREPARED FOR
JOHN PALAZZOLA
CHARLES TAYLOR
ROBIN HILL ESTATES
PLAT 28 LOT 5-10
MONTVILLE, C0NNECTICUT
SCALE: 1" —20' DRAWN BY: TM
MAY 08, 2002 CHECK BY: DSM
20 0 20 40 60 Feet
CHERENZIA & ASSOCIATES, LTD.
WESTERLY, RHODE ISLAND
STIE aT. t OF 1, JOB NO.. 202.100 7
TLE NO.,
3
IN RE
AVISI INS
DATE-
DE 3 rT()ILS
DVD [37'( C K I:}
4/29/02
Wetland Flags Added
TWS NDL
5/16/02
Revised Proposed Building Location
MEG RFC
7/19/02
A�UE8 yy k � ri1ENT oca ion
TM DSM
SURVEY NOTES:
1.
s This survey has been prepared pursuant to the Regulations of Connecticut
State Agencies Sections 20-300b-1 through 20-300b-20 and the
"Standards for Surveys and Maps in the State of Connecticut"
as adopted by the Connecticut Association of Land Surveyors, Inc.
on September 26, 1996.
s Type of Survey; Property Survey
s Boundary Determination Category; Dependent Resurvey
Class of Accuracy. Horrizontal- A-2
Vertical- T-2
Reference is made to the following plan:
FINAL SUBDIVISION PLAN ROBIN HILL ESTATES
BLACK ASH SWAMP ROAD, OAKDALE, CONNECTICUT
PREPARED FOR OWNER/DEVELOPER DIOLINDA & ALEJO ORTEGA
Prepared by John Kopko Jr. & Associates. Trails Corner Professional
Center, Suite 100, Groton, CT Scale: 1"=100' Dated: Revised July 1990.
Bearings are based on a magnetic observation taken January, 2002.
Vertical datum is assumed.
NOTES:
PROPOSED PLAN IS FOR CONSTRUCTION OF A SINGLE FAMILY HOME.
- WETLANDS WERE FLAGGED ON APRIL 26, 2002 BY DONALD J. FORTUNATO, CERTIFIED
SOIL SCIENTIST(#2278), SOIL & ENVIRONMENTAL SERVICES, INC.
- VERNAL POOL VERFIFIED ON MAY 7, 2002 BY SOIL & ENVIRONMENTAL SERVICES, INC.
fice
Grotort 0..
0 Bridge Street
F" _)289- 1 Groton, CT. 06,340
-< �. r) i 4r)5-1900
J
Wk"!vA,, 71(j.CCJ?l f
I er er1._.i: C}c: herenzir,i :oI--n
D4
S S
LEGEND
Water Gate or Shut -Off
Utility Pole
Existing Contours
Existing Tree To Remain
Sanitary Sewer
WF 3X WF 31^
Flagged Wetlands
PROPERTY SURVEY AND
CONSTRUCTION SITE PLAN
PREPARED FOR
JOHN PALAZZOLA
CHARLES TAYLOR
ROBIN HILL ESTATES
PLAT 28 LOT 5-10
MONTVILLE, C0NNECTICUT
SCALE: 1" —20' DRAWN BY: TM
MAY 08, 2002 CHECK BY: DSM
20 0 20 40 60 Feet
CHERENZIA & ASSOCIATES, LTD.
WESTERLY, RHODE ISLAND
STIE aT. t OF 1, JOB NO.. 202.100 7
TLE NO.,
3